Adarsh Crest Phase 1

2 & 3 BHK apartments by Adarsh Developers · Kempapura, Hebbal, Bengaluru

Kempapura, Hebbal, BengaluruOpen on Google Maps (opens in a new tab)

  • Under construction
  • RERA registered
  • RERA not updated: completion promised Dec 2025; no extension or completion filed
  • residential

by Adarsh Developers

Price: Price on request

Get brochure, floor plans & price

Brochure, floor plans and price list for Adarsh Crest Phase 1

Builders share their brochure, floor plans and price list only on request. Tell us how to reach you and we’ll get them and send them to you, free.

Free for buyers. If you book through us, the builder pays us a commission. How we earn

Project summary

Adarsh Crest Phase 1 is a residential project by Adarsh Developers in Kempapura, Bengaluru with 243 homes, registered with Karnataka RERA. The completion date on RERA is 31 Dec 2025.

Facts collected on 12 Oct 2026 from public records — each linked to its source. Free for buyers. If you book through us, the builder pays us a commission.

Adarsh Crest Phase 1 buyers’ group: join to ask for a group price

No one has joined yet. Be one of the first 10 buyers in this group — the founding members.

Join free. When enough buyers have joined, our agent partner asks Adarsh Developers for a group price — for example a lower price, an easier payment plan or waived charges. Nothing is promised: you see what the builder offers and book directly with the builder if you want to. Free for buyers. If you book through us, the builder pays us a commission.

  1. Gathering buyers
  2. Talking to the builder
  3. Group offer
  4. Group site visit
  5. Booking

0 buyers have joined · 0 committed

Committed buyers have confirmed their budget, home type and timeline with us on a call; builders negotiate with them. Joining is free and never obliges you to buy.

Join the Adarsh Crest Phase 1 buyers’ groupHow group buying works

See it for yourself

Visit the site with our team, or get a call to clear your questions. Free, no obligation.

Key facts: home types, towers, land and possession

Updated on 12 Oct 2026
Home types
2 BHK, 3 BHK
Carpet area
854 – 1,417 sq ft
Towers
2
Floors
10
Total homes
243
Land
3.65 acres
Possession (RERA)
Dec 2025
Built (RERA update)
74%

Adarsh Crest Phase 1 RERA number and registration details

RERA number
PRM/KA/RERA/1251/446/PR/211022/004369
Registered on
22 Oct 2021
Promised completion
31 Dec 2025
Extended to
No extension recorded
RERA status
New launch
Homes booked
122 of 243 as on
Price
Not found in public records yet: price
Project type
Residential

Towers and blocks (RERA filing)

TowerFloorsBasementsHomes
Block 110248
BLock 210274

A dash (—) means the filing did not state that value.

Sources:Source (rera.karnataka.gov.in) (opens in a new tab)

Summary in plain English

Adarsh Crest Phase 1 is a residential project by Adarsh Developers in Kempapura, Bengaluru East, with 243 homes across 2 towers of up to 10 floors. The project is registered with Karnataka RERA and is scheduled for completion on 31 December 2025.

Written by AI from the RERA record above on 12 Oct 2026. Every number in it was checked against that record; if anything differs, the record wins.

Open space, home loans, escrow and other details

Open space
76.7% of land
Water and power
Not found in public records yet: water and power
Home loans: approved banks
Not found in public records yet: bank approvals
Payment plans
Not found in public records yet: payment plans
Maintenance
Not found in public records yet: maintenance
Car parking
Not found in public records yet: car parking charge
Escrow bank (RERA)
HDFC, Richmond Road
Project cost declared to RERA
₹267 Cr

Open area as a share of the land, from the areas filed with RERA (includes driveways and landscaped areas).

Sources:Source (rera.karnataka.gov.in) (opens in a new tab)

Amenities

Not found in public records yet: amenities

Adarsh Crest Phase 1 location and address

Address
SY.NO.25/1,WARD NO.07,KHATHA NO.278/331,, OF KEMPAPURA VILLAGE, YELHANKA HOBLI,
Village (RERA)
Kempapura
Locality
Hebbal
City
Bengaluru
State
Karnataka
Coordinates
13.04923, 77.59868

Distances to landmarks

Not found in public records yet: landmarks

About Hebbal

Not found in public records yet: locality facts

Commute times to tech parks and the airport

As on 5 Oct 2026
ToStraight linePeak-hour drive (estimate)
Manyata Tech ParkMap point on OpenStreetMap (opens in a new tab)2.3 kmapprox. 9 min
KSR Bengaluru City railway station (Majestic)Map point on OpenStreetMap (opens in a new tab)8.51 kmapprox. 34 min
ITPL, Whitefield (main gate)Map point on OpenStreetMap (opens in a new tab)16.55 kmapprox. 67 min
Outer Ring Road tech corridor (RMZ Ecospace, Bellandur)Map point on OpenStreetMap (opens in a new tab)16.58 kmapprox. 67 min
Kempegowda International AirportMap point on OpenStreetMap (opens in a new tab)20.37 kmapprox. 82 min
Electronic City Phase 1Map point on OpenStreetMap (opens in a new tab)23.32 kmapprox. 94 min
How we calculate

Straight line: from the project’s map point on RERA to the destination’s point on OpenStreetMap.

Peak-hour drive is a rough estimate, not a route: straight line × 1.35 for the road network, at 20 km/h. Real times vary a lot with the route and the hour.

Sources:Source (openstreetmap.org) (opens in a new tab)How we calculate this

Schools and hospitals nearby

As on 5 Oct 2026

Within 2 km

  • 38Schools and colleges27 schools, 5 colleges, 6 kindergartens
  • 57Hospitals and clinics19 hospitals, 38 clinics

Nearest schools and colleges

  • Presidency College · 0.16 km
  • Sindhi High School · 0.17 km
  • Vidyaneketana School · 0.35 km

Nearest hospitals and clinics

  • Manipal Hospital · 0.56 km
  • Icon Hospital · 0.71 km
  • Physiotherapy clinic · 0.72 km

Places as mapped on OpenStreetMap (amenity=school, college, kindergarten, university; hospital, clinic), counted within 2 km in a straight line of the RERA map point. Volunteers map these, so some places may be missing or closed. Places data © OpenStreetMap contributors, extract of 5 Oct 2026.

Sources:Source (openstreetmap.org) (opens in a new tab)

Nearest metro station and railway

As on 5 Oct 2026
  • Hebbal (ಹೆಬ್ಬಾಳ)Blue Line metro, under construction0.84 km
  • Kempapura (ಕೆಂಪಾಪುರ)Blue Line metro, under construction0.93 km
  • Kodigehalli (ಕೊಡಿಗೇಹಳ್ಳಿ)Blue Line metro, under construction1 km
  • Yeshwantpur (ಯಶವಂತಪುರ)Open now — nearest operating metro station6.02 km
  • Hebbal (ಹೆಬ್ಬಾಳು)Nearest railway station1.54 km

Straight-line distances from the RERA map point to the station points mapped on OpenStreetMap; status (open or under construction) as tagged there. Places data © OpenStreetMap contributors, extract of 5 Oct 2026.

Lines under construction near here

  • 6 Aug 2026Namma Metro Blue Line, Phase 2B (KR Pura – Hebbal – Yelahanka – Kempegowda Airport, 38.44 km). Under construction; reported 72% complete overall, with the remaining work targeted for June 2027 and phased opening through 2027. Nearest: Hebbal, about 0.84 km straight-line. — Business Today. News report quoting BMRCL; the airport line has slipped before. Read (businesstoday.in) (opens in a new tab)

Sources:Source (businesstoday.in) (opens in a new tab)Source (openstreetmap.org) (opens in a new tab)

Lake and lake-buffer check

As on 5 Oct 2026

The nearest mapped lake is Nagawara Lake, 525 m from the project’s RERA map point.

The site boundary is not published as a shape, so its nearest edge can be closer than this point. Whether any building sits inside a lake buffer can only be checked on the approved plan.

The buffer rule

Bengaluru’s lake buffer rule has changed over time: the National Green Tribunal ordered a 75 m buffer in May 2016; the Supreme Court set that order aside on 5 March 2019, leaving the 30 m buffer of the Revised Master Plan 2015. Check the current rule and the approved plan before relying on either number.

Shortest distance from the RERA map point to the mapped water edge (OpenStreetMap water polygons tagged lake or reservoir, or named lake/kere/tank). Mapped shorelines can differ from the revenue-record boundary of a lake. Places data © OpenStreetMap contributors, extract of 5 Oct 2026.

Sources:Source (openstreetmap.org) (opens in a new tab)Source (livelaw.in) (opens in a new tab)Source (citizenmatters.in) (opens in a new tab)How we calculate this

Satellite time-lapse of the site

Satellite photos load when you scroll to them.

Photos from Esri World Imagery Wayback, centred on the project’s map point; dates are the capture dates in Esri’s metadata. Loaded from Esri when you scroll here.

Sources:Source (livingatlas.arcgis.com) (opens in a new tab)

Adarsh Crest Phase 1 home types and carpet areas

Floor plans and brochure not published? The builder shares them only on request. We’ll get the brochure, floor plans and current price list for you, free.

Get brochure, floor plans & price

Brochure, floor plans and price list for Adarsh Crest Phase 1

Builders share their brochure, floor plans and price list only on request. Tell us how to reach you and we’ll get them and send them to you, free.

Free for buyers. If you book through us, the builder pays us a commission. How we earn

Home typeCarpet areaHomes
2 BHK854 – 931 sq ft14
2 bkh893 sq ft22
3 BHK1,222 – 1,354 sq ft139
3 BHK + ser.1,299 – 1,417 sq ft26
3 BHK + servent1,367 sq ft42

Home types, counts and carpet areas as filed with Karnataka RERA (carpet area, not super built-up).

We have not collected floor-plan drawings; the builder’s sales team can share them.

Sources:Source (rera.karnataka.gov.in) (opens in a new tab)

Adarsh Crest Phase 1 possession date and construction status

  • Whole project (promoter’s RERA update)74%

    as on · 122 of 243 homes booked

Promoter’s quarterly update to RERA for Q1 2026-27, submitted 2026-07-15.

By tower (Q1 2026-27)

  • Block 178%
  • BLock 297%

Units sold and unsold, from RERA (Q1 2026-27)

TypeHomesBookedAvailable
3 BHK82820
2 BHK14140
3 BHK + SER.26260

As reported by the promoter in the quarterly update to RERA, not verified by us.

Timeline

  1. 1 Jun 2021Project start date given to RERA
  2. 22 Oct 2021Registered with Karnataka RERA
  3. 31 Dec 2025Completion date given at registration

Sources:Source (rera.karnataka.gov.in) (opens in a new tab)

Construction pace from RERA quarterly filings

As on 15 Jul 2026

At the average pace so far, construction would reach 100% around Apr 2028 — about 27 months after the completion date on RERA (31 Dec 2025).

At the pace between the 3 quarterly filings we have (68% → 74% in 6 months), it would be around Aug 2028 — about 32 months after the RERA date.

0%25%50%75%100%2022202320242025202620272028RERA date68%72%74%
  • Filed on RERA
  • Average pace since start
  • Pace between filings (and 0% assumed at the start date)
  • RERA completion date

Quarterly filings

QuarterFiled onBuiltHomes booked
Q1 2026-27to 30 Jun 202615 Jul 202674%122 of 122
Q4 2025-26to 31 Mar 202615 Apr 202672%122 of 122
Q3 2025-26to 31 Dec 202527 Jan 202668%112 of 122
How we calculate

Average pace = % built ÷ months since the start date in the RERA record. Here: 74% ÷ 60.9 months (1 Jun 2021 to 30 Jun 2026) = 1.2% a month.

Estimated finish = latest filing date + (100 − % built) ÷ pace = 30 Jun 2026 + 26 ÷ 1.2 = 21.4 months → Apr 2028. This is an estimate, not a date from the builder or RERA.

Pace between filings = (74% − 68%) ÷ 5.9 months = 1% a month.

A straight line is a simplification: the builder reports one overall %, which mixes excavation, structure and finishing, and work rarely moves at a constant speed. The % values are the promoter’s own figures filed with RERA, not checked by us. Promoter’s quarterly update to RERA for Q1 2026-27, submitted 2026-07-15.

Sources:Source (rera.karnataka.gov.in) (opens in a new tab)How we calculate this

Approvals and documents checklist

ApprovalAuthoritySource
Building planBBMP - Bruhat Bengaluru Mahanagara PalikeSource (rera.karnataka.gov.in) (opens in a new tab)

Documents uploaded to RERA

As on 12 Oct 2026
  • Building or layout plan · Approved drawings from the planning authorityFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
  • Commencement certificate · Permission to start buildingNot on RERA yet
  • Environment clearance · SEIAA KarnatakaNot on RERA yet
  • Fire NOC · Karnataka Fire and Emergency ServicesNot on RERA yet
  • Pollution board consent · KSPCBNot on RERA yet
  • Water and sewerage · BWSSBNot on RERA yet
  • Electricity · BESCOMNot on RERA yet
  • Height clearance · Airports Authority of IndiaNot on RERA yet
  • Occupancy certificate (OC) · Issued only when the building is finishedNot on RERA yet — expected at completion

From the documents the promoter uploaded to Karnataka RERA, collected 12 Oct 2026. “Filed” means a document is on RERA — we have not checked its contents or validity. Not every approval applies to every project (for example, smaller projects may not need an environment clearance). The project page on RERA lists each upload.

Sources:Source (rera.karnataka.gov.in) (opens in a new tab)

Adarsh Crest Phase 1 RERA complaints

No complaints listed on Karnataka RERA for this registration as on Source (rera.karnataka.gov.in) (opens in a new tab)

Court and consumer cases

Not found in public records yet: court cases

We list case numbers, courts and outcomes only — never names of private individuals.

About Adarsh Developers

Promoter type
Partnership Firm
Projects on this site
5
RERA complaints against promoter
24
Company number (CIN)
Not found in public records yet: CIN

From Karnataka RERA, as collected so far (12 Oct 2026). Complaints are those RERA lists against this promoter across all its projects.

Adarsh Developers’s RERA record

Adarsh Developers delivery record

As on 22 Oct 2026

What the complaints are about

  • Delay in possession or delay interest22
  • Refund of booking or other money1
  • Other1

24 complaint subjects as written on RERA, as on . Each subject is sorted into one group by keywords (first match wins: delay, refund, registration, quality, litigation, association); one complaint often raises several issues. Source (rera.karnataka.gov.in) (opens in a new tab)

Sources:Source (rera.karnataka.gov.in) (opens in a new tab)How we calculate this

What’s changed since Jun 2021

As on 12 Oct 2026
  1. 15 Jul 2026Quarterly update filed for Q1 2026-27: 74% built, 122 of 122 homes booked Source (rera.karnataka.gov.in) (opens in a new tab)
  2. 15 Apr 2026Quarterly update filed for Q4 2025-26: 72% built, 122 of 122 homes booked Source (rera.karnataka.gov.in) (opens in a new tab)
  3. 27 Jan 2026Quarterly update filed for Q3 2025-26: 68% built, 112 of 122 homes booked Source (rera.karnataka.gov.in) (opens in a new tab)
  4. 22 Oct 2021Registered with Karnataka RERA (PRM/KA/RERA/1251/446/PR/211022/004369); completion date 31 Dec 2025 Source (rera.karnataka.gov.in) (opens in a new tab)
  5. 1 Jun 2021Project start date in the RERA record Source (rera.karnataka.gov.in) (opens in a new tab)

Newest first. No extension of the completion date is recorded on RERA. When the RERA crawl sees a new filing, complaint or extension, it is added here with its date.

Home loan EMI calculator

No listed price found — enter one to try.

Example only — use your bank’s quote.

Monthly EMI
—
Down payment
—
Loan amount
—
Total interest
—

A calculation only, from the numbers you enter — not a loan offer.

All-in cost: GST, registration and other charges

The calculator loads when you scroll to it.

Assumptions
  • Base price: the builder’s price is not published in a form we could collect — enter it from the cost sheet.
  • GST 5% on the base price and charges — the usual rate for an under-construction home that is not “affordable housing” (1%).
  • Stamp duty about 5.6% and registration 2% — the Karnataka rule (registration was raised from 1% to 2% on 31 Aug 2025). Calculated on the agreement value.
  • Car parking, other charges and the maintenance deposit are not in the public record we collect; enter them from the builder’s cost sheet.
  • Loan on the agreement value (banks usually lend up to 75–90%); EMI is the standard reducing-balance formula. Example rate only — use your bank’s quote.

How we calculate this

Adarsh Crest Phase 1 FAQs

What is the completion date for Adarsh Crest Phase 1?

The completion date on RERA is 31 December 2025.

How many homes are in Adarsh Crest Phase 1?

The project has 243 homes.

What home types are available in Adarsh Crest Phase 1?

The project offers 3 BHK + servant, 3 BHK, 2 BHK + servant, and 2 BHK homes, with carpet areas ranging from 854 sq ft to 1,417 sq ft.

What is the carpet area range for homes in Adarsh Crest Phase 1?

Carpet areas range from 854 sq ft (2 BHK) to 1,417 sq ft (3 BHK + servant).

Where is Adarsh Crest Phase 1 located?

The project is in Kempapura, Bengaluru East taluk, PIN code 560001.

What is the RERA registration number for Adarsh Crest Phase 1?

The RERA registration number is PRM/KA/RERA/1251/446/PR/211022/004369, registered on 22 October 2021.

How many homes have been booked in Adarsh Crest Phase 1?

As of Q1 2026-27 (ended 30 June 2026), 122 homes have been booked out of 243 total homes.

What is the construction progress of Adarsh Crest Phase 1?

As of Q1 2026-27 (ended 30 June 2026), the project is 74% complete.

Are there any RERA complaints on Adarsh Crest Phase 1?

There are no RERA complaints on this project registration.

How many RERA complaints has Adarsh Developers faced across all projects?

Adarsh Developers has 24 RERA complaints across all projects in the Karnataka RERA records.

Written by AI from the RERA record above on 12 Oct 2026. Answers use only that record; check them against the source before you decide.

Questions about Adarsh Crest Phase 1

No questions published yet. Ask the first one: you get an instant answer from this page’s public record, and our team follows up on anything the record does not show.

Bought a home from Adarsh Developers? Review the builder.

Reviews of Adarsh Developers by verified buyers

No verified reviews of Adarsh Developers yet. If you bought a home from them, your review helps other buyers.

How reviews work: only buyers and owners can review; we confirm each purchase by phone before publishing, publish positive and negative reviews alike, never accept payment for reviews, and the builder may reply.

Similar projects within 5 km

ProjectDistanceHomesPossession (RERA)BuiltComplaintsPrice
The Formist MandalaFormist Realty Private Limited0.3 km245Mar 203034%0Not collected
Trendsquares Ortus IIIM/s Trendsquares Constructions1.8 km360Dec 2028—1Not collected
Cumins SanctumCumins Sanctum LLP2.3 km112Dec 203122%0Not collected
SB Urban ParkSB Urbanscapes2.5 km160Nov 202623%1Not collected
Olivia At Raintree Boulevard Cluster 7L and T Realty Developers Limited2.6 km480Mar 2026100%1Not collected
Elara CelestiaL&T Realty Developers Limited2.7 km634Mar 203023%1Not collected

Projects of the same kind within 5 km in a straight line of this project’s RERA map point, nearest first. % built is the promoter’s latest quarterly figure on RERA (shown for single-registration projects); prices are from the builder’s own website where we found one.

Sources:Source (rera.karnataka.gov.in) (opens in a new tab)

Sources and last checked dates

  1. Karnataka RERA — project register (search by the registration number) (opens in a new tab)

Collected on 12 Oct 2026 by AI research agents reading public pages. Facts are written in our own words. Not found yet: price; court cases; landmarks; specifications; news.

How to check on RERA: On rera.karnataka.gov.in/viewAllProjects, type the registration number in 'Registration No', press Search, then click the 'View Project Details' icon. Complaints open from the 'Complaints / Litigation' icon in the same row. Registration number: PRM/KA/RERA/1251/446/PR/211022/004369.

  • RERA record last checked: 12 Oct 2026
  • Last change in the record (registration, quarterly filing or complaint): 15 Jul 2026

How this page is made: software builds it from public records (Karnataka RERA filings, OpenStreetMap, the builder’s own website). AI is used only to read filings into fields and to write the plain-English summary and FAQ answers, which are checked against the record. Facts are checked automatically against the RERA filing. Methodology · How we earn · Report an error