Adarsh Welkin Park

1, 2, 3 & 4 BHK apartments by Akarshak Realty Private Limited · Gattahalli, near Hosur Road, Bengaluru

Gattahalli, near Hosur Road, BengaluruOpen on Google Maps (opens in a new tab)

  • Under construction
  • RERA registered
  • residential

by Akarshak Realty Private Limited

Price: Price on request

Get brochure, floor plans & price

Brochure, floor plans and price list for Adarsh Welkin Park

Builders share their brochure, floor plans and price list only on request. Tell us how to reach you and we’ll get them and send them to you, free.

Free for buyers. If you book through us, the builder pays us a commission. How we earn

Project summary

Adarsh Welkin Park is a residential project by Akarshak Realty Private Limited in Gattahalli, Bengaluru with 2,210 homes, registered with Karnataka RERA. The completion date on RERA is 31 Mar 2030. It is registered in 2 phases.

Facts collected on 22 Oct 2026 from public records — each linked to its source. Free for buyers. If you book through us, the builder pays us a commission.

Adarsh Welkin Park buyers’ group: join to ask for a group price

No one has joined yet. Be one of the first 10 buyers in this group — the founding members.

Join free. When enough buyers have joined, our agent partner asks Akarshak Realty Private Limited for a group price — for example a lower price, an easier payment plan or waived charges. Nothing is promised: you see what the builder offers and book directly with the builder if you want to. Free for buyers. If you book through us, the builder pays us a commission.

  1. Gathering buyers
  2. Talking to the builder
  3. Group offer
  4. Group site visit
  5. Booking

0 buyers have joined · 0 committed

Committed buyers have confirmed their budget, home type and timeline with us on a call; builders negotiate with them. Joining is free and never obliges you to buy.

Join the Adarsh Welkin Park buyers’ groupHow group buying works

See it for yourself

Visit the site with our team, or get a call to clear your questions. Free, no obligation.

Key facts: home types, towers, land and possession

Updated on 22 Oct 2026
Home types
1 BHK, 2 BHK, 2.5 BHK, 3 BHK, +1 more
Carpet area
405 – 2,313 sq ft
Towers
5
Floors
25
Total homes
2,210
Land
64.19 acres
Possession (RERA)
Mar 2030
Built (RERA update)
Not found in public records yet: construction progress

Adarsh Welkin Park RERA number and registration details

RERA number
PRM/KA/RERA/1251/308/PR/020923/006223
Registered on
2 Sep 2023
Promised completion
31 Mar 2030
Extended to
No extension recorded
RERA status
New launch
Homes booked
Not found in public records yet: homes booked
Price
Not found in public records yet: price
Project type
Residential

2 RERA registrations (one per phase) are shown together on this page; dates above are the latest across phases.

Phases and RERA numbers

PhaseRERA numberPromised completionHomesStatusSource
Phase 1PRM/KA/RERA/1251/308/PR/020923/00622331 Dec 2027832New launchSource (rera.karnataka.gov.in) (opens in a new tab)
Phase 2PRM/KA/RERA/1251/308/PR/080725/00790031 Mar 20301,378New launchSource (rera.karnataka.gov.in) (opens in a new tab)

Towers and blocks (RERA filing)

TowerPhaseFloorsBasementsHomes
Block 2Phase 1252312
Block 5Phase 1252520
Block 3Phase 2242200
Block 4Phase 2252520
Block 6Phase 2252658

A dash (—) means the filing did not state that value.

Sources:Source (rera.karnataka.gov.in) (opens in a new tab)

Summary in plain English

Adarsh Welkin Park is a residential project by Akarshak Realty Private Limited in Gattahalli, Anekal taluk, Bengaluru Urban. The project has 2,210 homes across 2 phases with 5 towers. Phase 1 is scheduled for completion on 31 December 2027, and Phase 2 on 31 March 2030.

Written by AI from the RERA record above on 22 Oct 2026. Every number in it was checked against that record; if anything differs, the record wins.

Open space, home loans, escrow and other details

Open space
Not found in public records yet: open space
Water and power
Water source filed with RERA: BoreWell
Home loans: approved banks
Not found in public records yet: bank approvals
Payment plans
Not found in public records yet: payment plans
Maintenance
Not found in public records yet: maintenance
Car parking
Not found in public records yet: car parking charge
Escrow bank (RERA) · Phase 1
ICICI Bank, Residency road Branch, Bangalore
Escrow bank (RERA) · Phase 2
ICICI Bank, Residency Road, Bangalore

Sources:Source (rera.karnataka.gov.in) (opens in a new tab)

Amenities

  • Electricity
  • CCTV Surveillance
  • Club House
  • Community Hall
  • Outdoor Sports facility
  • Indoor Sports facility
  • Swimming Pool
  • Gym
  • Parks
  • Power Backup
  • Piped Gas
  • Water and Sanitation

Amenities and internal works as filed by the promoter with Karnataka RERA; we have not visited the site.

Sources:Source (rera.karnataka.gov.in) (opens in a new tab)

Adarsh Welkin Park location and address

Address
Sy.no.196 , 197 , 198 , 199 , 203(P) & 204 , Gattahalli Village , Anekal , Bengaluru Urban, Karnataka - 560099
Village (RERA)
Gattahalli
Locality
Near Hosur RoadAlso known as Hosur Main Road, NH 48
PIN code
560099
City
Bengaluru
State
Karnataka
Coordinates
12.86863, 77.68725

Distances to landmarks

Not found in public records yet: landmarks

About Gattahalli

Not found in public records yet: locality facts

Commute times to tech parks and the airport

As on 5 Oct 2026
ToStraight linePeak-hour drive (estimate)
Electronic City Phase 1Map point on OpenStreetMap (opens in a new tab)3.21 kmapprox. 13 min
Outer Ring Road tech corridor (RMZ Ecospace, Bellandur)Map point on OpenStreetMap (opens in a new tab)6.16 kmapprox. 25 min
ITPL, Whitefield (main gate)Map point on OpenStreetMap (opens in a new tab)14.32 kmapprox. 58 min
KSR Bengaluru City railway station (Majestic)Map point on OpenStreetMap (opens in a new tab)17.64 kmapprox. 71 min
Manyata Tech ParkMap point on OpenStreetMap (opens in a new tab)21.25 kmapprox. 86 min
Kempegowda International AirportMap point on OpenStreetMap (opens in a new tab)36.97 kmapprox. 150 min
How we calculate

Straight line: from the project’s map point on RERA to the destination’s point on OpenStreetMap.

Peak-hour drive is a rough estimate, not a route: straight line × 1.35 for the road network, at 20 km/h. Real times vary a lot with the route and the hour.

Sources:Source (openstreetmap.org) (opens in a new tab)How we calculate this

Schools and hospitals nearby

As on 5 Oct 2026

Within 2 km

  • 9Schools and colleges9 schools, 0 colleges, 0 kindergartens
  • 0Hospitals and clinics0 hospitals, 0 clinics

Nearest schools and colleges

  • St Gasper School · 1.18 km
  • GHPS Doddanagamangala · 1.51 km
  • Edenbridge International School · 1.7 km

Places as mapped on OpenStreetMap (amenity=school, college, kindergarten, university; hospital, clinic), counted within 2 km in a straight line of the RERA map point. Volunteers map these, so some places may be missing or closed. Places data © OpenStreetMap contributors, extract of 5 Oct 2026.

Sources:Source (openstreetmap.org) (opens in a new tab)

Nearest metro station and railway

As on 5 Oct 2026
  • Electronic City (ಎಲೆಕ್ಟ್ರಾನಿಕ್ ಸಿಟಿ)Open now — nearest operating metro station2.9 km
  • Huskuru (ಹುಸ್ಕೂರ್)Nearest railway station2.7 km

Straight-line distances from the RERA map point to the station points mapped on OpenStreetMap; status (open or under construction) as tagged there. Places data © OpenStreetMap contributors, extract of 5 Oct 2026.

Sources:Source (openstreetmap.org) (opens in a new tab)

Lake and lake-buffer check

As on 5 Oct 2026

The nearest mapped lake is Gattahalli Lake, 712 m from the project’s RERA map point.

The site boundary is not published as a shape, so its nearest edge can be closer than this point. Whether any building sits inside a lake buffer can only be checked on the approved plan.

The buffer rule

Bengaluru’s lake buffer rule has changed over time: the National Green Tribunal ordered a 75 m buffer in May 2016; the Supreme Court set that order aside on 5 March 2019, leaving the 30 m buffer of the Revised Master Plan 2015. Check the current rule and the approved plan before relying on either number.

Shortest distance from the RERA map point to the mapped water edge (OpenStreetMap water polygons tagged lake or reservoir, or named lake/kere/tank). Mapped shorelines can differ from the revenue-record boundary of a lake. Places data © OpenStreetMap contributors, extract of 5 Oct 2026.

Sources:Source (openstreetmap.org) (opens in a new tab)Source (livelaw.in) (opens in a new tab)Source (citizenmatters.in) (opens in a new tab)How we calculate this

Satellite time-lapse of the site

Satellite photos load when you scroll to them.

Photos from Esri World Imagery Wayback, centred on the project’s map point; dates are the capture dates in Esri’s metadata. Loaded from Esri when you scroll here.

Sources:Source (livingatlas.arcgis.com) (opens in a new tab)

Adarsh Welkin Park floor plans, brochure and elevations

Documents the builder uploaded to Karnataka RERA, shown as filed. Tap a page to see it full size; the full PDF opens on the RERA website.

Elevations3 files

Approved building plan

Approved layout plan6 files

Home typeCarpet areaHomes
1 BHK405 – 675 sq ft5
1 BHK ews474 sq ft278
2 BHK735 – 1,274 sq ft22
2.5 BHK786 – 994 sq ft578
3 BHK812 – 1,564 sq ft1,227
4 BHK2,303 – 2,313 sq ft100

Home types, counts and carpet areas as filed with Karnataka RERA (carpet area, not super built-up).

We have not collected floor-plan drawings; the builder’s sales team can share them.

Sources:Source (rera.karnataka.gov.in) (opens in a new tab)

Adarsh Welkin Park possession date and construction status

  • Phase 188%

    as on · 813 of 832 homes booked

  • Phase 210%

    as on · 476 of 1,378 homes booked

Timeline

  1. 1 Jul 2023Phase 1: Project start date given to RERA
  2. 2 Sep 2023Phase 1: Registered with Karnataka RERA
  3. 1 Mar 2025Phase 2: Project start date given to RERA
  4. 8 Jul 2025Phase 2: Registered with Karnataka RERA
  5. 31 Dec 2027Phase 1: Completion date given at registration
  6. 31 Mar 2030Phase 2: Completion date given at registration

Sources:Source (rera.karnataka.gov.in) (opens in a new tab)

Construction pace from RERA quarterly filings (Phase 1)

As on 14 Oct 2026

At the average pace so far, construction would reach 100% around Mar 2027 — about 10 months before the completion date on RERA (31 Dec 2027).

At the pace between the 4 quarterly filings we have (62% → 88% in 9 months), it would be around Feb 2027 — about 11 months before the RERA date.

This project has 2 RERA registrations; the chart uses Phase 1, the one with the most quarterly filings.

0%25%50%75%100%20242025202620272028RERA date62%70%78%88%
  • Filed on RERA
  • Average pace since start
  • Pace between filings (and 0% assumed at the start date)
  • RERA completion date

Quarterly filings

QuarterFiled onBuiltHomes booked
Q2 2026-27to 30 Sep 202614 Oct 202688%813 of 832
Q1 2026-27to 30 Jun 202615 Jul 202678%812 of 832
Q4 2025-26to 31 Mar 202615 Apr 202670%812 of 832
Q3 2025-26to 31 Dec 202531 Jan 202662%808 of 832
How we calculate

Average pace = % built ÷ months since the start date in the RERA record. Here: 88% ÷ 39 months (1 Jul 2023 to 30 Sep 2026) = 2.3% a month.

Estimated finish = latest filing date + (100 − % built) ÷ pace = 30 Sep 2026 + 12 ÷ 2.3 = 5.3 months → Mar 2027. This is an estimate, not a date from the builder or RERA.

Pace between filings = (88% − 62%) ÷ 9 months = 2.9% a month.

A straight line is a simplification: the builder reports one overall %, which mixes excavation, structure and finishing, and work rarely moves at a constant speed. The % values are the promoter’s own figures filed with RERA, not checked by us.

Sources:Source (rera.karnataka.gov.in) (opens in a new tab)How we calculate this

Approvals and documents checklist

28 rows: approvals. Scroll inside the table to see them all.

ApprovalAuthoritySource
Building plan (Phase 1)BDA - Bangalore Development Authority · No. NM /A.S/ A.A -1 / T.S -4 / E-27/ 2021- 2022 · dated 2022-03-23Source (rera.karnataka.gov.in) (opens in a new tab)
Land conversion (6 orders) (Phase 1)Deputy Commissioner · No. ALN.(A)(SH)SR:112/2011-12 and 5 more · dated 2014-07-23Source (rera.karnataka.gov.in) (opens in a new tab)
Commencement Certificate (Phase 1)scan uploaded to RERASource (rera.karnataka.gov.in) (opens in a new tab)
Electricity Permission Letter (Phase 1)scan uploaded to RERASource (rera.karnataka.gov.in) (opens in a new tab)
Water Permission Letter (Phase 1)scan uploaded to RERASource (rera.karnataka.gov.in) (opens in a new tab)
Approved Layout Plan (Phase 1)scan uploaded to RERASource (rera.karnataka.gov.in) (opens in a new tab)
Approved Building/Plotting Plan (Phase 1)scan uploaded to RERASource (rera.karnataka.gov.in) (opens in a new tab)
Approved Section Of Building/Infrastructure Plan of Plotting (Phase 1)scan uploaded to RERASource (rera.karnataka.gov.in) (opens in a new tab)
Change of Land Use (Phase 1)scan uploaded to RERASource (rera.karnataka.gov.in) (opens in a new tab)
Conversion Certificate under section 95 of the KLR Act 1964 (Phase 1)scan uploaded to RERASource (rera.karnataka.gov.in) (opens in a new tab)
ESCOM/Electricity (Phase 1)scan uploaded to RERASource (rera.karnataka.gov.in) (opens in a new tab)
KWSSB/Water (Phase 1)scan uploaded to RERASource (rera.karnataka.gov.in) (opens in a new tab)
Approval/NOC under section 109 of KLR Act 1961 (Phase 1)scan uploaded to RERASource (rera.karnataka.gov.in) (opens in a new tab)
Approval/NOC under section 14 of the KTCP Act (Phase 1)scan uploaded to RERASource (rera.karnataka.gov.in) (opens in a new tab)
Fire Force Department (Phase 1)scan uploaded to RERASource (rera.karnataka.gov.in) (opens in a new tab)
Airport Authority of India (Phase 1)scan uploaded to RERASource (rera.karnataka.gov.in) (opens in a new tab)
KSPCB (Phase 1)scan uploaded to RERASource (rera.karnataka.gov.in) (opens in a new tab)
SEIAA (Phase 1)scan uploaded to RERASource (rera.karnataka.gov.in) (opens in a new tab)
Building plan (Phase 2)BDA - Bangalore Development Authority · No. PS/EM/EO-1/TA-4/E/27/2021-22 · dated 2022-03-23Source (rera.karnataka.gov.in) (opens in a new tab)
Land conversion (6 orders) (Phase 2)Deputy Commissioner · No. ALN.(A)(SH)SR:112/2011-12 and 5 more · dated 2014-04-28Source (rera.karnataka.gov.in) (opens in a new tab)
Commencement Certificate (Phase 2)scan uploaded to RERASource (rera.karnataka.gov.in) (opens in a new tab)
Approved Building Plan (Phase 2)scan uploaded to RERASource (rera.karnataka.gov.in) (opens in a new tab)
ESCOM/Electricity (Phase 2)scan uploaded to RERASource (rera.karnataka.gov.in) (opens in a new tab)
KWSSB/Water (Phase 2)scan uploaded to RERASource (rera.karnataka.gov.in) (opens in a new tab)
KSPCB (Phase 2)scan uploaded to RERASource (rera.karnataka.gov.in) (opens in a new tab)
SEIAA (Phase 2)scan uploaded to RERASource (rera.karnataka.gov.in) (opens in a new tab)
Fire Force Department (Phase 2)scan uploaded to RERASource (rera.karnataka.gov.in) (opens in a new tab)
Airport Authority of India (Phase 2)scan uploaded to RERASource (rera.karnataka.gov.in) (opens in a new tab)

Documents uploaded to RERA (Phase 1)

As on 22 Oct 2026
  • Building or layout plan · Approved drawings from the planning authorityFiled on RERA ✓ — BDA - Bangalore Development Authority · No. NM /A.S/ A.A -1 / T.S -4 / E-27/ 2021- 2022 · dated 23 Mar 2022
  • Commencement certificate · Permission to start buildingFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
  • Environment clearance · SEIAA KarnatakaFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
  • Fire NOC · Karnataka Fire and Emergency ServicesFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
  • Pollution board consent · KSPCBFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
  • Water and sewerage · BWSSBFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
  • Electricity · BESCOMFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
  • Height clearance · Airports Authority of IndiaFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
  • Occupancy certificate (OC) · Issued only when the building is finishedNot on RERA yet — expected at completion

From the documents the promoter uploaded to Karnataka RERA, collected 22 Oct 2026. “Filed” means a document is on RERA — we have not checked its contents or validity. Not every approval applies to every project (for example, smaller projects may not need an environment clearance). Each phase is registered separately; this list is for the phase named above. The project page on RERA lists each upload.

Sources:Source (rera.karnataka.gov.in) (opens in a new tab)

Adarsh Welkin Park RERA complaints and orders

2 complaints as on Source (rera.karnataka.gov.in) (opens in a new tab)

Complaint refFiledSubjectStatusSource
01034/202620 Aug 2026Complaint against Adarsh Developers for illegal forfeiture of booking amount refund for Unit B4-D1401 in Adarsh Welkin Park Phase 2Under enquirySource (rera.karnataka.gov.in) (opens in a new tab)
00812/202430 Aug 2024Unilateral Extension of Lock-in Period by Builder Without Prior Notice or AgreementDisposedSource (rera.karnataka.gov.in) (opens in a new tab)

Court and consumer cases

Not found in public records yet: court cases

We list case numbers, courts and outcomes only — never names of private individuals.

About Akarshak Realty Private Limited

Promoter type
Company
Projects on this site
2
RERA complaints against promoter
5
Company number (CIN)
U45200KA2011PTC059903

From Karnataka RERA, as collected so far (22 Oct 2026). Complaints are those RERA lists against this promoter across all its projects.

Akarshak Realty Private Limited’s RERA record

Akarshak Realty Private Limited delivery record

As on 22 Oct 2026

What the complaints are about

  • Registration, sale deed or agreement1
  • Refund of booking or other money1
  • Delay in possession or delay interest1
  • Construction quality, size or inspection1
  • Other1

5 complaint subjects as written on RERA, as on . Each subject is sorted into one group by keywords (first match wins: delay, refund, registration, quality, litigation, association); one complaint often raises several issues. Source (rera.karnataka.gov.in) (opens in a new tab)

Sources:Source (rera.karnataka.gov.in) (opens in a new tab)How we calculate this

What’s changed since Mar 2022

As on 22 Oct 2026
  1. 14 Oct 2026Phase 1: Quarterly update filed for Q2 2026-27: 88% built, 813 of 832 homes booked Source (rera.karnataka.gov.in) (opens in a new tab)
  2. 14 Oct 2026Phase 2: Quarterly update filed for Q2 2026-27: 10% built, 476 of 1,378 homes booked Source (rera.karnataka.gov.in) (opens in a new tab)
  3. 20 Aug 2026Complaint 01034/2026 filed with RERA: “Complaint against Adarsh Developers for illegal forfeiture of booking amount refund for Unit B4-D1401 in Adarsh Welkin Park Phase 2” — now under enquiry Source (rera.karnataka.gov.in) (opens in a new tab)
  4. 15 Jul 2026Phase 1: Quarterly update filed for Q1 2026-27: 78% built, 812 of 832 homes booked Source (rera.karnataka.gov.in) (opens in a new tab)
  5. 15 Jul 2026Phase 2: Quarterly update filed for Q1 2026-27: 7% built, 289 of 1,378 homes booked Source (rera.karnataka.gov.in) (opens in a new tab)
  6. 15 Apr 2026Phase 1: Quarterly update filed for Q4 2025-26: 70% built, 812 of 832 homes booked Source (rera.karnataka.gov.in) (opens in a new tab)
  7. 15 Apr 2026Phase 2: Quarterly update filed for Q4 2025-26: 5% built, 289 of 1,378 homes booked Source (rera.karnataka.gov.in) (opens in a new tab)
  8. 31 Jan 2026Phase 1: Quarterly update filed for Q3 2025-26: 62% built, 808 of 832 homes booked Source (rera.karnataka.gov.in) (opens in a new tab)
  9. 31 Jan 2026Phase 2: Quarterly update filed for Q3 2025-26: 3% built, 179 of 1,378 homes booked Source (rera.karnataka.gov.in) (opens in a new tab)
  10. 8 Jul 2025Phase 2: Registered with Karnataka RERA (PRM/KA/RERA/1251/308/PR/080725/007900); completion date 31 Mar 2030 Source (rera.karnataka.gov.in) (opens in a new tab)
  11. 1 Mar 2025Phase 2: Project start date in the RERA record Source (rera.karnataka.gov.in) (opens in a new tab)
  12. 30 Aug 2024Complaint 00812/2024 filed with RERA: “Unilateral Extension of Lock-in Period by Builder Without Prior Notice or Agreement” — now disposed Source (rera.karnataka.gov.in) (opens in a new tab)
  13. 2 Sep 2023Phase 1: Registered with Karnataka RERA (PRM/KA/RERA/1251/308/PR/020923/006223); completion date 31 Dec 2027 Source (rera.karnataka.gov.in) (opens in a new tab)
  14. 1 Jul 2023Phase 1: Project start date in the RERA record Source (rera.karnataka.gov.in) (opens in a new tab)
  15. 23 Mar 2022Phase 1: Building plan approved by BDA - Bangalore Development Authority (No. NM /A.S/ A.A -1 / T.S -4 / E-27/ 2021- 2022) Source (rera.karnataka.gov.in) (opens in a new tab)
  16. 23 Mar 2022Phase 2: Building plan approved by BDA - Bangalore Development Authority (No. PS/EM/EO-1/TA-4/E/27/2021-22) Source (rera.karnataka.gov.in) (opens in a new tab)

Newest first. No extension of the completion date is recorded on RERA. When the RERA crawl sees a new filing, complaint or extension, it is added here with its date.

Home loan EMI calculator

No listed price found — enter one to try.

Example only — use your bank’s quote.

Monthly EMI
—
Down payment
—
Loan amount
—
Total interest
—

A calculation only, from the numbers you enter — not a loan offer.

All-in cost: GST, registration and other charges

The calculator loads when you scroll to it.

Assumptions
  • Base price: the builder’s price is not published in a form we could collect — enter it from the cost sheet.
  • GST 5% on the base price and charges — the usual rate for an under-construction home that is not “affordable housing” (1%).
  • Stamp duty about 5.6% and registration 2% — the Karnataka rule (registration was raised from 1% to 2% on 31 Aug 2025). Calculated on the agreement value.
  • Car parking, other charges and the maintenance deposit are not in the public record we collect; enter them from the builder’s cost sheet.
  • Loan on the agreement value (banks usually lend up to 75–90%); EMI is the standard reducing-balance formula. Example rate only — use your bank’s quote.

How we calculate this

Adarsh Welkin Park FAQs

What is Adarsh Welkin Park?

Adarsh Welkin Park is a residential project by Akarshak Realty Private Limited located in Gattahalli, Anekal taluk, with PIN code 560099.

How many homes are in Adarsh Welkin Park?

The project has 2,210 homes across Phase 1 (832 homes) and Phase 2 (1,378 homes).

What home types are available in Adarsh Welkin Park?

Phase 1 offers 1 BHK, 2 BHK, 2.5 BHK, and 3 BHK homes. Phase 2 offers 1 BHK, 1 BHK EWS, 2 BHK, 2.5 BHK, 3 BHK, and 4 BHK homes with varying carpet areas.

What is the carpet area range for homes in Adarsh Welkin Park?

Carpet areas range from 405 sq ft to 2,313 sq ft depending on the home type and phase.

When will Adarsh Welkin Park Phase 1 be completed?

Phase 1 is scheduled for completion on 31 December 2027 according to the RERA record.

When will Adarsh Welkin Park Phase 2 be completed?

Phase 2 is scheduled for completion on 31 March 2030 according to the RERA record.

What is the construction progress of Adarsh Welkin Park?

As of Q2 2026-27, Phase 1 is 88% complete with 813 homes booked out of 832, and Phase 2 is 10% complete with 476 homes booked out of 1,378.

What are the RERA registration numbers for Adarsh Welkin Park?

Phase 1 is registered as PRM/KA/RERA/1251/308/PR/020923/006223, and Phase 2 is registered as PRM/KA/RERA/1251/308/PR/080725/007900.

How many RERA complaints are against Adarsh Welkin Park?

There are 2 complaints on the project: 1 on Phase 1 and 1 on Phase 2.

What is the builder's complaint record?

Akarshak Realty Private Limited has 5 complaints across all its projects in the Bengaluru RERA records and operates 3 projects.

Written by AI from the RERA record above on 22 Oct 2026. Answers use only that record; check them against the source before you decide.

Questions about Adarsh Welkin Park

No questions published yet. Ask the first one: you get an instant answer from this page’s public record, and our team follows up on anything the record does not show.

Bought a home from Akarshak Realty Private Limited? Review the builder.

Reviews of Akarshak Realty Private Limited by verified buyers

No verified reviews of Akarshak Realty Private Limited yet. If you bought a home from them, your review helps other buyers.

How reviews work: only buyers and owners can review; we confirm each purchase by phone before publishing, publish positive and negative reviews alike, never accept payment for reviews, and the builder may reply.

Similar projects within 5 km

ProjectDistanceHomesPossession (RERA)BuiltComplaintsPrice
Adarsh Welkin Park VillasAdarsh Developers0 km115Oct 202771%0Not collected
DS Max Sahara GrandDS MAX0.6 km365Jan 202966%0Not collected
Evershine NORTHEAST ApartmentsEvershine Dwellings Pvt ltd0.6 km168Sep 2026100%0Not collected
Assetz Muse & MaisonAssetz Private Limited0.7 km128Mar 203044%0Not collected
Assetz Ren & ReiApg Premium Residential Private Limited0.9 km218Jan 202957%1Not collected
VistaM S Shelters Private Limited0.9 km22Dec 202679%1Not collected

Projects of the same kind within 5 km in a straight line of this project’s RERA map point, nearest first. % built is the promoter’s latest quarterly figure on RERA (shown for single-registration projects); prices are from the builder’s own website where we found one.

Sources:Source (rera.karnataka.gov.in) (opens in a new tab)

Sources and last checked dates

  1. Karnataka RERA — project register (search by the registration number) (opens in a new tab)

Collected on 22 Oct 2026 by AI research agents reading public pages. Facts are written in our own words. Not found yet: price; court cases; landmarks; specifications; news.

How to check on RERA: On rera.karnataka.gov.in/viewAllProjects, type the registration number in 'Registration No', press Search, then click the 'View Project Details' icon. Complaints open from the 'Complaints / Litigation' icon in the same row. Registration numbers: PRM/KA/RERA/1251/308/PR/020923/006223, PRM/KA/RERA/1251/308/PR/080725/007900.

  • RERA record last checked: 22 Oct 2026
  • Last change in the record (registration, quarterly filing or complaint): 22 Oct 2026

How this page is made: software builds it from public records (Karnataka RERA filings, OpenStreetMap, the builder’s own website). AI is used only to read filings into fields and to write the plain-English summary and FAQ answers, which are checked against the record. Facts are checked automatically against the RERA filing. Methodology · How we earn · Report an error