Varnam

Apartments by Smart Value Homes (Peenya Project) Private Limited · Akkalenahalli Mallenahalli, Bellary Road (Airport Road), Bengaluru

Akkalenahalli Mallenahalli, Bellary Road (Airport Road), BengaluruOpen on Google Maps (opens in a new tab)

  • Under construction
  • RERA registered
  • residential

by Smart Value Homes (Peenya Project) Private Limited · registered with RERA by One Bangalore Luxury Projects LLP

Listed price: ₹2.05 Cr – ₹4.5 Cr

as on · Source (tatahousing.com) (opens in a new tab)

Get today’s price list

Latest price for Varnam

Builders change prices often and rarely publish them. Tell us how to reach you and we’ll send you the current price list.

Free for buyers. If you book through us, the builder pays us a commission. How we earn

Project summary

Varnam is a residential project by Smart Value Homes (Peenya Project) Private Limited in Akkalenahalli Mallenahalli, Bengaluru with 842 homes, registered with Karnataka RERA. The completion date on RERA is 30 Sep 2031. It is registered in 4 phases.

Facts collected on 20 Oct 2026 from public records — each linked to its source. Free for buyers. If you book through us, the builder pays us a commission.

Varnam buyers’ group: join to ask for a group price

No one has joined yet. Be one of the first 10 buyers in this group — the founding members.

Join free. When enough buyers have joined, our agent partner asks Smart Value Homes (Peenya Project) Private Limited for a group price — for example a lower price, an easier payment plan or waived charges. Nothing is promised: you see what the builder offers and book directly with the builder if you want to. Free for buyers. If you book through us, the builder pays us a commission.

  1. Gathering buyers
  2. Talking to the builder
  3. Group offer
  4. Group site visit
  5. Booking

0 buyers have joined · 0 committed

Committed buyers have confirmed their budget, home type and timeline with us on a call; builders negotiate with them. Joining is free and never obliges you to buy.

Join the Varnam buyers’ groupHow group buying works

See it for yourself

Visit the site with our team, or get a call to clear your questions. Free, no obligation.

Key facts: home types, towers, land and possession

Updated on 20 Oct 2026
Home types
2 BHK, 3 BHK, 5 BHK
Carpet area
789 – 2,557 sq ft
Towers
15
Floors
12
Total homes
842
Land
19.48 acres
Possession (RERA)
Sep 2031
Built (RERA update)
Not found in public records yet: construction progress

Varnam RERA number and registration details

RERA number
PRM/KA/RERA/1250/303/PR/110825/007988
Registered on
11 Aug 2025
Promised completion
30 Sep 2031
Extended to
No extension recorded
RERA status
New launch
Homes booked
Not found in public records yet: homes booked
Price
₹2.05 Cr – ₹4.5 Cr as on
Project type
Residential

4 RERA registrations (one per phase) are shown together on this page; dates above are the latest across phases.

From the builder’s own website; see the price list below for size basis.

Phases and RERA numbers

PhaseRERA numberPromised completionHomesStatusSource
Phase 1APRM/KA/RERA/1250/303/PR/110825/00798831 Aug 203048New launchSource (rera.karnataka.gov.in) (opens in a new tab)
Phase 1BPRM/KA/RERA/1250/303/PR/110825/00798931 Aug 2030285New launchSource (rera.karnataka.gov.in) (opens in a new tab)
Phase 1CPRM/KA/RERA/1250/303/PR/110825/00799031 Mar 2031298New launchSource (rera.karnataka.gov.in) (opens in a new tab)
Phase 1DPRM/KA/RERA/1250/303/PR/311225/00836730 Sep 2031211New launchSource (rera.karnataka.gov.in) (opens in a new tab)

Towers and blocks (RERA filing)

15 rows: towers. Scroll inside the table to see them all.

TowerPhaseFloorsBasementsHomes
RHPhase 1A2024
TH1Phase 1A328
TH2Phase 1A318
TH3Phase 1A318
T28Phase 1B12274
T29Phase 1B12274
T30Phase 1B12274
T31Phase 1B10263
T24Phase 1C12275
T25Phase 1C12275
T26Phase 1C12274
T27Phase 1C12274
T21Phase 1D11268
T22Phase 1D11269
T 23Phase 1D12274

A dash (—) means the filing did not state that value.

Sources:Source (rera.karnataka.gov.in) (opens in a new tab)

Varnam price list

From the builder’s website, as on 17 Oct 2026
Home typeSizePrice₹ per sq ftSource
3 BHK + 2T—unknownFrom ₹2.05 Cronwards—Source (tatahousing.com) (opens in a new tab)
3 BHK + 3T—unknownFrom ₹2.21 Cronwards—Source (tatahousing.com) (opens in a new tab)
5 BHK + 5T—unknownFrom ₹4.5 Cronwards—Source (tatahousing.com) (opens in a new tab)

As published by the builder on the date shown — not an offer, and not checked with the builder. Check whether the size is carpet or super built-up area before comparing.

Sources:Source (tatahousing.com) (opens in a new tab)

Price history

As on 17 Oct 2026

One snapshot so far: the builder’s “onwards” prices seen on 17 Oct 2026. Each new check of the builder’s website adds a dated point here, so rises and offers show up with their dates.

0₹2 Cr₹4 Cr₹6 CrOct 26NovDecJan 27FebMarAprMayJunJulAugSepLater checks will appear here3 BHK + 3T ₹2.21 Cr5 BHK + 5T ₹4.5 Cr
Seen onWherePrices
17 Oct 2026Builder’s website Source (tatahousing.com) (opens in a new tab)3 BHK + 2T from ₹2.05 Cr · 3 BHK + 3T from ₹2.21 Cr · 5 BHK + 5T from ₹4.5 Cr

Sources:Source (tatahousing.com) (opens in a new tab)

Open space, home loans, escrow and other details

Open space
Not found in public records yet: open space
Water and power
Water source filed with RERA: Local Authority, BoreWell,Local Authority
Home loans: approved banks
Not found in public records yet: bank approvals
Payment plans
Not found in public records yet: payment plans
Maintenance
Not found in public records yet: maintenance
Car parking
Not found in public records yet: car parking charge
Escrow bank (RERA) · Phase 1A
ICICI Bank, Residency Road
Escrow bank (RERA) · Phase 1B
ICICI Bank, Residency Road
Escrow bank (RERA) · Phase 1C
ICICI Bank, Residency Road
Escrow bank (RERA) · Phase 1D
ICICI Bank, Residency Road

Sources:Source (rera.karnataka.gov.in) (opens in a new tab)

Amenities

  • Electricity
  • CCTV Surveillance
  • Club House
  • Swimming Pool
  • Parks
  • Power Backup
  • Piped Gas
  • Water and Sanitation
  • Outdoor Amenities

Amenities and internal works as filed by the promoter with Karnataka RERA; we have not visited the site.

Sources:Source (rera.karnataka.gov.in) (opens in a new tab)

Varnam location and address

Address
Sy. No 1(P), 2/2, 7(P), 37/1, 37/2, 37/4, 37/7, 37/10 of Akkalenahalli Mallenahalli Village , Kasaba Hobli , Devanahalli , Bengaluru Rural, Karnataka - 562157
Village (RERA)
Akkalenahalli Mallenahalli
Locality
Bellary Road (Airport Road)Also known as Airport Road, International Airport Road, Bellary Road, NH 44
PIN code
562157
City
Bengaluru
State
Karnataka
Coordinates
13.19369, 77.66660

Distances to landmarks

Not found in public records yet: landmarks

About Bellary Road (Airport Road)

Not found in public records yet: locality facts

Commute times to tech parks and the airport

As on 5 Oct 2026
ToStraight linePeak-hour drive (estimate)
Kempegowda International AirportMap point on OpenStreetMap (opens in a new tab)4.17 kmapprox. 17 min
Manyata Tech ParkMap point on OpenStreetMap (opens in a new tab)16.96 kmapprox. 69 min
ITPL, Whitefield (main gate)Map point on OpenStreetMap (opens in a new tab)24.17 kmapprox. 98 min
KSR Bengaluru City railway station (Majestic)Map point on OpenStreetMap (opens in a new tab)26.17 kmapprox. 106 min
Outer Ring Road tech corridor (RMZ Ecospace, Bellandur)Map point on OpenStreetMap (opens in a new tab)30.06 kmapprox. 122 min
Electronic City Phase 1Map point on OpenStreetMap (opens in a new tab)38.25 kmapprox. 155 min
How we calculate

Straight line: from the project’s map point on RERA to the destination’s point on OpenStreetMap.

Peak-hour drive is a rough estimate, not a route: straight line × 1.35 for the road network, at 20 km/h. Real times vary a lot with the route and the hour.

Sources:Source (openstreetmap.org) (opens in a new tab)How we calculate this

Schools and hospitals nearby

As on 5 Oct 2026

Within 2 km

  • 3Schools and colleges2 schools, 1 colleges, 0 kindergartens
  • 0Hospitals and clinics0 hospitals, 0 clinics

Nearest schools and colleges

  • IIBS Bengaluru Airport Campus · 1.16 km
  • NAFL North Urbana · 1.55 km

Places as mapped on OpenStreetMap (amenity=school, college, kindergarten, university; hospital, clinic), counted within 2 km in a straight line of the RERA map point. Volunteers map these, so some places may be missing or closed. Places data © OpenStreetMap contributors, extract of 5 Oct 2026.

Sources:Source (openstreetmap.org) (opens in a new tab)

Nearest metro station and railway

As on 5 Oct 2026
  • Airport City (ವಿಮಾನ ನಿಲ್ದಾಣ ನಗರ)Blue Line metro, under construction2.27 km
  • Doddajala (ದೊಡ್ಡಜಾಲ)Blue Line metro, under construction2.45 km
  • KIAL Terminals (ಕೆಐಎಬಿ ವಿಮಾನ ನಿಲ್ದಾಣ ಟರ್ಮಿನಲ್ಸ್)Blue Line metro, under construction5.04 km
  • Krishnarajapura (ಕೃಷ್ಣರಾಜಪುರ (ಕೆ.ಆರ್.ಪುರ))Open now — nearest operating metro station21.58 km
  • Kempegowda International Airport Halt (ಕೆಂಪೇಗೌಡ ಅಂತರರಾಷ್ಟ್ರೀಯ ವಿಮಾನ-ನಿಲದಾಣ ಹಾಲ್ಟ)Nearest railway station2.15 km

Straight-line distances from the RERA map point to the station points mapped on OpenStreetMap; status (open or under construction) as tagged there. Places data © OpenStreetMap contributors, extract of 5 Oct 2026.

Sources:Source (openstreetmap.org) (opens in a new tab)

Lake and lake-buffer check

As on 5 Oct 2026

The nearest mapped lake is Unnamed lake (mapped on OpenStreetMap), 750 m from the project’s RERA map point.

The site boundary is not published as a shape, so its nearest edge can be closer than this point. Whether any building sits inside a lake buffer can only be checked on the approved plan.

The buffer rule

Bengaluru’s lake buffer rule has changed over time: the National Green Tribunal ordered a 75 m buffer in May 2016; the Supreme Court set that order aside on 5 March 2019, leaving the 30 m buffer of the Revised Master Plan 2015. Check the current rule and the approved plan before relying on either number.

Shortest distance from the RERA map point to the mapped water edge (OpenStreetMap water polygons tagged lake or reservoir, or named lake/kere/tank). Mapped shorelines can differ from the revenue-record boundary of a lake. Places data © OpenStreetMap contributors, extract of 5 Oct 2026.

Sources:Source (openstreetmap.org) (opens in a new tab)Source (livelaw.in) (opens in a new tab)Source (citizenmatters.in) (opens in a new tab)How we calculate this

Satellite time-lapse of the site

Satellite photos load when you scroll to them.

Photos from Esri World Imagery Wayback, centred on the project’s map point; dates are the capture dates in Esri’s metadata. Loaded from Esri when you scroll here.

Sources:Source (livingatlas.arcgis.com) (opens in a new tab)

Varnam home types and carpet areas

Documents the builder uploaded to Karnataka RERA, shown as filed. Tap a page to see it full size; the full PDF opens on the RERA website.

Approved building plan4 files

Approved layout plan8 files

Floor plans and brochure not published? The builder shares them only on request. We’ll get the brochure, floor plans and current price list for you, free.

Get brochure, floor plans & price

Brochure, floor plans and price list for Varnam

Builders share their brochure, floor plans and price list only on request. Tell us how to reach you and we’ll get them and send them to you, free.

Free for buyers. If you book through us, the builder pays us a commission. How we earn

Home typeCarpet areaHomes
2b + 2t789 – 810 sq ft12
2b + 3t1,020 – 1,068 sq ft24
3b + 2t969 – 1,067 sq ft489
3b + 3t1,211 – 1,872 sq ft271
4b + study2,417 sq ft24
5b + 5t [duplex]2,466 – 2,557 sq ft22

Home types, counts and carpet areas as filed with Karnataka RERA (carpet area, not super built-up).

We have not collected floor-plan drawings; the builder’s sales team can share them.

Sources:Source (rera.karnataka.gov.in) (opens in a new tab)

Varnam possession date and construction status

  • Phase 1A13%

    as on · 48 of 48 homes booked

  • Phase 1B13%

    as on · 200 of 285 homes booked

  • Phase 1C15%

    as on · 275 of 298 homes booked

  • Phase 1D7%

    as on · 161 of 211 homes booked

Timeline

  1. 11 Aug 2025Phase 1A: Registered with Karnataka RERA
  2. 11 Aug 2025Phase 1B: Registered with Karnataka RERA
  3. 11 Aug 2025Phase 1C: Registered with Karnataka RERA
  4. 15 Aug 2025Phase 1A: Project start date given to RERA
  5. 15 Aug 2025Phase 1B: Project start date given to RERA
  6. 15 Aug 2025Phase 1C: Project start date given to RERA
  7. 31 Dec 2025Phase 1D: Registered with Karnataka RERA
  8. 1 Jan 2026Phase 1D: Project start date given to RERA
  9. 31 Aug 2030Phase 1A: Completion date given at registration
  10. 31 Aug 2030Phase 1B: Completion date given at registration
  11. 31 Mar 2031Phase 1C: Completion date given at registration
  12. 30 Sep 2031Phase 1D: Completion date given at registration

Sources:Source (rera.karnataka.gov.in) (opens in a new tab)

Construction pace from RERA quarterly filings (Phase 1A)

As on 14 Oct 2026

At the average pace so far, construction would reach 100% around Apr 2034 — about 43 months after the completion date on RERA (31 Aug 2030).

At the pace between the 4 quarterly filings we have (4% → 13% in 9 months), it would be around Dec 2033 — about 40 months after the RERA date.

This project has 4 RERA registrations; the chart uses Phase 1A, the one with the most quarterly filings.

0%25%50%75%100%202620272028202920302031203220332034RERA date4%6%10%13%
  • Filed on RERA
  • Average pace since start
  • Pace between filings (and 0% assumed at the start date)
  • RERA completion date

Quarterly filings

QuarterFiled onBuiltHomes booked
Q2 2026-27to 30 Sep 202614 Oct 202613%48 of 48
Q1 2026-27to 30 Jun 202615 Jul 202610%48 of 48
Q4 2025-26to 31 Mar 202615 Apr 20266%48 of 48
Q3 2025-26to 31 Dec 202514 Jan 20264%46 of 48
How we calculate

Average pace = % built ÷ months since the start date in the RERA record. Here: 13% ÷ 13.5 months (15 Aug 2025 to 30 Sep 2026) = 1% a month.

Estimated finish = latest filing date + (100 − % built) ÷ pace = 30 Sep 2026 + 87 ÷ 1 = 90.4 months → Apr 2034. This is an estimate, not a date from the builder or RERA.

Pace between filings = (13% − 4%) ÷ 9 months = 1% a month.

A straight line is a simplification: the builder reports one overall %, which mixes excavation, structure and finishing, and work rarely moves at a constant speed. The % values are the promoter’s own figures filed with RERA, not checked by us.

Sources:Source (rera.karnataka.gov.in) (opens in a new tab)How we calculate this

Approvals and documents checklist

40 rows: approvals. Scroll inside the table to see them all.

ApprovalAuthoritySource
Building plan (Phase 1A)BIAPPA - Bangalore Airport Area Planning Authority · No. BIAAPA/TP/CC/331/2024-25/25-26/888 · dated 2025-06-25Source (rera.karnataka.gov.in) (opens in a new tab)
Land conversion (6 orders) (Phase 1A)DC Office, Bangalore Rural · No. 33/2004-05 and 5 more · dated 2004-07-19Source (rera.karnataka.gov.in) (opens in a new tab)
Commencement Certificate (Phase 1A)scan uploaded to RERASource (rera.karnataka.gov.in) (opens in a new tab)
Approved Building Plan (Phase 1A)scan uploaded to RERASource (rera.karnataka.gov.in) (opens in a new tab)
ESCOM/Electricity (Phase 1A)scan uploaded to RERASource (rera.karnataka.gov.in) (opens in a new tab)
KWSSB/Water (Phase 1A)scan uploaded to RERASource (rera.karnataka.gov.in) (opens in a new tab)
KSPCB (Phase 1A)scan uploaded to RERASource (rera.karnataka.gov.in) (opens in a new tab)
SEIAA (Phase 1A)scan uploaded to RERASource (rera.karnataka.gov.in) (opens in a new tab)
Fire Force Department (Phase 1A)scan uploaded to RERASource (rera.karnataka.gov.in) (opens in a new tab)
Airport Authority of India (Phase 1A)scan uploaded to RERASource (rera.karnataka.gov.in) (opens in a new tab)
Building plan (Phase 1B)BIAPPA - Bangalore Airport Area Planning Authority · No. BIAAPA/TP/CC/331/2024-25/25-26/888 · dated 2025-06-25Source (rera.karnataka.gov.in) (opens in a new tab)
Land conversion (6 orders) (Phase 1B)DC Office, Bangalore Rural · No. 33/2004-05 and 5 more · dated 2004-07-19Source (rera.karnataka.gov.in) (opens in a new tab)
Commencement Certificate (Phase 1B)scan uploaded to RERASource (rera.karnataka.gov.in) (opens in a new tab)
Approved Building Plan (Phase 1B)scan uploaded to RERASource (rera.karnataka.gov.in) (opens in a new tab)
ESCOM/Electricity (Phase 1B)scan uploaded to RERASource (rera.karnataka.gov.in) (opens in a new tab)
KWSSB/Water (Phase 1B)scan uploaded to RERASource (rera.karnataka.gov.in) (opens in a new tab)
KSPCB (Phase 1B)scan uploaded to RERASource (rera.karnataka.gov.in) (opens in a new tab)
SEIAA (Phase 1B)scan uploaded to RERASource (rera.karnataka.gov.in) (opens in a new tab)
Fire Force Department (Phase 1B)scan uploaded to RERASource (rera.karnataka.gov.in) (opens in a new tab)
Airport Authority of India (Phase 1B)scan uploaded to RERASource (rera.karnataka.gov.in) (opens in a new tab)
Building plan (Phase 1C)BIAPPA - Bangalore Airport Area Planning Authority · No. BIAAPA/TP/CC/331/2024-25/25-26/888 · dated 2025-06-25Source (rera.karnataka.gov.in) (opens in a new tab)
Land conversion (6 orders) (Phase 1C)DC office, Bangalore Rural · No. 33/2004-05 and 5 more · dated 2004-07-19Source (rera.karnataka.gov.in) (opens in a new tab)
Commencement Certificate (Phase 1C)scan uploaded to RERASource (rera.karnataka.gov.in) (opens in a new tab)
Approved Building Plan (Phase 1C)scan uploaded to RERASource (rera.karnataka.gov.in) (opens in a new tab)
ESCOM/Electricity (Phase 1C)scan uploaded to RERASource (rera.karnataka.gov.in) (opens in a new tab)
KWSSB/Water (Phase 1C)scan uploaded to RERASource (rera.karnataka.gov.in) (opens in a new tab)
KSPCB (Phase 1C)scan uploaded to RERASource (rera.karnataka.gov.in) (opens in a new tab)
SEIAA (Phase 1C)scan uploaded to RERASource (rera.karnataka.gov.in) (opens in a new tab)
Fire Force Department (Phase 1C)scan uploaded to RERASource (rera.karnataka.gov.in) (opens in a new tab)
Airport Authority of India (Phase 1C)scan uploaded to RERASource (rera.karnataka.gov.in) (opens in a new tab)
Building plan (Phase 1D)BIAPPA - Bangalore Airport Area Planning Authority · No. BIAAPA/TP/CC/331/2024-25/25-26/888 · dated 2025-06-25Source (rera.karnataka.gov.in) (opens in a new tab)
Land conversion (6 orders) (Phase 1D)DC Office, Bangalore Rural · No. 33/2004-05 and 5 more · dated 2004-07-19Source (rera.karnataka.gov.in) (opens in a new tab)
Commencement Certificate (Phase 1D)scan uploaded to RERASource (rera.karnataka.gov.in) (opens in a new tab)
Approved Building Plan (Phase 1D)scan uploaded to RERASource (rera.karnataka.gov.in) (opens in a new tab)
ESCOM/Electricity (Phase 1D)scan uploaded to RERASource (rera.karnataka.gov.in) (opens in a new tab)
KWSSB/Water (Phase 1D)scan uploaded to RERASource (rera.karnataka.gov.in) (opens in a new tab)
KSPCB (Phase 1D)scan uploaded to RERASource (rera.karnataka.gov.in) (opens in a new tab)
SEIAA (Phase 1D)scan uploaded to RERASource (rera.karnataka.gov.in) (opens in a new tab)
Fire Force Department (Phase 1D)scan uploaded to RERASource (rera.karnataka.gov.in) (opens in a new tab)
Airport Authority of India (Phase 1D)scan uploaded to RERASource (rera.karnataka.gov.in) (opens in a new tab)

Documents uploaded to RERA (Phase 1A)

As on 20 Oct 2026
  • Building or layout plan · Approved drawings from the planning authorityFiled on RERA ✓ — BIAPPA - Bangalore Airport Area Planning Authority · No. BIAAPA/TP/CC/331/2024-25/25-26/888 · dated 25 Jun 2025
  • Commencement certificate · Permission to start buildingFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
  • Environment clearance · SEIAA KarnatakaFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
  • Fire NOC · Karnataka Fire and Emergency ServicesFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
  • Pollution board consent · KSPCBFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
  • Water and sewerage · BWSSBFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
  • Electricity · BESCOMFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
  • Height clearance · Airports Authority of IndiaFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
  • Occupancy certificate (OC) · Issued only when the building is finishedNot on RERA yet — expected at completion

From the documents the promoter uploaded to Karnataka RERA, collected 20 Oct 2026. “Filed” means a document is on RERA — we have not checked its contents or validity. Not every approval applies to every project (for example, smaller projects may not need an environment clearance). Each phase is registered separately; this list is for the phase named above. The project page on RERA lists each upload.

Sources:Source (rera.karnataka.gov.in) (opens in a new tab)

Varnam RERA complaints

No complaints listed on Karnataka RERA for these registrations as on Source (rera.karnataka.gov.in) (opens in a new tab)

Court and consumer cases

Not found in public records yet: court cases

We list case numbers, courts and outcomes only — never names of private individuals.

About Smart Value Homes (Peenya Project) Private Limited

Promoter type
Partnership Firm
Projects on this site
4
RERA complaints against promoter
3
Company number (CIN)
Not found in public records yet: CIN

From Karnataka RERA, as collected so far (20 Oct 2026). Complaints are those RERA lists against this promoter across all its projects.

Smart Value Homes (Peenya Project) Private Limited’s RERA record

Smart Value Homes (Peenya Project) Private Limited delivery record

As on 5 Oct 2026
  • 4Projects in Bengaluru on RERA9 approved registrations under Smart Value Homes (Peenya Project) Private Limited in Bengaluru Urban and Rural. Source (rera.karnataka.gov.in) (opens in a new tab)
  • 1,643Homes and plots registeredAs stated in each registrations.
  • 3RERA complaints0 open, 3 disposed. as on Source (rera.karnataka.gov.in) (opens in a new tab)
  • 1.8Complaints per 1,000 homes and plots3 complaints ÷ 1,643 homes and plots in its 9 registrations on Karnataka RERA in Bengaluru.
  • 1Completion filed on RERARegistrations where the promoter applied to RERA for completion; 0 with an occupancy certificate on RERA.
  • 0 of 1Filed by the date given at registrationMedian gap 1.9 months (on-time ones count as 0). The completion application can come after handover, so this is an upper bound on lateness.

What the complaints are about

  • Construction quality, size or inspection1
  • Refund of booking or other money1
  • Delay in possession or delay interest1

3 complaint subjects as written on RERA, as on . Each subject is sorted into one group by keywords (first match wins: delay, refund, registration, quality, litigation, association); one complaint often raises several issues. Source (rera.karnataka.gov.in) (opens in a new tab)

Completion filed on RERA

ProjectDate at registrationCompletion filedGap
Swaram Phase-131 Dec 2023extended to 3 Jan 202428 Feb 20242 months after

Measured against the completion date given at registration; many projects had RERA extensions (including the COVID-period extension), shown under the date.

Sources:Source (rera.karnataka.gov.in) (opens in a new tab)How we calculate this

What’s changed since Jun 2025

As on 20 Oct 2026
  1. 17 Oct 2026Builder’s price list seen: 3 BHK + 2T from ₹2.05 Cr, 3 BHK + 3T from ₹2.21 Cr, 5 BHK + 5T from ₹4.5 Cr Source (tatahousing.com) (opens in a new tab)
  2. 14 Oct 2026Phase 1A: Quarterly update filed for Q2 2026-27: 13% built, 48 of 48 homes booked Source (rera.karnataka.gov.in) (opens in a new tab)
  3. 14 Oct 2026Phase 1B: Quarterly update filed for Q2 2026-27: 13% built, 200 of 223 homes booked Source (rera.karnataka.gov.in) (opens in a new tab)
  4. 14 Oct 2026Phase 1C: Quarterly update filed for Q2 2026-27: 15% built, 275 of 298 homes booked Source (rera.karnataka.gov.in) (opens in a new tab)
  5. 14 Oct 2026Phase 1D: Quarterly update filed for Q2 2026-27: 7% built, 161 of 211 homes booked Source (rera.karnataka.gov.in) (opens in a new tab)
  6. 15 Jul 2026Phase 1A: Quarterly update filed for Q1 2026-27: 10% built, 48 of 48 homes booked Source (rera.karnataka.gov.in) (opens in a new tab)
  7. 15 Jul 2026Phase 1B: Quarterly update filed for Q1 2026-27: 9% built, 249 of 285 homes booked Source (rera.karnataka.gov.in) (opens in a new tab)
  8. 15 Jul 2026Phase 1C: Quarterly update filed for Q1 2026-27: 9% built, 262 of 298 homes booked Source (rera.karnataka.gov.in) (opens in a new tab)
  9. 15 Jul 2026Phase 1D: Quarterly update filed for Q1 2026-27: 7% built, 135 of 211 homes booked Source (rera.karnataka.gov.in) (opens in a new tab)
  10. 15 Apr 2026Phase 1A: Quarterly update filed for Q4 2025-26: 6% built, 48 of 48 homes booked Source (rera.karnataka.gov.in) (opens in a new tab)
  11. 15 Apr 2026Phase 1B: Quarterly update filed for Q4 2025-26: 6% built, 245 of 285 homes booked Source (rera.karnataka.gov.in) (opens in a new tab)
  12. 15 Apr 2026Phase 1C: Quarterly update filed for Q4 2025-26: 6% built, 261 of 298 homes booked Source (rera.karnataka.gov.in) (opens in a new tab)
  13. 15 Apr 2026Phase 1D: Quarterly update filed for Q4 2025-26: 6% built, 116 of 211 homes booked Source (rera.karnataka.gov.in) (opens in a new tab)
  14. 15 Jan 2026Phase 1B: Quarterly update filed for Q3 2025-26: 4% built, 227 of 285 homes booked Source (rera.karnataka.gov.in) (opens in a new tab)
  15. 15 Jan 2026Phase 1C: Quarterly update filed for Q3 2025-26: 4% built, 240 of 298 homes booked Source (rera.karnataka.gov.in) (opens in a new tab)
  16. 14 Jan 2026Phase 1A: Quarterly update filed for Q3 2025-26: 4% built, 46 of 48 homes booked Source (rera.karnataka.gov.in) (opens in a new tab)
  17. 14 Jan 2026Phase 1D: Quarterly update filed for Q3 2025-26: 4% built, 0 of 211 homes booked Source (rera.karnataka.gov.in) (opens in a new tab)
  18. 1 Jan 2026Phase 1D: Project start date in the RERA record Source (rera.karnataka.gov.in) (opens in a new tab)
  19. 31 Dec 2025Phase 1D: Registered with Karnataka RERA (PRM/KA/RERA/1250/303/PR/311225/008367); completion date 30 Sep 2031 Source (rera.karnataka.gov.in) (opens in a new tab)
  20. 15 Aug 2025Phase 1A: Project start date in the RERA record Source (rera.karnataka.gov.in) (opens in a new tab)
  21. 15 Aug 2025Phase 1B: Project start date in the RERA record Source (rera.karnataka.gov.in) (opens in a new tab)
  22. 15 Aug 2025Phase 1C: Project start date in the RERA record Source (rera.karnataka.gov.in) (opens in a new tab)
  23. 11 Aug 2025Phase 1A: Registered with Karnataka RERA (PRM/KA/RERA/1250/303/PR/110825/007988); completion date 31 Aug 2030 Source (rera.karnataka.gov.in) (opens in a new tab)
  24. 11 Aug 2025Phase 1B: Registered with Karnataka RERA (PRM/KA/RERA/1250/303/PR/110825/007989); completion date 31 Aug 2030 Source (rera.karnataka.gov.in) (opens in a new tab)
  25. 11 Aug 2025Phase 1C: Registered with Karnataka RERA (PRM/KA/RERA/1250/303/PR/110825/007990); completion date 31 Mar 2031 Source (rera.karnataka.gov.in) (opens in a new tab)
  26. 25 Jun 2025Phase 1A: Building plan approved by BIAPPA - Bangalore Airport Area Planning Authority (No. BIAAPA/TP/CC/331/2024-25/25-26/888) Source (rera.karnataka.gov.in) (opens in a new tab)
  27. 25 Jun 2025Phase 1B: Building plan approved by BIAPPA - Bangalore Airport Area Planning Authority (No. BIAAPA/TP/CC/331/2024-25/25-26/888) Source (rera.karnataka.gov.in) (opens in a new tab)
  28. 25 Jun 2025Phase 1C: Building plan approved by BIAPPA - Bangalore Airport Area Planning Authority (No. BIAAPA/TP/CC/331/2024-25/25-26/888) Source (rera.karnataka.gov.in) (opens in a new tab)
  29. 25 Jun 2025Phase 1D: Building plan approved by BIAPPA - Bangalore Airport Area Planning Authority (No. BIAAPA/TP/CC/331/2024-25/25-26/888) Source (rera.karnataka.gov.in) (opens in a new tab)

Newest first. No extension of the completion date is recorded on RERA. When the RERA crawl sees a new filing, complaint or extension, it is added here with its date.

Home loan EMI calculator

Starts at the lowest listed price; change it to the home you want.

Example only — use your bank’s quote.

Monthly EMI
₹1,42,323
Down payment
₹41,00,000
Loan amount
₹1,64,00,000
Total interest
₹1,77,57,522

A calculation only, from the numbers you enter — not a loan offer.

All-in cost: GST, registration and other charges

The calculator loads when you scroll to it.

Assumptions
  • Base price: the builder’s price is not published in a form we could collect — enter it from the cost sheet.
  • GST 5% on the base price and charges — the usual rate for an under-construction home that is not “affordable housing” (1%).
  • Stamp duty about 5.6% and registration 2% — the Karnataka rule (registration was raised from 1% to 2% on 31 Aug 2025). Calculated on the agreement value.
  • Car parking, other charges and the maintenance deposit are not in the public record we collect; enter them from the builder’s cost sheet.
  • Loan on the agreement value (banks usually lend up to 75–90%); EMI is the standard reducing-balance formula. Example rate only — use your bank’s quote.

How we calculate this

Varnam FAQs

Not found in public records yet: FAQs

Questions about Varnam

No questions published yet. Ask the first one: you get an instant answer from this page’s public record, and our team follows up on anything the record does not show.

Bought a home from Smart Value Homes (Peenya Project) Private Limited? Review the builder.

Reviews of Smart Value Homes (Peenya Project) Private Limited by verified buyers

No verified reviews of Smart Value Homes (Peenya Project) Private Limited yet. If you bought a home from them, your review helps other buyers.

How reviews work: only buyers and owners can review; we confirm each purchase by phone before publishing, publish positive and negative reviews alike, never accept payment for reviews, and the builder may reply.

Similar projects within 5 km

ProjectDistanceHomesPossession (RERA)BuiltComplaintsPrice
Birla TrimayaBirla Arnaa LLP0.6 km1,484Dec 2031—0Not collected
Barca II At Godrej MSR CityGodrej Properties Limited1 km602Dec 203016%0Not collected
Legacy ViviendaLegacy Global Projects Private Limited1.1 km249Dec 2028extended47%14Not collected
Barca At Godrej MSR CityGodrej Properties Limited1.3 km1,961Mar 203019%2from ₹1.79 Crabout ₹20,500/sq ft carpet
Sattva Vasanta CoveSattva Resi Private Limited1.3 km200Dec 20309%0Not collected
Sattva Vasanta SkyeSattva Resi Private Limited1.6 km1,077May 203117%0Not collected

Projects of the same kind within 5 km in a straight line of this project’s RERA map point, nearest first. % built is the promoter’s latest quarterly figure on RERA (shown for single-registration projects); prices are from the builder’s own website where we found one.

Sources:Source (rera.karnataka.gov.in) (opens in a new tab)

Sources and last checked dates

  1. Karnataka RERA — project register (search by the registration number) (opens in a new tab)

Collected on 20 Oct 2026 by AI research agents reading public pages. Facts are written in our own words. Not found yet: price; court cases; landmarks; specifications; news.

How to check on RERA: On rera.karnataka.gov.in/viewAllProjects, type the registration number in 'Registration No', press Search, then click the 'View Project Details' icon. Complaints open from the 'Complaints / Litigation' icon in the same row. Registration numbers: PRM/KA/RERA/1250/303/PR/110825/007988, PRM/KA/RERA/1250/303/PR/110825/007989, PRM/KA/RERA/1250/303/PR/110825/007990, PRM/KA/RERA/1250/303/PR/311225/008367.

  • RERA record last checked: 20 Oct 2026
  • Last change in the record (registration, quarterly filing or complaint): 20 Oct 2026
  • Builder price list seen: 17 Oct 2026

How this page is made: software builds it from public records (Karnataka RERA filings, OpenStreetMap, the builder’s own website). AI is used only to read filings into fields and to write the plain-English summary and FAQ answers, which are checked against the record. Facts are checked automatically against the RERA filing. Methodology · How we earn · Report an error