Adarsh Welkin Park Villas
3 & 4 BHK apartments by Adarsh Developers · Gattahalli, near Hosur Road, Bengaluru
Gattahalli, near Hosur Road, BengaluruOpen on Google Maps (opens in a new tab)
- Under construction
- RERA registered
- residential
Price: Price on request
Site photo filed with Karnataka RERA Karnataka RERA filing · Source ↗ (opens in a new tab)
Adarsh Welkin Park Villas at a glance
- Possession (RERA)Oct 2027Karnataka RERA
- Construction71% built · on pace for Feb 2028 3 mo after RERA dateRERA filing to 30 Sep 2026; estimate from average pace
- Homes booked117 bookedRERA lists 115 homes; figures as filed · RERA update · as on 30 Sep 2026
- RERA complaints (project)None listedKarnataka RERA · as on 22 Oct 2026
- Approvals filed8 of 9 on RERAKarnataka RERA uploads · 22 Oct 2026
- Nearest metroElectronic City · 2.9 kmstraight line · OpenStreetMap, 5 Oct 2026
- Airport driveapprox. 150 min at peak36.97 km straight line · estimate
- Nearest lakeGattahalli Lake · 712 mFrom the RERA map point · OpenStreetMap, 5 Oct 2026
Project summary
Adarsh Welkin Park Villas is a residential project by Adarsh Developers in Gattahalli, Bengaluru with 115 homes, registered with Karnataka RERA. The completion date on RERA is 31 Oct 2027.
Facts collected on 22 Oct 2026 from public records — each linked to its source. Free for buyers. If you book through us, the builder pays us a commission.
Adarsh Welkin Park Villas buyers’ group: join to ask for a group price
No one has joined yet. Be one of the first 10 buyers in this group — the founding members.
Join free. When enough buyers have joined, our agent partner asks Adarsh Developers for a group price — for example a lower price, an easier payment plan or waived charges. Nothing is promised: you see what the builder offers and book directly with the builder if you want to. Free for buyers. If you book through us, the builder pays us a commission.
- Gathering buyers
- Talking to the builder
- Group offer
- Group site visit
- Booking
0 buyers have joined · 0 committed
Committed buyers have confirmed their budget, home type and timeline with us on a call; builders negotiate with them. Joining is free and never obliges you to buy.
Join the Adarsh Welkin Park Villas buyers’ groupHow group buying works
See it for yourself
Visit the site with our team, or get a call to clear your questions. Free, no obligation.
Key facts: home types, towers, land and possession
- Home types
- 3 BHK, 4 BHK
- Carpet area
- 1,921 – 4,477 sq ft
- Towers
- 174
- Floors
- 1
- Total homes
- 115
- Land
- 22.61 acres
- Possession (RERA)
- Oct 2027
- Built (RERA update)
- 71%
Adarsh Welkin Park Villas RERA number and registration details
- RERA number
- PRM/KA/RERA/1251/308/PR/020923/006224
- Registered on
- 2 Sep 2023
- Promised completion
- 31 Oct 2027
- Extended to
- No extension recorded
- RERA status
- New launch
- Homes booked
- 117 of 115 as on
- Price
- Not found in public records yet: price
- Project type
- Residential
Towers and blocks (RERA filing)
174 rows: towers. Scroll inside the table to see them all.
| Tower | Floors | Basements | Homes |
|---|---|---|---|
| Villa No 1 | 1 | 0 | 1 |
| Villa No 2 | 1 | 0 | 1 |
| Villa No 3 | 1 | 0 | 1 |
| Villa No 4 | 1 | 0 | 1 |
| Villa No 5 | 1 | 0 | 1 |
| Villa No 6 | 1 | 0 | 1 |
| Villa No 7 | 1 | 0 | 1 |
| Villa No 8 | 1 | 0 | 1 |
| Villa No 9 | 1 | 0 | 1 |
| Villa No 10 | 1 | 0 | 1 |
| Villa No 11 | 1 | 0 | 1 |
| Villa No 12 | 1 | 0 | 1 |
| Villa No 13 | 1 | 0 | 1 |
| Villa No 14 | 1 | 0 | 1 |
| Villa No 15 | 1 | 0 | 1 |
| Villa No 16 | 1 | 0 | 1 |
| Villa No 17 | 1 | 0 | 1 |
| Villa No 18 | 1 | 0 | 1 |
| Villa No 19 | 1 | 0 | 1 |
| Villa No 20 | 1 | 0 | 1 |
| Villa No 21 | 1 | 0 | 1 |
| Villa No 22 | 1 | 0 | 1 |
| Villa No 23 | 1 | 0 | 1 |
| Villa No 24 | 1 | 0 | 1 |
| Villa No 25 | 1 | 0 | 1 |
| Villa No 26 | 1 | 0 | 1 |
| Villa No 27 | 1 | 0 | 1 |
| Villa No 28 | 1 | 0 | 1 |
| Villa No 29 | 1 | 0 | 1 |
| Villa No 30 | 1 | 0 | 1 |
| Villa No 31 | 1 | 0 | 1 |
| Villa No 32 | 1 | 0 | 1 |
| Villa No 33 | 1 | 0 | 1 |
| Villa No 34 | 1 | 0 | 1 |
| Villa No 35 | 1 | 0 | 1 |
| Villa No 36 | 1 | 0 | 1 |
| Villa No 37 | 1 | 0 | 1 |
| Villa No 38 | 1 | 0 | 1 |
| Villa No 39 | 1 | 0 | 1 |
| Villa No 40 | 1 | 0 | 1 |
| Villa No 41 | 1 | 0 | 1 |
| Villa No 42 | 1 | 0 | 1 |
| Villa No 43 | 1 | 0 | 1 |
| Villa No 44 | 1 | 0 | 1 |
| Villa No 45 | 1 | 0 | 1 |
| Villa No 46 | 1 | 0 | 1 |
| Villa No 47 | 1 | 0 | 1 |
| Villa No 48 | 1 | 0 | 1 |
| Villa No 49 | 1 | 0 | 1 |
| Villa No 50 | 1 | 0 | 1 |
| Villa No 51 | 1 | 0 | 1 |
| Villa No 52 | 1 | 0 | 1 |
| Villa No 53 | 1 | 0 | 1 |
| Villa No 54 | 1 | 0 | 1 |
| Villa No 55 | 1 | 0 | 1 |
| Villa No 56 | 1 | 0 | 1 |
| Villa No 57 | 1 | 0 | 1 |
| Villa No 58 | 1 | 0 | 1 |
| Villa No 59 | 1 | 0 | 1 |
| Villa No 60 | 1 | 0 | 1 |
| Villa No 61 | 1 | 0 | 1 |
| Villa No 62 | 1 | 0 | 1 |
| Villa No 63 | 1 | 0 | 1 |
| Villa No 64 | 1 | 0 | 1 |
| Villa No 65 | 1 | 0 | 1 |
| Villa No 66 | 1 | 0 | 1 |
| Villa No 67 | 1 | 0 | 1 |
| Villa No 68 | 1 | 0 | 1 |
| Villa No 69 | 1 | 0 | 1 |
| Villa No 70 | 1 | 0 | 1 |
| Villa No 71 | 1 | 0 | 1 |
| Villa No 72 | 1 | 0 | 1 |
| Villa No 73 | 1 | 0 | 1 |
| Villa No 74 | 1 | 0 | 1 |
| Villa No 75 | 1 | 0 | 1 |
| Villa No 76 | 1 | 0 | 1 |
| Villa No 77 | 1 | 0 | 1 |
| Villa No 78 | 1 | 0 | 1 |
| Villa No 79 | 1 | 0 | 1 |
| Villa No 80 | 1 | 0 | 1 |
| Villa No 81 | 1 | 0 | 1 |
| Villa No 82 | 1 | 0 | 1 |
| Villa No 83 | 1 | 0 | 1 |
| Villa No 84 | 1 | 0 | 1 |
| Villa No 85 | 1 | 0 | 1 |
| Villa No 86 | 1 | 0 | 1 |
| Villa No 87 | 1 | 0 | 1 |
| Villa No 88 | 1 | 0 | 1 |
| Villa No 89 | 1 | 0 | 1 |
| Villa No 90 | 1 | 0 | 1 |
| Villa No 91 | 1 | 0 | 1 |
| Villa No 92 | 1 | 0 | 1 |
| Villa No 93 | 1 | 0 | 1 |
| Villa No 94 | 1 | 0 | 1 |
| Villa No 95 | 1 | 0 | 1 |
| Villa No 96 | 1 | 0 | 1 |
| Villa No 97 | 1 | 0 | 1 |
| Villa No 98 | 1 | 0 | 1 |
| Villa No 99 | 1 | 0 | 1 |
| Villa No 100 | 1 | 0 | 1 |
| Villa No 101 | 1 | 0 | 1 |
| Villa No 102 | 1 | 0 | 1 |
| Villa No 103 | 1 | 0 | 1 |
| Villa No 104 | 1 | 0 | 1 |
| Villa No 105 | 1 | 0 | 1 |
| Villa No 106 | 1 | 0 | 1 |
| Villa No 107 | 1 | 0 | 1 |
| Villa No 108 | 1 | 0 | 1 |
| Villa No 109 | 1 | 0 | 1 |
| Villa No 110 | 1 | 0 | 1 |
| Villa No 111 | 1 | 0 | 1 |
| Villa No 112 | 1 | 0 | 1 |
| Villa No 113 | 1 | 0 | 1 |
| Villa No 114 | 1 | 0 | 1 |
| Villa No 115 | 1 | 0 | 1 |
| Villa No 116 | 1 | 0 | 1 |
| Villa No 117 | 1 | 0 | 1 |
| Villa No 118 | 1 | 0 | 1 |
| Villa No 119 | 1 | 0 | 1 |
| Villa No 120 | 1 | 0 | 1 |
| Villa No 121 | 1 | 0 | 1 |
| Villa No 122 | 1 | 0 | 1 |
| Villa No 123 | 1 | 0 | 1 |
| Villa No 124 | 1 | 0 | 1 |
| Villa No 125 | 1 | 0 | 1 |
| Villa No 126 | 1 | 0 | 1 |
| Villa No 127 | 1 | 0 | 1 |
| Villa No 128 | 1 | 0 | 1 |
| Villa No 129 | 1 | 0 | 1 |
| Villa No 130 | 1 | 0 | 1 |
| Villa No 131 | 1 | 0 | 1 |
| Villa No 132 | 1 | 0 | 1 |
| Villa No 133 | 1 | 0 | 1 |
| Villa No 134 | 1 | 0 | 1 |
| Villa No 135 | 1 | 0 | 1 |
| Villa No 136 | 1 | 0 | 1 |
| Villa No 137 | 1 | 0 | 1 |
| Villa No 138 | 1 | 0 | 1 |
| Villa No 139 | 1 | 0 | 1 |
| Villa No 140 | 1 | 0 | 1 |
| Villa No 141 | 1 | 0 | 1 |
| Villa No 142 | 1 | 0 | 1 |
| Villa No 143 | 1 | 0 | 1 |
| Villa No 144 | 1 | 0 | 1 |
| Villa No 145 | 1 | 0 | 1 |
| Villa No 146 | 1 | 0 | 1 |
| Villa No 147 | 1 | 0 | 1 |
| Villa No 148 | 1 | 0 | 1 |
| Villa No 149 | 1 | 0 | 1 |
| Villa No 150 | 1 | 0 | 1 |
| Villa No 151 | 1 | 0 | 1 |
| Villa No 152 | 1 | 0 | 1 |
| Villa No 153 | 1 | 0 | 1 |
| Villa No 154 | 1 | 0 | 1 |
| Villa No 155 | 1 | 0 | 1 |
| Villa No 156 | 1 | 0 | 1 |
| Villa No 157 | 1 | 0 | 1 |
| Villa No 158 | 1 | 0 | 1 |
| Villa No 159 | 1 | 0 | 1 |
| Villa No 160 | 1 | 0 | 1 |
| Villa No 161 | 1 | 0 | 1 |
| Villa No 162 | 1 | 0 | 1 |
| Villa No 163 | 1 | 0 | 1 |
| Villa No 164 | 1 | 0 | 1 |
| Villa No 165 | 1 | 0 | 1 |
| Villa No 166 | 1 | 0 | 1 |
| Villa No 167 | 1 | 0 | 1 |
| Villa No 168 | 1 | 0 | 1 |
| Villa No 169 | 1 | 0 | 1 |
| Villa No 170 | 1 | 0 | 1 |
| Villa No 171 | 1 | 0 | 1 |
| Villa No 172 | 1 | 0 | 1 |
| Villa No 173 | 1 | 0 | 1 |
| Villa No 174 | 1 | 0 | 1 |
A dash (—) means the filing did not state that value.
Summary in plain English
Adarsh Welkin Park Villas is a residential project by Adarsh Developers in Gattahalli, Anekal. The project has 115 homes across 174 towers with a completion date of 31 October 2027.
Written by AI from the RERA record above on 22 Oct 2026. Every number in it was checked against that record; if anything differs, the record wins.
Open space, home loans, escrow and other details
- Open space
- 65.8% of land
- Water and power
- Water source filed with RERA: BoreWell
- Home loans: approved banks
- Not found in public records yet: bank approvals
- Payment plans
- Not found in public records yet: payment plans
- Maintenance
- Not found in public records yet: maintenance
- Car parking
- Not found in public records yet: car parking charge
- Escrow bank (RERA)
- ICICI Bank, Residency Road Branch, Bangalore
- Building plan (RERA)
- BDA - Bangalore Development Authority · No. NM /A.S/ A.A -1 / T.S -4 / E-27/ 2021- 2022 · dated 23 Mar 2022
- Project cost declared to RERA
- ₹318 Cr
Open area as a share of the land, from the areas filed with RERA (includes driveways and landscaped areas).
Amenities
- Electricity
- Club House
- Outdoor Sports facility
- Indoor Sports facility
- Swimming Pool
- Gym
- Parks
- Power Backup
- Water and Sanitation
Amenities and internal works as filed by the promoter with Karnataka RERA; we have not visited the site.
Adarsh Welkin Park Villas location and address
- Address
- Sy No 18, 19, 20, 23, 24 of Srirampura & , Sy No 213 & 214/1 of Gattahalli Village , Anekal , Bengaluru Urban, Karnataka - 560099
- Village (RERA)
- Gattahalli
- Locality
- Near Hosur RoadAlso known as Hosur Main Road, NH 48
- PIN code
- 560099
- City
- Bengaluru
- State
- Karnataka
- Coordinates
- 12.86864, 77.68725
Distances to landmarks
Not found in public records yet: landmarksAbout Gattahalli
Not found in public records yet: locality factsCommute times to tech parks and the airport
| To | Straight line | Peak-hour drive (estimate) |
|---|---|---|
| Electronic City Phase 1Map point on OpenStreetMap (opens in a new tab) | 3.21 km | approx. 13 min |
| Outer Ring Road tech corridor (RMZ Ecospace, Bellandur)Map point on OpenStreetMap (opens in a new tab) | 6.16 km | approx. 25 min |
| ITPL, Whitefield (main gate)Map point on OpenStreetMap (opens in a new tab) | 14.32 km | approx. 58 min |
| KSR Bengaluru City railway station (Majestic)Map point on OpenStreetMap (opens in a new tab) | 17.64 km | approx. 71 min |
| Manyata Tech ParkMap point on OpenStreetMap (opens in a new tab) | 21.25 km | approx. 86 min |
| Kempegowda International AirportMap point on OpenStreetMap (opens in a new tab) | 36.97 km | approx. 150 min |
How we calculate
Straight line: from the project’s map point on RERA to the destination’s point on OpenStreetMap.
Peak-hour drive is a rough estimate, not a route: straight line × 1.35 for the road network, at 20 km/h. Real times vary a lot with the route and the hour.
Sources:Source (openstreetmap.org) (opens in a new tab)How we calculate this
Schools and hospitals nearby
Within 2 km
- 9Schools and colleges9 schools, 0 colleges, 0 kindergartens
- 0Hospitals and clinics0 hospitals, 0 clinics
Nearest schools and colleges
- St Gasper School · 1.18 km
- GHPS Doddanagamangala · 1.51 km
- Edenbridge International School · 1.7 km
Places as mapped on OpenStreetMap (amenity=school, college, kindergarten, university; hospital, clinic), counted within 2 km in a straight line of the RERA map point. Volunteers map these, so some places may be missing or closed. Places data © OpenStreetMap contributors, extract of 5 Oct 2026.
Nearest metro station and railway
- Electronic City (ಎಲೆಕ್ಟ್ರಾನಿಕ್ ಸಿಟಿ)Open now — nearest operating metro station2.9 km
- Huskuru (ಹುಸ್ಕೂರ್)Nearest railway station2.7 km
Straight-line distances from the RERA map point to the station points mapped on OpenStreetMap; status (open or under construction) as tagged there. Places data © OpenStreetMap contributors, extract of 5 Oct 2026.
Lake and lake-buffer check
The nearest mapped lake is Gattahalli Lake, 712 m from the project’s RERA map point.
The site boundary is not published as a shape, so its nearest edge can be closer than this point. Whether any building sits inside a lake buffer can only be checked on the approved plan.
- Gattahalli Lake on OpenStreetMap (opens in a new tab) (ಗಟ್ಟಹಳ್ಳಿ ಕೆರೆ)712 m
- Rayasandra Lake on OpenStreetMap (opens in a new tab) (ರಾಯಸಂದ್ರ ಕೆರೆ)730 m
- Unnamed lake (mapped on OpenStreetMap) on OpenStreetMap (opens in a new tab) 1,467 m
The buffer rule
Bengaluru’s lake buffer rule has changed over time: the National Green Tribunal ordered a 75 m buffer in May 2016; the Supreme Court set that order aside on 5 March 2019, leaving the 30 m buffer of the Revised Master Plan 2015. Check the current rule and the approved plan before relying on either number.
- LiveLaw: SC sets aside NGT order enlarging buffer zones (2019) (livelaw.in) (opens in a new tab)
- Citizen Matters: Shrinking lake buffers (citizenmatters.in) (opens in a new tab)
Shortest distance from the RERA map point to the mapped water edge (OpenStreetMap water polygons tagged lake or reservoir, or named lake/kere/tank). Mapped shorelines can differ from the revenue-record boundary of a lake. Places data © OpenStreetMap contributors, extract of 5 Oct 2026.
Sources:Source (openstreetmap.org) (opens in a new tab)Source (livelaw.in) (opens in a new tab)Source (citizenmatters.in) (opens in a new tab)How we calculate this
Satellite time-lapse of the site
Satellite photos load when you scroll to them.
Photos from Esri World Imagery Wayback, centred on the project’s map point; dates are the capture dates in Esri’s metadata. Loaded from Esri when you scroll here.
Sources:Source (livingatlas.arcgis.com) (opens in a new tab)
Adarsh Welkin Park Villas floor plans, brochure and elevations
Documents the builder uploaded to Karnataka RERA, shown as filed. Tap a page to see it full size; the full PDF opens on the RERA website.
Elevations5 files

Plan, Sectio & Elevation - Block 11 & Block 12Filed 25 Aug 2023 · Full PDF on RERA 
Plan, Sectio & Elevation - Block13 & Block 14Filed 25 Aug 2023 · Full PDF on RERA 
Plan, Sectio & Elevation - Block 15 & Block 16Filed 25 Aug 2023 · Full PDF on RERA 
Plan, Sectio & Elevation - Block 17 & Block 18Filed 25 Aug 2023 · Full PDF on RERA 
Plan, Sectio & Elevation - Block 7 & Block 8Filed 25 Aug 2023 · Full PDF on RERA
Approved layout plan3 files

Approved Layout PlanFull PDF on RERA 
Existing Layout PlanFull PDF on RERA 
Adarsh Welkin Park Villas Area- Demarcation.pdfFull PDF on RERA
| Home type | Carpet area | Homes |
|---|---|---|
| 3 BHK | 1,921 – 2,440 sq ft | 53 |
| 4 BHK | 2,263 – 4,477 sq ft | 62 |
Home types, counts and carpet areas as filed with Karnataka RERA (carpet area, not super built-up).
We have not collected floor-plan drawings; the builder’s sales team can share them.
Adarsh Welkin Park Villas possession date and construction status
Promoter’s quarterly update to RERA for Q2 2026-27, submitted 2026-10-14.
By tower (Q2 2026-27)
Units sold and unsold, from RERA (Q2 2026-27)
| Type | Homes | Booked | Available |
|---|---|---|---|
| 4 BHK | 97 | 62 | 35 |
| 3 BHK | 77 | 55 | 22 |
As reported by the promoter in the quarterly update to RERA, not verified by us.
Timeline
- 15 Jun 2023Project start date given to RERA
- 2 Sep 2023Registered with Karnataka RERA
- 31 Oct 2027Completion date given at registration
Construction pace from RERA quarterly filings
At the average pace so far, construction would reach 100% around Feb 2028 — about 3 months after the completion date on RERA (31 Oct 2027).
At the pace between the 4 quarterly filings we have (42% → 71% in 9 months), it would be around Jun 2027 — about 4 months before the RERA date.
- Filed on RERA
- Average pace since start
- Pace between filings (and 0% assumed at the start date)
- RERA completion date
Quarterly filings
| Quarter | Filed on | Built | Homes booked |
|---|---|---|---|
| Q2 2026-27to 30 Sep 2026 | 14 Oct 2026 | 71% | 117 of 174 |
| Q1 2026-27to 30 Jun 2026 | 15 Jul 2026 | 58% | 114 of 174 |
| Q4 2025-26to 31 Mar 2026 | 15 Apr 2026 | 48% | 115 of 174 |
| Q3 2025-26to 31 Dec 2025 | 31 Jan 2026 | 42% | 117 of 174 |
How we calculate
Average pace = % built ÷ months since the start date in the RERA record. Here: 71% ÷ 39.5 months (15 Jun 2023 to 30 Sep 2026) = 1.8% a month.
Estimated finish = latest filing date + (100 − % built) ÷ pace = 30 Sep 2026 + 29 ÷ 1.8 = 16.1 months → Feb 2028. This is an estimate, not a date from the builder or RERA.
Pace between filings = (71% − 42%) ÷ 9 months = 3.2% a month.
A straight line is a simplification: the builder reports one overall %, which mixes excavation, structure and finishing, and work rarely moves at a constant speed. The % values are the promoter’s own figures filed with RERA, not checked by us. Promoter’s quarterly update to RERA for Q2 2026-27, submitted 2026-10-14.
Sources:Source (rera.karnataka.gov.in) (opens in a new tab)How we calculate this
Approvals and documents checklist
16 rows: approvals. Scroll inside the table to see them all.
| Approval | Authority | Source |
|---|---|---|
| Building plan | BDA - Bangalore Development Authority · No. NM /A.S/ A.A -1 / T.S -4 / E-27/ 2021- 2022 · dated 2022-03-23 | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Land conversion (6 orders) | Deputy Commissioner · No. ALN.(A)(S)SR:11/2010-11 and 5 more · dated 2021-02-11 | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Commencement Certificate | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Electricity Permission Letter | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Water Permission Letter | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Approved Layout Plan | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Approved Building/Plotting Plan | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Approved Section Of Building/Infrastructure Plan of Plotting | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Change of Land Use | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Conversion Certificate under section 95 of the KLR Act 1964 | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| ESCOM/Electricity | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| KWSSB/Water | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Fire Force Department | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Airport Authority of India | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| KSPCB | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| SEIAA | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
Documents uploaded to RERA
- Building or layout plan · Approved drawings from the planning authorityFiled on RERA ✓ — BDA - Bangalore Development Authority · No. NM /A.S/ A.A -1 / T.S -4 / E-27/ 2021- 2022 · dated 23 Mar 2022
- Commencement certificate · Permission to start buildingFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
- Environment clearance · SEIAA KarnatakaFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
- Fire NOC · Karnataka Fire and Emergency ServicesFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
- Pollution board consent · KSPCBFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
- Water and sewerage · BWSSBFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
- Electricity · BESCOMFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
- Height clearance · Airports Authority of IndiaFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
- Occupancy certificate (OC) · Issued only when the building is finishedNot on RERA yet — expected at completion
From the documents the promoter uploaded to Karnataka RERA, collected 22 Oct 2026. “Filed” means a document is on RERA — we have not checked its contents or validity. Not every approval applies to every project (for example, smaller projects may not need an environment clearance). The project page on RERA lists each upload.
Adarsh Welkin Park Villas RERA complaints
No complaints listed on Karnataka RERA for this registration as on Source (rera.karnataka.gov.in) (opens in a new tab)
Court and consumer cases
We list case numbers, courts and outcomes only — never names of private individuals.
About Adarsh Developers
- Promoter type
- Partnership Firm
- Projects on this site
- 5
- RERA complaints against promoter
- 24
- Company number (CIN)
- Not found in public records yet: CIN
From Karnataka RERA, as collected so far (22 Oct 2026). Complaints are those RERA lists against this promoter across all its projects.
Adarsh Developers’s RERA recordAdarsh Developers delivery record
- 5Projects in Bengaluru on RERA5 approved registrations under Adarsh Developers in Bengaluru Urban and Rural. Source (rera.karnataka.gov.in) (opens in a new tab)
- 929Homes registeredAs stated in each registrations.
- 24RERA complaints17 open, 7 disposed. as on Source (rera.karnataka.gov.in) (opens in a new tab)
- 25.8Complaints per 1,000 homes24 complaints ÷ 929 homes in its 5 registrations on Karnataka RERA in Bengaluru.
What the complaints are about
24 complaint subjects as written on RERA, as on . Each subject is sorted into one group by keywords (first match wins: delay, refund, registration, quality, litigation, association); one complaint often raises several issues. Source (rera.karnataka.gov.in) (opens in a new tab)
Sources:Source (rera.karnataka.gov.in) (opens in a new tab)How we calculate this
What’s changed since Mar 2022
- 14 Oct 2026Quarterly update filed for Q2 2026-27: 71% built, 117 of 174 homes booked Source (rera.karnataka.gov.in) (opens in a new tab)
- 15 Jul 2026Quarterly update filed for Q1 2026-27: 58% built, 114 of 174 homes booked Source (rera.karnataka.gov.in) (opens in a new tab)
- 15 Apr 2026Quarterly update filed for Q4 2025-26: 48% built, 115 of 174 homes booked Source (rera.karnataka.gov.in) (opens in a new tab)
- 31 Jan 2026Quarterly update filed for Q3 2025-26: 42% built, 117 of 174 homes booked Source (rera.karnataka.gov.in) (opens in a new tab)
- 2 Sep 2023Registered with Karnataka RERA (PRM/KA/RERA/1251/308/PR/020923/006224); completion date 31 Oct 2027 Source (rera.karnataka.gov.in) (opens in a new tab)
- 15 Jun 2023Project start date in the RERA record Source (rera.karnataka.gov.in) (opens in a new tab)
- 23 Mar 2022Building plan approved by BDA - Bangalore Development Authority (No. NM /A.S/ A.A -1 / T.S -4 / E-27/ 2021- 2022) Source (rera.karnataka.gov.in) (opens in a new tab)
Newest first. No extension of the completion date is recorded on RERA. When the RERA crawl sees a new filing, complaint or extension, it is added here with its date.
Home loan EMI calculator
- Monthly EMI
- —
- Down payment
- —
- Loan amount
- —
- Total interest
- —
A calculation only, from the numbers you enter — not a loan offer.
All-in cost: GST, registration and other charges
The calculator loads when you scroll to it.
Assumptions
- Base price: the builder’s price is not published in a form we could collect — enter it from the cost sheet.
- GST 5% on the base price and charges — the usual rate for an under-construction home that is not “affordable housing” (1%).
- Stamp duty about 5.6% and registration 2% — the Karnataka rule (registration was raised from 1% to 2% on 31 Aug 2025). Calculated on the agreement value.
- Car parking, other charges and the maintenance deposit are not in the public record we collect; enter them from the builder’s cost sheet.
- Loan on the agreement value (banks usually lend up to 75–90%); EMI is the standard reducing-balance formula. Example rate only — use your bank’s quote.
Adarsh Welkin Park Villas FAQs
What is Adarsh Welkin Park Villas?
Adarsh Welkin Park Villas is a residential project by Adarsh Developers located in Gattahalli, Anekal, Bengaluru Urban district, PIN 560099.
How many homes are in Adarsh Welkin Park Villas?
The project has 115 homes across 174 towers.
What home types are available in Adarsh Welkin Park Villas?
The project offers 4 BHK homes with carpet area from 2,263 to 4,477 sq ft (62 homes) and 3 BHK homes with carpet area from 1,921 to 2,440 sq ft (53 homes).
When will Adarsh Welkin Park Villas be completed?
The completion date on RERA is 31 October 2027.
What is the construction progress of Adarsh Welkin Park Villas?
As of Q2 2026-27, construction is 71% complete with 117 homes booked out of 174 in the booking table.
What is the RERA registration number for Adarsh Welkin Park Villas?
The RERA registration number is PRM/KA/RERA/1251/308/PR/020923/006224, registered on 2 September 2023.
Are there any RERA complaints against Adarsh Welkin Park Villas?
There are no RERA complaints filed on this project registration.
How many RERA complaints are there against Adarsh Developers?
Adarsh Developers has 24 RERA complaints across all its projects on record.
How many other projects does Adarsh Developers have in Bengaluru?
Adarsh Developers has 9 projects in the Bengaluru RERA records.
Which bank holds the escrow for Adarsh Welkin Park Villas?
ICICI Bank holds the escrow for this project.
Written by AI from the RERA record above on 22 Oct 2026. Answers use only that record; check them against the source before you decide.
Questions about Adarsh Welkin Park Villas
No questions published yet. Ask the first one: you get an instant answer from this page’s public record, and our team follows up on anything the record does not show.
Bought a home from Adarsh Developers? Review the builder.
Reviews of Adarsh Developers by verified buyers
No verified reviews of Adarsh Developers yet. If you bought a home from them, your review helps other buyers.
How reviews work: only buyers and owners can review; we confirm each purchase by phone before publishing, publish positive and negative reviews alike, never accept payment for reviews, and the builder may reply.
Similar projects within 5 km
| Project | Distance | Homes | Possession (RERA) | Built | Complaints | Price |
|---|---|---|---|---|---|---|
| Adarsh Welkin ParkAkarshak Realty Private Limited | 0 km | 2,210 | Mar 2030 | — | 2 | Not collected |
| DS Max Sahara GrandDS MAX | 0.6 km | 365 | Jan 2029 | 66% | 0 | Not collected |
| Evershine NORTHEAST ApartmentsEvershine Dwellings Pvt ltd | 0.6 km | 168 | Sep 2026 | 100% | 0 | Not collected |
| Assetz Muse & MaisonAssetz Private Limited | 0.7 km | 128 | Mar 2030 | 44% | 0 | Not collected |
| Assetz Ren & ReiApg Premium Residential Private Limited | 0.9 km | 218 | Jan 2029 | 57% | 1 | Not collected |
| VistaM S Shelters Private Limited | 0.9 km | 22 | Dec 2026 | 79% | 1 | Not collected |
Projects of the same kind within 5 km in a straight line of this project’s RERA map point, nearest first. % built is the promoter’s latest quarterly figure on RERA (shown for single-registration projects); prices are from the builder’s own website where we found one.
Sources and last checked dates
Collected on 22 Oct 2026 by AI research agents reading public pages. Facts are written in our own words. Not found yet: price; court cases; landmarks; specifications; news.
How to check on RERA: On rera.karnataka.gov.in/viewAllProjects, type the registration number in 'Registration No', press Search, then click the 'View Project Details' icon. Complaints open from the 'Complaints / Litigation' icon in the same row. Registration number: PRM/KA/RERA/1251/308/PR/020923/006224.
- RERA record last checked: 22 Oct 2026
- Last change in the record (registration, quarterly filing or complaint): 22 Oct 2026
How this page is made: software builds it from public records (Karnataka RERA filings, OpenStreetMap, the builder’s own website). AI is used only to read filings into fields and to write the plain-English summary and FAQ answers, which are checked against the record. Facts are checked automatically against the RERA filing. Methodology · How we earn · Report an error
More new projects nearby
Gattahalli, near Hosur RoadUnder constructionRERA registeredBuyers’ group openAdarsh Welkin Park
by Akarshak Realty
Price: Price on requestGet brochure & price →
- 1 BHK, 2 BHK, 2.5 BHK, 3 BHK, +1 more
- 405 – 2,313 sq ft
- Mar 2030
2 phases on RERA · 2,210 homes · 2 RERA complaints
Be one of the first 10 buyers in this groupFounding members — it’s free
Join group for Adarsh Welkin Park
Gattahalli, near Kodathi–CarmelaramReady to moveRERA registeredBuyers’ group openEvershine NORTHEAST Apartments
by Evershine Dwellings
Price: Price on requestGet brochure & price →
- 2 BHK, 3 BHK
- 534 – 792 sq ft
- Sep 2026
168 homes
Be one of the first 10 buyers in this groupFounding members — it’s free
Join group for Evershine NORTHEAST Apartments
Gattahalli, near Kodathi–CarmelaramUnder constructionRERA registeredBuyers’ group openAssetz Muse & Maison
by Assetz
Price: Price on requestGet brochure & price →
- 3 BHK
- 1,124 – 1,262 sq ft
- Mar 2030
128 homes
Be one of the first 10 buyers in this groupFounding members — it’s free
Join group for Assetz Muse & Maison