Swaram
30×40, 30×50 +2 more plots by Smart Value Homes (Peenya Project) Private Limited · Mallenahalli, Bellary Road (Airport Road), Bengaluru
Mallenahalli, Bellary Road (Airport Road), BengaluruOpen on Google Maps (opens in a new tab)
- Under construction
- RERA registered
- RERA not updated: completion promised Mar 2026; no extension or completion filed
- plotted
by Smart Value Homes (Peenya Project) Private Limited · registered with RERA by One Bangalore Luxury Projects LLP
Price: Price on request
Site photo filed with Karnataka RERA Karnataka RERA filing · Source ↗ (opens in a new tab)
Swaram at a glance
- Completion (RERA)Mar 2026 Date passedWas Mar 2025 · Karnataka RERA
- RERA complaints (project)None listedKarnataka RERA · as on 17 Oct 2026
- Approvals filed5 of 9 on RERAKarnataka RERA uploads · 4 Oct 2026
- Nearest metroAirport City · 2.34 km (under construction)Open now: Krishnarajapura, 21.36 km · straight line · OpenStreetMap, 5 Oct 2026
- Airport driveapprox. 17 min at peak4.22 km straight line · estimate
- Nearest lakeUnnamed lake · 553 mFrom the RERA map point · OpenStreetMap, 5 Oct 2026
Project summary
Swaram is a plotted development by Smart Value Homes (Peenya Project) Private Limited in Mallenahalli, Bengaluru with 182 plots, registered with Karnataka RERA. The completion date on RERA is 31 Mar 2026. It is registered in 2 phases.
Facts collected on 17 Oct 2026 from public records — each linked to its source. Free for buyers. If you book through us, the developer pays us a commission.
Swaram buyers’ group: join to ask for a group price
No one has joined yet. Be one of the first 10 buyers in this group — the founding members.
Join free. When enough buyers have joined, our agent partner asks Smart Value Homes (Peenya Project) Private Limited for a group price — for example a lower price, an easier payment plan or waived charges. Nothing is promised: you see what the developer offers and book directly with the developer if you want to. Free for buyers. If you book through us, the developer pays us a commission.
- Gathering buyers
- Talking to the developer
- Group offer
- Group site visit
- Booking
0 buyers have joined · 0 committed
Committed buyers have confirmed their budget, plot size and timeline with us on a call; developers negotiate with them. Joining is free and never obliges you to buy.
Join the Swaram buyers’ groupHow group buying works
See it for yourself
Visit the site with our team, or get a call to clear your questions. Free, no obligation.
Key facts: plot sizes, approval, land and completion
- Plot sizes (feet)
- 30×40, 30×50, 40×50, 40×60
- Plot area
- 904 – 14,238 sq ft
- Total plots
- 182
- Layout approved by
- BIAAPA
- Land
- Not found in public records yet: land area
- Land conversion orders
- 4
- Completion (extended)
- Mar 2026
- Development (RERA update)
- Not found in public records yet: development progress
Plot sizes (RERA filing)
| Size (feet) | Area | Plots |
|---|---|---|
| 30×40 | 1,200 sq ft | 100 |
| 30×50 | 1,500 sq ft | 21 |
| 40×50 | 2,000 sq ft | 7 |
| 40×60 | 2,400 sq ft | 16 |
| Odd-sized (irregular) | varies | 38 |
Sizes as filed with RERA, converted from metres to feet (9.14 m = 30 ft, 12.19 m = 40 ft). Ask the developer which plots are still unsold.
Approving authority as filed: BIAPPA - Bangalore Airport Area Planning Authority.
Land conversion orders (RERA filing)
| Phase | Survey no. | Converted for | Order | By |
|---|---|---|---|---|
| Phase-1 | Sy No 1(P) | Residential | No. ALN(DE)SR/33/2004-05, 19 Jul 2004 | DC, Bengaluru Rural |
| Phase-1 | 37/2(P) | Residential | No. ALN(DE)SR/58/1991-92, 11 Sep 2007 | DC, Bengaluru Rural |
| Phase-2 | 1(P) | Residential | No. ALN(DE)SR/33/2004-05, 19 Jul 2004 | DC, Bengaluru Rural |
| Phase-2 | 37/2(P) | Residential | No. ALN(DE)SR/58/1991-92, 11 Sep 2007 | DC, Bengaluru Rural |
RERA does not cover each plot’s khata. Ask the developer for the khata and title documents and have a lawyer check them before paying an advance.
Swaram RERA number and registration details
- RERA number
- PRM/KA/RERA/1250/303/PR/250222/004734
- Registered on
- 25 Feb 2022
- Promised completion
- 31 Mar 2025
- Extended to
- 31 Mar 2026
- RERA status
- New launch
- Plots booked
- Not found in public records yet: plots booked
- Price
- Not found in public records yet: price
- Project type
- Plotted
2 RERA registrations (one per phase) are shown together on this page; dates above are the latest across phases.
Phases and RERA numbers
| Phase | RERA number | Promised completion | Plots | Status | Source |
|---|---|---|---|---|---|
| Phase-1 | PRM/KA/RERA/1250/303/PR/250222/004734 | 31 Dec 2023Extended to 3 Jan 2024 | 159 | Completed | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Phase-2 | PRM/KA/RERA/1250/303/PR/300922/005285 | 31 Mar 2025Extended to 31 Mar 2026 | 23 | New launch | Source (rera.karnataka.gov.in) (opens in a new tab) |
Summary in plain English
Swaram is a plotted layout by One Bangalore Projects LLP in Mallenahalli, Devanahalli, with 182 plots across two RERA-registered phases. Phase 1 has 159 plots with a completion date of 3 January 2024, and Phase 2 has 23 plots with a completion date of 31 March 2026. The layout is approved by BIAAPA with 2 land conversion orders.
Written by AI from the RERA record above on 7 Oct 2026. Every number in it was checked against that record; if anything differs, the record wins.
Open space, loans, escrow and other details
- Open space
- Not found in public records yet: open space
- Water and power
- Water source filed with RERA: Local Authority
- Plot loans: approved banks
- Not found in public records yet: bank approvals
- Payment plans
- Not found in public records yet: payment plans
- Maintenance
- Not found in public records yet: maintenance
- Car parking
- Not found in public records yet: car parking charge
- Escrow bank (RERA) · Phase-1
- Industrial Development Bank of India, Specialized Corporate Branch, Bangalore
- Escrow bank (RERA) · Phase-2
- Industrial Development Bank of India, Bangalore IDBI Mission Road Branch
Amenities
Swaram location and address
- Address
- Sy. No. 1(P) & 37/2(P) of JODI AKKALENA HALLI - MALLENA HALLI VILLAGE , KASABA HOBLI , Devanahalli , Bengaluru Rural, Karnataka - 562129
- Village (RERA)
- Mallenahalli
- Locality
- Bellary Road (Airport Road)Also known as Airport Road, International Airport Road, Bellary Road, NH 44
- PIN code
- 562129
- City
- Bengaluru
- State
- Karnataka
- Coordinates
- 13.19168, 77.66651
Distances to landmarks
Not found in public records yet: landmarksAbout Bellary Road (Airport Road)
Not found in public records yet: locality factsCommute times to tech parks and the airport
| To | Straight line | Peak-hour drive (estimate) |
|---|---|---|
| Kempegowda International AirportMap point on OpenStreetMap (opens in a new tab) | 4.22 km | approx. 17 min |
| Manyata Tech ParkMap point on OpenStreetMap (opens in a new tab) | 16.74 km | approx. 68 min |
| ITPL, Whitefield (main gate)Map point on OpenStreetMap (opens in a new tab) | 23.97 km | approx. 97 min |
| KSR Bengaluru City railway station (Majestic)Map point on OpenStreetMap (opens in a new tab) | 25.96 km | approx. 105 min |
| Outer Ring Road tech corridor (RMZ Ecospace, Bellandur)Map point on OpenStreetMap (opens in a new tab) | 29.84 km | approx. 121 min |
| Electronic City Phase 1Map point on OpenStreetMap (opens in a new tab) | 38.03 km | approx. 154 min |
How we calculate
Straight line: from the project’s map point on RERA to the destination’s point on OpenStreetMap.
Peak-hour drive is a rough estimate, not a route: straight line × 1.35 for the road network, at 20 km/h. Real times vary a lot with the route and the hour.
Sources:Source (openstreetmap.org) (opens in a new tab)How we calculate this
Schools and hospitals nearby
Within 2 km
- 2Schools and colleges1 schools, 1 colleges, 0 kindergartens
- 0Hospitals and clinics0 hospitals, 0 clinics
Nearest schools and colleges
- IIBS Bengaluru Airport Campus · 1.05 km
- NAFL North Urbana · 1.76 km
Places as mapped on OpenStreetMap (amenity=school, college, kindergarten, university; hospital, clinic), counted within 2 km in a straight line of the RERA map point. Volunteers map these, so some places may be missing or closed. Places data © OpenStreetMap contributors, extract of 5 Oct 2026.
Nearest metro station and railway
- Airport City (ವಿಮಾನ ನಿಲ್ದಾಣ ನಗರ)Blue Line metro, under construction2.34 km
- Doddajala (ದೊಡ್ಡಜಾಲ)Blue Line metro, under construction2.4 km
- KIAL Terminals (ಕೆಐಎಬಿ ವಿಮಾನ ನಿಲ್ದಾಣ ಟರ್ಮಿನಲ್ಸ್)Blue Line metro, under construction5.08 km
- Krishnarajapura (ಕೃಷ್ಣರಾಜಪುರ (ಕೆ.ಆರ್.ಪುರ))Open now — nearest operating metro station21.36 km
- Kempegowda International Airport Halt (ಕೆಂಪೇಗೌಡ ಅಂತರರಾಷ್ಟ್ರೀಯ ವಿಮಾನ-ನಿಲದಾಣ ಹಾಲ್ಟ)Nearest railway station2.35 km
Straight-line distances from the RERA map point to the station points mapped on OpenStreetMap; status (open or under construction) as tagged there. Places data © OpenStreetMap contributors, extract of 5 Oct 2026.
Lake and lake-buffer check
The nearest mapped lake is Unnamed lake (mapped on OpenStreetMap), 553 m from the project’s RERA map point.
The site boundary is not published as a shape, so its nearest edge can be closer than this point. Whether any building sits inside a lake buffer can only be checked on the approved plan.
- Unnamed lake (mapped on OpenStreetMap) on OpenStreetMap (opens in a new tab) 553 m
- Unnamed lake (mapped on OpenStreetMap) on OpenStreetMap (opens in a new tab) 1,313 m
The buffer rule
Bengaluru’s lake buffer rule has changed over time: the National Green Tribunal ordered a 75 m buffer in May 2016; the Supreme Court set that order aside on 5 March 2019, leaving the 30 m buffer of the Revised Master Plan 2015. Check the current rule and the approved plan before relying on either number.
- LiveLaw: SC sets aside NGT order enlarging buffer zones (2019) (livelaw.in) (opens in a new tab)
- Citizen Matters: Shrinking lake buffers (citizenmatters.in) (opens in a new tab)
Shortest distance from the RERA map point to the mapped water edge (OpenStreetMap water polygons tagged lake or reservoir, or named lake/kere/tank). Mapped shorelines can differ from the revenue-record boundary of a lake. Places data © OpenStreetMap contributors, extract of 5 Oct 2026.
Sources:Source (openstreetmap.org) (opens in a new tab)Source (livelaw.in) (opens in a new tab)Source (citizenmatters.in) (opens in a new tab)How we calculate this
Satellite time-lapse of the site
Satellite photos load when you scroll to them.
Photos from Esri World Imagery Wayback, centred on the project’s map point; dates are the capture dates in Esri’s metadata. Loaded from Esri when you scroll here.
Sources:Source (livingatlas.arcgis.com) (opens in a new tab)
Swaram layout plan and plot types as filed
Documents the developer uploaded to Karnataka RERA, shown as filed. Tap a page to see it full size; the full PDF opens on the RERA website.
Approved layout plan3 files

Phase-2: Approved Layout PlanFull PDF on RERA 
Phase-2: Approved Building/Plotting PlanFull PDF on RERA 
Phase-2: Existing Layout PlanFull PDF on RERA
Layout plan and brochure not published? The developer shares them only on request. We’ll get the brochure, layout plan and current price list for you, free.
Get brochure, layout plan & price| Plot type (as filed) | Area | Plots |
|---|---|---|
| Plot 09 m × 12 m | — | 91 |
| Plot 9 m × 12 m | — | 9 |
| Plot 09 m × 15 m | — | 21 |
| Plot 12 m × 15 m | — | 7 |
| Plot 12 m × 18 m | — | 16 |
| Odd | — | 38 |
Plot types and counts as filed with Karnataka RERA.
We have not collected the layout plan drawing; the developer’s sales team can share it.
Swaram completion date and development status
Timeline
- 25 Feb 2022Phase-1: Registered with Karnataka RERA
- 1 Apr 2022Phase-1: Project start date given to RERA
- 30 Sep 2022Phase-2: Registered with Karnataka RERA
- 1 Oct 2022Phase-2: Project start date given to RERA
- 31 Dec 2023Phase-1: Completion date given at registration
- 3 Jan 2024Phase-1: Section 6 Extension: completion date moved to this date
- 28 Feb 2024Phase-1: Promoter applied to RERA for completion
- 31 Mar 2025Phase-2: Completion date given at registration
- 31 Mar 2026Phase-2: Section 6 Extension: completion date moved to this date
Approvals and documents checklist
26 rows: approvals. Scroll inside the table to see them all.
| Approval | Authority | Source |
|---|---|---|
| Layout plan (Phase-1) | BIAPPA - Bangalore Airport Area Planning Authority · No. BIAAPA / TP / DP/LAO/27/2016-17 · dated 2022-02-08 | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Land conversion (2 orders) (Phase-1) | DC, Bengaluru Rural · No. ALN(DE)SR/33/2004-05 and 1 more · dated 2007-09-11 | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Commencement Certificate (Phase-1) | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Electricity Permission Letter (Phase-1) | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Water Permission Letter (Phase-1) | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Approved Layout Plan (Phase-1) | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Approved Building/Plotting Plan (Phase-1) | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Change of Land Use (Phase-1) | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| District Magistrate (Phase-1) | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Conversion Certificate under section 95 of the KLR Act 1964 (Phase-1) | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| ESCOM/Electricity (Phase-1) | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| KWSSB/Water (Phase-1) | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| KSPCB (Phase-1) | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Layout plan (Phase-2) | BIAPPA - Bangalore Airport Area Planning Authority · No. BIAAPA / TP/ DP/LAO/27/2016-17 · dated 2022-02-08 | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Land conversion (2 orders) (Phase-2) | DC, Bengaluru Rural · No. ALN(DE)SR/33/2004-05 and 1 more · dated 2007-09-11 | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Commencement Certificate (Phase-2) | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Electricity Permission Letter (Phase-2) | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Water Permission Letter (Phase-2) | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Approved Layout Plan (Phase-2) | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Approved Building/Plotting Plan (Phase-2) | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Change of Land Use (Phase-2) | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| District Magistrate (Phase-2) | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Conversion Certificate under section 95 of the KLR Act 1964 (Phase-2) | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| ESCOM/Electricity (Phase-2) | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| KWSSB/Water (Phase-2) | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| KSPCB (Phase-2) | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
Documents uploaded to RERA (Phase-1)
- Building or layout plan · Approved drawings from the planning authorityFiled on RERA ✓ — BIAPPA - Bangalore Airport Area Planning Authority · No. BIAAPA / TP / DP/LAO/27/2016-17 · dated 8 Feb 2022
- Commencement certificate · Permission to start buildingFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
- Environment clearance · SEIAA KarnatakaNot on RERA yet
- Fire NOC · Karnataka Fire and Emergency ServicesNot on RERA yet
- Pollution board consent · KSPCBFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
- Water and sewerage · BWSSBFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
- Electricity · BESCOMFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
- Height clearance · Airports Authority of IndiaNot on RERA yet
- Occupancy certificate (OC) · Issued only when the building is finishedNot on RERA yet — expected at completion
From the documents the promoter uploaded to Karnataka RERA, collected 4 Oct 2026. “Filed” means a document is on RERA — we have not checked its contents or validity. Not every approval applies to every project (for example, smaller projects may not need an environment clearance). Each phase is registered separately; this list is for the phase named above. The project page on RERA lists each upload.
Swaram RERA complaints
No complaints listed on Karnataka RERA for these registrations as on Source (rera.karnataka.gov.in) (opens in a new tab)
Court and consumer cases
We list case numbers, courts and outcomes only — never names of private individuals.
About Smart Value Homes (Peenya Project) Private Limited
- Promoter type
- Partnership Firm
- Projects on this site
- 4
- RERA complaints against promoter
- 3
- Company number (CIN)
- Not found in public records yet: CIN
From Karnataka RERA, as collected so far (17 Oct 2026). Complaints are those RERA lists against this promoter across all its projects.
Smart Value Homes (Peenya Project) Private Limited’s RERA recordSmart Value Homes (Peenya Project) Private Limited delivery record
- 4Projects in Bengaluru on RERA9 approved registrations under Smart Value Homes (Peenya Project) Private Limited in Bengaluru Urban and Rural. Source (rera.karnataka.gov.in) (opens in a new tab)
- 1,643Homes and plots registeredAs stated in each registrations.
- 3RERA complaints0 open, 3 disposed. as on Source (rera.karnataka.gov.in) (opens in a new tab)
- 1.8Complaints per 1,000 homes and plots3 complaints ÷ 1,643 homes and plots in its 9 registrations on Karnataka RERA in Bengaluru.
- 1Completion filed on RERARegistrations where the promoter applied to RERA for completion; 0 with an occupancy certificate on RERA.
- 0 of 1Filed by the date given at registrationMedian gap 1.9 months (on-time ones count as 0). The completion application can come after handover, so this is an upper bound on lateness.
What the complaints are about
3 complaint subjects as written on RERA, as on . Each subject is sorted into one group by keywords (first match wins: delay, refund, registration, quality, litigation, association); one complaint often raises several issues. Source (rera.karnataka.gov.in) (opens in a new tab)
Completion filed on RERA
| Project | Date at registration | Completion filed | Gap |
|---|---|---|---|
| Swaram Phase-1 | 31 Dec 2023extended to 3 Jan 2024 | 28 Feb 2024 | 2 months after |
Measured against the completion date given at registration; many projects had RERA extensions (including the COVID-period extension), shown under the date.
Sources:Source (rera.karnataka.gov.in) (opens in a new tab)How we calculate this
What’s changed since Feb 2022
- 15 Apr 2026Phase-2: Quarterly update filed for Q4 2025-26: 100% built Source (rera.karnataka.gov.in) (opens in a new tab)
- 31 Mar 2026Phase-2: Completion date extended to 31 Mar 2026 Source (rera.karnataka.gov.in) (opens in a new tab)
- 15 Jan 2026Phase-2: Quarterly update filed for Q3 2025-26: 75% built Source (rera.karnataka.gov.in) (opens in a new tab)
- 28 Feb 2024Phase-1: Promoter applied to RERA for completion Source (rera.karnataka.gov.in) (opens in a new tab)
- 3 Jan 2024Phase-1: Completion date extended to 3 Jan 2024 Source (rera.karnataka.gov.in) (opens in a new tab)
- 1 Oct 2022Phase-2: Project start date in the RERA record Source (rera.karnataka.gov.in) (opens in a new tab)
- 30 Sep 2022Phase-2: Registered with Karnataka RERA (PRM/KA/RERA/1250/303/PR/300922/005285); completion date 31 Mar 2025 Source (rera.karnataka.gov.in) (opens in a new tab)
- 1 Apr 2022Phase-1: Project start date in the RERA record Source (rera.karnataka.gov.in) (opens in a new tab)
- 25 Feb 2022Phase-1: Registered with Karnataka RERA (PRM/KA/RERA/1250/303/PR/250222/004734); completion date 31 Dec 2023 Source (rera.karnataka.gov.in) (opens in a new tab)
- 8 Feb 2022Phase-1: Building plan approved by BIAPPA - Bangalore Airport Area Planning Authority (No. BIAAPA / TP / DP/LAO/27/2016-17) Source (rera.karnataka.gov.in) (opens in a new tab)
- 8 Feb 2022Phase-2: Building plan approved by BIAPPA - Bangalore Airport Area Planning Authority (No. BIAAPA / TP/ DP/LAO/27/2016-17) Source (rera.karnataka.gov.in) (opens in a new tab)
Newest first. When the RERA crawl sees a new filing, complaint or extension, it is added here with its date.
Plot loan EMI calculator
- Monthly EMI
- —
- Down payment
- —
- Loan amount
- —
- Total interest
- —
A calculation only, from the numbers you enter — not a loan offer.
Swaram FAQs
What plot sizes are available in Swaram Phase 1?
Phase 1 offers plots of 30×40 ft (1,200 sq ft, 91 plots), 30×50 ft (1,500 sq ft, 21 plots), 40×50 ft (2,000 sq ft, 7 plots), 40×60 ft (2,400 sq ft, 5 plots), and 35 odd-sized plots. The sizes of the odd-sized plots are not in the RERA record.
How many plots are in Swaram Phase 2?
Phase 2 has 23 plots: 11 plots of 40×60 ft (2,400 sq ft), 9 plots of 30×40 ft (1,200 sq ft), and 3 odd-sized plots.
What is the total number of plots in Swaram?
Swaram has 182 plots in total across both phases.
When is Swaram Phase 1 scheduled to be completed?
Phase 1 has a completion date of 3 January 2024 on RERA, with one extension granted under Section 6.
When is Swaram Phase 2 scheduled to be completed?
Phase 2 has a completion date of 31 March 2026 on RERA, with one extension granted under Section 6.
What are the RERA registration numbers for Swaram?
Phase 1 is registered as PRM/KA/RERA/1250/303/PR/250222/004734 (registered on 25 February 2022), and Phase 2 is registered as PRM/KA/RERA/1250/303/PR/300922/005285 (registered on 30 September 2022).
What authority approved the Swaram layout?
The layout is approved by BIAAPA (Bangalore International Airport Area Planning Authority).
How many land conversion orders does Swaram have?
Both Phase 1 and Phase 2 have 2 land conversion orders each.
Are there any RERA complaints against Swaram or the developer?
There are no RERA complaints on this project, and no RERA complaints against One Bangalore Projects LLP across all its projects on record.
Where is Swaram located?
Swaram is in Mallenahalli, Devanahalli taluk, Bengaluru Rural district, PIN code 562129.
Written by AI from the RERA record above on 7 Oct 2026. Answers use only that record; check them against the source before you decide.
Questions about Swaram
No questions published yet. Ask the first one: you get an instant answer from this page’s public record, and our team follows up on anything the record does not show.
Bought a plot from Smart Value Homes (Peenya Project) Private Limited? Review the developer.
Reviews of Smart Value Homes (Peenya Project) Private Limited by verified buyers
No verified reviews of Smart Value Homes (Peenya Project) Private Limited yet. If you bought a plot from them, your review helps other buyers.
How reviews work: only buyers and owners can review; we confirm each purchase by phone before publishing, publish positive and negative reviews alike, never accept payment for reviews, and the developer may reply.
Similar projects within 5 km
| Project | Distance | Plots | Completion (RERA) | Developed | Complaints | Price |
|---|---|---|---|---|---|---|
| RaagamSmart Value Homes (Peenya Project) Private Limited | 0.5 km | 583 | Jun 2028 | — | 0 | Not collected |
| Heritage EnclaveIG3 Infra Limited | 0.5 km | 118 | Dec 2029 | 21% | 0 | Not collected |
| Ekta ElementsIg3 Infra Limited | 0.8 km | 289 | Dec 2027 | 41% | 0 | Not collected |
| Vedam By Essem18Essem18 Ventures LLP | 1.1 km | 113 | Mar 2027 | 98% | 0 | Not collected |
| Pinakini Life Spaces Phase 1Sse Projects Pvt Ltd | 1.9 km | 81 | Dec 2029 | 14% | 0 | Not collected |
| Konig Pearl County 1Konig Homes | 3.1 km | 74 | Dec 2028 | 60% | 0 | Not collected |
Projects of the same kind within 5 km in a straight line of this project’s RERA map point, nearest first. % built is the promoter’s latest quarterly figure on RERA (shown for single-registration projects); prices are from the developer’s own website where we found one.
Sources and last checked dates
Collected on 17 Oct 2026 by AI research agents reading public pages. Facts are written in our own words. Not found yet: price; court cases; landmarks; specifications; news.
How to check on RERA: On rera.karnataka.gov.in/viewAllProjects, type the registration number in 'Registration No', press Search, then click the 'View Project Details' icon. Complaints open from the 'Complaints / Litigation' icon in the same row. Registration numbers: PRM/KA/RERA/1250/303/PR/250222/004734, PRM/KA/RERA/1250/303/PR/300922/005285.
- RERA record last checked: 17 Oct 2026
- Last change in the record (registration, quarterly filing or complaint): 15 Apr 2026
How this page is made: software builds it from public records (Karnataka RERA filings, OpenStreetMap, the developer’s own website). AI is used only to read filings into fields and to write the plain-English summary and FAQ answers, which are checked against the record. Facts are checked automatically against the RERA filing. Methodology · How we earn · Report an error
More new projects in Bellary Road (Airport Road)
Mallenahalli, Bellary Road (Airport Road)Under constructionRERA registeredBuyers’ group openRaagam
by Smart Value Homes (Peenya Project)
Price: Price on requestGet brochure & price →
- 30×40, 30×50, 30×60 +2 more
- 1,163 – 15,764 sq ft plots
- Approved by BIAAPA
- Jun 2028
2 phases on RERA · 583 plots
Be one of the first 10 buyers in this groupFounding members — it’s free
Join group for Raagam
Mallenahalli, Bellary Road (Airport Road)Under constructionRERA registeredBuyers’ group openHeritage Enclave
by IG3 Infra
Price: Price on requestGet brochure & price →
- 30×40, 40×40, 40×50
- 1,163 – 8,722 sq ft plots
- Approved by BIAAPA
- Dec 2029
118 plots
Be one of the first 10 buyers in this groupFounding members — it’s free
Join group for Heritage Enclave
Mallenahalli, Bellary Road (Airport Road)Under constructionRERA registeredBuyers’ group openEkta Elements
by Ig3 Infra
Price: Price on requestGet brochure & price →
- 30×40, 40×40, 40×50 +1 more
- 1,074 – 40,013 sq ft plots
- Approved by BIAAPA
- Dec 2027
289 plots
Be one of the first 10 buyers in this groupFounding members — it’s free
Join group for Ekta Elements