Mahaveer Camelia
1 & 2 BHK apartments by Reddy Structures Private Limited · Hoodi, Mahadevapura, Bengaluru
Hoodi, Mahadevapura, BengaluruOpen on Google Maps (opens in a new tab)
- Under construction
- RERA registered
- residential
by Reddy Structures Private Limited
Price: Price on request
Site photo filed with Karnataka RERA Karnataka RERA filing · Source ↗ (opens in a new tab)
Mahaveer Camelia at a glance
- Possession (RERA)Oct 2026Karnataka RERA
- Construction47% built · on pace for Apr 2031 53 mo after RERA dateRERA filing to 30 Sep 2026; estimate from average pace
- Homes booked0 of 92 (0%)RERA update · as on 30 Sep 2026
- RERA complaints (project)None listedKarnataka RERA · as on 22 Oct 2026
- Approvals filed5 of 9 on RERAKarnataka RERA uploads · 22 Oct 2026
- Nearest metroGarudacharpalya · 0.99 kmstraight line · OpenStreetMap, 5 Oct 2026
- Airport driveapprox. 91 min at peak22.43 km straight line · estimate
- Nearest lakeHoodi Lake · 521 mFrom the RERA map point · OpenStreetMap, 5 Oct 2026
Project summary
Mahaveer Camelia is a residential project by Reddy Structures Private Limited in Hoodi, Bengaluru with 92 homes, registered with Karnataka RERA. The completion date on RERA is 31 Oct 2026.
Facts collected on 22 Oct 2026 from public records — each linked to its source. Free for buyers. If you book through us, the builder pays us a commission.
Mahaveer Camelia buyers’ group: join to ask for a group price
No one has joined yet. Be one of the first 10 buyers in this group — the founding members.
Join free. When enough buyers have joined, our agent partner asks Reddy Structures Private Limited for a group price — for example a lower price, an easier payment plan or waived charges. Nothing is promised: you see what the builder offers and book directly with the builder if you want to. Free for buyers. If you book through us, the builder pays us a commission.
- Gathering buyers
- Talking to the builder
- Group offer
- Group site visit
- Booking
0 buyers have joined · 0 committed
Committed buyers have confirmed their budget, home type and timeline with us on a call; builders negotiate with them. Joining is free and never obliges you to buy.
Join the Mahaveer Camelia buyers’ groupHow group buying works
See it for yourself
Visit the site with our team, or get a call to clear your questions. Free, no obligation.
Key facts: home types, towers, land and possession
- Home types
- 1 BHK, 2 BHK
- Carpet area
- 427 – 833 sq ft
- Towers
- 1
- Floors
- 3
- Total homes
- 92
- Land
- 1.09 acres
- Possession (RERA)
- Oct 2026
- Built (RERA update)
- 47%
Mahaveer Camelia RERA number and registration details
- RERA number
- PRM/KA/RERA/1251/446/PR/041122/005406
- Registered on
- 4 Nov 2022
- Promised completion
- 31 Oct 2026
- Extended to
- No extension recorded
- RERA status
- New launch
- Homes booked
- 0 of 92 as on
- Price
- Not found in public records yet: price
- Project type
- Residential
Towers and blocks (RERA filing)
| Tower | Floors | Basements | Homes |
|---|---|---|---|
| Mahaveer Camelia | 3 | 0 | 92 |
A dash (—) means the filing did not state that value.
Summary in plain English
Mahaveer Camelia is a residential project by Reddy Structures Private Limited in Hoodi, Bengaluru East with 92 homes in 1 tower. The project is registered with Karnataka RERA and is scheduled for completion on 31 October 2026.
Written by AI from the RERA record above on 22 Oct 2026. Every number in it was checked against that record; if anything differs, the record wins.
Open space, home loans, escrow and other details
- Open space
- 52.7% of land
- Water and power
- Water source filed with RERA: BoreWell,BWSSB
- Home loans: approved banks
- Not found in public records yet: bank approvals
- Payment plans
- Not found in public records yet: payment plans
- Maintenance
- Not found in public records yet: maintenance
- Car parking
- Not found in public records yet: car parking charge
- Escrow bank (RERA)
- HDFC, Richmond Road Bengaluru
- Building plan (RERA)
- BBMP - Bruhat Bengaluru Mahanagara Palike · No. BBMP/Ad.Com./MDP/1303/20-21 · dated 5 Oct 2021
- Project cost declared to RERA
- ₹67.09 Cr
Open area as a share of the land, from the areas filed with RERA (includes driveways and landscaped areas).
Amenities
- Electricity
- CCTV Surveillance
- Club House
- Community Hall
- Outdoor Sports facility
- Indoor Sports facility
- Swimming Pool
- Gym
- Parks
- Power Backup
- Water and Sanitation
- Air Conditioning
Amenities and internal works as filed by the promoter with Karnataka RERA; we have not visited the site.
Mahaveer Camelia location and address
- Address
- SY NO:44/2, BBMP KATHA NO:688, SITUATED AT HOODI VILLAGE, K.R.PURAM HOBLI, , BANGALORE EAST TALUK, WARD NO:054 , Bengaluru East , Bengaluru Urban, Karnataka - 560036
- Village (RERA)
- Hoodi
- Locality
- Mahadevapura
- PIN code
- 560036
- City
- Bengaluru
- State
- Karnataka
- Coordinates
- 12.99914, 77.71076
Distances to landmarks
Not found in public records yet: landmarksAbout Mahadevapura
Not found in public records yet: locality factsCommute times to tech parks and the airport
| To | Straight line | Peak-hour drive (estimate) |
|---|---|---|
| ITPL, Whitefield (main gate)Map point on OpenStreetMap (opens in a new tab) | 3.19 km | approx. 13 min |
| Outer Ring Road tech corridor (RMZ Ecospace, Bellandur)Map point on OpenStreetMap (opens in a new tab) | 8.98 km | approx. 36 min |
| Manyata Tech ParkMap point on OpenStreetMap (opens in a new tab) | 11.25 km | approx. 46 min |
| KSR Bengaluru City railway station (Majestic)Map point on OpenStreetMap (opens in a new tab) | 15.48 km | approx. 63 min |
| Electronic City Phase 1Map point on OpenStreetMap (opens in a new tab) | 17.34 km | approx. 70 min |
| Kempegowda International AirportMap point on OpenStreetMap (opens in a new tab) | 22.43 km | approx. 91 min |
How we calculate
Straight line: from the project’s map point on RERA to the destination’s point on OpenStreetMap.
Peak-hour drive is a rough estimate, not a route: straight line × 1.35 for the road network, at 20 km/h. Real times vary a lot with the route and the hour.
Sources:Source (openstreetmap.org) (opens in a new tab)How we calculate this
Schools and hospitals nearby
Within 2 km
- 36Schools and colleges25 schools, 9 colleges, 2 kindergartens
- 46Hospitals and clinics15 hospitals, 31 clinics
Nearest schools and colleges
- Sri Krishna High School and PU College · 0.67 km
- The Brigade School · 0.85 km
- Hoodi High School · 0.91 km
Nearest hospitals and clinics
- Kids Health Link · 0.51 km
- Bharat Piles & Fistula Clinic · 0.51 km
- Amrutha Healthcare · 0.57 km
Places as mapped on OpenStreetMap (amenity=school, college, kindergarten, university; hospital, clinic), counted within 2 km in a straight line of the RERA map point. Volunteers map these, so some places may be missing or closed. Places data © OpenStreetMap contributors, extract of 5 Oct 2026.
Nearest metro station and railway
- Garudacharpalya (ಗರುಡಾಚಾರ್ ಪಾಳ್ಯ)Open now — nearest operating metro station0.99 km
- Hoodi Nearest railway station0.99 km
Straight-line distances from the RERA map point to the station points mapped on OpenStreetMap; status (open or under construction) as tagged there. Places data © OpenStreetMap contributors, extract of 5 Oct 2026.
Lake and lake-buffer check
The nearest mapped lake is Hoodi Lake, 521 m from the project’s RERA map point.
The site boundary is not published as a shape, so its nearest edge can be closer than this point. Whether any building sits inside a lake buffer can only be checked on the approved plan.
- Hoodi Lake on OpenStreetMap (opens in a new tab) (ಹೂಡಿ ಕೆರೆ)521 m
- Devasandra lake on OpenStreetMap (opens in a new tab) (ದೇವಸಂದ್ರ ಕೆರೆ)740 m
- Basavanapura Kere on OpenStreetMap (opens in a new tab) (ಬಸವನಪುರ ಕೆರೆ)1,136 m
The buffer rule
Bengaluru’s lake buffer rule has changed over time: the National Green Tribunal ordered a 75 m buffer in May 2016; the Supreme Court set that order aside on 5 March 2019, leaving the 30 m buffer of the Revised Master Plan 2015. Check the current rule and the approved plan before relying on either number.
- LiveLaw: SC sets aside NGT order enlarging buffer zones (2019) (livelaw.in) (opens in a new tab)
- Citizen Matters: Shrinking lake buffers (citizenmatters.in) (opens in a new tab)
Shortest distance from the RERA map point to the mapped water edge (OpenStreetMap water polygons tagged lake or reservoir, or named lake/kere/tank). Mapped shorelines can differ from the revenue-record boundary of a lake. Places data © OpenStreetMap contributors, extract of 5 Oct 2026.
Sources:Source (openstreetmap.org) (opens in a new tab)Source (livelaw.in) (opens in a new tab)Source (citizenmatters.in) (opens in a new tab)How we calculate this
Satellite time-lapse of the site
Satellite photos load when you scroll to them.
Photos from Esri World Imagery Wayback, centred on the project’s map point; dates are the capture dates in Esri’s metadata. Loaded from Esri when you scroll here.
Sources:Source (livingatlas.arcgis.com) (opens in a new tab)
Mahaveer Camelia home types and carpet areas
Documents the builder uploaded to Karnataka RERA, shown as filed. Tap a page to see it full size; the full PDF opens on the RERA website.
Approved building plan3 pages

Approved Building/Plotting PlanFull PDF on RERA
Approved layout plan3 files

Approved Layout PlanFull PDF on RERA 
Existing Layout PlanFull PDF on RERA 
CDP Camelia with demarcation.JPGFull PDF on RERA
Floor plans and brochure not published? The builder shares them only on request. We’ll get the brochure, floor plans and current price list for you, free.
Get brochure, floor plans & price| Home type | Carpet area | Homes |
|---|---|---|
| 1 BHK | 661 – 833 sq ft | 5 |
| 2 BHK | 427 – 833 sq ft | 87 |
Home types, counts and carpet areas as filed with Karnataka RERA (carpet area, not super built-up).
We have not collected floor-plan drawings; the builder’s sales team can share them.
Mahaveer Camelia possession date and construction status
Promoter’s quarterly update to RERA for Q2 2026-27, submitted 2026-10-08.
Units sold and unsold, from RERA (Q2 2026-27)
| Type | Homes | Booked | Available |
|---|---|---|---|
| 1 BHK | 5 | 0 | 5 |
| 2 BHK | 87 | 0 | 87 |
As reported by the promoter in the quarterly update to RERA, not verified by us.
Timeline
- 1 Oct 2022Project start date given to RERA
- 4 Nov 2022Registered with Karnataka RERA
- 31 Oct 2026Completion date given at registration
Construction pace from RERA quarterly filings
At the average pace so far, construction would reach 100% around Apr 2031 — about 53 months after the completion date on RERA (31 Oct 2026).
- Filed on RERA
- Average pace since start
- RERA completion date
Quarterly filings
| Quarter | Filed on | Built | Homes booked |
|---|---|---|---|
| Q2 2026-27to 30 Sep 2026 | 8 Oct 2026 | 47% | 0 of 92 |
| Q1 2026-27to 30 Jun 2026 | 3 Jul 2026 | 47% | 0 of 92 |
| Q4 2025-26to 31 Mar 2026 | 14 Apr 2026 | 47% | 0 of 92 |
| Q3 2025-26to 31 Dec 2025 | 3 Mar 2026 | 47% | 0 of 92 |
How we calculate
Average pace = % built ÷ months since the start date in the RERA record. Here: 47% ÷ 48 months (1 Oct 2022 to 30 Sep 2026) = 1% a month.
Estimated finish = latest filing date + (100 − % built) ÷ pace = 30 Sep 2026 + 53 ÷ 1 = 54.1 months → Apr 2031. This is an estimate, not a date from the builder or RERA.
A straight line is a simplification: the builder reports one overall %, which mixes excavation, structure and finishing, and work rarely moves at a constant speed. The % values are the promoter’s own figures filed with RERA, not checked by us. Promoter’s quarterly update to RERA for Q2 2026-27, submitted 2026-10-08.
Sources:Source (rera.karnataka.gov.in) (opens in a new tab)How we calculate this
Approvals and documents checklist
14 rows: approvals. Scroll inside the table to see them all.
| Approval | Authority | Source |
|---|---|---|
| Building plan | BBMP - Bruhat Bengaluru Mahanagara Palike · No. BBMP/Ad.Com./MDP/1303/20-21 · dated 2021-10-05 | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Land conversion | DC Bengaluru · No. ALN [EKHW] SR 10/2011-12 · dated 2011-08-05 | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Commencement Certificate | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Electricity Permission Letter | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Water Permission Letter | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Approved Layout Plan | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Approved Building/Plotting Plan | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Approved Section Of Building/Infrastructure Plan of Plotting | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Change of Land Use | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| District Magistrate | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Conversion Certificate under section 95 of the KLR Act 1964 | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| ESCOM/Electricity | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| KWSSB/Water | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| KSPCB | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
Documents uploaded to RERA
- Building or layout plan · Approved drawings from the planning authorityFiled on RERA ✓ — BBMP - Bruhat Bengaluru Mahanagara Palike · No. BBMP/Ad.Com./MDP/1303/20-21 · dated 5 Oct 2021
- Commencement certificate · Permission to start buildingFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
- Environment clearance · SEIAA KarnatakaNot on RERA yet
- Fire NOC · Karnataka Fire and Emergency ServicesNot on RERA yet
- Pollution board consent · KSPCBFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
- Water and sewerage · BWSSBFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
- Electricity · BESCOMFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
- Height clearance · Airports Authority of IndiaNot on RERA yet
- Occupancy certificate (OC) · Issued only when the building is finishedNot on RERA yet — expected at completion
From the documents the promoter uploaded to Karnataka RERA, collected 22 Oct 2026. “Filed” means a document is on RERA — we have not checked its contents or validity. Not every approval applies to every project (for example, smaller projects may not need an environment clearance). The project page on RERA lists each upload.
Mahaveer Camelia RERA complaints
No complaints listed on Karnataka RERA for this registration as on Source (rera.karnataka.gov.in) (opens in a new tab)
Court and consumer cases
We list case numbers, courts and outcomes only — never names of private individuals.
About Reddy Structures Private Limited
- Promoter type
- Company
- Projects on this site
- 4
- RERA complaints against promoter
- 102
- Company number (CIN)
- U07010KA2002PTC031181
From Karnataka RERA, as collected so far (22 Oct 2026). Complaints are those RERA lists against this promoter across all its projects.
Reddy Structures Private Limited’s RERA recordReddy Structures Private Limited delivery record
- 4Projects in Bengaluru on RERA4 approved registrations under Reddy Structures Private Limited in Bengaluru Urban and Rural. Source (rera.karnataka.gov.in) (opens in a new tab)
- 960Homes registeredAs stated in each registrations.
- 102RERA complaints0 open, 102 disposed. as on Source (rera.karnataka.gov.in) (opens in a new tab)
- 106.3Complaints per 1,000 homes102 complaints ÷ 960 homes in its 4 registrations on Karnataka RERA in Bengaluru.
What the complaints are about
102 complaint subjects as written on RERA, as on . Each subject is sorted into one group by keywords (first match wins: delay, refund, registration, quality, litigation, association); one complaint often raises several issues. Source (rera.karnataka.gov.in) (opens in a new tab)
Sources:Source (rera.karnataka.gov.in) (opens in a new tab)How we calculate this
What’s changed since Oct 2021
- 8 Oct 2026Quarterly update filed for Q2 2026-27: 47% built, 0 of 92 homes booked Source (rera.karnataka.gov.in) (opens in a new tab)
- 3 Jul 2026Quarterly update filed for Q1 2026-27: 47% built, 0 of 92 homes booked Source (rera.karnataka.gov.in) (opens in a new tab)
- 14 Apr 2026Quarterly update filed for Q4 2025-26: 47% built, 0 of 92 homes booked Source (rera.karnataka.gov.in) (opens in a new tab)
- 3 Mar 2026Quarterly update filed for Q3 2025-26: 47% built, 0 of 92 homes booked Source (rera.karnataka.gov.in) (opens in a new tab)
- 4 Nov 2022Registered with Karnataka RERA (PRM/KA/RERA/1251/446/PR/041122/005406); completion date 31 Oct 2026 Source (rera.karnataka.gov.in) (opens in a new tab)
- 1 Oct 2022Project start date in the RERA record Source (rera.karnataka.gov.in) (opens in a new tab)
- 5 Oct 2021Building plan approved by BBMP - Bruhat Bengaluru Mahanagara Palike (No. BBMP/Ad.Com./MDP/1303/20-21) Source (rera.karnataka.gov.in) (opens in a new tab)
Newest first. No extension of the completion date is recorded on RERA. When the RERA crawl sees a new filing, complaint or extension, it is added here with its date.
Home loan EMI calculator
- Monthly EMI
- —
- Down payment
- —
- Loan amount
- —
- Total interest
- —
A calculation only, from the numbers you enter — not a loan offer.
All-in cost: GST, registration and other charges
The calculator loads when you scroll to it.
Assumptions
- Base price: the builder’s price is not published in a form we could collect — enter it from the cost sheet.
- GST 5% on the base price and charges — the usual rate for an under-construction home that is not “affordable housing” (1%).
- Stamp duty about 5.6% and registration 2% — the Karnataka rule (registration was raised from 1% to 2% on 31 Aug 2025). Calculated on the agreement value.
- Car parking, other charges and the maintenance deposit are not in the public record we collect; enter them from the builder’s cost sheet.
- Loan on the agreement value (banks usually lend up to 75–90%); EMI is the standard reducing-balance formula. Example rate only — use your bank’s quote.
Mahaveer Camelia FAQs
What is Mahaveer Camelia?
Mahaveer Camelia is a residential project developed by Reddy Structures Private Limited located in Hoodi, Bengaluru East with PIN code 560036.
How many homes are in Mahaveer Camelia?
The project has 92 homes across 1 tower with a maximum of 3 floors.
What home types are available in Mahaveer Camelia?
The project offers 2 BHK homes (87 units, carpet area 427 to 833 sq ft) and 1 BHK homes (5 units, carpet area 661 to 833 sq ft).
What is the RERA registration number for Mahaveer Camelia?
The project is registered with RERA number PRM/KA/RERA/1251/446/PR/041122/005406, registered on 4 November 2022.
When will Mahaveer Camelia be completed?
According to the RERA record, the project completion date is 31 October 2026.
What is the construction progress of Mahaveer Camelia?
As of Q2 2026-27 (quarter ended 30 September 2026), the project is 47% complete.
How many homes are booked in Mahaveer Camelia?
As of the latest quarterly update (Q2 2026-27), 0 homes are booked out of 92 homes available.
Are there any RERA complaints on Mahaveer Camelia?
There are no RERA complaints filed on this project registration.
What is the builder's track record?
Reddy Structures Private Limited has 11 projects in the Bengaluru RERA records and 102 complaints filed against the builder across all projects.
Which bank holds the escrow for Mahaveer Camelia?
HDFC is the escrow bank for this project.
Written by AI from the RERA record above on 22 Oct 2026. Answers use only that record; check them against the source before you decide.
Questions about Mahaveer Camelia
No questions published yet. Ask the first one: you get an instant answer from this page’s public record, and our team follows up on anything the record does not show.
Bought a home from Reddy Structures Private Limited? Review the builder.
Reviews of Reddy Structures Private Limited by verified buyers
No verified reviews of Reddy Structures Private Limited yet. If you bought a home from them, your review helps other buyers.
How reviews work: only buyers and owners can review; we confirm each purchase by phone before publishing, publish positive and negative reviews alike, never accept payment for reviews, and the builder may reply.
Similar projects within 5 km
| Project | Distance | Homes | Possession (RERA) | Built | Complaints | Price |
|---|---|---|---|---|---|---|
| 2g TULATogetherments Infra Pvt Ltd | 0.9 km | 186 | Dec 2027extended | 78% | 0 | Not collected |
| Jai Fortune SquareJai Builders | 1.2 km | 136 | Dec 2025 | — | 0 | Not collected |
| Jai SignatureJai Shelters , H.A.Venugopal & 10 Others | 1.2 km | 50 | Mar 2028 | — | 0 | Not collected |
| Garuda GrandBalaji Buildres | 1.3 km | 136 | Mar 2028extended | 87% | 0 | Not collected |
| Vikyath ElegantVikyath Properties Pvt Ltd | 1.3 km | 80 | Dec 2025 | — | 0 | Not collected |
| Amrutha MMK LuminaM/s AMRUTHA CONSTRUCTIONS | 1.6 km | 40 | Apr 2028 | — | 0 | Not collected |
Projects of the same kind within 5 km in a straight line of this project’s RERA map point, nearest first. % built is the promoter’s latest quarterly figure on RERA (shown for single-registration projects); prices are from the builder’s own website where we found one.
Sources and last checked dates
Collected on 22 Oct 2026 by AI research agents reading public pages. Facts are written in our own words. Not found yet: price; court cases; landmarks; specifications; news.
How to check on RERA: On rera.karnataka.gov.in/viewAllProjects, type the registration number in 'Registration No', press Search, then click the 'View Project Details' icon. Complaints open from the 'Complaints / Litigation' icon in the same row. Registration number: PRM/KA/RERA/1251/446/PR/041122/005406.
- RERA record last checked: 22 Oct 2026
- Last change in the record (registration, quarterly filing or complaint): 11 Oct 2026
How this page is made: software builds it from public records (Karnataka RERA filings, OpenStreetMap, the builder’s own website). AI is used only to read filings into fields and to write the plain-English summary and FAQ answers, which are checked against the record. Facts are checked automatically against the RERA filing. Methodology · How we earn · Report an error
More new projects in Mahadevapura
Hoodi, MahadevapuraUnder constructionRERA registeredBuyers’ group open2g TULA
by Togetherments Infra
Price: Price on requestGet brochure & price →
- 3 BHK
- 1,049 – 1,198 sq ft
- Dec 2027 (extended)
186 homes
Be one of the first 10 buyers in this groupFounding members — it’s free
Join group for 2g TULA
Hoodi, near MahadevapuraUnder constructionRERA registeredBuyers’ group openJai Fortune Square
by Jai Builders
Price: Price on requestGet brochure & price →
- 2 BHK, 3 BHK
- 653 – 1,143 sq ft
- Dec 2025
RERA not updated since promised Dec 2025 · 136 homes
Be one of the first 10 buyers in this groupFounding members — it’s free
Join group for Jai Fortune Square
Hoodi, near MahadevapuraUnder constructionRERA registeredBuyers’ group openJai Signature
by Jai Shelters , H.A.Venugopal & 10 Others
Price: Price on requestGet brochure & price →
- 2 BHK, 3 BHK
- 418 – 723 sq ft
- Mar 2028
50 homes
Be one of the first 10 buyers in this groupFounding members — it’s free
Join group for Jai Signature