Meridian Park
2 & 3 BHK apartments by Prestige Projects Private Limited · Valagere Kallahalli, Dommasandra, Bengaluru
Valagere Kallahalli, Dommasandra, BengaluruOpen on Google Maps (opens in a new tab)
- Completion filed with RERA
- RERA registered
- residential
Ready homes still available: 6 of 2,900 homes were unsold when the builder filed completion with RERA (10 Sep 2026). Some may have sold since — join the group and we’ll ask the builder what is left and for a group price.
by Prestige Projects Private Limited
Price: Price on request
Site photo filed with Karnataka RERA Karnataka RERA filing · Source ↗ (opens in a new tab)
Meridian Park at a glance
- Possession (RERA)Aug 2026 ExtendedWas Feb 2026 · Karnataka RERA
- RERA complaints (project)7 complaintsKarnataka RERA · as on 4 Oct 2026
- Approvals filed8 of 9 on RERAKarnataka RERA uploads · 4 Oct 2026
- Nearest metroHuskur Road · 10.4 kmstraight line · OpenStreetMap, 5 Oct 2026
- Airport driveapprox. 148 min at peak36.6 km straight line · estimate
- Nearest lakeSompura Lake · 552 mFrom the RERA map point · OpenStreetMap, 5 Oct 2026
Project summary
Meridian Park is a residential project by Prestige Projects Private Limited in Valagere Kallahalli, Bengaluru with 2,900 homes, registered with Karnataka RERA. The completion date on RERA is 27 Aug 2026. It is registered in 3 phases.
Facts collected on 4 Oct 2026 from public records — each linked to its source. Free for buyers. If you book through us, the builder pays us a commission.
Meridian Park buyers’ group: join to ask for a group price
No one has joined yet. Be one of the first 10 buyers in this group — the founding members.
Join free. When enough buyers have joined, our agent partner asks Prestige Projects Private Limited for a group price — for example a lower price, an easier payment plan or waived charges. Nothing is promised: you see what the builder offers and book directly with the builder if you want to. Free for buyers. If you book through us, the builder pays us a commission.
- Gathering buyers
- Talking to the builder
- Group offer
- Group site visit
- Booking
0 buyers have joined · 0 committed
Committed buyers have confirmed their budget, home type and timeline with us on a call; builders negotiate with them. Joining is free and never obliges you to buy.
Join the Meridian Park buyers’ groupHow group buying works
See it for yourself
Visit the site with our team, or get a call to clear your questions. Free, no obligation.
Key facts: home types, towers, land and possession
- Home types
- 2 BHK, 3 BHK
- Carpet area
- 838 – 1,359 sq ft
- Towers
- 16
- Floors
- 31
- Total homes
- 2,900
- Land
- 168.28 acres
- Possession (extended)
- Aug 2026
- Built (RERA update)
- Not found in public records yet: construction progress
Meridian Park RERA number and registration details
- RERA number
- PRM/KA/RERA/1251/308/PR/090222/004684
- Registered on
- 9 Feb 2022
- Promised completion
- 28 Feb 2026
- Extended to
- 27 Aug 2026
- RERA status
- Completed
- Homes booked
- Not found in public records yet: homes booked
- Price
- Not found in public records yet: price
- Project type
- Residential
3 RERA registrations (one per phase) are shown together on this page; dates above are the latest across phases.
Phases and RERA numbers
| Phase | RERA number | Promised completion | Homes | Status | Source |
|---|---|---|---|---|---|
| Phase I @ The Prestige City | PRM/KA/RERA/1251/308/PR/090222/004684 | 14 Jul 2025Extended to 14 Jan 2026 | 898 | Completed | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Phase II @ The Prestige City | PRM/KA/RERA/1251/308/PR/230522/004901 | 14 Jan 2026Extended to 13 Jul 2026 | 1,104 | Completed | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Phase III @ The Prestige City | PRM/KA/RERA/1251/308/PR/110822/005151 | 28 Feb 2026Extended to 27 Aug 2026 | 898 | Completed | Source (rera.karnataka.gov.in) (opens in a new tab) |
Towers and blocks (RERA filing)
16 rows: towers. Scroll inside the table to see them all.
| Tower | Phase | Floors | Basements | Homes |
|---|---|---|---|---|
| Building 5 - T6 | Phase I @ The Prestige City | 30 | 2 | 180 |
| Building 5 - T7 | Phase I @ The Prestige City | 30 | 2 | 180 |
| Building 5 - T8 | Phase I @ The Prestige City | 30 | 2 | 180 |
| Building 5 - T9 | Phase I @ The Prestige City | 30 | 2 | 178 |
| Building 5 - T10 | Phase I @ The Prestige City | 30 | 2 | 180 |
| Building 6 - T1 | Phase II @ The Prestige City | 31 | 2 | 186 |
| Building 6 - T2 | Phase II @ The Prestige City | 31 | 2 | 186 |
| Building 6 - T3 | Phase II @ The Prestige City | 31 | 2 | 186 |
| Building 6 - T4 | Phase II @ The Prestige City | 31 | 2 | 186 |
| Building 6 - T5 | Phase II @ The Prestige City | 30 | 2 | 180 |
| Building 6 - T6 | Phase II @ The Prestige City | 30 | 2 | 180 |
| Building 5 - T1 | Phase III @ The Prestige City | 30 | 2 | 180 |
| Building 5 - T2 | Phase III @ The Prestige City | 30 | 2 | 178 |
| Building 5 - T3 | Phase III @ The Prestige City | 30 | 2 | 180 |
| Building 5 - T4 | Phase III @ The Prestige City | 30 | 2 | 180 |
| Building 5 - T5 | Phase III @ The Prestige City | 30 | 2 | 180 |
A dash (—) means the filing did not state that value.
Summary in plain English
Meridian Park is a residential project by Prestige Projects Private Limited in Valagere Kallahalli, Anekal, with 2,900 homes across three phases and five to six towers each. Phase I completion is set for 14 January 2026, Phase II for 13 July 2026, and Phase III for 27 August 2026.
Written by AI from the RERA record above on 5 Oct 2026. Every number in it was checked against that record; if anything differs, the record wins.
Open space, home loans, escrow and other details
- Open space
- Not found in public records yet: open space
- Water and power
- Water source filed with RERA: BoreWell,Local Authority, Local Authority
- Home loans: approved banks
- Not found in public records yet: bank approvals
- Payment plans
- Not found in public records yet: payment plans
- Maintenance
- Not found in public records yet: maintenance
- Car parking
- Not found in public records yet: car parking charge
- Escrow bank (RERA) · Phase I @ The Prestige City
- KOTAK MAHINDRA BANK, Lavelle Road Branch
- Escrow bank (RERA) · Phase II @ The Prestige City
- KOTAK MAHINDRA BANK, LAVELLE ROAD
- Escrow bank (RERA) · Phase III @ The Prestige City
- KOTAK MAHINDRA BANK, Lavelle Road
Amenities
- Electricity
- CCTV Surveillance
- Club House
- Community Hall
- Outdoor Sports facility
- Indoor Sports facility
- Swimming Pool
- Gym
- Parks
- Power Backup
- Water and Sanitation
Amenities and internal works as filed by the promoter with Karnataka RERA; we have not visited the site.
Meridian Park location and address
- Address
- Sy.Nos. 19/2, 19/3, 19/4, 20/1,20/2, 21, (New No.21/1, 21/2,21/4), 21/5, 22/1, 22/2A (new No.22/5), 22/2B, 22/3, 23/2 (new No.23/3,23/4 & 23/5) , 24/1, 24/2 and Sy.No.25 of Valagere Kallahalli Village, Sarjapura Hobli, Anekal taluk, Bangalore , Anekal , Bengaluru Urban, Karnataka - 562125
- Village (RERA)
- Valagere Kallahalli
- Locality
- Dommasandra
- PIN code
- 562125
- City
- Bengaluru
- State
- Karnataka
- Coordinates
- 12.87691, 77.76518
Distances to landmarks
Not found in public records yet: landmarksAbout Dommasandra
Not found in public records yet: locality factsCommute times to tech parks and the airport
| To | Straight line | Peak-hour drive (estimate) |
|---|---|---|
| Outer Ring Road tech corridor (RMZ Ecospace, Bellandur)Map point on OpenStreetMap (opens in a new tab) | 10.48 km | approx. 42 min |
| Electronic City Phase 1Map point on OpenStreetMap (opens in a new tab) | 11.28 km | approx. 46 min |
| ITPL, Whitefield (main gate)Map point on OpenStreetMap (opens in a new tab) | 12.67 km | approx. 51 min |
| KSR Bengaluru City railway station (Majestic)Map point on OpenStreetMap (opens in a new tab) | 24 km | approx. 97 min |
| Manyata Tech ParkMap point on OpenStreetMap (opens in a new tab) | 24.71 km | approx. 100 min |
| Kempegowda International AirportMap point on OpenStreetMap (opens in a new tab) | 36.6 km | approx. 148 min |
How we calculate
Straight line: from the project’s map point on RERA to the destination’s point on OpenStreetMap.
Peak-hour drive is a rough estimate, not a route: straight line × 1.35 for the road network, at 20 km/h. Real times vary a lot with the route and the hour.
Sources:Source (openstreetmap.org) (opens in a new tab)How we calculate this
Schools and hospitals nearby
Within 2 km
- 7Schools and colleges4 schools, 3 colleges, 0 kindergartens
- 5Hospitals and clinics3 hospitals, 2 clinics
Nearest schools and colleges
- International School Of Management Excellence · 0.65 km
- Oakridge International School · 1.84 km
Nearest hospitals and clinics
- Thyrocare · 0.37 km
- Spandana · 1.13 km
- Healing Hands Clinic - Sarjapura, Bengaluru · 1.18 km
Places as mapped on OpenStreetMap (amenity=school, college, kindergarten, university; hospital, clinic), counted within 2 km in a straight line of the RERA map point. Volunteers map these, so some places may be missing or closed. Places data © OpenStreetMap contributors, extract of 5 Oct 2026.
Nearest metro station and railway
- Huskur Road (ಹುಸ್ಕೂರು ರಸ್ತೆ)Open now — nearest operating metro station10.4 km
- Huskuru (ಹುಸ್ಕೂರ್)Nearest railway station6.23 km
Straight-line distances from the RERA map point to the station points mapped on OpenStreetMap; status (open or under construction) as tagged there. Places data © OpenStreetMap contributors, extract of 5 Oct 2026.
Lake and lake-buffer check
The nearest mapped lake is Sompura Lake, 552 m from the project’s RERA map point.
The site boundary is not published as a shape, so its nearest edge can be closer than this point. Whether any building sits inside a lake buffer can only be checked on the approved plan.
- Sompura Lake on OpenStreetMap (opens in a new tab) 552 m
- Yamare Lake on OpenStreetMap (opens in a new tab) 724 m
- Thiagalara Chowdenahalli Lake on OpenStreetMap (opens in a new tab) 862 m
The buffer rule
Bengaluru’s lake buffer rule has changed over time: the National Green Tribunal ordered a 75 m buffer in May 2016; the Supreme Court set that order aside on 5 March 2019, leaving the 30 m buffer of the Revised Master Plan 2015. Check the current rule and the approved plan before relying on either number.
- LiveLaw: SC sets aside NGT order enlarging buffer zones (2019) (livelaw.in) (opens in a new tab)
- Citizen Matters: Shrinking lake buffers (citizenmatters.in) (opens in a new tab)
Shortest distance from the RERA map point to the mapped water edge (OpenStreetMap water polygons tagged lake or reservoir, or named lake/kere/tank). Mapped shorelines can differ from the revenue-record boundary of a lake. Places data © OpenStreetMap contributors, extract of 5 Oct 2026.
Sources:Source (openstreetmap.org) (opens in a new tab)Source (livelaw.in) (opens in a new tab)Source (citizenmatters.in) (opens in a new tab)How we calculate this
Satellite time-lapse of the site
Satellite photos load when you scroll to them.
Photos from Esri World Imagery Wayback, centred on the project’s map point; dates are the capture dates in Esri’s metadata. Loaded from Esri when you scroll here.
Sources:Source (livingatlas.arcgis.com) (opens in a new tab)
Meridian Park home types and carpet areas
Floor plans and brochure not published? The builder shares them only on request. We’ll get the brochure, floor plans and current price list for you, free.
Get brochure, floor plans & price| Home type | Carpet area | Homes |
|---|---|---|
| D2 - 3 BHK | 943 sq ft | 310 |
| D2 - 3bed | 943 sq ft | 310 |
| D2 3bed (compact) | 943 sq ft | 36 |
| D2-3bed(compact) | 943 sq ft | 522 |
| E4 - 3bed | 1,121 sq ft | 298 |
| E4 3bed (medium) | 1,121 sq ft | 20 |
| E4- 3bed(medium) | 1,121 sq ft | 356 |
| E4-3 BHK | 1,121 sq ft | 368 |
| E4-3bed(medium) | 1,121 sq ft | 290 |
| E6- 3bed(medium) | 1,120 sq ft | 368 |
| E6-3 BHK | 1,120 sq ft | 368 |
| E6a-2 BHK | 838 sq ft | 12 |
| E6a-2bed(odd) | 838 sq ft | 12 |
| E8 - 3 BHK | 1,125 sq ft | 298 |
| E8- 3bed(medium) | 1,125 sq ft | 238 |
| F1 - 3 BHK | 1,276 sq ft | 56 |
| F1-3 BHK | 1,276 sq ft | 116 |
| F1-3bed(large) | 1,276 sq ft | 116 |
| F1a - 2 BHK | 985 sq ft | 2 |
| F1a- 2 bed(odd) | 986 sq ft | 2 |
| F1a-2 bed(odd) | 986 sq ft | 2 |
| F1a-2 BHK | 985 sq ft | 4 |
| F2 - 3 BHK | 1,265 sq ft | 224 |
| F2 - 3bed | 1,265 sq ft | 280 |
| F2 3bed (large) | 1,265 sq ft | 26 |
| F2-3 BHK | 1,359 sq ft | 228 |
| F2-3bed(large) | 1,265 sq ft | 706 |
| F2a - 2 BHK | 974 sq ft | 8 |
| F2a - 2bed | 974 sq ft | 10 |
| F2a 2 bed odd | 975 sq ft | 26 |
| F2a-2 BHK | 974 sq ft | 8 |
| Na | 943 – 1,276 sq ft | 180 |
Home types, counts and carpet areas as filed with Karnataka RERA (carpet area, not super built-up).
We have not collected floor-plan drawings; the builder’s sales team can share them.
Meridian Park possession date and construction status
Timeline
- 9 Feb 2022Phase I @ The Prestige City: Registered with Karnataka RERA
- 15 Mar 2022Phase I @ The Prestige City: Project start date given to RERA
- 23 May 2022Phase II @ The Prestige City: Registered with Karnataka RERA
- 11 Aug 2022Phase III @ The Prestige City: Registered with Karnataka RERA
- 15 Sep 2022Phase II @ The Prestige City: Project start date given to RERA
- 1 Nov 2022Phase III @ The Prestige City: Project start date given to RERA
- 14 Jul 2025Phase I @ The Prestige City: Completion date given at registration
- 14 Jan 2026Phase I @ The Prestige City: Section 6 Extension: completion date moved to this date
- 14 Jan 2026Phase I @ The Prestige City: Promoter applied to RERA for completion
- 14 Jan 2026Phase II @ The Prestige City: Completion date given at registration
- 28 Feb 2026Phase III @ The Prestige City: Completion date given at registration
- 13 Jul 2026Phase II @ The Prestige City: Section 6 Extension: completion date moved to this date
- 31 Jul 2026Phase II @ The Prestige City: Promoter applied to RERA for completion
- 27 Aug 2026Phase III @ The Prestige City: Section 6 Extension: completion date moved to this date
- 10 Sep 2026Phase III @ The Prestige City: Promoter applied to RERA for completion
Approvals and documents checklist
44 rows: approvals. Scroll inside the table to see them all.
| Approval | Authority | Source |
|---|---|---|
| Building plan (Phase I @ The Prestige City) | BMRDA - Bangalore Metropolitan Region Development Authority · No. APA/LAO/44/2018-19 · dated 2021-01-29 | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Land conversion (14 orders) (Phase I @ The Prestige City) | DC, Bangalore District · No. ALN (A) (S) SR:40/2013-14 and 13 more · dated 2020-11-17 | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Commencement Certificate (Phase I @ The Prestige City) | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Electricity Permission Letter (Phase I @ The Prestige City) | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Water Permission Letter (Phase I @ The Prestige City) | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Approved Layout Plan (Phase I @ The Prestige City) | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Approved Building/Plotting Plan (Phase I @ The Prestige City) | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Approved Section Of Building/Infrastructure Plan of Plotting (Phase I @ The Prestige City) | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| ESCOM/Electricity (Phase I @ The Prestige City) | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| KWSSB/Water (Phase I @ The Prestige City) | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Fire Force Department (Phase I @ The Prestige City) | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Airport Authority of India (Phase I @ The Prestige City) | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| KSPCB (Phase I @ The Prestige City) | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| SEIAA (Phase I @ The Prestige City) | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Building plan (Phase II @ The Prestige City) | BMRDA - Bangalore Metropolitan Region Development Authority · No. APA/LAO/44/2018-19 · dated 2021-01-29 | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Land conversion (15 orders) (Phase II @ The Prestige City) | DC, Bangalore District · No. ALN (A) (S) SR:40/2013-14 and 14 more · dated 2020-11-17 | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Commencement Certificate (Phase II @ The Prestige City) | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Electricity Permission Letter (Phase II @ The Prestige City) | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Water Permission Letter (Phase II @ The Prestige City) | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Approved Layout Plan (Phase II @ The Prestige City) | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Approved Building/Plotting Plan (Phase II @ The Prestige City) | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Approved Section Of Building/Infrastructure Plan of Plotting (Phase II @ The Prestige City) | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Conversion Certificate under section 95 of the KLR Act 1964 (Phase II @ The Prestige City) | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| ESCOM/Electricity (Phase II @ The Prestige City) | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| KWSSB/Water (Phase II @ The Prestige City) | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Fire Force Department (Phase II @ The Prestige City) | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Airport Authority of India (Phase II @ The Prestige City) | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| KSPCB (Phase II @ The Prestige City) | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| SEIAA (Phase II @ The Prestige City) | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Building plan (Phase III @ The Prestige City) | BMRDA - Bangalore Metropolitan Region Development Authority · No. APA/LAO/44/2018-19 · dated 2021-01-29 | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Land conversion (14 orders) (Phase III @ The Prestige City) | DC, Bangalore · No. ALN (A) (S) SR:40/2013-14 and 13 more · dated 2020-11-17 | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Commencement Certificate (Phase III @ The Prestige City) | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Electricity Permission Letter (Phase III @ The Prestige City) | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Water Permission Letter (Phase III @ The Prestige City) | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Approved Layout Plan (Phase III @ The Prestige City) | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Approved Building/Plotting Plan (Phase III @ The Prestige City) | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Approved Section Of Building/Infrastructure Plan of Plotting (Phase III @ The Prestige City) | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Conversion Certificate under section 95 of the KLR Act 1964 (Phase III @ The Prestige City) | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| ESCOM/Electricity (Phase III @ The Prestige City) | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| KWSSB/Water (Phase III @ The Prestige City) | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Fire Force Department (Phase III @ The Prestige City) | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Airport Authority of India (Phase III @ The Prestige City) | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| KSPCB (Phase III @ The Prestige City) | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| SEIAA (Phase III @ The Prestige City) | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
Documents uploaded to RERA (Phase II @ The Prestige City)
- Building or layout plan · Approved drawings from the planning authorityFiled on RERA ✓ — BMRDA - Bangalore Metropolitan Region Development Authority · No. APA/LAO/44/2018-19 · dated 29 Jan 2021
- Commencement certificate · Permission to start buildingFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
- Environment clearance · SEIAA KarnatakaFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
- Fire NOC · Karnataka Fire and Emergency ServicesFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
- Pollution board consent · KSPCBFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
- Water and sewerage · BWSSBFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
- Electricity · BESCOMFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
- Height clearance · Airports Authority of IndiaFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
- Occupancy certificate (OC) · Issued only when the building is finishedNot on RERA yet
From the documents the promoter uploaded to Karnataka RERA, collected 4 Oct 2026. “Filed” means a document is on RERA — we have not checked its contents or validity. Not every approval applies to every project (for example, smaller projects may not need an environment clearance). Each phase is registered separately; this list is for the phase named above. The project page on RERA lists each upload.
Meridian Park RERA complaints and orders
7 complaints as on Source (rera.karnataka.gov.in) (opens in a new tab)
| Complaint ref | Filed | Subject | Status | Source |
|---|---|---|---|---|
| 01142/2026 | 22 Sep 2026 | Delay in handover of possession of Flat No. 61301, Meridian Park Phase II @ The Prestige City, and claim for interest under Section 18(1) of RERA | Scrutiny completed | Source (rera.karnataka.gov.in) (opens in a new tab) |
| 01111/2026 | 9 Sep 2026 | Complaint under Section 31 read with Section 18(1) of RERA for delayed possession and rental expenses incurred due to the delay. | Disposed | Source (rera.karnataka.gov.in) (opens in a new tab) |
| 01070/2026 | 29 Aug 2026 | Complaint for Delayed Possession of Flat No. 61092 and Claim for Interest/Compensation under Section 18(1) of RERA | Under enquiry | Source (rera.karnataka.gov.in) (opens in a new tab) |
| 00737/2026 | 24 Jun 2026 | Possession of Flat delayed by 9 months. | Posted for orders | Source (rera.karnataka.gov.in) (opens in a new tab) |
| 00450/2026 | 27 Apr 2026 | Complaint under Section 18 of RERA for Delay in Possession, Misrepresentation, and Unjustified Payment Demands – Prestige City Meridian Park Phase 2 (RERA PRM/KA/RERA/1251308PR230522004901) | Posted for orders | Source (rera.karnataka.gov.in) (opens in a new tab) |
| 00291/2026 | 24 Mar 2026 | compensation for rental loss, mental stress, legal cost and misrepresenation by the builder regarding project completion. | Under enquiry ao | Source (rera.karnataka.gov.in) (opens in a new tab) |
| 01283/2025 | 15 Oct 2025 | Interst due to delay in possession on amount deposited with builder. | Disposed | Source (rera.karnataka.gov.in) (opens in a new tab) |
Court and consumer cases
We list case numbers, courts and outcomes only — never names of private individuals.
About Prestige Projects Private Limited
- Promoter type
- Company
- Projects on this site
- 7
- RERA complaints against promoter
- 17
- Company number (CIN)
- U45201KA2008PTC046784
From Karnataka RERA, as collected so far (4 Oct 2026). Complaints are those RERA lists against this promoter across all its projects.
Prestige Projects Private Limited’s RERA recordPrestige Projects Private Limited delivery record
- 7Projects in Bengaluru on RERA9 approved registrations under Prestige Projects Private Limited in Bengaluru Urban and Rural. Source (rera.karnataka.gov.in) (opens in a new tab)
- 13,158Homes registeredAs stated in each registrations.
- 17RERA complaints12 open, 5 disposed. as on Source (rera.karnataka.gov.in) (opens in a new tab)
- 1.3Complaints per 1,000 homes17 complaints ÷ 13,158 homes in its 9 registrations on Karnataka RERA in Bengaluru.
- 4Completion filed on RERARegistrations where the promoter applied to RERA for completion; 4 with an occupancy certificate on RERA.
- 0 of 4Filed by the date given at registrationMedian gap 6.2 months (on-time ones count as 0). The completion application can come after handover, so this is an upper bound on lateness.
What the complaints are about
17 complaint subjects as written on RERA, as on . Each subject is sorted into one group by keywords (first match wins: delay, refund, registration, quality, litigation, association); one complaint often raises several issues. Source (rera.karnataka.gov.in) (opens in a new tab)
Completion filed on RERA
| Project | Date at registration | Completion filed | Gap |
|---|---|---|---|
| Meridian Park Phase III @ The Prestige CityOC on RERA | 28 Feb 2026extended to 27 Aug 2026 | 10 Sep 2026 | 6 months after |
| Meridian Park Phase II @ The Prestige CityOC on RERA | 14 Jan 2026extended to 13 Jul 2026 | 31 Jul 2026 | 7 months after |
| Meridian Park Phase I @ The Prestige CityOC on RERA | 14 Jul 2025extended to 14 Jan 2026 | 14 Jan 2026 | 6 months after |
| Eden Park @ The Prestige CityOC on RERA | 31 May 2025extended to 30 Nov 2025 | 28 Nov 2025 | 6 months after |
Measured against the completion date given at registration; many projects had RERA extensions (including the COVID-period extension), shown under the date.
Sources:Source (rera.karnataka.gov.in) (opens in a new tab)How we calculate this
What’s changed since Jan 2021
- 22 Sep 2026Complaint 01142/2026 filed with RERA: “Delay in handover of possession of Flat No. 61301, Meridian Park Phase II @ The Prestige City, and claim for interest under Section 18(1) of RERA” — now scrutiny completed Source (rera.karnataka.gov.in) (opens in a new tab)
- 10 Sep 2026Phase III @ The Prestige City: Promoter applied to RERA for completion (occupancy certificate on RERA) Source (rera.karnataka.gov.in) (opens in a new tab)
- 9 Sep 2026Complaint 01111/2026 filed with RERA: “Complaint under Section 31 read with Section 18(1) of RERA for delayed possession and rental expenses incurred due to the delay.” — now disposed Source (rera.karnataka.gov.in) (opens in a new tab)
- 2 Sep 2026Phase III @ The Prestige City: Quarterly update filed for Q2 2026-27: 100% built, 898 of 898 homes booked Source (rera.karnataka.gov.in) (opens in a new tab)
- 29 Aug 2026Complaint 01070/2026 filed with RERA: “Complaint for Delayed Possession of Flat No. 61092 and Claim for Interest/Compensation under Section 18(1) of RERA” — now under enquiry Source (rera.karnataka.gov.in) (opens in a new tab)
- 27 Aug 2026Phase III @ The Prestige City: Completion date extended to 27 Aug 2026 Source (rera.karnataka.gov.in) (opens in a new tab)
- 31 Jul 2026Phase II @ The Prestige City: Promoter applied to RERA for completion (occupancy certificate on RERA) Source (rera.karnataka.gov.in) (opens in a new tab)
- 29 Jul 2026Phase II @ The Prestige City: Quarterly update filed for Q2 2026-27: 100% built, 1,103 of 1,103 homes booked Source (rera.karnataka.gov.in) (opens in a new tab)
- 15 Jul 2026Phase II @ The Prestige City: Quarterly update filed for Q1 2026-27: 93% built, 1,104 of 1,104 homes booked Source (rera.karnataka.gov.in) (opens in a new tab)
- 15 Jul 2026Phase III @ The Prestige City: Quarterly update filed for Q1 2026-27: 91% built, 898 of 898 homes booked Source (rera.karnataka.gov.in) (opens in a new tab)
- 13 Jul 2026Phase II @ The Prestige City: Completion date extended to 13 Jul 2026 Source (rera.karnataka.gov.in) (opens in a new tab)
- 24 Jun 2026Complaint 00737/2026 filed with RERA: “Possession of Flat delayed by 9 months.” — now posted for orders Source (rera.karnataka.gov.in) (opens in a new tab)
- 27 Apr 2026Complaint 00450/2026 filed with RERA: “Complaint under Section 18 of RERA for Delay in Possession, Misrepresentation, and Unjustified Payment Demands – Prestige City Meridian Park Phase 2 (RERA PRM/KA/RERA/1251308PR230522004901)” — now posted for orders Source (rera.karnataka.gov.in) (opens in a new tab)
- 15 Apr 2026Phase II @ The Prestige City: Quarterly update filed for Q4 2025-26: 89% built, 1,104 of 1,104 homes booked Source (rera.karnataka.gov.in) (opens in a new tab)
- 15 Apr 2026Phase III @ The Prestige City: Quarterly update filed for Q4 2025-26: 90% built, 898 of 898 homes booked Source (rera.karnataka.gov.in) (opens in a new tab)
- 24 Mar 2026Complaint 00291/2026 filed with RERA: “compensation for rental loss, mental stress, legal cost and misrepresenation by the builder regarding project completion.” — now under enquiry Source (rera.karnataka.gov.in) (opens in a new tab)
- 15 Jan 2026Phase II @ The Prestige City: Quarterly update filed for Q3 2025-26: 92% built, 1,104 of 1,104 homes booked Source (rera.karnataka.gov.in) (opens in a new tab)
- 15 Jan 2026Phase III @ The Prestige City: Quarterly update filed for Q3 2025-26: 93% built, 898 of 898 homes booked Source (rera.karnataka.gov.in) (opens in a new tab)
- 14 Jan 2026Phase I @ The Prestige City: Quarterly update filed for Q3 2025-26: 100% built, 898 of 898 homes booked Source (rera.karnataka.gov.in) (opens in a new tab)
- 14 Jan 2026Phase I @ The Prestige City: Quarterly update filed for Q4 2025-26: 100% built, 898 of 898 homes booked Source (rera.karnataka.gov.in) (opens in a new tab)
- 14 Jan 2026Phase I @ The Prestige City: Promoter applied to RERA for completion (occupancy certificate on RERA) Source (rera.karnataka.gov.in) (opens in a new tab)
- 14 Jan 2026Phase I @ The Prestige City: Completion date extended to 14 Jan 2026 Source (rera.karnataka.gov.in) (opens in a new tab)
- 15 Oct 2025Complaint 01283/2025 filed with RERA: “Interst due to delay in possession on amount deposited with builder.” — now disposed Source (rera.karnataka.gov.in) (opens in a new tab)
- 1 Nov 2022Phase III @ The Prestige City: Project start date in the RERA record Source (rera.karnataka.gov.in) (opens in a new tab)
- 15 Sep 2022Phase II @ The Prestige City: Project start date in the RERA record Source (rera.karnataka.gov.in) (opens in a new tab)
- 11 Aug 2022Phase III @ The Prestige City: Registered with Karnataka RERA (PRM/KA/RERA/1251/308/PR/110822/005151); completion date 28 Feb 2026 Source (rera.karnataka.gov.in) (opens in a new tab)
- 23 May 2022Phase II @ The Prestige City: Registered with Karnataka RERA (PRM/KA/RERA/1251/308/PR/230522/004901); completion date 14 Jan 2026 Source (rera.karnataka.gov.in) (opens in a new tab)
- 15 Mar 2022Phase I @ The Prestige City: Project start date in the RERA record Source (rera.karnataka.gov.in) (opens in a new tab)
- 9 Feb 2022Phase I @ The Prestige City: Registered with Karnataka RERA (PRM/KA/RERA/1251/308/PR/090222/004684); completion date 14 Jul 2025 Source (rera.karnataka.gov.in) (opens in a new tab)
- 29 Jan 2021Phase I @ The Prestige City: Building plan approved by BMRDA - Bangalore Metropolitan Region Development Authority (No. APA/LAO/44/2018-19) Source (rera.karnataka.gov.in) (opens in a new tab)
Newest first. Showing the latest 30 of 32 dated events. When the RERA crawl sees a new filing, complaint or extension, it is added here with its date.
Home loan EMI calculator
- Monthly EMI
- —
- Down payment
- —
- Loan amount
- —
- Total interest
- —
A calculation only, from the numbers you enter — not a loan offer.
All-in cost: GST, registration and other charges
The calculator loads when you scroll to it.
Assumptions
- Base price: the builder’s price is not published in a form we could collect — enter it from the cost sheet.
- GST 5% on the base price and charges — the usual rate for an under-construction home that is not “affordable housing” (1%).
- Stamp duty about 5.6% and registration 2% — the Karnataka rule (registration was raised from 1% to 2% on 31 Aug 2025). Calculated on the agreement value.
- Car parking, other charges and the maintenance deposit are not in the public record we collect; enter them from the builder’s cost sheet.
- Loan on the agreement value (banks usually lend up to 75–90%); EMI is the standard reducing-balance formula. Example rate only — use your bank’s quote.
Meridian Park FAQs
What is Meridian Park?
Meridian Park is a residential project developed by Prestige Projects Private Limited located in Valagere Kallahalli, Anekal, Bengaluru Urban, PIN 562125.
How many homes are in Meridian Park?
The project has 2,900 homes across three phases registered on Karnataka RERA.
What home types are available in Meridian Park?
The project offers 2 BHK and 3 BHK homes with carpet areas ranging from 838 sq ft to 1,359 sq ft across various configurations.
When will Phase I of Meridian Park be completed?
Phase I is scheduled for completion on 14 January 2026, with an occupancy certificate already uploaded on RERA.
When will Phase II and Phase III of Meridian Park be completed?
Phase II is scheduled for 13 July 2026 and Phase III for 27 August 2026, both with occupancy certificates uploaded.
How many homes have been booked in Meridian Park?
As of the latest quarterly updates, Phase I has 898 homes booked, Phase II has 1,103 homes booked, and Phase III has 898 homes booked.
What are the RERA registration numbers for Meridian Park?
Phase I is registered as PRM/KA/RERA/1251/308/PR/090222/004684, Phase II as PRM/KA/RERA/1251/308/PR/230522/004901, and Phase III as PRM/KA/RERA/1251/308/PR/110822/005151.
How many RERA complaints have been filed on Meridian Park?
There are 7 complaints on the project: 3 on Phase I, 4 on Phase II, and 0 on Phase III.
How many other projects does Prestige Projects Private Limited have on RERA record?
The builder has 10 projects listed in the Bengaluru RERA records and 13 complaints filed against it across all projects.
What is the land area of Meridian Park?
Phase I and II occupy 3,29,281 sq m each, while Phase III occupies 22,455 sq m.
Written by AI from the RERA record above on 5 Oct 2026. Answers use only that record; check them against the source before you decide.
Questions about Meridian Park
No questions published yet. Ask the first one: you get an instant answer from this page’s public record, and our team follows up on anything the record does not show.
Bought a home from Prestige Projects Private Limited? Review the builder.
Reviews of Prestige Projects Private Limited by verified buyers
No verified reviews of Prestige Projects Private Limited yet. If you bought a home from them, your review helps other buyers.
How reviews work: only buyers and owners can review; we confirm each purchase by phone before publishing, publish positive and negative reviews alike, never accept payment for reviews, and the builder may reply.
Similar projects within 5 km
| Project | Distance | Homes | Possession (RERA) | Built | Complaints | Price |
|---|---|---|---|---|---|---|
| Sri Sai Nandana CrystalSri Sai Nandana Builders | 0.4 km | 44 | Dec 2030 | 78% | 0 | Not collected |
| Sri Sai ViharSri Sai Ventures | 0.5 km | 88 | Nov 2028 | 95% | 0 | Not collected |
| Fernvale @ The Prestige CityPrestige Projects Private Limited | 0.6 km | 387 | Mar 2030 | 20% | 0 | Not collected |
| Sri Nandana GalaxySri Nandana Builders | 0.6 km | 80 | Dec 2026 | 100% | 0 | Not collected |
| Bilva Phase-II By Bhavisha HomesBhavisha Properties | 0.6 km | 226 | Apr 2027 | 37% | 0 | Not collected |
| Srinis PristineSrinivasa Constructions | 0.7 km | 76 | Dec 2028 | 74% | 0 | Not collected |
Projects of the same kind within 5 km in a straight line of this project’s RERA map point, nearest first. % built is the promoter’s latest quarterly figure on RERA (shown for single-registration projects); prices are from the builder’s own website where we found one.
Sources and last checked dates
Collected on 4 Oct 2026 by AI research agents reading public pages. Facts are written in our own words. Not found yet: price; court cases; landmarks; specifications; news.
How to check on RERA: On rera.karnataka.gov.in/viewAllProjects, type the registration number in 'Registration No', press Search, then click the 'View Project Details' icon. Complaints open from the 'Complaints / Litigation' icon in the same row. Registration numbers: PRM/KA/RERA/1251/308/PR/090222/004684, PRM/KA/RERA/1251/308/PR/230522/004901, PRM/KA/RERA/1251/308/PR/110822/005151.
- RERA record last checked: 4 Oct 2026
- Last change in the record (registration, quarterly filing or complaint): 22 Sep 2026
How this page is made: software builds it from public records (Karnataka RERA filings, OpenStreetMap, the builder’s own website). AI is used only to read filings into fields and to write the plain-English summary and FAQ answers, which are checked against the record. Facts are checked automatically against the RERA filing. Methodology · How we earn · Report an error
More new projects in Dommasandra
Chambenahalli, DommasandraUnder constructionRERA registeredBuyers’ group openSri Sai Nandana Crystal
by Sri Sai Nandana Builders
Price: Price on requestGet brochure & price →
- 2 BHK, 3 BHK
- 700 – 1,057 sq ft
- Dec 2030
44 homes
Be one of the first 10 buyers in this groupFounding members — it’s free
Join group for Sri Sai Nandana Crystal
Valagere Kalahalli, DommasandraUnder constructionRERA registeredBuyers’ group openFernvale @ The Prestige City
by Prestige
Price: Price on requestGet brochure & price →
- 2 BHK, 3 BHK
- 700 – 1,250 sq ft
- Mar 2030
387 homes
Be one of the first 10 buyers in this groupFounding members — it’s free
Join group for Fernvale @ The Prestige City
Chambenahalli, DommasandraUnder constructionRERA registeredBuyers’ group openSri Nandana Galaxy
by Sri Nandana Builders
Price: Price on requestGet brochure & price →
- 2 BHK, 3 BHK
- 641 – 974 sq ft
- Dec 2026
80 homes
Be one of the first 10 buyers in this groupFounding members — it’s free
Join group for Sri Nandana Galaxy