Assetz Bloom & Dell
3 & 4 BHK apartments by Apg Premium Residential Private Limited · Doddabanahalli, Old Madras Road, Bengaluru
Doddabanahalli, Old Madras Road, BengaluruOpen on Google Maps (opens in a new tab)
- Under construction
- RERA registered
- residential
by Apg Premium Residential Private Limited
Price: Price on request
Site photo filed with Karnataka RERA Karnataka RERA filing · Source ↗ (opens in a new tab)
Assetz Bloom & Dell at a glance
- Possession (RERA)Oct 2027Karnataka RERA
- Construction89% built · on pace for Mar 2027RERA filing to 30 Sep 2026 (Main registration); estimate from average pace
- RERA complaints (project)None listedKarnataka RERA · as on 22 Oct 2026
- Approvals filed8 of 9 on RERAKarnataka RERA uploads · 22 Oct 2026
- Nearest metroWhitefield (Kadugodi) · 3.52 kmstraight line · OpenStreetMap, 5 Oct 2026
- Airport driveapprox. 81 min at peak20.03 km straight line · estimate
- Nearest lakeBidare Agrahara Lake · 697 mFrom the RERA map point · OpenStreetMap, 5 Oct 2026
Project summary
Assetz Bloom & Dell is a residential project by Apg Premium Residential Private Limited in Doddabanahalli, Bengaluru with 446 homes, registered with Karnataka RERA. The completion date on RERA is 31 Oct 2027. It is registered in 2 phases.
Facts collected on 22 Oct 2026 from public records — each linked to its source. Free for buyers. If you book through us, the builder pays us a commission.
Assetz Bloom & Dell buyers’ group: join to ask for a group price
No one has joined yet. Be one of the first 10 buyers in this group — the founding members.
Join free. When enough buyers have joined, our agent partner asks Apg Premium Residential Private Limited for a group price — for example a lower price, an easier payment plan or waived charges. Nothing is promised: you see what the builder offers and book directly with the builder if you want to. Free for buyers. If you book through us, the builder pays us a commission.
- Gathering buyers
- Talking to the builder
- Group offer
- Group site visit
- Booking
0 buyers have joined · 0 committed
Committed buyers have confirmed their budget, home type and timeline with us on a call; builders negotiate with them. Joining is free and never obliges you to buy.
Join the Assetz Bloom & Dell buyers’ groupHow group buying works
See it for yourself
Visit the site with our team, or get a call to clear your questions. Free, no obligation.
Key facts: home types, towers, land and possession
- Home types
- Studio, 3 BHK, 4 BHK
- Carpet area
- 231 – 1,775 sq ft
- Towers
- 4
- Floors
- 14
- Total homes
- 446
- Land
- 7.73 acres
- Possession (RERA)
- Oct 2027
- Built (RERA update)
- Not found in public records yet: construction progress
Assetz Bloom & Dell RERA number and registration details
- RERA number
- PRM/KA/RERA/1251/446/PR/201222/005545
- Registered on
- 20 Dec 2022
- Promised completion
- 31 Oct 2027
- Extended to
- No extension recorded
- RERA status
- New launch
- Homes booked
- Not found in public records yet: homes booked
- Price
- Not found in public records yet: price
- Project type
- Residential
2 RERA registrations (one per phase) are shown together on this page; dates above are the latest across phases.
Phases and RERA numbers
| Phase | RERA number | Promised completion | Homes | Status | Source |
|---|---|---|---|---|---|
| Main registration | PRM/KA/RERA/1251/446/PR/201222/005545 | 30 Jun 2027 | 208 | New launch | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Phase 2 | PRM/KA/RERA/1251/446/PR/050523/005911 | 31 Oct 2027 | 238 | New launch | Source (rera.karnataka.gov.in) (opens in a new tab) |
Towers and blocks (RERA filing)
| Tower | Phase | Floors | Basements | Homes |
|---|---|---|---|---|
| Tower A | Main registration | 13 | 1 | 104 |
| Tower B | Main registration | 13 | 1 | 104 |
| Tower C | Phase 2 | 13 | 1 | 130 |
| TOWER-D | Phase 2 | 14 | 1 | 108 |
A dash (—) means the filing did not state that value.
Open space, home loans, escrow and other details
- Open space
- Not found in public records yet: open space
- Water and power
- Water source filed with RERA: Local Authority
- Home loans: approved banks
- Not found in public records yet: bank approvals
- Payment plans
- Not found in public records yet: payment plans
- Maintenance
- Not found in public records yet: maintenance
- Car parking
- Not found in public records yet: car parking charge
- Escrow bank (RERA) · Main registration
- ICICI Bank, Kumara Park Bangalore
- Escrow bank (RERA) · Phase 2
- ICICI Bank, Kumara Park
Amenities
- Electricity
- CCTV Surveillance
- Club House
- Outdoor Sports facility
- Indoor Sports facility
- Swimming Pool
- Gym
- Parks
- Power Backup
- Water and Sanitation
- Community Hall
- Air Conditioning
Amenities and internal works as filed by the promoter with Karnataka RERA; we have not visited the site.
Assetz Bloom & Dell location and address
- Address
- Sy.No. 109/1, 109/2,109/10 & 110 , Doddabanahalli Village, Bidarahalli Hobli, Bengaluru East Taluk, , Bengaluru East , Bengaluru Urban, Karnataka - 560067
- Village (RERA)
- Doddabanahalli
- Locality
- Old Madras RoadAlso known as OMR, Old Madras Road
- PIN code
- 560067
- City
- Bengaluru
- State
- Karnataka
- Coordinates
- 13.02522, 77.74618
Distances to landmarks
Not found in public records yet: landmarksAbout Old Madras Road
Not found in public records yet: locality factsCommute times to tech parks and the airport
| To | Straight line | Peak-hour drive (estimate) |
|---|---|---|
| ITPL, Whitefield (main gate)Map point on OpenStreetMap (opens in a new tab) | 4.28 km | approx. 17 min |
| Outer Ring Road tech corridor (RMZ Ecospace, Bellandur)Map point on OpenStreetMap (opens in a new tab) | 13.3 km | approx. 54 min |
| Manyata Tech ParkMap point on OpenStreetMap (opens in a new tab) | 13.92 km | approx. 56 min |
| KSR Bengaluru City railway station (Majestic)Map point on OpenStreetMap (opens in a new tab) | 19.84 km | approx. 80 min |
| Kempegowda International AirportMap point on OpenStreetMap (opens in a new tab) | 20.03 km | approx. 81 min |
| Electronic City Phase 1Map point on OpenStreetMap (opens in a new tab) | 21.41 km | approx. 87 min |
How we calculate
Straight line: from the project’s map point on RERA to the destination’s point on OpenStreetMap.
Peak-hour drive is a rough estimate, not a route: straight line × 1.35 for the road network, at 20 km/h. Real times vary a lot with the route and the hour.
Sources:Source (openstreetmap.org) (opens in a new tab)How we calculate this
Schools and hospitals nearby
Within 2 km
- 8Schools and colleges8 schools, 0 colleges, 0 kindergartens
- 3Hospitals and clinics3 hospitals, 0 clinics
Nearest schools and colleges
- Auxillium School · 1.67 km
- Lake Montfort · 1.9 km
Nearest hospitals and clinics
- Kannamangala Primary Health Center · 1.62 km
- Geetha Hospital · 1.67 km
- S.N. Hospital · 1.71 km
Places as mapped on OpenStreetMap (amenity=school, college, kindergarten, university; hospital, clinic), counted within 2 km in a straight line of the RERA map point. Volunteers map these, so some places may be missing or closed. Places data © OpenStreetMap contributors, extract of 5 Oct 2026.
Nearest metro station and railway
- Whitefield (Kadugodi) (ವೈಟ್ಫೀಲ್ಡ್ (ಕಾಡುಗೋಡಿ))Open now — nearest operating metro station3.52 km
- Whitefield (ವೈಟ್ಫೀಲ್ಡ್)Nearest railway station3.6 km
Straight-line distances from the RERA map point to the station points mapped on OpenStreetMap; status (open or under construction) as tagged there. Places data © OpenStreetMap contributors, extract of 5 Oct 2026.
Lake and lake-buffer check
The nearest mapped lake is Bidare Agrahara Lake, 697 m from the project’s RERA map point.
The site boundary is not published as a shape, so its nearest edge can be closer than this point. Whether any building sits inside a lake buffer can only be checked on the approved plan.
- Bidare Agrahara Lake on OpenStreetMap (opens in a new tab) 697 m
- Unnamed lake (mapped on OpenStreetMap) on OpenStreetMap (opens in a new tab) 888 m
- Yellamallappa Chetty Lake on OpenStreetMap (opens in a new tab) (ಯೆಲ್ಲಮಲ್ಲಪ್ಪ ಚೆಟ್ಟಿ ಕೆರೆ)1,213 m
The buffer rule
Bengaluru’s lake buffer rule has changed over time: the National Green Tribunal ordered a 75 m buffer in May 2016; the Supreme Court set that order aside on 5 March 2019, leaving the 30 m buffer of the Revised Master Plan 2015. Check the current rule and the approved plan before relying on either number.
- LiveLaw: SC sets aside NGT order enlarging buffer zones (2019) (livelaw.in) (opens in a new tab)
- Citizen Matters: Shrinking lake buffers (citizenmatters.in) (opens in a new tab)
Shortest distance from the RERA map point to the mapped water edge (OpenStreetMap water polygons tagged lake or reservoir, or named lake/kere/tank). Mapped shorelines can differ from the revenue-record boundary of a lake. Places data © OpenStreetMap contributors, extract of 5 Oct 2026.
Sources:Source (openstreetmap.org) (opens in a new tab)Source (livelaw.in) (opens in a new tab)Source (citizenmatters.in) (opens in a new tab)How we calculate this
Satellite time-lapse of the site
Satellite photos load when you scroll to them.
Photos from Esri World Imagery Wayback, centred on the project’s map point; dates are the capture dates in Esri’s metadata. Loaded from Esri when you scroll here.
Sources:Source (livingatlas.arcgis.com) (opens in a new tab)
Assetz Bloom & Dell floor plans, brochure and elevations
Documents the builder uploaded to Karnataka RERA, shown as filed. Tap a page to see it full size; the full PDF opens on the RERA website.
Brochure4 files

Main registration: BrochureFull PDF on RERA 
Phase 2: BrochureFull PDF on RERA 







Main registration: Annexure 34-Bloom Dell - BrochureFiled 5 Dec 2022 · Full PDF on RERA 







Phase 2: E-Brochure_Tower CDFiled 25 Apr 2023 · Full PDF on RERA 






Floor plans

Phase 2: Annexure 12b-Tower C & D Basement Floor PlanFiled 25 Apr 2023 · Full PDF on RERA
Elevations2 pages

Phase 2: Area Development Plan Of Project AreaFull PDF on RERA
Approved building plan2 files

Phase 2: Approved Building/Plotting PlanFull PDF on RERA 
Main registration: Annexure 16-Approved Building PlanFiled 5 Dec 2022 · Full PDF on RERA
| Home type | Carpet area | Homes |
|---|---|---|
| 3 BHK | 1,292 – 1,356 sq ft | 390 |
| 4 BHK | 1,775 sq ft | 4 |
| Ews, 3 BHK , 4 BHK | 1,097 sq ft | 238 |
| Studio | 231 – 237 sq ft | 52 |
Home types, counts and carpet areas as filed with Karnataka RERA (carpet area, not super built-up).
We have not collected floor-plan drawings; the builder’s sales team can share them.
Assetz Bloom & Dell possession date and construction status
Timeline
- 20 Dec 2022Main registration: Registered with Karnataka RERA
- 1 Jan 2023Main registration: Project start date given to RERA
- 2 May 2023Phase 2: Project start date given to RERA
- 5 May 2023Phase 2: Registered with Karnataka RERA
- 30 Jun 2027Main registration: Completion date given at registration
- 31 Oct 2027Phase 2: Completion date given at registration
Construction pace from RERA quarterly filings (Main registration)
At the average pace so far, construction would reach 100% around Mar 2027 — about 3 months before the completion date on RERA (30 Jun 2027).
At the pace between the 4 quarterly filings we have (79% → 89% in 9 months), it would be around Jul 2027 — about 1 month after the RERA date.
This project has 2 RERA registrations; the chart uses Main registration, the one with the most quarterly filings.
- Filed on RERA
- Average pace since start
- Pace between filings (and 0% assumed at the start date)
- RERA completion date
Quarterly filings
| Quarter | Filed on | Built | Homes booked |
|---|---|---|---|
| Q2 2026-27to 30 Sep 2026 | 15 Oct 2026 | 89% | 208 of 208 |
| Q1 2026-27to 30 Jun 2026 | 15 Jul 2026 | 87% | 208 of 208 |
| Q4 2025-26to 31 Mar 2026 | 15 Apr 2026 | 81% | 208 of 208 |
| Q3 2025-26to 31 Dec 2025 | 10 Mar 2026 | 79% | 208 of 208 |
How we calculate
Average pace = % built ÷ months since the start date in the RERA record. Here: 89% ÷ 44.9 months (1 Jan 2023 to 30 Sep 2026) = 2% a month.
Estimated finish = latest filing date + (100 − % built) ÷ pace = 30 Sep 2026 + 11 ÷ 2 = 5.6 months → Mar 2027. This is an estimate, not a date from the builder or RERA.
Pace between filings = (89% − 79%) ÷ 9 months = 1.1% a month.
A straight line is a simplification: the builder reports one overall %, which mixes excavation, structure and finishing, and work rarely moves at a constant speed. The % values are the promoter’s own figures filed with RERA, not checked by us.
Sources:Source (rera.karnataka.gov.in) (opens in a new tab)How we calculate this
Approvals and documents checklist
29 rows: approvals. Scroll inside the table to see them all.
| Approval | Authority | Source |
|---|---|---|
| Building plan (Main registration) | BDA - Bangalore Development Authority · No. BDA/LP/EM/EO-1/TA-04/E/32/2022-23 · dated 2022-11-24 | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Land conversion (4 orders) (Main registration) | Deputy Commissioner · No. ALN/EBK/SR/42/18-19 and 3 more · dated 2020-07-24 | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Commencement Certificate (Main registration) | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Electricity Permission Letter (Main registration) | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Water Permission Letter (Main registration) | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Approved Section Of Building/Infrastructure Plan of Plotting (Main registration) | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Change of Land Use (Main registration) | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Conversion Certificate under section 95 of the KLR Act 1964 (Main registration) | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| ESCOM/Electricity (Main registration) | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| KWSSB/Water (Main registration) | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Fire Force Department (Main registration) | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Airport Authority of India (Main registration) | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| KSPCB (Main registration) | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| SEIAA (Main registration) | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Building plan (Phase 2) | BDA - Bangalore Development Authority · No. BDA/LP/EM/EO-1/TA-04/E/51/2022-23 · dated 2023-03-17 | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Land conversion (4 orders) (Phase 2) | Deputy Commissioner · No. ALN/EBK/SR/42/18-19 and 3 more · dated 2020-07-24 | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Commencement Certificate (Phase 2) | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Electricity Permission Letter (Phase 2) | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Water Permission Letter (Phase 2) | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Approved Building/Plotting Plan (Phase 2) | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Approved Section Of Building/Infrastructure Plan of Plotting (Phase 2) | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Change of Land Use (Phase 2) | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Conversion Certificate under section 95 of the KLR Act 1964 (Phase 2) | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| ESCOM/Electricity (Phase 2) | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| KWSSB/Water (Phase 2) | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Fire Force Department (Phase 2) | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Airport Authority of India (Phase 2) | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| KSPCB (Phase 2) | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| SEIAA (Phase 2) | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
Documents uploaded to RERA (Phase 2)
- Building or layout plan · Approved drawings from the planning authorityFiled on RERA ✓ — BDA - Bangalore Development Authority · No. BDA/LP/EM/EO-1/TA-04/E/51/2022-23 · dated 17 Mar 2023
- Commencement certificate · Permission to start buildingFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
- Environment clearance · SEIAA KarnatakaFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
- Fire NOC · Karnataka Fire and Emergency ServicesFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
- Pollution board consent · KSPCBFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
- Water and sewerage · BWSSBFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
- Electricity · BESCOMFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
- Height clearance · Airports Authority of IndiaFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
- Occupancy certificate (OC) · Issued only when the building is finishedNot on RERA yet — expected at completion
From the documents the promoter uploaded to Karnataka RERA, collected 22 Oct 2026. “Filed” means a document is on RERA — we have not checked its contents or validity. Not every approval applies to every project (for example, smaller projects may not need an environment clearance). Each phase is registered separately; this list is for the phase named above. The project page on RERA lists each upload.
Assetz Bloom & Dell RERA complaints
No complaints listed on Karnataka RERA for these registrations as on Source (rera.karnataka.gov.in) (opens in a new tab)
Court and consumer cases
We list case numbers, courts and outcomes only — never names of private individuals.
About Apg Premium Residential Private Limited
- Promoter type
- Company
- Projects on this site
- 2
- RERA complaints against promoter
- 1
- Company number (CIN)
- U45201KA2018PTC114159
From Karnataka RERA, as collected so far (22 Oct 2026). Complaints are those RERA lists against this promoter across all its projects.
Apg Premium Residential Private Limited’s RERA recordApg Premium Residential Private Limited delivery record
- 2Projects in Bengaluru on RERA3 approved registrations under Apg Premium Residential Private Limited in Bengaluru Urban and Rural. Source (rera.karnataka.gov.in) (opens in a new tab)
- 664Homes registeredAs stated in each registrations.
- 1RERA complaints0 open, 1 disposed. as on Source (rera.karnataka.gov.in) (opens in a new tab)
- 1.5Complaints per 1,000 homes1 complaints ÷ 664 homes in its 3 registrations on Karnataka RERA in Bengaluru.
What the complaints are about
1 complaint subject as written on RERA, as on . Each subject is sorted into one group by keywords (first match wins: delay, refund, registration, quality, litigation, association); one complaint often raises several issues. Source (rera.karnataka.gov.in) (opens in a new tab)
Sources:Source (rera.karnataka.gov.in) (opens in a new tab)How we calculate this
What’s changed since Nov 2022
- 15 Oct 2026Main registration: Quarterly update filed for Q2 2026-27: 89% built, 208 of 208 homes booked Source (rera.karnataka.gov.in) (opens in a new tab)
- 15 Jul 2026Main registration: Quarterly update filed for Q1 2026-27: 87% built, 208 of 208 homes booked Source (rera.karnataka.gov.in) (opens in a new tab)
- 15 Apr 2026Main registration: Quarterly update filed for Q4 2025-26: 81% built, 208 of 208 homes booked Source (rera.karnataka.gov.in) (opens in a new tab)
- 15 Apr 2026Phase 2: Quarterly update filed for Q4 2025-26: 100% built, 238 of 238 homes booked Source (rera.karnataka.gov.in) (opens in a new tab)
- 11 Mar 2026Phase 2: Quarterly update filed for Q3 2025-26: 90% built, 238 of 238 homes booked Source (rera.karnataka.gov.in) (opens in a new tab)
- 10 Mar 2026Main registration: Quarterly update filed for Q3 2025-26: 79% built, 208 of 208 homes booked Source (rera.karnataka.gov.in) (opens in a new tab)
- 5 May 2023Phase 2: Registered with Karnataka RERA (PRM/KA/RERA/1251/446/PR/050523/005911); completion date 31 Oct 2027 Source (rera.karnataka.gov.in) (opens in a new tab)
- 2 May 2023Phase 2: Project start date in the RERA record Source (rera.karnataka.gov.in) (opens in a new tab)
- 17 Mar 2023Phase 2: Building plan approved by BDA - Bangalore Development Authority (No. BDA/LP/EM/EO-1/TA-04/E/51/2022-23) Source (rera.karnataka.gov.in) (opens in a new tab)
- 1 Jan 2023Main registration: Project start date in the RERA record Source (rera.karnataka.gov.in) (opens in a new tab)
- 20 Dec 2022Main registration: Registered with Karnataka RERA (PRM/KA/RERA/1251/446/PR/201222/005545); completion date 30 Jun 2027 Source (rera.karnataka.gov.in) (opens in a new tab)
- 24 Nov 2022Main registration: Building plan approved by BDA - Bangalore Development Authority (No. BDA/LP/EM/EO-1/TA-04/E/32/2022-23) Source (rera.karnataka.gov.in) (opens in a new tab)
Newest first. No extension of the completion date is recorded on RERA. When the RERA crawl sees a new filing, complaint or extension, it is added here with its date.
Home loan EMI calculator
- Monthly EMI
- —
- Down payment
- —
- Loan amount
- —
- Total interest
- —
A calculation only, from the numbers you enter — not a loan offer.
All-in cost: GST, registration and other charges
The calculator loads when you scroll to it.
Assumptions
- Base price: the builder’s price is not published in a form we could collect — enter it from the cost sheet.
- GST 5% on the base price and charges — the usual rate for an under-construction home that is not “affordable housing” (1%).
- Stamp duty about 5.6% and registration 2% — the Karnataka rule (registration was raised from 1% to 2% on 31 Aug 2025). Calculated on the agreement value.
- Car parking, other charges and the maintenance deposit are not in the public record we collect; enter them from the builder’s cost sheet.
- Loan on the agreement value (banks usually lend up to 75–90%); EMI is the standard reducing-balance formula. Example rate only — use your bank’s quote.
Assetz Bloom & Dell FAQs
Questions about Assetz Bloom & Dell
No questions published yet. Ask the first one: you get an instant answer from this page’s public record, and our team follows up on anything the record does not show.
Bought a home from Apg Premium Residential Private Limited? Review the builder.
Reviews of Apg Premium Residential Private Limited by verified buyers
No verified reviews of Apg Premium Residential Private Limited yet. If you bought a home from them, your review helps other buyers.
How reviews work: only buyers and owners can review; we confirm each purchase by phone before publishing, publish positive and negative reviews alike, never accept payment for reviews, and the builder may reply.
Similar projects within 5 km
| Project | Distance | Homes | Possession (RERA) | Built | Complaints | Price |
|---|---|---|---|---|---|---|
| Amrutha Lake VistaAmrutha Shelters Private Limited | 0.7 km | 523 | Apr 2031 | 25% | 0 | Not collected |
| Sarang By SumadhuraSumadhura Infracon Private Limited | 0.8 km | 410 | Jun 2027 | — | 0 | Not collected |
| Godrej SplendourGodrej Properties Limited | 1.6 km | 2,052 | Jan 2028 | — | 5 | from ₹1.1 Crabout ₹21,300/sq ft carpet |
| Sattva AanganeSattva Resi Private Limited | 1.6 km | 625 | Oct 2032 | 3% | 0 | Not collected |
| Bren AsperaBren Corporation Private Limited | 1.6 km | 394 | Nov 2026extended | 94% | 0 | Not collected |
| Sekhar OakwoodsSekhar Builders And Infratech Private Limited | 1.6 km | 96 | Mar 2027 | 92% | 0 | Not collected |
Projects of the same kind within 5 km in a straight line of this project’s RERA map point, nearest first. % built is the promoter’s latest quarterly figure on RERA (shown for single-registration projects); prices are from the builder’s own website where we found one.
Sources and last checked dates
Collected on 22 Oct 2026 by AI research agents reading public pages. Facts are written in our own words. Not found yet: price; court cases; landmarks; specifications; news.
How to check on RERA: On rera.karnataka.gov.in/viewAllProjects, type the registration number in 'Registration No', press Search, then click the 'View Project Details' icon. Complaints open from the 'Complaints / Litigation' icon in the same row. Registration numbers: PRM/KA/RERA/1251/446/PR/201222/005545, PRM/KA/RERA/1251/446/PR/050523/005911.
- RERA record last checked: 22 Oct 2026
- Last change in the record (registration, quarterly filing or complaint): 22 Oct 2026
How this page is made: software builds it from public records (Karnataka RERA filings, OpenStreetMap, the builder’s own website). AI is used only to read filings into fields and to write the plain-English summary and FAQ answers, which are checked against the record. Facts are checked automatically against the RERA filing. Methodology · How we earn · Report an error
More new projects in Old Madras Road
Bidare Agrahara, Old Madras RoadUnder constructionRERA registeredBuyers’ group openAmrutha Lake Vista
by Amrutha Shelters
Price: Price on requestGet brochure & price →
- 3 BHK
- 965 – 1,250 sq ft
- Apr 2031
523 homes
Be one of the first 10 buyers in this groupFounding members — it’s free
Join group for Amrutha Lake Vista
Doddabanahalli, Old Madras RoadUnder constructionRERA registeredBuyers’ group openSarang By Sumadhura
by Sumadhura Infracon
Price: Price on requestGet brochure & price →
- 2 BHK, 3 BHK, 4 BHK
- 770 – 1,640 sq ft
- Jun 2027
2 phases on RERA · 410 homes
Be one of the first 10 buyers in this groupFounding members — it’s free
Join group for Sarang By Sumadhura
Bandapura, Old Madras RoadArtist’s impressionUnder constructionRERA registeredBuyers’ group openSattva Aangane
by Sattva Resi
Price: Price on requestGet brochure & price →
- 3 BHK, 4 BHK, 5 BHK
- 1,063 – 3,091 sq ft
- Oct 2032
625 homes
Be one of the first 10 buyers in this groupFounding members — it’s free
Join group for Sattva Aangane