Aeropolis, a project of Sattva Group
1, 2 & 3 BHK apartments by Trinayani Realtor Private Limited · Udayagiri, Bellary Road (Airport Road), Bengaluru
Udayagiri, Bellary Road (Airport Road), BengaluruOpen on Google Maps (opens in a new tab)
- Under construction
- RERA registered
- RERA not updated: completion promised Jul 2026; no extension or completion filed
- residential
by Trinayani Realtor Private Limited
Price: Price on request
Site photo filed with Karnataka RERA Karnataka RERA filing · Source ↗ (opens in a new tab)
Aeropolis, a project of Sattva Group at a glance
- Possession (RERA)Jul 2026 Date passedKarnataka RERA
- Construction89% built · on pace for Feb 2027 7 mo after RERA dateRERA filing to 30 Jun 2026; estimate from average pace
- Homes booked938 of 1,001 (94%)RERA update · as on 30 Jun 2026
- RERA complaints (project)None listedKarnataka RERA · as on 12 Oct 2026
- Approvals filed8 of 9 on RERAKarnataka RERA uploads · 12 Oct 2026
- Nearest metroAirport City · 2.05 km (under construction)Open now: Krishnarajapura, 23.43 km · straight line · OpenStreetMap, 5 Oct 2026
- Airport driveapprox. 15 min at peak3.59 km straight line · estimate
- Nearest lakeDoddasanne Tank · 1,402 mFrom the RERA map point · OpenStreetMap, 5 Oct 2026
Project summary
Aeropolis, a project of Sattva Group is a residential project by Trinayani Realtor Private Limited in Udayagiri, Bengaluru with 1,001 homes, registered with Karnataka RERA. The completion date on RERA is 9 Jul 2026.
Facts collected on 12 Oct 2026 from public records — each linked to its source. Free for buyers. If you book through us, the builder pays us a commission.
Aeropolis, a project of Sattva Group buyers’ group: join to ask for a group price
No one has joined yet. Be one of the first 10 buyers in this group — the founding members.
Join free. When enough buyers have joined, our agent partner asks Trinayani Realtor Private Limited for a group price — for example a lower price, an easier payment plan or waived charges. Nothing is promised: you see what the builder offers and book directly with the builder if you want to. Free for buyers. If you book through us, the builder pays us a commission.
- Gathering buyers
- Talking to the builder
- Group offer
- Group site visit
- Booking
0 buyers have joined · 0 committed
Committed buyers have confirmed their budget, home type and timeline with us on a call; builders negotiate with them. Joining is free and never obliges you to buy.
Join the Aeropolis, a project of Sattva Group buyers’ groupHow group buying works
See it for yourself
Visit the site with our team, or get a call to clear your questions. Free, no obligation.
Key facts: home types, towers, land and possession
- Home types
- Studio, 1 BHK, 2 BHK, 3 BHK
- Carpet area
- 172 – 645 sq ft
- Towers
- 9
- Floors
- 11
- Total homes
- 1,001
- Land
- 10.32 acres
- Possession (RERA)
- Jul 2026
- Built (RERA update)
- 89%
Aeropolis, a project of Sattva Group RERA number and registration details
- RERA number
- PRM/KA/RERA/1250/303/PR/110522/004869
- Registered on
- 11 May 2022
- Promised completion
- 9 Jul 2026
- Extended to
- No extension recorded
- RERA status
- New launch
- Homes booked
- 938 of 1,001 as on
- Price
- Not found in public records yet: price
- Project type
- Residential
Towers and blocks (RERA filing)
| Tower | Floors | Basements | Homes |
|---|---|---|---|
| Block B (Studio Units) | 10 | 1 | 176 |
| Block C- Wing 4 | 11 | 1 | 121 |
| Block C- Wing 5 | 11 | 1 | 77 |
| Block C- Wing 6 | 11 | 1 | 99 |
| Block D- Wing 7 | 11 | 1 | 99 |
| Block D- Wing 8 | 11 | 1 | 77 |
| Block D- Wing 9 | 11 | 1 | 132 |
| Block D- Wing 10 | 11 | 1 | 110 |
| Block D- Wing 11 | 11 | 1 | 110 |
A dash (—) means the filing did not state that value.
Summary in plain English
Aeropolis is a residential project by Trinayani Realtor Private Limited in Udayagiri, Devanahalli, with 1,001 homes across 9 towers. The project is expected to be completed on 9 July 2026.
Written by AI from the RERA record above on 12 Oct 2026. Every number in it was checked against that record; if anything differs, the record wins.
Open space, home loans, escrow and other details
- Open space
- 77.5% of land
- Water and power
- Water source filed with RERA: Others
- Home loans: approved banks
- Not found in public records yet: bank approvals
- Payment plans
- Not found in public records yet: payment plans
- Maintenance
- Not found in public records yet: maintenance
- Car parking
- Not found in public records yet: car parking charge
- Escrow bank (RERA)
- ICICI Bank, 33/1, Ulsoor Road, Bangalore
- Building plan (RERA)
- BIAPPA - Bangalore Airport Area Planning Authority · No. BIAAPA/TP/CC/05/2021-22 · dated 5 Aug 2021
- Project cost declared to RERA
- ₹273 Cr
Open area as a share of the land, from the areas filed with RERA (includes driveways and landscaped areas).
Amenities
- Electricity
- CCTV Surveillance
- Club House
- Indoor Sports facility
- Swimming Pool
- Gym
- Parks
- Power Backup
- Piped Gas
- Water and Sanitation
Amenities and internal works as filed by the promoter with Karnataka RERA; we have not visited the site.
Aeropolis, a project of Sattva Group location and address
- Address
- Sy. Nos. 39/2,41/1,43,44 and 75/1 at Udayagiri Village, , Kasaba Hobli, National Highway No.7 , Devanahalli , Bengaluru Rural, Karnataka - 562157
- Village (RERA)
- Udayagiri
- Locality
- Bellary Road (Airport Road)Also known as Airport Road, International Airport Road, Bellary Road, NH 44
- PIN code
- 562157
- City
- Bengaluru
- State
- Karnataka
- Coordinates
- 13.21059, 77.67287
Distances to landmarks
Not found in public records yet: landmarksAbout Bellary Road (Airport Road)
Not found in public records yet: locality factsCommute times to tech parks and the airport
| To | Straight line | Peak-hour drive (estimate) |
|---|---|---|
| Kempegowda International AirportMap point on OpenStreetMap (opens in a new tab) | 3.59 km | approx. 15 min |
| Manyata Tech ParkMap point on OpenStreetMap (opens in a new tab) | 18.95 km | approx. 77 min |
| ITPL, Whitefield (main gate)Map point on OpenStreetMap (opens in a new tab) | 25.77 km | approx. 104 min |
| KSR Bengaluru City railway station (Majestic)Map point on OpenStreetMap (opens in a new tab) | 28.16 km | approx. 114 min |
| Outer Ring Road tech corridor (RMZ Ecospace, Bellandur)Map point on OpenStreetMap (opens in a new tab) | 31.91 km | approx. 129 min |
| Electronic City Phase 1Map point on OpenStreetMap (opens in a new tab) | 40.14 km | approx. 163 min |
How we calculate
Straight line: from the project’s map point on RERA to the destination’s point on OpenStreetMap.
Peak-hour drive is a rough estimate, not a route: straight line × 1.35 for the road network, at 20 km/h. Real times vary a lot with the route and the hour.
Sources:Source (openstreetmap.org) (opens in a new tab)How we calculate this
Schools and hospitals nearby
Within 2 km
- 2Schools and colleges2 schools, 0 colleges, 0 kindergartens
- 0Hospitals and clinics0 hospitals, 0 clinics
Nearest schools and colleges
- NAFL North Urbana · 1.34 km
Places as mapped on OpenStreetMap (amenity=school, college, kindergarten, university; hospital, clinic), counted within 2 km in a straight line of the RERA map point. Volunteers map these, so some places may be missing or closed. Places data © OpenStreetMap contributors, extract of 5 Oct 2026.
Nearest metro station and railway
- Airport City (ವಿಮಾನ ನಿಲ್ದಾಣ ನಗರ)Blue Line metro, under construction2.05 km
- Doddajala (ದೊಡ್ಡಜಾಲ)Blue Line metro, under construction3.93 km
- KIAL Terminals (ಕೆಐಎಬಿ ವಿಮಾನ ನಿಲ್ದಾಣ ಟರ್ಮಿನಲ್ಸ್)Blue Line metro, under construction4.55 km
- Krishnarajapura (ಕೃಷ್ಣರಾಜಪುರ (ಕೆ.ಆರ್.ಪುರ))Open now — nearest operating metro station23.43 km
- Kempegowda International Airport Halt (ಕೆಂಪೇಗೌಡ ಅಂತರರಾಷ್ಟ್ರೀಯ ವಿಮಾನ-ನಿಲದಾಣ ಹಾಲ್ಟ)Nearest railway station0.36 km
Straight-line distances from the RERA map point to the station points mapped on OpenStreetMap; status (open or under construction) as tagged there. Places data © OpenStreetMap contributors, extract of 5 Oct 2026.
Lake and lake-buffer check
The nearest mapped lake is Doddasanne Tank, 1,402 m from the project’s RERA map point.
The site boundary is not published as a shape, so its nearest edge can be closer than this point. Whether any building sits inside a lake buffer can only be checked on the approved plan.
- Doddasanne Tank on OpenStreetMap (opens in a new tab) (ದೊಡ್ಡಸಣ್ಣೆ ಕೆರೆ)1,402 m
- Unnamed lake (mapped on OpenStreetMap) on OpenStreetMap (opens in a new tab) 1,566 m
The buffer rule
Bengaluru’s lake buffer rule has changed over time: the National Green Tribunal ordered a 75 m buffer in May 2016; the Supreme Court set that order aside on 5 March 2019, leaving the 30 m buffer of the Revised Master Plan 2015. Check the current rule and the approved plan before relying on either number.
- LiveLaw: SC sets aside NGT order enlarging buffer zones (2019) (livelaw.in) (opens in a new tab)
- Citizen Matters: Shrinking lake buffers (citizenmatters.in) (opens in a new tab)
Shortest distance from the RERA map point to the mapped water edge (OpenStreetMap water polygons tagged lake or reservoir, or named lake/kere/tank). Mapped shorelines can differ from the revenue-record boundary of a lake. Places data © OpenStreetMap contributors, extract of 5 Oct 2026.
Sources:Source (openstreetmap.org) (opens in a new tab)Source (livelaw.in) (opens in a new tab)Source (citizenmatters.in) (opens in a new tab)How we calculate this
Satellite time-lapse of the site
Satellite photos load when you scroll to them.
Photos from Esri World Imagery Wayback, centred on the project’s map point; dates are the capture dates in Esri’s metadata. Loaded from Esri when you scroll here.
Sources:Source (livingatlas.arcgis.com) (opens in a new tab)
Aeropolis, a project of Sattva Group floor plans, brochure and elevations
Documents the builder uploaded to Karnataka RERA, shown as filed. Tap a page to see it full size; the full PDF opens on the RERA website.
Brochure15 pages

BrochureFull PDF on RERA 






Floor plans9 files

DN 14 of 27 A Block 1st Floor to 11th floor planFiled 29 Jan 2022 · Full PDF on RERA 
DN 15 of 27 C Block 1st Floor to 11th floor planFiled 29 Jan 2022 · Full PDF on RERA 
DN 16 of 27 D Block 1st Floor to 11th floor planFiled 29 Jan 2022 · Full PDF on RERA 
DN 24 of 27 B- Block(Studio Units) Floor PlansFiled 29 Jan 2022 · Full PDF on RERA 
DN 26 of 27 E Block(Hotel) Floor PlansFiled 14 Feb 2022 · Full PDF on RERA 
DN 17 of 27 A Block Terrace Floor planFiled 29 Jan 2022 · Full PDF on RERA 
DN 18 of 27 C Block Terrace Floor PlanFiled 29 Jan 2022 · Full PDF on RERA 
DN 19 of 27 D Block Terrace Floor PlanFiled 29 Jan 2022 · Full PDF on RERA 
DN 7 of 27 Basement Floor Plan(E Block) Sheet 06of06Filed 14 Feb 2022 · Full PDF on RERA
Approved building plan7 pages

Approved Building/Plotting PlanFull PDF on RERA
Approved layout plan3 pages

Approved Layout PlanFull PDF on RERA
| Home type | Carpet area | Homes |
|---|---|---|
| 1 BHK | 356 – 388 sq ft | 297 |
| 1 BHK type 1 | 355 sq ft | 121 |
| 1 BHK type 1a | 355 sq ft | 22 |
| 1 BHK type 2 | 388 sq ft | 143 |
| 1 BHK type 2a | 388 sq ft | 11 |
| 2 BHK | 570 – 572 sq ft | 352 |
| 2 BHK type 1 | 570 sq ft | 121 |
| 2 BHK type 1a | 570 sq ft | 88 |
| 2 BHK type 1b | 570 sq ft | 44 |
| 2 BHK type 2 | 570 sq ft | 55 |
| 2 BHK type 3 | 570 sq ft | 11 |
| 2 BHK type 4 | 570 sq ft | 33 |
| 3 BHK | 645 sq ft | 176 |
| 3 BHK type 1 | 635 sq ft | 77 |
| 3 BHK type 1a | 635 sq ft | 22 |
| 3 BHK type 2 | 635 sq ft | 11 |
| 3 BHK type 3 | 635 sq ft | 66 |
| Studio apartment 1 | 172 – 176 sq ft | 116 |
| Studio apartment 2 | 280 – 282 sq ft | 60 |
Home types, counts and carpet areas as filed with Karnataka RERA (carpet area, not super built-up).
We have not collected floor-plan drawings; the builder’s sales team can share them.
Aeropolis, a project of Sattva Group possession date and construction status
Promoter’s quarterly update to RERA for Q1 2026-27, submitted 2026-07-15.
By tower (Q1 2026-27)
Units sold and unsold, from RERA (Q1 2026-27)
| Type | Homes | Booked | Available |
|---|---|---|---|
| STUDIO APARTMENT 1 | 116 | 115 | 1 |
| STUDIO APARTMENT 2 | 60 | 60 | 0 |
| 1 BHK | 297 | 284 | 13 |
| 2 BHK | 352 | 313 | 39 |
| 3 BHK | 176 | 166 | 10 |
As reported by the promoter in the quarterly update to RERA, not verified by us.
Timeline
- 15 Sep 2021Project start date given to RERA
- 11 May 2022Registered with Karnataka RERA
- 9 Jul 2026Completion date given at registration
Construction pace from RERA quarterly filings
At the average pace so far, construction would reach 100% around Feb 2027 — about 7 months after the completion date on RERA (9 Jul 2026).
At the pace between the 3 quarterly filings we have (78% → 89% in 6 months), it would be around Dec 2026 — about 6 months after the RERA date.
- Filed on RERA
- Average pace since start
- Pace between filings (and 0% assumed at the start date)
- RERA completion date
Quarterly filings
| Quarter | Filed on | Built | Homes booked |
|---|---|---|---|
| Q1 2026-27to 30 Jun 2026 | 15 Jul 2026 | 89% | 938 of 1,001 |
| Q4 2025-26to 31 Mar 2026 | 15 Apr 2026 | 85% | 932 of 1,001 |
| Q3 2025-26to 31 Dec 2025 | 14 Jan 2026 | 78% | 928 of 1,001 |
How we calculate
Average pace = % built ÷ months since the start date in the RERA record. Here: 89% ÷ 57.5 months (15 Sep 2021 to 30 Jun 2026) = 1.5% a month.
Estimated finish = latest filing date + (100 − % built) ÷ pace = 30 Jun 2026 + 11 ÷ 1.5 = 7.1 months → Feb 2027. This is an estimate, not a date from the builder or RERA.
Pace between filings = (89% − 78%) ÷ 5.9 months = 1.8% a month.
A straight line is a simplification: the builder reports one overall %, which mixes excavation, structure and finishing, and work rarely moves at a constant speed. The % values are the promoter’s own figures filed with RERA, not checked by us. Promoter’s quarterly update to RERA for Q1 2026-27, submitted 2026-07-15.
Sources:Source (rera.karnataka.gov.in) (opens in a new tab)How we calculate this
Approvals and documents checklist
15 rows: approvals. Scroll inside the table to see them all.
| Approval | Authority | Source |
|---|---|---|
| Building plan | BIAPPA - Bangalore Airport Area Planning Authority · No. BIAAPA/TP/CC/05/2021-22 · dated 2021-08-05 | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Land conversion (3 orders) | Deputy commissioner Bangalore Rural District · No. ALN(DHT)SR67/2010-11 and 2 more · dated 2013-02-05 | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Commencement Certificate | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Approved Layout Plan | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Approved Building/Plotting Plan | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Approved Section Of Building/Infrastructure Plan of Plotting | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Change of Land Use | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Conversion Certificate under section 95 of the KLR Act 1964 | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| ESCOM/Electricity | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| KWSSB/Water | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Approval/NOC under section 14 of the KTCP Act | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Fire Force Department | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Airport Authority of India | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| KSPCB | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| SEIAA | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
Documents uploaded to RERA
- Building or layout plan · Approved drawings from the planning authorityFiled on RERA ✓ — BIAPPA - Bangalore Airport Area Planning Authority · No. BIAAPA/TP/CC/05/2021-22 · dated 5 Aug 2021
- Commencement certificate · Permission to start buildingFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
- Environment clearance · SEIAA KarnatakaFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
- Fire NOC · Karnataka Fire and Emergency ServicesFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
- Pollution board consent · KSPCBFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
- Water and sewerage · BWSSBFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
- Electricity · BESCOMFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
- Height clearance · Airports Authority of IndiaFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
- Occupancy certificate (OC) · Issued only when the building is finishedNot on RERA yet — expected at completion
From the documents the promoter uploaded to Karnataka RERA, collected 12 Oct 2026. “Filed” means a document is on RERA — we have not checked its contents or validity. Not every approval applies to every project (for example, smaller projects may not need an environment clearance). The project page on RERA lists each upload.
Aeropolis, a project of Sattva Group RERA complaints
No complaints listed on Karnataka RERA for this registration as on Source (rera.karnataka.gov.in) (opens in a new tab)
Court and consumer cases
We list case numbers, courts and outcomes only — never names of private individuals.
About Trinayani Realtor Private Limited
- Promoter type
- Company
- Projects on this site
- 1
- RERA complaints against promoter
- 0
- Company number (CIN)
- U45400WB2006PTC108571
From Karnataka RERA, as collected so far (12 Oct 2026). Complaints are those RERA lists against this promoter across all its projects.
Trinayani Realtor Private Limited’s RERA recordTrinayani Realtor Private Limited delivery record
- 1Projects in Bengaluru on RERA1 approved registration under Trinayani Realtor Private Limited in Bengaluru Urban and Rural. Source (rera.karnataka.gov.in) (opens in a new tab)
- 1,001Homes registeredAs stated in each registrations.
- 0RERA complaintsas on Source (rera.karnataka.gov.in) (opens in a new tab)
- 0Complaints per 1,000 homes0 complaints ÷ 1,001 homes in its 1 registration on Karnataka RERA in Bengaluru.
Sources:Source (rera.karnataka.gov.in) (opens in a new tab)How we calculate this
What’s changed since Aug 2021
- 15 Jul 2026Quarterly update filed for Q1 2026-27: 89% built, 938 of 1,001 homes booked Source (rera.karnataka.gov.in) (opens in a new tab)
- 15 Apr 2026Quarterly update filed for Q4 2025-26: 85% built, 932 of 1,001 homes booked Source (rera.karnataka.gov.in) (opens in a new tab)
- 14 Jan 2026Quarterly update filed for Q3 2025-26: 78% built, 928 of 1,001 homes booked Source (rera.karnataka.gov.in) (opens in a new tab)
- 11 May 2022Registered with Karnataka RERA (PRM/KA/RERA/1250/303/PR/110522/004869); completion date 9 Jul 2026 Source (rera.karnataka.gov.in) (opens in a new tab)
- 15 Sep 2021Project start date in the RERA record Source (rera.karnataka.gov.in) (opens in a new tab)
- 5 Aug 2021Building plan approved by BIAPPA - Bangalore Airport Area Planning Authority (No. BIAAPA/TP/CC/05/2021-22) Source (rera.karnataka.gov.in) (opens in a new tab)
Newest first. No extension of the completion date is recorded on RERA. When the RERA crawl sees a new filing, complaint or extension, it is added here with its date.
Home loan EMI calculator
- Monthly EMI
- —
- Down payment
- —
- Loan amount
- —
- Total interest
- —
A calculation only, from the numbers you enter — not a loan offer.
All-in cost: GST, registration and other charges
The calculator loads when you scroll to it.
Assumptions
- Base price: the builder’s price is not published in a form we could collect — enter it from the cost sheet.
- GST 5% on the base price and charges — the usual rate for an under-construction home that is not “affordable housing” (1%).
- Stamp duty about 5.6% and registration 2% — the Karnataka rule (registration was raised from 1% to 2% on 31 Aug 2025). Calculated on the agreement value.
- Car parking, other charges and the maintenance deposit are not in the public record we collect; enter them from the builder’s cost sheet.
- Loan on the agreement value (banks usually lend up to 75–90%); EMI is the standard reducing-balance formula. Example rate only — use your bank’s quote.
Aeropolis, a project of Sattva Group FAQs
What is the RERA registration number for Aeropolis?
The RERA registration number is PRM/KA/RERA/1250/303/PR/110522/004869, registered on 11 May 2022.
Where is Aeropolis located?
Aeropolis is located in Udayagiri, Devanahalli taluk, Bengaluru Rural district, with PIN code 562157.
What home types are available in Aeropolis?
The project offers studio apartments (172 to 282 sq ft carpet area), 1 BHK (355 to 388 sq ft), 2 BHK (570 to 572 sq ft), and 3 BHK (635 to 645 sq ft) homes.
How many homes are in Aeropolis?
The project has a total of 1,001 homes across 9 towers with a maximum of 11 floors each.
What is the expected completion date for Aeropolis?
The completion date on RERA is 9 July 2026.
What is the construction progress of Aeropolis?
As of Q1 2026-27 (quarter ended 30 June 2026), the project is 89% complete with 938 homes booked out of 1,001.
Are there any RERA complaints against Aeropolis?
There are no RERA complaints filed on this project or against the builder Trinayani Realtor Private Limited.
What are the studio apartment options available?
There are two studio variants: Studio Apartment 1 (172 to 176 sq ft with 116 homes) and Studio Apartment 2 (280 to 282 sq ft with 60 homes).
What is the land area of Aeropolis?
The project is built on a land area of 41,783 sq m.
What are the 3 BHK options in Aeropolis?
There are four 3 BHK variants: 3 BHK (645 sq ft with 176 homes), 3 BHK TYPE 1 (635 sq ft with 77 homes), 3 BHK TYPE 1A (635 sq ft with 22 homes), 3 BHK TYPE 2 (635 sq ft with 11 homes), and 3 BHK TYPE 3 (635 sq ft with 66 homes).
Written by AI from the RERA record above on 12 Oct 2026. Answers use only that record; check them against the source before you decide.
Questions about Aeropolis, a project of Sattva Group
No questions published yet. Ask the first one: you get an instant answer from this page’s public record, and our team follows up on anything the record does not show.
Bought a home from Trinayani Realtor Private Limited? Review the builder.
Reviews of Trinayani Realtor Private Limited by verified buyers
No verified reviews of Trinayani Realtor Private Limited yet. If you bought a home from them, your review helps other buyers.
How reviews work: only buyers and owners can review; we confirm each purchase by phone before publishing, publish positive and negative reviews alike, never accept payment for reviews, and the builder may reply.
Similar projects within 5 km
| Project | Distance | Homes | Possession (RERA) | Built | Complaints | Price |
|---|---|---|---|---|---|---|
| Sattva Aeropolis Phase 2Sattva Resi Private Limited | 0 km | 554 | Oct 2028 | 39% | 1 | Not collected |
| Impact Sanvi Aero GardensSanvi Constructions | 0.5 km | 316 | Dec 2028 | 47% | 0 | Not collected |
| Sattva Vasanta CoveSattva Resi Private Limited | 1.2 km | 200 | Dec 2030 | 9% | 0 | Not collected |
| Sattva Vasanta SkyeSattva Resi Private Limited | 1.5 km | 1,077 | May 2031 | 17% | 0 | Not collected |
| CosmosCorbital Builders | 1.5 km | 68 | Dec 2029 | — | 0 | Not collected |
| VarnamSmart Value Homes (Peenya Project) Private Limited | 2 km | 842 | Sep 2031 | — | 0 | from ₹2.05 Cr |
Projects of the same kind within 5 km in a straight line of this project’s RERA map point, nearest first. % built is the promoter’s latest quarterly figure on RERA (shown for single-registration projects); prices are from the builder’s own website where we found one.
Sources and last checked dates
Collected on 12 Oct 2026 by AI research agents reading public pages. Facts are written in our own words. Not found yet: price; court cases; landmarks; specifications; news.
How to check on RERA: On rera.karnataka.gov.in/viewAllProjects, type the registration number in 'Registration No', press Search, then click the 'View Project Details' icon. Complaints open from the 'Complaints / Litigation' icon in the same row. Registration number: PRM/KA/RERA/1250/303/PR/110522/004869.
- RERA record last checked: 12 Oct 2026
- Last change in the record (registration, quarterly filing or complaint): 15 Jul 2026
How this page is made: software builds it from public records (Karnataka RERA filings, OpenStreetMap, the builder’s own website). AI is used only to read filings into fields and to write the plain-English summary and FAQ answers, which are checked against the record. Facts are checked automatically against the RERA filing. Methodology · How we earn · Report an error
More new projects in Bellary Road (Airport Road)
Udayagiri, Bellary Road (Airport Road)Artist’s impressionUnder constructionRERA registeredBuyers’ group openSattva Aeropolis Phase 2
by Sattva Resi
Price: Price on requestGet brochure & price →
- 1 BHK, 3 BHK
- 176 – 644 sq ft
- Oct 2028
554 homes · 1 RERA complaint
Be one of the first 10 buyers in this groupFounding members — it’s free
Join group for Sattva Aeropolis Phase 2
Akkalenahalli Mallenahalli, Bellary Road (Airport Road)Artist’s impressionUnder constructionRERA registeredBuyers’ group openVarnam
by Smart Value Homes (Peenya Project)
Price: Price on requestGet brochure & price →
- 2 BHK, 3 BHK, 5 BHK
- 789 – 2,557 sq ft
- Sep 2031
4 phases on RERA · 842 homes
Be one of the first 10 buyers in this groupFounding members — it’s free
Join group for Varnam
Mallenahalli, Bellary Road (Airport Road)Artist’s impressionUnder constructionRERA registeredBuyers’ group openBarca At Godrej MSR City
by Godrej Properties
Price: Price on requestGet brochure & price →
- 2 BHK, 3 BHK
- 707 – 1,037 sq ft
- Mar 2030
1,961 homes · 2 RERA complaints
Be one of the first 10 buyers in this groupFounding members — it’s free
Join group for Barca At Godrej MSR City