BELVEDERE by UKN AIRPORT DISTRICT
1, 2 & 3 BHK apartments by U.K.N. Properties Private Limited · Navrathna Agrahara, near Bellary Road (Airport Road), Bengaluru
Navrathna Agrahara, near Bellary Road (Airport Road), BengaluruOpen on Google Maps (opens in a new tab)
- Under construction
- RERA registered
- residential
by U.K.N. Properties Private Limited
Price: Price on request
Building exterior view © U.K.N. Properties Private Limited · Source ↗ (opens in a new tab)
BELVEDERE by UKN AIRPORT DISTRICT at a glance
- Possession (RERA)Nov 2023 Date passedWas Feb 2031 · Karnataka RERA
- Construction51% built · on pace for Mar 2029RERA filing to 30 Sep 2026 (Phase 2); estimate from average pace
- RERA complaints (project)1 complaintKarnataka RERA · as on 21 Oct 2026
- Approvals filed8 of 9 on RERAKarnataka RERA uploads · 21 Oct 2026
- Nearest metroDoddajala · 1.44 km (under construction)Open now: Peenya, 21.61 km · straight line · OpenStreetMap, 5 Oct 2026
- Airport driveapprox. 30 min at peak7.3 km straight line · estimate
- Nearest lakeUnnamed lake · 527 mFrom the RERA map point · OpenStreetMap, 5 Oct 2026
Project summary
BELVEDERE by UKN AIRPORT DISTRICT is a residential project by U.K.N. Properties Private Limited in Navrathna Agrahara, Bengaluru with 1,439 homes, registered with Karnataka RERA. The completion date on RERA is 2 Nov 2023. It is registered in 2 phases.
Facts collected on 21 Oct 2026 from public records — each linked to its source. Free for buyers. If you book through us, the builder pays us a commission.
BELVEDERE by UKN AIRPORT DISTRICT buyers’ group: join to ask for a group price
No one has joined yet. Be one of the first 10 buyers in this group — the founding members.
Join free. When enough buyers have joined, our agent partner asks U.K.N. Properties Private Limited for a group price — for example a lower price, an easier payment plan or waived charges. Nothing is promised: you see what the builder offers and book directly with the builder if you want to. Free for buyers. If you book through us, the builder pays us a commission.
- Gathering buyers
- Talking to the builder
- Group offer
- Group site visit
- Booking
0 buyers have joined · 0 committed
Committed buyers have confirmed their budget, home type and timeline with us on a call; builders negotiate with them. Joining is free and never obliges you to buy.
Join the BELVEDERE by UKN AIRPORT DISTRICT buyers’ groupHow group buying works
See it for yourself
Visit the site with our team, or get a call to clear your questions. Free, no obligation.
Key facts: home types, towers, land and possession
- Home types
- 1 BHK, 2 BHK, 3 BHK
- Carpet area
- 425 – 37,555 sq ft
- Towers
- 9
- Floors
- 16
- Total homes
- 1,439
- Land
- 9.21 acres
- Possession (extended)
- Nov 2023
- Built (RERA update)
- Not found in public records yet: construction progress
BELVEDERE by UKN AIRPORT DISTRICT RERA number and registration details
- RERA number
- PRM/KA/RERA/1251/309/PR/171014/000527
- Registered on
- 14 Oct 2017
- Promised completion
- 28 Feb 2031
- Extended to
- 2 Nov 2023
- RERA status
- New launch
- Homes booked
- Not found in public records yet: homes booked
- Price
- Not found in public records yet: price
- Project type
- Residential
2 RERA registrations (one per phase) are shown together on this page; dates above are the latest across phases.
Phases and RERA numbers
| Phase | RERA number | Promised completion | Homes | Status | Source |
|---|---|---|---|---|---|
| PHASE 1 | PRM/KA/RERA/1251/309/PR/171014/000527 | 3 Feb 2022Extended to 2 Nov 2023 | 844 | Completed | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Phase 2 | PRM/KA/RERA/1251/309/PR/060324/006682 | 28 Feb 2031 | 595 | New launch | Source (rera.karnataka.gov.in) (opens in a new tab) |
Towers and blocks (RERA filing)
| Tower | Phase | Floors | Basements | Homes |
|---|---|---|---|---|
| Block 1 | PHASE 1 | 16 | 2 | 171 |
| Block 2 | PHASE 1 | 4 | 2 | 5 |
| Block 3 | PHASE 1 | 16 | 2 | 249 |
| A | Phase 2 | 16 | 2 | 175 |
| B | Phase 2 | 4 | 2 | 5 |
| E | Phase 2 | 16 | 2 | 102 |
| F | Phase 2 | 16 | 2 | 136 |
| G | Phase 2 | 16 | 2 | 118 |
| H | Phase 2 | 16 | 2 | 68 |
A dash (—) means the filing did not state that value.
Summary in plain English
BELVEDERE by UKN AIRPORT DISTRICT is a residential project by U.K.N. Properties Private Limited in Navrathna Agrahara, Bengaluru North, with 1,439 homes across two phases and 9 towers. Phase 1 (844 homes) has a current completion date of 2 November 2023, while Phase 2 (595 homes) is targeted for completion on 28 February 2031.
Written by AI from the RERA record above on 21 Oct 2026. Every number in it was checked against that record; if anything differs, the record wins.
Open space, home loans, escrow and other details
- Open space
- Not found in public records yet: open space
- Water and power
- Water source filed with RERA: BoreWell
- Home loans: approved banks
- Not found in public records yet: bank approvals
- Payment plans
- Not found in public records yet: payment plans
- Maintenance
- Not found in public records yet: maintenance
- Car parking
- Not found in public records yet: car parking charge
- Escrow bank (RERA) · PHASE 1
- HDFC, Richond Road
- Escrow bank (RERA) · Phase 2
- HDFC, Kasturba Gandhi Marg
Amenities
- Electricity
- CCTV Surveillance
- Club House
- Community Hall
- Outdoor Sports facility
- Indoor Sports facility
- Swimming Pool
- Gym
- Parks
- Power Backup
- Water and Sanitation
Amenities and internal works as filed by the promoter with Karnataka RERA; we have not visited the site.
BELVEDERE by UKN AIRPORT DISTRICT location and address
- Address
- SURVEY NOS. 7/1 AND 20 OF NAVRATHNA AGRAHARA VILLAGE, JALA HOBLI, BANGALORE NORTH TALUK
- Village (RERA)
- Navrathna Agrahara
- Locality
- Near Bellary Road (Airport Road)Also known as Airport Road, International Airport Road, Bellary Road, NH 44
- PIN code
- 560038
- City
- Bengaluru
- State
- Karnataka
- Coordinates
- 13.19898, 77.63704
Distances to landmarks
Not found in public records yet: landmarksAbout Navrathna Agrahara
Not found in public records yet: locality factsCommute times to tech parks and the airport
| To | Straight line | Peak-hour drive (estimate) |
|---|---|---|
| Kempegowda International AirportMap point on OpenStreetMap (opens in a new tab) | 7.3 km | approx. 30 min |
| Manyata Tech ParkMap point on OpenStreetMap (opens in a new tab) | 16.87 km | approx. 68 min |
| KSR Bengaluru City railway station (Majestic)Map point on OpenStreetMap (opens in a new tab) | 25.62 km | approx. 104 min |
| ITPL, Whitefield (main gate)Map point on OpenStreetMap (opens in a new tab) | 25.91 km | approx. 105 min |
| Outer Ring Road tech corridor (RMZ Ecospace, Bellandur)Map point on OpenStreetMap (opens in a new tab) | 30.98 km | approx. 125 min |
| Electronic City Phase 1Map point on OpenStreetMap (opens in a new tab) | 38.96 km | approx. 158 min |
How we calculate
Straight line: from the project’s map point on RERA to the destination’s point on OpenStreetMap.
Peak-hour drive is a rough estimate, not a route: straight line × 1.35 for the road network, at 20 km/h. Real times vary a lot with the route and the hour.
Sources:Source (openstreetmap.org) (opens in a new tab)How we calculate this
Schools and hospitals nearby
Within 2 km
- 4Schools and colleges2 schools, 2 colleges, 0 kindergartens
- 0Hospitals and clinics0 hospitals, 0 clinics
Nearest schools and colleges
- VEDIC · 1.17 km
- Akash Global College of Management & Science · 1.54 km
- M S Engineering College · 1.68 km
Places as mapped on OpenStreetMap (amenity=school, college, kindergarten, university; hospital, clinic), counted within 2 km in a straight line of the RERA map point. Volunteers map these, so some places may be missing or closed. Places data © OpenStreetMap contributors, extract of 5 Oct 2026.
Nearest metro station and railway
- Doddajala (ದೊಡ್ಡಜಾಲ)Blue Line metro, under construction1.44 km
- Airport City (ವಿಮಾನ ನಿಲ್ದಾಣ ನಗರ)Blue Line metro, under construction5.41 km
- KIAL Terminals (ಕೆಐಎಬಿ ವಿಮಾನ ನಿಲ್ದಾಣ ಟರ್ಮಿನಲ್ಸ್)Blue Line metro, under construction8.21 km
- Peenya (ಪೀಣ್ಯ)Open now — nearest operating metro station21.61 km
- Doddajala Nearest railway station2.08 km
Straight-line distances from the RERA map point to the station points mapped on OpenStreetMap; status (open or under construction) as tagged there. Places data © OpenStreetMap contributors, extract of 5 Oct 2026.
Lines under construction near here
- 6 Aug 2026Namma Metro Blue Line, Phase 2B (KR Pura – Hebbal – Yelahanka – Kempegowda Airport, 38.44 km). Under construction; reported 72% complete overall, with the remaining work targeted for June 2027 and phased opening through 2027. Nearest: Doddajala, about 1.44 km straight-line. — Business Today. News report quoting BMRCL; the airport line has slipped before. Read (businesstoday.in) (opens in a new tab)
Sources:Source (businesstoday.in) (opens in a new tab)Source (openstreetmap.org) (opens in a new tab)
Lake and lake-buffer check
The nearest mapped lake is Unnamed lake (mapped on OpenStreetMap), 527 m from the project’s RERA map point.
The site boundary is not published as a shape, so its nearest edge can be closer than this point. Whether any building sits inside a lake buffer can only be checked on the approved plan.
- Unnamed lake (mapped on OpenStreetMap) on OpenStreetMap (opens in a new tab) 527 m
- Navrathna Agrahara Lake on OpenStreetMap (opens in a new tab) 888 m
- Unnamed lake (mapped on OpenStreetMap) on OpenStreetMap (opens in a new tab) 1,728 m
The buffer rule
Bengaluru’s lake buffer rule has changed over time: the National Green Tribunal ordered a 75 m buffer in May 2016; the Supreme Court set that order aside on 5 March 2019, leaving the 30 m buffer of the Revised Master Plan 2015. Check the current rule and the approved plan before relying on either number.
- LiveLaw: SC sets aside NGT order enlarging buffer zones (2019) (livelaw.in) (opens in a new tab)
- Citizen Matters: Shrinking lake buffers (citizenmatters.in) (opens in a new tab)
Shortest distance from the RERA map point to the mapped water edge (OpenStreetMap water polygons tagged lake or reservoir, or named lake/kere/tank). Mapped shorelines can differ from the revenue-record boundary of a lake. Places data © OpenStreetMap contributors, extract of 5 Oct 2026.
Sources:Source (openstreetmap.org) (opens in a new tab)Source (livelaw.in) (opens in a new tab)Source (citizenmatters.in) (opens in a new tab)How we calculate this
Satellite time-lapse of the site
Satellite photos load when you scroll to them.
Photos from Esri World Imagery Wayback, centred on the project’s map point; dates are the capture dates in Esri’s metadata. Loaded from Esri when you scroll here.
Sources:Source (livingatlas.arcgis.com) (opens in a new tab)
BELVEDERE by UKN AIRPORT DISTRICT floor plans, brochure and elevations
Documents the builder uploaded to Karnataka RERA, shown as filed. Tap a page to see it full size; the full PDF opens on the RERA website.
Brochure

Phase 2: BrochureFull PDF on RERA
Approved layout plan2 files

Phase 2: Approved Layout PlanFull PDF on RERA 
Phase 2: Existing Layout PlanFull PDF on RERA
| Home type | Carpet area | Homes |
|---|---|---|
| 1 BHK | 469 – 672 sq ft | 228 |
| 1 br | 425 sq ft | 110 |
| 1br/1ba(gf) | 506 sq ft | 2 |
| 2 BHK | 469 – 926 sq ft | 362 |
| 2 br | 656 sq ft | 60 |
| 2br/1ba(ff) | 689 sq ft | 1 |
| 2br/2ba | 673 sq ft | 99 |
| 3 BHK | 712 – 1,334 sq ft | 425 |
| 3br/2ba | 882 sq ft | 32 |
| 3br/3ba- type-2 | 1,011 sq ft | 17 |
| 3br/3ba-type-1 | 1,013 sq ft | 98 |
| Commercial | 2,836 – 37,555 sq ft | 10 |
| Residential 2 BHK | 749 sq ft | 214 |
| Residential 3 BHK/2ba | 960 sq ft | 48 |
| Residential 3 BHK/3ba | 1,124 sq ft | 219 |
| Residential1 BHK | 471 sq ft | 114 |
Home types, counts and carpet areas as filed with Karnataka RERA (carpet area, not super built-up).
We have not collected floor-plan drawings; the builder’s sales team can share them.
BELVEDERE by UKN AIRPORT DISTRICT possession date and construction status
Timeline
- 4 May 2017PHASE 1: Project start date given to RERA
- 14 Oct 2017PHASE 1: Registered with Karnataka RERA
- 3 Feb 2022PHASE 1: Completion date given at registration
- 3 Nov 2022PHASE 1: Covid Extension: completion date moved to this date
- 2 Nov 2023PHASE 1: Section 6 Extension: completion date moved to this date
- 1 Mar 2024Phase 2: Project start date given to RERA
- 6 Mar 2024Phase 2: Registered with Karnataka RERA
- 30 Mar 2024PHASE 1: Promoter applied to RERA for completion
- 28 Feb 2031Phase 2: Completion date given at registration
Construction pace from RERA quarterly filings (Phase 2)
At the average pace so far, construction would reach 100% around Mar 2029 — about 23 months before the completion date on RERA (28 Feb 2031).
At the pace between the 4 quarterly filings we have (35% → 51% in 9 months), it would be around Jan 2029 — about 25 months before the RERA date.
This project has 2 RERA registrations; the chart uses Phase 2, the one with the most quarterly filings.
- Filed on RERA
- Average pace since start
- Pace between filings (and 0% assumed at the start date)
- RERA completion date
Quarterly filings
| Quarter | Filed on | Built | Homes booked |
|---|---|---|---|
| Q2 2026-27to 30 Sep 2026 | 13 Oct 2026 | 51% | 328 of 604 |
| Q1 2026-27to 30 Jun 2026 | 14 Jul 2026 | 43% | 327 of 604 |
| Q4 2025-26to 31 Mar 2026 | 14 Apr 2026 | 41% | 326 of 604 |
| Q3 2025-26to 31 Dec 2025 | 12 Jan 2026 | 35% | 316 of 604 |
How we calculate
Average pace = % built ÷ months since the start date in the RERA record. Here: 51% ÷ 31 months (1 Mar 2024 to 30 Sep 2026) = 1.6% a month.
Estimated finish = latest filing date + (100 − % built) ÷ pace = 30 Sep 2026 + 49 ÷ 1.6 = 29.8 months → Mar 2029. This is an estimate, not a date from the builder or RERA.
Pace between filings = (51% − 35%) ÷ 9 months = 1.8% a month.
A straight line is a simplification: the builder reports one overall %, which mixes excavation, structure and finishing, and work rarely moves at a constant speed. The % values are the promoter’s own figures filed with RERA, not checked by us.
Sources:Source (rera.karnataka.gov.in) (opens in a new tab)How we calculate this
Approvals and documents checklist
18 rows: approvals. Scroll inside the table to see them all.
| Approval | Authority | Source |
|---|---|---|
| Building plan (PHASE 1) | BIAPPA - Bangalore Airport Area Planning Authority | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Building plan (Phase 2) | BIAPPA - Bangalore Airport Area Planning Authority · No. BIAAPA/TP1/CC/16/2015-16 · dated 2016-04-27 | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Land conversion (2 orders) (Phase 2) | Deputy Commissioner Bangalore Urban · No. B. Dis AALN SR (NA) 628/96-97 and 1 more · dated 1997-08-04 | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Commencement Certificate (Phase 2) | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Electricity Permission Letter (Phase 2) | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Water Permission Letter (Phase 2) | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Approved Layout Plan (Phase 2) | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Approved Building/Plotting Plan (Phase 2) | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Approved Section Of Building/Infrastructure Plan of Plotting (Phase 2) | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Conversion Certificate under section 95 of the KLR Act 1964 (Phase 2) | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| ESCOM/Electricity (Phase 2) | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| KWSSB/Water (Phase 2) | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Approval/NOC under section 109 of KLR Act 1961 (Phase 2) | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Approval/NOC under section 14 of the KTCP Act (Phase 2) | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Fire Force Department (Phase 2) | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Airport Authority of India (Phase 2) | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| KSPCB (Phase 2) | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| SEIAA (Phase 2) | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
Documents uploaded to RERA (Phase 2)
- Building or layout plan · Approved drawings from the planning authorityFiled on RERA ✓ — BIAPPA - Bangalore Airport Area Planning Authority · No. BIAAPA/TP1/CC/16/2015-16 · dated 27 Apr 2016
- Commencement certificate · Permission to start buildingFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
- Environment clearance · SEIAA KarnatakaFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
- Fire NOC · Karnataka Fire and Emergency ServicesFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
- Pollution board consent · KSPCBFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
- Water and sewerage · BWSSBFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
- Electricity · BESCOMFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
- Height clearance · Airports Authority of IndiaFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
- Occupancy certificate (OC) · Issued only when the building is finishedNot on RERA yet — expected at completion
From the documents the promoter uploaded to Karnataka RERA, collected 21 Oct 2026. “Filed” means a document is on RERA — we have not checked its contents or validity. Not every approval applies to every project (for example, smaller projects may not need an environment clearance). Each phase is registered separately; this list is for the phase named above. The project page on RERA lists each upload.
BELVEDERE by UKN AIRPORT DISTRICT RERA complaints and orders
1 complaint as on Source (rera.karnataka.gov.in) (opens in a new tab)
| Complaint ref | Filed | Subject | Status | Source |
|---|---|---|---|---|
| 00736/2025 | 14 May 2025 | pending Amenities | Posted for orders | Source (rera.karnataka.gov.in) (opens in a new tab) |
Court and consumer cases
We list case numbers, courts and outcomes only — never names of private individuals.
About U.K.N. Properties Private Limited
- Promoter type
- Company
- Projects on this site
- 1
- RERA complaints against promoter
- 1
- Company number (CIN)
- U70102KA1997PTC022387
From Karnataka RERA, as collected so far (21 Oct 2026). Complaints are those RERA lists against this promoter across all its projects.
U.K.N. Properties Private Limited’s RERA recordU.K.N. Properties Private Limited delivery record
- 1Projects in Bengaluru on RERA2 approved registrations under U.K.N. Properties Private Limited in Bengaluru Urban and Rural. Source (rera.karnataka.gov.in) (opens in a new tab)
- 1,439Homes registeredAs stated in each registrations.
- 1RERA complaints1 open, 0 disposed. as on Source (rera.karnataka.gov.in) (opens in a new tab)
- 0.7Complaints per 1,000 homes1 complaints ÷ 1,439 homes in its 2 registrations on Karnataka RERA in Bengaluru.
- 1Completion filed on RERARegistrations where the promoter applied to RERA for completion; 1 with an occupancy certificate on RERA.
- 0 of 1Filed by the date given at registrationMedian gap 25.8 months (on-time ones count as 0). The completion application can come after handover, so this is an upper bound on lateness.
What the complaints are about
1 complaint subject as written on RERA, as on . Each subject is sorted into one group by keywords (first match wins: delay, refund, registration, quality, litigation, association); one complaint often raises several issues. Source (rera.karnataka.gov.in) (opens in a new tab)
Completion filed on RERA
| Project | Date at registration | Completion filed | Gap |
|---|---|---|---|
| BELVEDERE by UKN AIRPORT DISTRICT -PHASE 1OC on RERA | 3 Feb 2022extended to 2 Nov 2023 | 30 Mar 2024 | 26 months after |
Measured against the completion date given at registration; many projects had RERA extensions (including the COVID-period extension), shown under the date.
Sources:Source (rera.karnataka.gov.in) (opens in a new tab)How we calculate this
What’s changed since Apr 2016
- 13 Oct 2026Phase 2: Quarterly update filed for Q2 2026-27: 51% built, 328 of 604 homes booked Source (rera.karnataka.gov.in) (opens in a new tab)
- 14 Jul 2026Phase 2: Quarterly update filed for Q1 2026-27: 43% built, 327 of 604 homes booked Source (rera.karnataka.gov.in) (opens in a new tab)
- 14 Apr 2026Phase 2: Quarterly update filed for Q4 2025-26: 41% built, 326 of 604 homes booked Source (rera.karnataka.gov.in) (opens in a new tab)
- 12 Jan 2026Phase 2: Quarterly update filed for Q3 2025-26: 35% built, 316 of 604 homes booked Source (rera.karnataka.gov.in) (opens in a new tab)
- 14 May 2025Complaint 00736/2025 filed with RERA: “pending Amenities” — now posted for orders Source (rera.karnataka.gov.in) (opens in a new tab)
- 30 Mar 2024PHASE 1: Promoter applied to RERA for completion (occupancy certificate on RERA) Source (rera.karnataka.gov.in) (opens in a new tab)
- 6 Mar 2024Phase 2: Registered with Karnataka RERA (PRM/KA/RERA/1251/309/PR/060324/006682); completion date 28 Feb 2031 Source (rera.karnataka.gov.in) (opens in a new tab)
- 1 Mar 2024Phase 2: Project start date in the RERA record Source (rera.karnataka.gov.in) (opens in a new tab)
- 2 Nov 2023PHASE 1: Completion date extended to 2 Nov 2023 Source (rera.karnataka.gov.in) (opens in a new tab)
- 14 Oct 2017PHASE 1: Registered with Karnataka RERA (PRM/KA/RERA/1251/309/PR/171014/000527); completion date 3 Feb 2022 Source (rera.karnataka.gov.in) (opens in a new tab)
- 4 May 2017PHASE 1: Project start date in the RERA record Source (rera.karnataka.gov.in) (opens in a new tab)
- 27 Apr 2016Phase 2: Building plan approved by BIAPPA - Bangalore Airport Area Planning Authority (No. BIAAPA/TP1/CC/16/2015-16) Source (rera.karnataka.gov.in) (opens in a new tab)
Newest first. When the RERA crawl sees a new filing, complaint or extension, it is added here with its date.
Home loan EMI calculator
- Monthly EMI
- —
- Down payment
- —
- Loan amount
- —
- Total interest
- —
A calculation only, from the numbers you enter — not a loan offer.
All-in cost: GST, registration and other charges
The calculator loads when you scroll to it.
Assumptions
- Base price: the builder’s price is not published in a form we could collect — enter it from the cost sheet.
- GST 5% on the base price and charges — the usual rate for an under-construction home that is not “affordable housing” (1%).
- Stamp duty about 5.6% and registration 2% — the Karnataka rule (registration was raised from 1% to 2% on 31 Aug 2025). Calculated on the agreement value.
- Car parking, other charges and the maintenance deposit are not in the public record we collect; enter them from the builder’s cost sheet.
- Loan on the agreement value (banks usually lend up to 75–90%); EMI is the standard reducing-balance formula. Example rate only — use your bank’s quote.
BELVEDERE by UKN AIRPORT DISTRICT FAQs
What is BELVEDERE by UKN AIRPORT DISTRICT?
BELVEDERE by UKN AIRPORT DISTRICT is a residential project in Navrathna Agrahara, Bengaluru North (PIN 560038), developed by U.K.N. Properties Private Limited.
How many homes are in BELVEDERE by UKN AIRPORT DISTRICT?
The project has 1,439 homes across Phase 1 (844 homes) and Phase 2 (595 homes).
What home types are available in BELVEDERE by UKN AIRPORT DISTRICT Phase 1?
Phase 1 offers 1 BHK (425-672 sq ft carpet area), 2 BHK (469-749 sq ft), 2 BR (656 sq ft), 3 BHK (712-1,049 sq ft), 3 BR (882-1,013 sq ft), and 5 commercial units (37,555 sq ft each).
What home types are available in BELVEDERE by UKN AIRPORT DISTRICT Phase 2?
Phase 2 offers 1 BHK (469-563 sq ft carpet area), 2 BHK (672-926 sq ft), 3 BHK (767-1,334 sq ft), and 5 commercial units (2,836-5,907 sq ft).
When is Phase 1 of BELVEDERE by UKN AIRPORT DISTRICT expected to be completed?
Phase 1 is scheduled for completion on 2 November 2023, with extensions previously granted for Covid and under Section 6.
When is Phase 2 of BELVEDERE by UKN AIRPORT DISTRICT expected to be completed?
Phase 2 is targeted for completion on 28 February 2031.
What is the current construction status of BELVEDERE by UKN AIRPORT DISTRICT Phase 2?
As of Q2 2026-27 (ended 30 September 2026), Phase 2 is 51% complete with 328 homes booked out of 604 homes in the booking table.
What are the RERA registration numbers for BELVEDERE by UKN AIRPORT DISTRICT?
Phase 1 is registered as PRM/KA/RERA/1251/309/PR/171014/000527 and Phase 2 as PRM/KA/RERA/1251/309/PR/060324/006682.
Has an occupancy certificate been uploaded for BELVEDERE by UKN AIRPORT DISTRICT Phase 1?
Yes, an occupancy certificate has been uploaded for Phase 1.
How many RERA complaints are there for BELVEDERE by UKN AIRPORT DISTRICT?
There is 1 RERA complaint on Phase 1 and 0 complaints on Phase 2. The builder has 1 complaint across all projects in the RERA record.
Written by AI from the RERA record above on 21 Oct 2026. Answers use only that record; check them against the source before you decide.
Questions about BELVEDERE by UKN AIRPORT DISTRICT
No questions published yet. Ask the first one: you get an instant answer from this page’s public record, and our team follows up on anything the record does not show.
Bought a home from U.K.N. Properties Private Limited? Review the builder.
Reviews of U.K.N. Properties Private Limited by verified buyers
No verified reviews of U.K.N. Properties Private Limited yet. If you bought a home from them, your review helps other buyers.
How reviews work: only buyers and owners can review; we confirm each purchase by phone before publishing, publish positive and negative reviews alike, never accept payment for reviews, and the builder may reply.
Similar projects within 5 km
| Project | Distance | Homes | Possession (RERA) | Built | Complaints | Price |
|---|---|---|---|---|---|---|
| DS Max Sky ShlokamDS Max Properties Private Limited | 0.2 km | 992 | Mar 2031 | 46% | 0 | Not collected |
| Bhartiya Garden EstateBhartiya Urban Pvt Ltd | 0.4 km | 1,947 | Aug 2031 | — | 3 | Not collected |
| Jayan OneJayan Homes | 0.4 km | 71 | Oct 2030 | 39% | 0 | Not collected |
| ECHOES of EDEN by SUMOEchoes of Eden | 0.6 km | 57 | Apr 2030 | 76% | 0 | Not collected |
| Fiorana@Beaumont Estate(Phase-1)Lodha Developers Limited | 1.1 km | 540 | Mar 2032 | 0% | 0 | Not collected |
| Serene Amara by Columbia PacificEmbassy-Columbia Pacific ASL Pvt Ltd | 1.6 km | 239 | Dec 2026 | 100% | 1 | Not collected |
Projects of the same kind within 5 km in a straight line of this project’s RERA map point, nearest first. % built is the promoter’s latest quarterly figure on RERA (shown for single-registration projects); prices are from the builder’s own website where we found one.
Sources and last checked dates
Collected on 21 Oct 2026 by AI research agents reading public pages. Facts are written in our own words. Not found yet: price; court cases; landmarks; specifications; news.
How to check on RERA: On rera.karnataka.gov.in/viewAllProjects, type the registration number in 'Registration No', press Search, then click the 'View Project Details' icon. Complaints open from the 'Complaints / Litigation' icon in the same row. Registration numbers: PRM/KA/RERA/1251/309/PR/171014/000527, PRM/KA/RERA/1251/309/PR/060324/006682.
- RERA record last checked: 21 Oct 2026
- Last change in the record (registration, quarterly filing or complaint): 21 Oct 2026
How this page is made: software builds it from public records (Karnataka RERA filings, OpenStreetMap, the builder’s own website). AI is used only to read filings into fields and to write the plain-English summary and FAQ answers, which are checked against the record. Facts are checked automatically against the RERA filing. Methodology · How we earn · Report an error
More new projects nearby
Navrathna Agrahara, near Bellary Road (Airport Road)Ready to moveRERA registeredBuyers’ group openSerene Amara by Columbia Pacific
by Embassy-Columbia Pacific ASL
Price: Price on requestGet brochure & price →
- 1 BHK, 2 BHK
- 560 – 764 sq ft
- Dec 2026
239 homes · 1 RERA complaint
Be one of the first 10 buyers in this groupFounding members — it’s free
Join group for Serene Amara by Columbia Pacific
Navarathna Agrahara, near Bellary Road (Airport Road)Under constructionRERA registeredBuyers’ group openDS Max Sky Shlokam
by DS Max Properties
Price: Price on requestGet brochure & price →
- 2 BHK, 3 BHK
- 686 – 1,328 sq ft
- Mar 2031
992 homes
Be one of the first 10 buyers in this groupFounding members — it’s free
Join group for DS Max Sky Shlokam
Navarathna Agrahara, near Bellary Road (Airport Road)Under constructionRERA registeredBuyers’ group openBhartiya Garden Estate
by Bhartiya Urban
Price: Price on requestGet brochure & price →
- Studio, 1 BHK, 1.5 BHK, 2 BHK, +6 more
- 382 – 2,666 sq ft
- Aug 2031
3 phases on RERA · 1,947 homes · 3 RERA complaints
Be one of the first 10 buyers in this groupFounding members — it’s free
Join group for Bhartiya Garden Estate