Adarsh Welkin Park
1, 2, 3 & 4 BHK apartments by Akarshak Realty Private Limited · Gattahalli, near Hosur Road, Bengaluru
Gattahalli, near Hosur Road, BengaluruOpen on Google Maps (opens in a new tab)
- Under construction
- RERA registered
- residential
by Akarshak Realty Private Limited
Price: Price on request
Site photo filed with Karnataka RERA Karnataka RERA filing · Source ↗ (opens in a new tab)
Adarsh Welkin Park at a glance
- Possession (RERA)Mar 2030Karnataka RERA
- Construction88% built · on pace for Mar 2027RERA filing to 30 Sep 2026 (Phase 1); estimate from average pace
- RERA complaints (project)2 complaintsKarnataka RERA · as on 22 Oct 2026
- Approvals filed8 of 9 on RERAKarnataka RERA uploads · 22 Oct 2026
- Nearest metroElectronic City · 2.9 kmstraight line · OpenStreetMap, 5 Oct 2026
- Airport driveapprox. 150 min at peak36.97 km straight line · estimate
- Nearest lakeGattahalli Lake · 712 mFrom the RERA map point · OpenStreetMap, 5 Oct 2026
Project summary
Adarsh Welkin Park is a residential project by Akarshak Realty Private Limited in Gattahalli, Bengaluru with 2,210 homes, registered with Karnataka RERA. The completion date on RERA is 31 Mar 2030. It is registered in 2 phases.
Facts collected on 22 Oct 2026 from public records — each linked to its source. Free for buyers. If you book through us, the builder pays us a commission.
Adarsh Welkin Park buyers’ group: join to ask for a group price
No one has joined yet. Be one of the first 10 buyers in this group — the founding members.
Join free. When enough buyers have joined, our agent partner asks Akarshak Realty Private Limited for a group price — for example a lower price, an easier payment plan or waived charges. Nothing is promised: you see what the builder offers and book directly with the builder if you want to. Free for buyers. If you book through us, the builder pays us a commission.
- Gathering buyers
- Talking to the builder
- Group offer
- Group site visit
- Booking
0 buyers have joined · 0 committed
Committed buyers have confirmed their budget, home type and timeline with us on a call; builders negotiate with them. Joining is free and never obliges you to buy.
Join the Adarsh Welkin Park buyers’ groupHow group buying works
See it for yourself
Visit the site with our team, or get a call to clear your questions. Free, no obligation.
Key facts: home types, towers, land and possession
- Home types
- 1 BHK, 2 BHK, 2.5 BHK, 3 BHK, +1 more
- Carpet area
- 405 – 2,313 sq ft
- Towers
- 5
- Floors
- 25
- Total homes
- 2,210
- Land
- 64.19 acres
- Possession (RERA)
- Mar 2030
- Built (RERA update)
- Not found in public records yet: construction progress
Adarsh Welkin Park RERA number and registration details
- RERA number
- PRM/KA/RERA/1251/308/PR/020923/006223
- Registered on
- 2 Sep 2023
- Promised completion
- 31 Mar 2030
- Extended to
- No extension recorded
- RERA status
- New launch
- Homes booked
- Not found in public records yet: homes booked
- Price
- Not found in public records yet: price
- Project type
- Residential
2 RERA registrations (one per phase) are shown together on this page; dates above are the latest across phases.
Phases and RERA numbers
| Phase | RERA number | Promised completion | Homes | Status | Source |
|---|---|---|---|---|---|
| Phase 1 | PRM/KA/RERA/1251/308/PR/020923/006223 | 31 Dec 2027 | 832 | New launch | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Phase 2 | PRM/KA/RERA/1251/308/PR/080725/007900 | 31 Mar 2030 | 1,378 | New launch | Source (rera.karnataka.gov.in) (opens in a new tab) |
Towers and blocks (RERA filing)
| Tower | Phase | Floors | Basements | Homes |
|---|---|---|---|---|
| Block 2 | Phase 1 | 25 | 2 | 312 |
| Block 5 | Phase 1 | 25 | 2 | 520 |
| Block 3 | Phase 2 | 24 | 2 | 200 |
| Block 4 | Phase 2 | 25 | 2 | 520 |
| Block 6 | Phase 2 | 25 | 2 | 658 |
A dash (—) means the filing did not state that value.
Summary in plain English
Adarsh Welkin Park is a residential project by Akarshak Realty Private Limited in Gattahalli, Anekal taluk, Bengaluru Urban. The project has 2,210 homes across 2 phases with 5 towers. Phase 1 is scheduled for completion on 31 December 2027, and Phase 2 on 31 March 2030.
Written by AI from the RERA record above on 22 Oct 2026. Every number in it was checked against that record; if anything differs, the record wins.
Open space, home loans, escrow and other details
- Open space
- Not found in public records yet: open space
- Water and power
- Water source filed with RERA: BoreWell
- Home loans: approved banks
- Not found in public records yet: bank approvals
- Payment plans
- Not found in public records yet: payment plans
- Maintenance
- Not found in public records yet: maintenance
- Car parking
- Not found in public records yet: car parking charge
- Escrow bank (RERA) · Phase 1
- ICICI Bank, Residency road Branch, Bangalore
- Escrow bank (RERA) · Phase 2
- ICICI Bank, Residency Road, Bangalore
Amenities
- Electricity
- CCTV Surveillance
- Club House
- Community Hall
- Outdoor Sports facility
- Indoor Sports facility
- Swimming Pool
- Gym
- Parks
- Power Backup
- Piped Gas
- Water and Sanitation
Amenities and internal works as filed by the promoter with Karnataka RERA; we have not visited the site.
Adarsh Welkin Park location and address
- Address
- Sy.no.196 , 197 , 198 , 199 , 203(P) & 204 , Gattahalli Village , Anekal , Bengaluru Urban, Karnataka - 560099
- Village (RERA)
- Gattahalli
- Locality
- Near Hosur RoadAlso known as Hosur Main Road, NH 48
- PIN code
- 560099
- City
- Bengaluru
- State
- Karnataka
- Coordinates
- 12.86863, 77.68725
Distances to landmarks
Not found in public records yet: landmarksAbout Gattahalli
Not found in public records yet: locality factsCommute times to tech parks and the airport
| To | Straight line | Peak-hour drive (estimate) |
|---|---|---|
| Electronic City Phase 1Map point on OpenStreetMap (opens in a new tab) | 3.21 km | approx. 13 min |
| Outer Ring Road tech corridor (RMZ Ecospace, Bellandur)Map point on OpenStreetMap (opens in a new tab) | 6.16 km | approx. 25 min |
| ITPL, Whitefield (main gate)Map point on OpenStreetMap (opens in a new tab) | 14.32 km | approx. 58 min |
| KSR Bengaluru City railway station (Majestic)Map point on OpenStreetMap (opens in a new tab) | 17.64 km | approx. 71 min |
| Manyata Tech ParkMap point on OpenStreetMap (opens in a new tab) | 21.25 km | approx. 86 min |
| Kempegowda International AirportMap point on OpenStreetMap (opens in a new tab) | 36.97 km | approx. 150 min |
How we calculate
Straight line: from the project’s map point on RERA to the destination’s point on OpenStreetMap.
Peak-hour drive is a rough estimate, not a route: straight line × 1.35 for the road network, at 20 km/h. Real times vary a lot with the route and the hour.
Sources:Source (openstreetmap.org) (opens in a new tab)How we calculate this
Schools and hospitals nearby
Within 2 km
- 9Schools and colleges9 schools, 0 colleges, 0 kindergartens
- 0Hospitals and clinics0 hospitals, 0 clinics
Nearest schools and colleges
- St Gasper School · 1.18 km
- GHPS Doddanagamangala · 1.51 km
- Edenbridge International School · 1.7 km
Places as mapped on OpenStreetMap (amenity=school, college, kindergarten, university; hospital, clinic), counted within 2 km in a straight line of the RERA map point. Volunteers map these, so some places may be missing or closed. Places data © OpenStreetMap contributors, extract of 5 Oct 2026.
Nearest metro station and railway
- Electronic City (ಎಲೆಕ್ಟ್ರಾನಿಕ್ ಸಿಟಿ)Open now — nearest operating metro station2.9 km
- Huskuru (ಹುಸ್ಕೂರ್)Nearest railway station2.7 km
Straight-line distances from the RERA map point to the station points mapped on OpenStreetMap; status (open or under construction) as tagged there. Places data © OpenStreetMap contributors, extract of 5 Oct 2026.
Lake and lake-buffer check
The nearest mapped lake is Gattahalli Lake, 712 m from the project’s RERA map point.
The site boundary is not published as a shape, so its nearest edge can be closer than this point. Whether any building sits inside a lake buffer can only be checked on the approved plan.
- Gattahalli Lake on OpenStreetMap (opens in a new tab) (ಗಟ್ಟಹಳ್ಳಿ ಕೆರೆ)712 m
- Rayasandra Lake on OpenStreetMap (opens in a new tab) (ರಾಯಸಂದ್ರ ಕೆರೆ)730 m
- Unnamed lake (mapped on OpenStreetMap) on OpenStreetMap (opens in a new tab) 1,467 m
The buffer rule
Bengaluru’s lake buffer rule has changed over time: the National Green Tribunal ordered a 75 m buffer in May 2016; the Supreme Court set that order aside on 5 March 2019, leaving the 30 m buffer of the Revised Master Plan 2015. Check the current rule and the approved plan before relying on either number.
- LiveLaw: SC sets aside NGT order enlarging buffer zones (2019) (livelaw.in) (opens in a new tab)
- Citizen Matters: Shrinking lake buffers (citizenmatters.in) (opens in a new tab)
Shortest distance from the RERA map point to the mapped water edge (OpenStreetMap water polygons tagged lake or reservoir, or named lake/kere/tank). Mapped shorelines can differ from the revenue-record boundary of a lake. Places data © OpenStreetMap contributors, extract of 5 Oct 2026.
Sources:Source (openstreetmap.org) (opens in a new tab)Source (livelaw.in) (opens in a new tab)Source (citizenmatters.in) (opens in a new tab)How we calculate this
Satellite time-lapse of the site
Satellite photos load when you scroll to them.
Photos from Esri World Imagery Wayback, centred on the project’s map point; dates are the capture dates in Esri’s metadata. Loaded from Esri when you scroll here.
Sources:Source (livingatlas.arcgis.com) (opens in a new tab)
Adarsh Welkin Park floor plans, brochure and elevations
Documents the builder uploaded to Karnataka RERA, shown as filed. Tap a page to see it full size; the full PDF opens on the RERA website.
Elevations3 files

Phase 1: Elevations_compressed.pdfFull PDF on RERA 
Phase 2: Elevations.pdfFull PDF on RERA 
Phase 2: Elevations_Filed 27 Jun 2025 · Full PDF on RERA
Approved building plan

Phase 2: Approved Building PlanFull PDF on RERA
Approved layout plan6 files

Phase 1: Approved Layout PlanFull PDF on RERA 
Phase 1: Existing Layout PlanFull PDF on RERA 
Phase 1: Adarsh Welkin Park Apartments Phase-1 Area ( Demarcation).pdfFull PDF on RERA 
Phase 2: Demarcation DrawingFiled 27 Jun 2025 · Full PDF on RERA 
Phase 2: Demarcation DrawingFiled 5 Jul 2025 · Full PDF on RERA 
Phase 2: STP Demarcation plan.pdfFull PDF on RERA
| Home type | Carpet area | Homes |
|---|---|---|
| 1 BHK | 405 – 675 sq ft | 5 |
| 1 BHK ews | 474 sq ft | 278 |
| 2 BHK | 735 – 1,274 sq ft | 22 |
| 2.5 BHK | 786 – 994 sq ft | 578 |
| 3 BHK | 812 – 1,564 sq ft | 1,227 |
| 4 BHK | 2,303 – 2,313 sq ft | 100 |
Home types, counts and carpet areas as filed with Karnataka RERA (carpet area, not super built-up).
We have not collected floor-plan drawings; the builder’s sales team can share them.
Adarsh Welkin Park possession date and construction status
Timeline
- 1 Jul 2023Phase 1: Project start date given to RERA
- 2 Sep 2023Phase 1: Registered with Karnataka RERA
- 1 Mar 2025Phase 2: Project start date given to RERA
- 8 Jul 2025Phase 2: Registered with Karnataka RERA
- 31 Dec 2027Phase 1: Completion date given at registration
- 31 Mar 2030Phase 2: Completion date given at registration
Construction pace from RERA quarterly filings (Phase 1)
At the average pace so far, construction would reach 100% around Mar 2027 — about 10 months before the completion date on RERA (31 Dec 2027).
At the pace between the 4 quarterly filings we have (62% → 88% in 9 months), it would be around Feb 2027 — about 11 months before the RERA date.
This project has 2 RERA registrations; the chart uses Phase 1, the one with the most quarterly filings.
- Filed on RERA
- Average pace since start
- Pace between filings (and 0% assumed at the start date)
- RERA completion date
Quarterly filings
| Quarter | Filed on | Built | Homes booked |
|---|---|---|---|
| Q2 2026-27to 30 Sep 2026 | 14 Oct 2026 | 88% | 813 of 832 |
| Q1 2026-27to 30 Jun 2026 | 15 Jul 2026 | 78% | 812 of 832 |
| Q4 2025-26to 31 Mar 2026 | 15 Apr 2026 | 70% | 812 of 832 |
| Q3 2025-26to 31 Dec 2025 | 31 Jan 2026 | 62% | 808 of 832 |
How we calculate
Average pace = % built ÷ months since the start date in the RERA record. Here: 88% ÷ 39 months (1 Jul 2023 to 30 Sep 2026) = 2.3% a month.
Estimated finish = latest filing date + (100 − % built) ÷ pace = 30 Sep 2026 + 12 ÷ 2.3 = 5.3 months → Mar 2027. This is an estimate, not a date from the builder or RERA.
Pace between filings = (88% − 62%) ÷ 9 months = 2.9% a month.
A straight line is a simplification: the builder reports one overall %, which mixes excavation, structure and finishing, and work rarely moves at a constant speed. The % values are the promoter’s own figures filed with RERA, not checked by us.
Sources:Source (rera.karnataka.gov.in) (opens in a new tab)How we calculate this
Approvals and documents checklist
28 rows: approvals. Scroll inside the table to see them all.
| Approval | Authority | Source |
|---|---|---|
| Building plan (Phase 1) | BDA - Bangalore Development Authority · No. NM /A.S/ A.A -1 / T.S -4 / E-27/ 2021- 2022 · dated 2022-03-23 | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Land conversion (6 orders) (Phase 1) | Deputy Commissioner · No. ALN.(A)(SH)SR:112/2011-12 and 5 more · dated 2014-07-23 | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Commencement Certificate (Phase 1) | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Electricity Permission Letter (Phase 1) | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Water Permission Letter (Phase 1) | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Approved Layout Plan (Phase 1) | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Approved Building/Plotting Plan (Phase 1) | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Approved Section Of Building/Infrastructure Plan of Plotting (Phase 1) | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Change of Land Use (Phase 1) | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Conversion Certificate under section 95 of the KLR Act 1964 (Phase 1) | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| ESCOM/Electricity (Phase 1) | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| KWSSB/Water (Phase 1) | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Approval/NOC under section 109 of KLR Act 1961 (Phase 1) | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Approval/NOC under section 14 of the KTCP Act (Phase 1) | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Fire Force Department (Phase 1) | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Airport Authority of India (Phase 1) | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| KSPCB (Phase 1) | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| SEIAA (Phase 1) | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Building plan (Phase 2) | BDA - Bangalore Development Authority · No. PS/EM/EO-1/TA-4/E/27/2021-22 · dated 2022-03-23 | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Land conversion (6 orders) (Phase 2) | Deputy Commissioner · No. ALN.(A)(SH)SR:112/2011-12 and 5 more · dated 2014-04-28 | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Commencement Certificate (Phase 2) | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Approved Building Plan (Phase 2) | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| ESCOM/Electricity (Phase 2) | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| KWSSB/Water (Phase 2) | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| KSPCB (Phase 2) | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| SEIAA (Phase 2) | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Fire Force Department (Phase 2) | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Airport Authority of India (Phase 2) | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
Documents uploaded to RERA (Phase 1)
- Building or layout plan · Approved drawings from the planning authorityFiled on RERA ✓ — BDA - Bangalore Development Authority · No. NM /A.S/ A.A -1 / T.S -4 / E-27/ 2021- 2022 · dated 23 Mar 2022
- Commencement certificate · Permission to start buildingFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
- Environment clearance · SEIAA KarnatakaFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
- Fire NOC · Karnataka Fire and Emergency ServicesFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
- Pollution board consent · KSPCBFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
- Water and sewerage · BWSSBFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
- Electricity · BESCOMFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
- Height clearance · Airports Authority of IndiaFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
- Occupancy certificate (OC) · Issued only when the building is finishedNot on RERA yet — expected at completion
From the documents the promoter uploaded to Karnataka RERA, collected 22 Oct 2026. “Filed” means a document is on RERA — we have not checked its contents or validity. Not every approval applies to every project (for example, smaller projects may not need an environment clearance). Each phase is registered separately; this list is for the phase named above. The project page on RERA lists each upload.
Adarsh Welkin Park RERA complaints and orders
2 complaints as on Source (rera.karnataka.gov.in) (opens in a new tab)
| Complaint ref | Filed | Subject | Status | Source |
|---|---|---|---|---|
| 01034/2026 | 20 Aug 2026 | Complaint against Adarsh Developers for illegal forfeiture of booking amount refund for Unit B4-D1401 in Adarsh Welkin Park Phase 2 | Under enquiry | Source (rera.karnataka.gov.in) (opens in a new tab) |
| 00812/2024 | 30 Aug 2024 | Unilateral Extension of Lock-in Period by Builder Without Prior Notice or Agreement | Disposed | Source (rera.karnataka.gov.in) (opens in a new tab) |
Court and consumer cases
We list case numbers, courts and outcomes only — never names of private individuals.
About Akarshak Realty Private Limited
- Promoter type
- Company
- Projects on this site
- 2
- RERA complaints against promoter
- 5
- Company number (CIN)
- U45200KA2011PTC059903
From Karnataka RERA, as collected so far (22 Oct 2026). Complaints are those RERA lists against this promoter across all its projects.
Akarshak Realty Private Limited’s RERA recordAkarshak Realty Private Limited delivery record
- 2Projects in Bengaluru on RERA3 approved registrations under Akarshak Realty Private Limited in Bengaluru Urban and Rural. Source (rera.karnataka.gov.in) (opens in a new tab)
- 2,424Homes and plots registeredAs stated in each registrations.
- 5RERA complaints3 open, 2 disposed. as on Source (rera.karnataka.gov.in) (opens in a new tab)
- 2.1Complaints per 1,000 homes and plots5 complaints ÷ 2,424 homes and plots in its 3 registrations on Karnataka RERA in Bengaluru.
What the complaints are about
5 complaint subjects as written on RERA, as on . Each subject is sorted into one group by keywords (first match wins: delay, refund, registration, quality, litigation, association); one complaint often raises several issues. Source (rera.karnataka.gov.in) (opens in a new tab)
Sources:Source (rera.karnataka.gov.in) (opens in a new tab)How we calculate this
What’s changed since Mar 2022
- 14 Oct 2026Phase 1: Quarterly update filed for Q2 2026-27: 88% built, 813 of 832 homes booked Source (rera.karnataka.gov.in) (opens in a new tab)
- 14 Oct 2026Phase 2: Quarterly update filed for Q2 2026-27: 10% built, 476 of 1,378 homes booked Source (rera.karnataka.gov.in) (opens in a new tab)
- 20 Aug 2026Complaint 01034/2026 filed with RERA: “Complaint against Adarsh Developers for illegal forfeiture of booking amount refund for Unit B4-D1401 in Adarsh Welkin Park Phase 2” — now under enquiry Source (rera.karnataka.gov.in) (opens in a new tab)
- 15 Jul 2026Phase 1: Quarterly update filed for Q1 2026-27: 78% built, 812 of 832 homes booked Source (rera.karnataka.gov.in) (opens in a new tab)
- 15 Jul 2026Phase 2: Quarterly update filed for Q1 2026-27: 7% built, 289 of 1,378 homes booked Source (rera.karnataka.gov.in) (opens in a new tab)
- 15 Apr 2026Phase 1: Quarterly update filed for Q4 2025-26: 70% built, 812 of 832 homes booked Source (rera.karnataka.gov.in) (opens in a new tab)
- 15 Apr 2026Phase 2: Quarterly update filed for Q4 2025-26: 5% built, 289 of 1,378 homes booked Source (rera.karnataka.gov.in) (opens in a new tab)
- 31 Jan 2026Phase 1: Quarterly update filed for Q3 2025-26: 62% built, 808 of 832 homes booked Source (rera.karnataka.gov.in) (opens in a new tab)
- 31 Jan 2026Phase 2: Quarterly update filed for Q3 2025-26: 3% built, 179 of 1,378 homes booked Source (rera.karnataka.gov.in) (opens in a new tab)
- 8 Jul 2025Phase 2: Registered with Karnataka RERA (PRM/KA/RERA/1251/308/PR/080725/007900); completion date 31 Mar 2030 Source (rera.karnataka.gov.in) (opens in a new tab)
- 1 Mar 2025Phase 2: Project start date in the RERA record Source (rera.karnataka.gov.in) (opens in a new tab)
- 30 Aug 2024Complaint 00812/2024 filed with RERA: “Unilateral Extension of Lock-in Period by Builder Without Prior Notice or Agreement” — now disposed Source (rera.karnataka.gov.in) (opens in a new tab)
- 2 Sep 2023Phase 1: Registered with Karnataka RERA (PRM/KA/RERA/1251/308/PR/020923/006223); completion date 31 Dec 2027 Source (rera.karnataka.gov.in) (opens in a new tab)
- 1 Jul 2023Phase 1: Project start date in the RERA record Source (rera.karnataka.gov.in) (opens in a new tab)
- 23 Mar 2022Phase 1: Building plan approved by BDA - Bangalore Development Authority (No. NM /A.S/ A.A -1 / T.S -4 / E-27/ 2021- 2022) Source (rera.karnataka.gov.in) (opens in a new tab)
- 23 Mar 2022Phase 2: Building plan approved by BDA - Bangalore Development Authority (No. PS/EM/EO-1/TA-4/E/27/2021-22) Source (rera.karnataka.gov.in) (opens in a new tab)
Newest first. No extension of the completion date is recorded on RERA. When the RERA crawl sees a new filing, complaint or extension, it is added here with its date.
Home loan EMI calculator
- Monthly EMI
- —
- Down payment
- —
- Loan amount
- —
- Total interest
- —
A calculation only, from the numbers you enter — not a loan offer.
All-in cost: GST, registration and other charges
The calculator loads when you scroll to it.
Assumptions
- Base price: the builder’s price is not published in a form we could collect — enter it from the cost sheet.
- GST 5% on the base price and charges — the usual rate for an under-construction home that is not “affordable housing” (1%).
- Stamp duty about 5.6% and registration 2% — the Karnataka rule (registration was raised from 1% to 2% on 31 Aug 2025). Calculated on the agreement value.
- Car parking, other charges and the maintenance deposit are not in the public record we collect; enter them from the builder’s cost sheet.
- Loan on the agreement value (banks usually lend up to 75–90%); EMI is the standard reducing-balance formula. Example rate only — use your bank’s quote.
Adarsh Welkin Park FAQs
What is Adarsh Welkin Park?
Adarsh Welkin Park is a residential project by Akarshak Realty Private Limited located in Gattahalli, Anekal taluk, with PIN code 560099.
How many homes are in Adarsh Welkin Park?
The project has 2,210 homes across Phase 1 (832 homes) and Phase 2 (1,378 homes).
What home types are available in Adarsh Welkin Park?
Phase 1 offers 1 BHK, 2 BHK, 2.5 BHK, and 3 BHK homes. Phase 2 offers 1 BHK, 1 BHK EWS, 2 BHK, 2.5 BHK, 3 BHK, and 4 BHK homes with varying carpet areas.
What is the carpet area range for homes in Adarsh Welkin Park?
Carpet areas range from 405 sq ft to 2,313 sq ft depending on the home type and phase.
When will Adarsh Welkin Park Phase 1 be completed?
Phase 1 is scheduled for completion on 31 December 2027 according to the RERA record.
When will Adarsh Welkin Park Phase 2 be completed?
Phase 2 is scheduled for completion on 31 March 2030 according to the RERA record.
What is the construction progress of Adarsh Welkin Park?
As of Q2 2026-27, Phase 1 is 88% complete with 813 homes booked out of 832, and Phase 2 is 10% complete with 476 homes booked out of 1,378.
What are the RERA registration numbers for Adarsh Welkin Park?
Phase 1 is registered as PRM/KA/RERA/1251/308/PR/020923/006223, and Phase 2 is registered as PRM/KA/RERA/1251/308/PR/080725/007900.
How many RERA complaints are against Adarsh Welkin Park?
There are 2 complaints on the project: 1 on Phase 1 and 1 on Phase 2.
What is the builder's complaint record?
Akarshak Realty Private Limited has 5 complaints across all its projects in the Bengaluru RERA records and operates 3 projects.
Written by AI from the RERA record above on 22 Oct 2026. Answers use only that record; check them against the source before you decide.
Questions about Adarsh Welkin Park
No questions published yet. Ask the first one: you get an instant answer from this page’s public record, and our team follows up on anything the record does not show.
Bought a home from Akarshak Realty Private Limited? Review the builder.
Reviews of Akarshak Realty Private Limited by verified buyers
No verified reviews of Akarshak Realty Private Limited yet. If you bought a home from them, your review helps other buyers.
How reviews work: only buyers and owners can review; we confirm each purchase by phone before publishing, publish positive and negative reviews alike, never accept payment for reviews, and the builder may reply.
Similar projects within 5 km
| Project | Distance | Homes | Possession (RERA) | Built | Complaints | Price |
|---|---|---|---|---|---|---|
| Adarsh Welkin Park VillasAdarsh Developers | 0 km | 115 | Oct 2027 | 71% | 0 | Not collected |
| DS Max Sahara GrandDS MAX | 0.6 km | 365 | Jan 2029 | 66% | 0 | Not collected |
| Evershine NORTHEAST ApartmentsEvershine Dwellings Pvt ltd | 0.6 km | 168 | Sep 2026 | 100% | 0 | Not collected |
| Assetz Muse & MaisonAssetz Private Limited | 0.7 km | 128 | Mar 2030 | 44% | 0 | Not collected |
| Assetz Ren & ReiApg Premium Residential Private Limited | 0.9 km | 218 | Jan 2029 | 57% | 1 | Not collected |
| VistaM S Shelters Private Limited | 0.9 km | 22 | Dec 2026 | 79% | 1 | Not collected |
Projects of the same kind within 5 km in a straight line of this project’s RERA map point, nearest first. % built is the promoter’s latest quarterly figure on RERA (shown for single-registration projects); prices are from the builder’s own website where we found one.
Sources and last checked dates
Collected on 22 Oct 2026 by AI research agents reading public pages. Facts are written in our own words. Not found yet: price; court cases; landmarks; specifications; news.
How to check on RERA: On rera.karnataka.gov.in/viewAllProjects, type the registration number in 'Registration No', press Search, then click the 'View Project Details' icon. Complaints open from the 'Complaints / Litigation' icon in the same row. Registration numbers: PRM/KA/RERA/1251/308/PR/020923/006223, PRM/KA/RERA/1251/308/PR/080725/007900.
- RERA record last checked: 22 Oct 2026
- Last change in the record (registration, quarterly filing or complaint): 22 Oct 2026
How this page is made: software builds it from public records (Karnataka RERA filings, OpenStreetMap, the builder’s own website). AI is used only to read filings into fields and to write the plain-English summary and FAQ answers, which are checked against the record. Facts are checked automatically against the RERA filing. Methodology · How we earn · Report an error
More new projects nearby
Gattahalli, near Hosur RoadUnder constructionRERA registeredBuyers’ group openAdarsh Welkin Park Villas
by Adarsh
Price: Price on requestGet brochure & price →
- 3 BHK, 4 BHK
- 1,921 – 4,477 sq ft
- Oct 2027
115 homes
Be one of the first 10 buyers in this groupFounding members — it’s free
Join group for Adarsh Welkin Park Villas
Gattahalli, near Kodathi–CarmelaramReady to moveRERA registeredBuyers’ group openEvershine NORTHEAST Apartments
by Evershine Dwellings
Price: Price on requestGet brochure & price →
- 2 BHK, 3 BHK
- 534 – 792 sq ft
- Sep 2026
168 homes
Be one of the first 10 buyers in this groupFounding members — it’s free
Join group for Evershine NORTHEAST Apartments
Gattahalli, near Kodathi–CarmelaramUnder constructionRERA registeredBuyers’ group openAssetz Muse & Maison
by Assetz
Price: Price on requestGet brochure & price →
- 3 BHK
- 1,124 – 1,262 sq ft
- Mar 2030
128 homes
Be one of the first 10 buyers in this groupFounding members — it’s free
Join group for Assetz Muse & Maison