Amrutha MMK Lumina at a glance
- Possession (RERA)Apr 2028Karnataka RERA
- RERA complaints (project)None listedKarnataka RERA · as on 18 Oct 2026
- Approvals filed2 of 9 on RERAKarnataka RERA uploads · 18 Oct 2026
- Nearest metroGarudacharpalya · 0.61 kmstraight line · OpenStreetMap, 5 Oct 2026
- Airport driveapprox. 95 min at peak23.56 km straight line · estimate
- Nearest lakeGoshala Lake · 290 mFrom the RERA map point · OpenStreetMap, 5 Oct 2026
Project summary
Amrutha MMK Lumina is a residential project by M/s AMRUTHA CONSTRUCTIONS in Mahadevapura, Bengaluru with 40 homes, registered with Karnataka RERA. The completion date on RERA is 30 Apr 2028.
Facts collected on 18 Oct 2026 from public records — each linked to its source. Free for buyers. If you book through us, the builder pays us a commission.
Amrutha MMK Lumina buyers’ group: join to ask for a group price
No one has joined yet. Be one of the first 10 buyers in this group — the founding members.
Join free. When enough buyers have joined, our agent partner asks M/s AMRUTHA CONSTRUCTIONS for a group price — for example a lower price, an easier payment plan or waived charges. Nothing is promised: you see what the builder offers and book directly with the builder if you want to. Free for buyers. If you book through us, the builder pays us a commission.
- Gathering buyers
- Talking to the builder
- Group offer
- Group site visit
- Booking
0 buyers have joined · 0 committed
Committed buyers have confirmed their budget, home type and timeline with us on a call; builders negotiate with them. Joining is free and never obliges you to buy.
Join the Amrutha MMK Lumina buyers’ groupHow group buying works
See it for yourself
Visit the site with our team, or get a call to clear your questions. Free, no obligation.
Key facts: home types, towers, land and possession
- Home types
- 2 BHK, 3 BHK
- Carpet area
- 760 – 1,135 sq ft
- Towers
- 2
- Floors
- 3
- Total homes
- 40
- Land
- 0.56 acres
- Possession (RERA)
- Apr 2028
- Built (RERA update)
- Not found in public records yet: construction progress
Amrutha MMK Lumina RERA number and registration details
- RERA number
- PRM/KA/RERA/1251/446/PR/071026/008998
- Registered on
- 7 Oct 2026
- Promised completion
- 30 Apr 2028
- Extended to
- No extension recorded
- RERA status
- New launch
- Homes booked
- Not found in public records yet: homes booked
- Price
- Not found in public records yet: price
- Project type
- Residential
Towers and blocks (RERA filing)
| Tower | Floors | Basements | Homes |
|---|---|---|---|
| Block A | 3 | 0 | 16 |
| Block B | 3 | 0 | 24 |
A dash (—) means the filing did not state that value.
Summary in plain English
Amrutha MMK Lumina is a residential project by M/s Amrutha Constructions in Mahadevapura, Bengaluru East. The project has 40 homes across 2 towers with a maximum of 3 floors each, registered with Karnataka RERA for completion by 30 April 2028.
Written by AI from the RERA record above on 7 Oct 2026. Every number in it was checked against that record; if anything differs, the record wins.
Open space, home loans, escrow and other details
- Open space
- 45.1% of land
- Water and power
- Water source filed with RERA: BoreWell
- Home loans: approved banks
- Not found in public records yet: bank approvals
- Payment plans
- Not found in public records yet: payment plans
- Maintenance
- Not found in public records yet: maintenance
- Car parking
- Not found in public records yet: car parking charge
- Escrow bank (RERA)
- Union Bank of India, Kithaganur
- Building plan (RERA)
- BBMP - Bruhat Bengaluru Mahanagara Palike · No. GBA/BECC/0130/2025-26 · dated 20 Jan 2026
- Project cost declared to RERA
- ₹33.7 Cr
Open area as a share of the land, from the areas filed with RERA (includes driveways and landscaped areas).
Amenities
- Electricity
- Power Backup
- Water and Sanitation
Amenities and internal works as filed by the promoter with Karnataka RERA; we have not visited the site.
Amrutha MMK Lumina location and address
- Address
- New Survey No.89/10, Old Sy No.89/1, situated at Mahadevapura Village, K.R.Puram Hobli, earlier Bengaluru South Taluk, , now Bengaluru East Taluk , Bengaluru East , Bengaluru Urban, Karnataka - 560048
- Village (RERA)
- Mahadevapura
- Locality
- Mahadevapura
- PIN code
- 560048
- City
- Bengaluru
- State
- Karnataka
- Coordinates
- 12.98892, 77.70058
Distances to landmarks
Not found in public records yet: landmarksAbout Mahadevapura
Not found in public records yet: locality factsCommute times to tech parks and the airport
| To | Straight line | Peak-hour drive (estimate) |
|---|---|---|
| ITPL, Whitefield (main gate)Map point on OpenStreetMap (opens in a new tab) | 4.03 km | approx. 16 min |
| Outer Ring Road tech corridor (RMZ Ecospace, Bellandur)Map point on OpenStreetMap (opens in a new tab) | 7.55 km | approx. 31 min |
| Manyata Tech ParkMap point on OpenStreetMap (opens in a new tab) | 10.95 km | approx. 44 min |
| KSR Bengaluru City railway station (Majestic)Map point on OpenStreetMap (opens in a new tab) | 14.25 km | approx. 58 min |
| Electronic City Phase 1Map point on OpenStreetMap (opens in a new tab) | 15.96 km | approx. 65 min |
| Kempegowda International AirportMap point on OpenStreetMap (opens in a new tab) | 23.56 km | approx. 95 min |
How we calculate
Straight line: from the project’s map point on RERA to the destination’s point on OpenStreetMap.
Peak-hour drive is a rough estimate, not a route: straight line × 1.35 for the road network, at 20 km/h. Real times vary a lot with the route and the hour.
Sources:Source (openstreetmap.org) (opens in a new tab)How we calculate this
Schools and hospitals nearby
Within 2 km
- 30Schools and colleges20 schools, 6 colleges, 4 kindergartens
- 38Hospitals and clinics11 hospitals, 27 clinics
Nearest schools and colleges
- MTB School · 0.74 km
- Gopalan National School · 0.76 km
- KLAY Preschool and Day Care Bagmane WTC · 0.87 km
Nearest hospitals and clinics
- Tata Health Clinic · 0.46 km
- Chirayu Health care centre · 0.54 km
- Sai Kripa Nursing Home · 0.6 km
Places as mapped on OpenStreetMap (amenity=school, college, kindergarten, university; hospital, clinic), counted within 2 km in a straight line of the RERA map point. Volunteers map these, so some places may be missing or closed. Places data © OpenStreetMap contributors, extract of 5 Oct 2026.
Nearest metro station and railway
- Garudacharpalya (ಗರುಡಾಚಾರ್ ಪಾಳ್ಯ)Open now — nearest operating metro station0.61 km
- Hoodi Nearest railway station2.17 km
Straight-line distances from the RERA map point to the station points mapped on OpenStreetMap; status (open or under construction) as tagged there. Places data © OpenStreetMap contributors, extract of 5 Oct 2026.
Lake and lake-buffer check
The nearest mapped lake is Goshala Lake, 290 m from the project’s RERA map point.
The site boundary is not published as a shape, so its nearest edge can be closer than this point. Whether any building sits inside a lake buffer can only be checked on the approved plan.
- Goshala Lake on OpenStreetMap (opens in a new tab) (ಗೋಶಾಲ ಕೆರೆ)290 m
- Garudacharpalya Lake on OpenStreetMap (opens in a new tab) 475 m
- Mahadevapura Lake on OpenStreetMap (opens in a new tab) (ಕಗ್ಗದಾಸಪುರ ಕೆರೆ)759 m
The buffer rule
Bengaluru’s lake buffer rule has changed over time: the National Green Tribunal ordered a 75 m buffer in May 2016; the Supreme Court set that order aside on 5 March 2019, leaving the 30 m buffer of the Revised Master Plan 2015. Check the current rule and the approved plan before relying on either number.
- LiveLaw: SC sets aside NGT order enlarging buffer zones (2019) (livelaw.in) (opens in a new tab)
- Citizen Matters: Shrinking lake buffers (citizenmatters.in) (opens in a new tab)
Shortest distance from the RERA map point to the mapped water edge (OpenStreetMap water polygons tagged lake or reservoir, or named lake/kere/tank). Mapped shorelines can differ from the revenue-record boundary of a lake. Places data © OpenStreetMap contributors, extract of 5 Oct 2026.
Sources:Source (openstreetmap.org) (opens in a new tab)Source (livelaw.in) (opens in a new tab)Source (citizenmatters.in) (opens in a new tab)How we calculate this
Satellite time-lapse of the site
Satellite photos load when you scroll to them.
Photos from Esri World Imagery Wayback, centred on the project’s map point; dates are the capture dates in Esri’s metadata. Loaded from Esri when you scroll here.
Sources:Source (livingatlas.arcgis.com) (opens in a new tab)
Amrutha MMK Lumina floor plans, brochure and elevations
Documents the builder uploaded to Karnataka RERA, shown as filed. Tap a page to see it full size; the full PDF opens on the RERA website.
Brochure

BrochureFull PDF on RERA
Approved building plan6 pages

Approved Building PlanFull PDF on RERA
| Home type | Carpet area | Homes |
|---|---|---|
| 2 BHK | 760 – 836 sq ft | 16 |
| 3 BHK | 899 – 1,135 sq ft | 24 |
Home types, counts and carpet areas as filed with Karnataka RERA (carpet area, not super built-up).
We have not collected floor-plan drawings; the builder’s sales team can share them.
Amrutha MMK Lumina possession date and construction status
Timeline
- 1 Jul 2026Project start date given to RERA
- 7 Oct 2026Registered with Karnataka RERA
- 30 Apr 2028Completion date given at registration
Approvals and documents checklist
| Approval | Authority | Source |
|---|---|---|
| Building plan | BBMP - Bruhat Bengaluru Mahanagara Palike · No. GBA/BECC/0130/2025-26 · dated 2026-01-20 | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Land conversion | Deputy Commissioner, Bangalore District · No. ALN(KRP-1)SR/25/2022-23 · dated 2022-09-06 | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Commencement Certificate | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Approved Building Plan | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
Documents uploaded to RERA
- Building or layout plan · Approved drawings from the planning authorityFiled on RERA ✓ — BBMP - Bruhat Bengaluru Mahanagara Palike · No. GBA/BECC/0130/2025-26 · dated 20 Jan 2026
- Commencement certificate · Permission to start buildingFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
- Environment clearance · SEIAA KarnatakaNot on RERA yet
- Fire NOC · Karnataka Fire and Emergency ServicesNot on RERA yet
- Pollution board consent · KSPCBNot on RERA yet
- Water and sewerage · BWSSBNot on RERA yet
- Electricity · BESCOMNot on RERA yet
- Height clearance · Airports Authority of IndiaNot on RERA yet
- Occupancy certificate (OC) · Issued only when the building is finishedNot on RERA yet — expected at completion
From the documents the promoter uploaded to Karnataka RERA, collected 18 Oct 2026. “Filed” means a document is on RERA — we have not checked its contents or validity. Not every approval applies to every project (for example, smaller projects may not need an environment clearance). The project page on RERA lists each upload.
Amrutha MMK Lumina RERA complaints
No complaints listed on Karnataka RERA for this registration as on Source (rera.karnataka.gov.in) (opens in a new tab)
Court and consumer cases
We list case numbers, courts and outcomes only — never names of private individuals.
About M/s AMRUTHA CONSTRUCTIONS
- Promoter type
- Partnership Firm
- Projects on this site
- 1
- RERA complaints against promoter
- 0
- Company number (CIN)
- Not found in public records yet: CIN
From Karnataka RERA, as collected so far (18 Oct 2026). Complaints are those RERA lists against this promoter across all its projects.
M/s AMRUTHA CONSTRUCTIONS’s RERA recordM/s AMRUTHA CONSTRUCTIONS delivery record
- 1Projects in Bengaluru on RERA1 approved registration under M/s AMRUTHA CONSTRUCTIONS in Bengaluru Urban and Rural. Source (rera.karnataka.gov.in) (opens in a new tab)
- 40Homes registeredAs stated in each registrations.
- 0RERA complaintsas on Source (rera.karnataka.gov.in) (opens in a new tab)
- 0Complaints per 1,000 homes0 complaints ÷ 40 homes in its 1 registration on Karnataka RERA in Bengaluru.
Sources:Source (rera.karnataka.gov.in) (opens in a new tab)How we calculate this
What’s changed since Jan 2026
- 7 Oct 2026Registered with Karnataka RERA (PRM/KA/RERA/1251/446/PR/071026/008998); completion date 30 Apr 2028 Source (rera.karnataka.gov.in) (opens in a new tab)
- 1 Jul 2026Project start date in the RERA record Source (rera.karnataka.gov.in) (opens in a new tab)
- 20 Jan 2026Building plan approved by BBMP - Bruhat Bengaluru Mahanagara Palike (No. GBA/BECC/0130/2025-26) Source (rera.karnataka.gov.in) (opens in a new tab)
Newest first. No extension of the completion date is recorded on RERA. When the RERA crawl sees a new filing, complaint or extension, it is added here with its date.
Home loan EMI calculator
- Monthly EMI
- —
- Down payment
- —
- Loan amount
- —
- Total interest
- —
A calculation only, from the numbers you enter — not a loan offer.
All-in cost: GST, registration and other charges
The calculator loads when you scroll to it.
Assumptions
- Base price: the builder’s price is not published in a form we could collect — enter it from the cost sheet.
- GST 5% on the base price and charges — the usual rate for an under-construction home that is not “affordable housing” (1%).
- Stamp duty about 5.6% and registration 2% — the Karnataka rule (registration was raised from 1% to 2% on 31 Aug 2025). Calculated on the agreement value.
- Car parking, other charges and the maintenance deposit are not in the public record we collect; enter them from the builder’s cost sheet.
- Loan on the agreement value (banks usually lend up to 75–90%); EMI is the standard reducing-balance formula. Example rate only — use your bank’s quote.
Amrutha MMK Lumina FAQs
What is Amrutha MMK Lumina?
Amrutha MMK Lumina is a residential project by M/s Amrutha Constructions located in Mahadevapura, Bengaluru East.
How many homes are in Amrutha MMK Lumina?
The project has 40 homes across 2 towers.
What home types are available in Amrutha MMK Lumina?
The project offers 2 BHK homes with carpet area from 760 to 836 sq ft (16 homes) and 3 BHK homes with carpet area from 899 to 1,135 sq ft (24 homes).
When will Amrutha MMK Lumina be completed?
According to the RERA record, the project completion date is 30 April 2028.
What is the RERA registration number for Amrutha MMK Lumina?
The RERA registration number is PRM/KA/RERA/1251/446/PR/071026/008998, registered on 7 October 2026.
How many complaints are there against Amrutha MMK Lumina?
There are no RERA complaints on this project.
What is the location and PIN code of Amrutha MMK Lumina?
Amrutha MMK Lumina is located in Mahadevapura, Bengaluru East taluk, with PIN code 560048.
How many floors does Amrutha MMK Lumina have?
The project has a maximum of 3 floors across its 2 towers.
Which bank is the escrow bank for Amrutha MMK Lumina?
Union Bank of India is the escrow bank for this project.
How many other projects does the builder have on RERA record?
M/s Amrutha Constructions has 2 projects in the Bengaluru RERA records, with no complaints against the builder.
Written by AI from the RERA record above on 7 Oct 2026. Answers use only that record; check them against the source before you decide.
Questions about Amrutha MMK Lumina
No questions published yet. Ask the first one: you get an instant answer from this page’s public record, and our team follows up on anything the record does not show.
Bought a home from M/s AMRUTHA CONSTRUCTIONS? Review the builder.
Reviews of M/s AMRUTHA CONSTRUCTIONS by verified buyers
No verified reviews of M/s AMRUTHA CONSTRUCTIONS yet. If you bought a home from them, your review helps other buyers.
How reviews work: only buyers and owners can review; we confirm each purchase by phone before publishing, publish positive and negative reviews alike, never accept payment for reviews, and the builder may reply.
Similar projects within 5 km
| Project | Distance | Homes | Possession (RERA) | Built | Complaints | Price |
|---|---|---|---|---|---|---|
| Wf48Ozone Elegant Developers LLP | 0.9 km | 831 | Sep 2025extended | — | 25 | Not collected |
| Mahaveer CameliaReddy Structures Private Limited | 1.6 km | 92 | Oct 2026 | 47% | 0 | Not collected |
| Pursuit Of A Radical RhapsodyTotal Environment Habitat Private Limited | 2.2 km | 715 | Dec 2029extended | — | 5 | Not collected |
| Sai SrikaramYoga Builders | 2.2 km | 64 | Dec 2026 | 75% | 0 | Not collected |
| 2g TULATogetherments Infra Pvt Ltd | 2.5 km | 186 | Dec 2027extended | 78% | 0 | Not collected |
| Vikyath ElegantVikyath Properties Pvt Ltd | 2.5 km | 80 | Dec 2025 | — | 0 | Not collected |
Projects of the same kind within 5 km in a straight line of this project’s RERA map point, nearest first. % built is the promoter’s latest quarterly figure on RERA (shown for single-registration projects); prices are from the builder’s own website where we found one.
Sources and last checked dates
Collected on 18 Oct 2026 by AI research agents reading public pages. Facts are written in our own words. Not found yet: price; court cases; landmarks; specifications; news.
How to check on RERA: On rera.karnataka.gov.in/viewAllProjects, type the registration number in 'Registration No', press Search, then click the 'View Project Details' icon. Complaints open from the 'Complaints / Litigation' icon in the same row. Registration number: PRM/KA/RERA/1251/446/PR/071026/008998.
- RERA record last checked: 18 Oct 2026
- Last change in the record (registration, quarterly filing or complaint): 7 Oct 2026
How this page is made: software builds it from public records (Karnataka RERA filings, OpenStreetMap, the builder’s own website). AI is used only to read filings into fields and to write the plain-English summary and FAQ answers, which are checked against the record. Facts are checked automatically against the RERA filing. Methodology · How we earn · Report an error
More new projects in Mahadevapura
Mahadevpura, MahadevapuraArtist’s impressionUnder constructionRERA registeredBuyers’ group openWf48
by Ozone Elegant
Price: Price on requestGet brochure & price →
- 2 BHK, 3 BHK
- 942 – 2,180 sq ft
- Sep 2025 (extended)
RERA not updated since promised Sep 2025 · 831 homes · 25 RERA complaints
Be one of the first 10 buyers in this groupFounding members — it’s free
Join group for Wf48
Hoodi, MahadevapuraUnder constructionRERA registeredBuyers’ group openMahaveer Camelia
by Reddy Structures
Price: Price on requestGet brochure & price →
- 1 BHK, 2 BHK
- 427 – 833 sq ft
- Oct 2026
92 homes
Be one of the first 10 buyers in this groupFounding members — it’s free
Join group for Mahaveer Camelia
Hoodi, MahadevapuraUnder constructionRERA registeredBuyers’ group openPursuit Of A Radical Rhapsody
by Total Environment Habitat
Price: Price on requestGet brochure & price →
- 2 BHK, 3 BHK, 4 BHK, 5 BHK
- 846 – 18,056 sq ft
- Dec 2029 (extended)
4 phases on RERA · 715 homes · 5 RERA complaints
Be one of the first 10 buyers in this groupFounding members — it’s free
Join group for Pursuit Of A Radical Rhapsody