Plots still available: 86 of 86 plots were unsold when the developer filed completion with RERA (5 Feb 2026). Some may have sold since — join the group and we’ll ask the developer what is left and for a group price.

by Bhumi Constructions And Developers

Price: Price on request

Get brochure, layout plan & price

Brochure, layout plan and price list for Bhumi’S Divi Dream Land

Developers share their brochure, layout plan and price list only on request. Tell us how to reach you and we’ll get them and send them to you, free.

Free for buyers. If you book through us, the developer pays us a commission. How we earn

Project summary

Bhumi’S Divi Dream Land is a plotted development by Bhumi Constructions And Developers in Tellohalli Agrahara, Bengaluru with 86 plots, registered with Karnataka RERA. The completion date on RERA is 10 Dec 2025.

Facts collected on 4 Oct 2026 from public records — each linked to its source. Free for buyers. If you book through us, the developer pays us a commission.

Bhumi’S Divi Dream Land buyers’ group: join to ask for a group price

No one has joined yet. Be one of the first 10 buyers in this group — the founding members.

Join free. When enough buyers have joined, our agent partner asks Bhumi Constructions And Developers for a group price — for example a lower price, an easier payment plan or waived charges. Nothing is promised: you see what the developer offers and book directly with the developer if you want to. Free for buyers. If you book through us, the developer pays us a commission.

  1. Gathering buyers
  2. Talking to the developer
  3. Group offer
  4. Group site visit
  5. Booking

0 buyers have joined · 0 committed

Committed buyers have confirmed their budget, plot size and timeline with us on a call; developers negotiate with them. Joining is free and never obliges you to buy.

Join the Bhumi’S Divi Dream Land buyers’ groupHow group buying works

See it for yourself

Visit the site with our team, or get a call to clear your questions. Free, no obligation.

Key facts: plot sizes, approval, land and completion

Updated on 4 Oct 2026
Plot sizes (feet)
25×40, 30×40, 33×40
Plot area
652 – 2,513 sq ft
Total plots
86
Layout approved by
BIAAPA
Land
Not found in public records yet: land area
Land conversion orders
1
Completion (RERA)
Dec 2025
Development (RERA update)
Not found in public records yet: development progress

Plot sizes (RERA filing)

Size (feet)AreaPlots
25×401,000 sq ft2
30×401,200 sq ft60
33×401,320 sq ft3
Odd-sized (irregular)varies21

Sizes as filed with RERA, converted from metres to feet (9.14 m = 30 ft, 12.19 m = 40 ft). Ask the developer which plots are still unsold.

Approving authority as filed: BIAPPA - Bangalore Airport Area Planning Authority.

Land conversion orders (RERA filing)

Survey no.Converted forOrderBy
18ResidentialNo. 347222, 4 Jun 2022DC OFFICE DEVANAHALLI

RERA does not cover each plot’s khata. Ask the developer for the khata and title documents and have a lawyer check them before paying an advance.

Bhumi’S Divi Dream Land RERA number and registration details

RERA number
PRM/KA/RERA/1250/303/PR/290126/008435
Registered on
29 Jan 2026
Promised completion
10 Dec 2025
Extended to
No extension recorded
RERA status
Completed
Plots booked
Not found in public records yet: plots booked
Price
Not found in public records yet: price
Project type
Plotted

Sources:Source (rera.karnataka.gov.in) (opens in a new tab)

Summary in plain English

Bhumi's Divi is a plotted layout by Bhumi Constructions And Developers in Tellohalli Agarhara, Devanahalli. The project has 86 plots across multiple sizes and was registered with RERA on 29 January 2026 with a completion date of 10 December 2025.

Written by AI from the RERA record above on 7 Oct 2026. Every number in it was checked against that record; if anything differs, the record wins.

Open space, loans, escrow and other details

Open space
Not found in public records yet: open space
Water and power
Water source filed with RERA: BoreWell
Plot loans: approved banks
Not found in public records yet: bank approvals
Payment plans
Not found in public records yet: payment plans
Maintenance
Not found in public records yet: maintenance
Car parking
Not found in public records yet: car parking charge
Escrow bank (RERA)
Not found in public records yet: escrow bank
Building plan (RERA)
BIAPPA - Bangalore Airport Area Planning Authority · No. BIAPPA/TP/LAO/113/2025-26 · dated 12 Mar 2025
Project cost declared to RERA
₹18.9 Cr

Sources:Source (rera.karnataka.gov.in) (opens in a new tab)

Amenities

Not found in public records yet: amenities

Bhumi’S Divi Dream Land location and address

Address
Sy. No. 18, Tellohalli Agrahara Village, Channarayapatna Hobli, Devanahalli Taluk, Bangalore Rural Dist. Devanahalli - 562110 , Sy. No. 18, Tellohalli Agrahara Village, Channarayapatna Hobli, Devanahalli Taluk, Bangalore Rural Dist. Devanahalli - 562110 , Devanahalli , Bengaluru Rural, Karnataka - 562110
Village (RERA)
Tellohalli Agrahara
Locality
Devanahalli
PIN code
562110
City
Bengaluru
State
Karnataka
Coordinates
13.23522, 77.75291

Distances to landmarks

Not found in public records yet: landmarks

About Devanahalli

Not found in public records yet: locality facts

Commute times to tech parks and the airport

As on 5 Oct 2026
ToStraight linePeak-hour drive (estimate)
Kempegowda International AirportMap point on OpenStreetMap (opens in a new tab)6.5 kmapprox. 26 min
Manyata Tech ParkMap point on OpenStreetMap (opens in a new tab)25.3 kmapprox. 102 min
ITPL, Whitefield (main gate)Map point on OpenStreetMap (opens in a new tab)27.58 kmapprox. 112 min
KSR Bengaluru City railway station (Majestic)Map point on OpenStreetMap (opens in a new tab)34.8 kmapprox. 141 min
Outer Ring Road tech corridor (RMZ Ecospace, Bellandur)Map point on OpenStreetMap (opens in a new tab)35.5 kmapprox. 144 min
Electronic City Phase 1Map point on OpenStreetMap (opens in a new tab)43.92 kmapprox. 178 min
How we calculate

Straight line: from the project’s map point on RERA to the destination’s point on OpenStreetMap.

Peak-hour drive is a rough estimate, not a route: straight line × 1.35 for the road network, at 20 km/h. Real times vary a lot with the route and the hour.

Sources:Source (openstreetmap.org) (opens in a new tab)How we calculate this

Schools and hospitals nearby

As on 5 Oct 2026

Within 2 km

  • 1Schools and colleges0 schools, 1 colleges, 0 kindergartens
  • 0Hospitals and clinics0 hospitals, 0 clinics

Nearest schools and colleges

  • Chanakya University · 1.15 km

Places as mapped on OpenStreetMap (amenity=school, college, kindergarten, university; hospital, clinic), counted within 2 km in a straight line of the RERA map point. Volunteers map these, so some places may be missing or closed. Places data © OpenStreetMap contributors, extract of 5 Oct 2026.

Sources:Source (openstreetmap.org) (opens in a new tab)

Nearest metro station and railway

As on 5 Oct 2026
  • KIAL Terminals (ಕೆಐಎಬಿ ವಿಮಾನ ನಿಲ್ದಾಣ ಟರ್ಮಿನಲ್ಸ್)Blue Line metro, under construction5.98 km
  • Airport City (ವಿಮಾನ ನಿಲ್ದಾಣ ನಗರ)Blue Line metro, under construction8.23 km
  • Doddajala (ದೊಡ್ಡಜಾಲ)Blue Line metro, under construction12.83 km
  • Whitefield (Kadugodi) (ವೈಟ್‌ಫೀಲ್ಡ್ (ಕಾಡುಗೋಡಿ))Open now — nearest operating metro station26.63 km
  • Devanahalli (ದೇವನಹಳ್ಳಿ)Nearest railway station5.32 km

Straight-line distances from the RERA map point to the station points mapped on OpenStreetMap; status (open or under construction) as tagged there. Places data © OpenStreetMap contributors, extract of 5 Oct 2026.

Sources:Source (openstreetmap.org) (opens in a new tab)

Lake and lake-buffer check

As on 5 Oct 2026

The nearest mapped lake is Unnamed lake (mapped on OpenStreetMap), 252 m from the project’s RERA map point.

The site boundary is not published as a shape, so its nearest edge can be closer than this point. Whether any building sits inside a lake buffer can only be checked on the approved plan.

The buffer rule

Bengaluru’s lake buffer rule has changed over time: the National Green Tribunal ordered a 75 m buffer in May 2016; the Supreme Court set that order aside on 5 March 2019, leaving the 30 m buffer of the Revised Master Plan 2015. Check the current rule and the approved plan before relying on either number.

Shortest distance from the RERA map point to the mapped water edge (OpenStreetMap water polygons tagged lake or reservoir, or named lake/kere/tank). Mapped shorelines can differ from the revenue-record boundary of a lake. Places data © OpenStreetMap contributors, extract of 5 Oct 2026.

Sources:Source (openstreetmap.org) (opens in a new tab)Source (livelaw.in) (opens in a new tab)Source (citizenmatters.in) (opens in a new tab)How we calculate this

Satellite time-lapse of the site

Satellite photos load when you scroll to them.

Photos from Esri World Imagery Wayback, centred on the project’s map point; dates are the capture dates in Esri’s metadata. Loaded from Esri when you scroll here.

Sources:Source (livingatlas.arcgis.com) (opens in a new tab)

Bhumi’S Divi Dream Land layout plan and plot types as filed

Layout plan and brochure not published? The developer shares them only on request. We’ll get the brochure, layout plan and current price list for you, free.

Get brochure, layout plan & price

Brochure, layout plan and price list for Bhumi’S Divi Dream Land

Developers share their brochure, layout plan and price list only on request. Tell us how to reach you and we’ll get them and send them to you, free.

Free for buyers. If you book through us, the developer pays us a commission. How we earn

Plot type (as filed)AreaPlots
7.62*12.19—2
9.14*12.19—60
10.05*12.19—3
Odd—21

Plot types and counts as filed with Karnataka RERA.

We have not collected the layout plan drawing; the developer’s sales team can share it.

Sources:Source (rera.karnataka.gov.in) (opens in a new tab)

Bhumi’S Divi Dream Land completion date and development status

Not found in public records yet: construction progress

Timeline

  1. 12 Mar 2025Project start date given to RERA
  2. 10 Dec 2025Completion date given at registration
  3. 29 Jan 2026Registered with Karnataka RERA
  4. 5 Feb 2026Promoter applied to RERA for completion

Approvals and documents checklist

ApprovalAuthoritySource
Layout planBIAPPA - Bangalore Airport Area Planning Authority · No. BIAPPA/TP/LAO/113/2025-26 · dated 2025-03-12Source (rera.karnataka.gov.in) (opens in a new tab)
Land conversionDC OFFICE DEVANAHALLI · No. 347222 · dated 2022-06-04Source (rera.karnataka.gov.in) (opens in a new tab)
Approved Layout Plan/Demarcation Planscan uploaded to RERASource (rera.karnataka.gov.in) (opens in a new tab)
Final Approved Layout Planscan uploaded to RERASource (rera.karnataka.gov.in) (opens in a new tab)
NOC from ESCOMsscan uploaded to RERASource (rera.karnataka.gov.in) (opens in a new tab)
NOC for Waterscan uploaded to RERASource (rera.karnataka.gov.in) (opens in a new tab)
KSPCB (If Applicable)scan uploaded to RERASource (rera.karnataka.gov.in) (opens in a new tab)
SEIAA (If Applicable)scan uploaded to RERASource (rera.karnataka.gov.in) (opens in a new tab)

Documents uploaded to RERA

As on 4 Oct 2026
  • Building or layout plan · Approved drawings from the planning authorityFiled on RERA ✓ — BIAPPA - Bangalore Airport Area Planning Authority · No. BIAPPA/TP/LAO/113/2025-26 · dated 12 Mar 2025
  • Commencement certificate · Permission to start buildingNot on RERA yet
  • Environment clearance · SEIAA KarnatakaFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
  • Fire NOC · Karnataka Fire and Emergency ServicesNot on RERA yet
  • Pollution board consent · KSPCBFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
  • Water and sewerage · BWSSBFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
  • Electricity · BESCOMFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
  • Height clearance · Airports Authority of IndiaNot on RERA yet
  • Occupancy certificate (OC) · Issued only when the building is finishedNot on RERA yet — expected at completion

From the documents the promoter uploaded to Karnataka RERA, collected 4 Oct 2026. “Filed” means a document is on RERA — we have not checked its contents or validity. Not every approval applies to every project (for example, smaller projects may not need an environment clearance). The project page on RERA lists each upload.

Sources:Source (rera.karnataka.gov.in) (opens in a new tab)

Bhumi’S Divi Dream Land RERA complaints

No complaints listed on Karnataka RERA for this registration as on Source (rera.karnataka.gov.in) (opens in a new tab)

Court and consumer cases

Not found in public records yet: court cases

We list case numbers, courts and outcomes only — never names of private individuals.

About Bhumi Constructions And Developers

Promoter type
Proprietorship
Projects on this site
1
RERA complaints against promoter
0
Company number (CIN)
Not found in public records yet: CIN

From Karnataka RERA, as collected so far (4 Oct 2026). Complaints are those RERA lists against this promoter across all its projects.

Bhumi Constructions And Developers’s RERA record

Bhumi Constructions And Developers delivery record

As on 5 Oct 2026
  • 1Projects in Bengaluru on RERA1 approved registration under Bhumi Constructions And Developers in Bengaluru Urban and Rural. Source (rera.karnataka.gov.in) (opens in a new tab)
  • 86Plots registeredAs stated in each registrations.
  • 0RERA complaintsas on Source (rera.karnataka.gov.in) (opens in a new tab)
  • 0Complaints per 1,000 plots0 complaints ÷ 86 plots in its 1 registration on Karnataka RERA in Bengaluru.
  • 1Completion filed on RERARegistrations where the promoter applied to RERA for completion; 0 with an occupancy certificate on RERA.
  • 0 of 1Filed by the date given at registrationMedian gap 1.9 months (on-time ones count as 0). The completion application can come after handover, so this is an upper bound on lateness.

Completion filed on RERA

ProjectDate at registrationCompletion filedGap
Bhumi’S Divi Dream Land10 Dec 20255 Feb 20262 months after

Measured against the completion date given at registration; many projects had RERA extensions (including the COVID-period extension), shown under the date.

Sources:Source (rera.karnataka.gov.in) (opens in a new tab)How we calculate this

What’s changed since Mar 2025

As on 4 Oct 2026
  1. 5 Feb 2026Promoter applied to RERA for completion Source (rera.karnataka.gov.in) (opens in a new tab)
  2. 29 Jan 2026Registered with Karnataka RERA (PRM/KA/RERA/1250/303/PR/290126/008435); completion date 10 Dec 2025 Source (rera.karnataka.gov.in) (opens in a new tab)
  3. 12 Mar 2025Building plan approved by BIAPPA - Bangalore Airport Area Planning Authority (No. BIAPPA/TP/LAO/113/2025-26) Source (rera.karnataka.gov.in) (opens in a new tab)
  4. 12 Mar 2025Project start date in the RERA record Source (rera.karnataka.gov.in) (opens in a new tab)

Newest first. No extension of the completion date is recorded on RERA. When the RERA crawl sees a new filing, complaint or extension, it is added here with its date.

Plot loan EMI calculator

No listed price found — enter one to try.

Example only — use your bank’s quote.

Monthly EMI
—
Down payment
—
Loan amount
—
Total interest
—

A calculation only, from the numbers you enter — not a loan offer.

Bhumi’S Divi Dream Land FAQs

What plot sizes are available in Bhumi's Divi?

The project has plots of 30×40 feet (1,200 sq ft), 33×40 feet (1,320 sq ft), 25×40 feet (1,000 sq ft), and 21 plots of other sizes not detailed in the RERA record.

How many plots are in this project?

Bhumi's Divi has 86 plots in total.

What is the RERA registration number for Bhumi's Divi?

The RERA registration number is PRM/KA/RERA/1250/303/PR/290126/008435.

When is Bhumi's Divi expected to be completed?

The completion date on RERA is 10 December 2025.

Who approved the layout for Bhumi's Divi?

The layout was approved by BIAAPA (Bangalore International Airport Area Planning Authority).

How many land conversion orders has this project received?

The project has 1 land conversion order on record.

Are there any RERA complaints against Bhumi's Divi?

No complaints are on record for this project.

What is the location and PIN code of Bhumi's Divi?

The project is in Tellohalli Agrahara, Devanahalli taluk, Bengaluru Rural district, with PIN code 562110.

Does the developer have other projects registered with Karnataka RERA?

Bhumi Constructions And Developers has 1 project in the Karnataka RERA record.

Are there any complaints against Bhumi Constructions And Developers across all their projects?

No complaints are recorded against the developer across all their projects.

Written by AI from the RERA record above on 7 Oct 2026. Answers use only that record; check them against the source before you decide.

Questions about Bhumi’S Divi Dream Land

No questions published yet. Ask the first one: you get an instant answer from this page’s public record, and our team follows up on anything the record does not show.

Bought a plot from Bhumi Constructions And Developers? Review the developer.

Reviews of Bhumi Constructions And Developers by verified buyers

No verified reviews of Bhumi Constructions And Developers yet. If you bought a plot from them, your review helps other buyers.

How reviews work: only buyers and owners can review; we confirm each purchase by phone before publishing, publish positive and negative reviews alike, never accept payment for reviews, and the developer may reply.

Similar projects within 5 km

ProjectDistancePlotsCompletion (RERA)DevelopedComplaintsPrice
Hare Krishna Enclave at Rajani FarmsHare Krishna Villas2.9 km93Apr 2025100%0Not collected
Maharaja Ikon ParkSamvir Estates Limited Liability Partnership3.1 km135May 2026—0Not collected
Urban SpacesShridevi B T3.3 km20Apr 2026—0Not collected
Elite ParkElite Estates3.4 km558Dec 2026—0Not collected
Merusri Swamy OrchardsMerusri Developers3.4 km119Mar 203099%0Not collected
Elite RoseElite Estates3.7 km105Dec 2025—0Not collected

Projects of the same kind within 5 km in a straight line of this project’s RERA map point, nearest first. % built is the promoter’s latest quarterly figure on RERA (shown for single-registration projects); prices are from the developer’s own website where we found one.

Sources:Source (rera.karnataka.gov.in) (opens in a new tab)

Sources and last checked dates

  1. Karnataka RERA — project register (search by the registration number) (opens in a new tab)

Collected on 4 Oct 2026 by AI research agents reading public pages. Facts are written in our own words. Not found yet: price; court cases; landmarks; specifications; news.

How to check on RERA: On rera.karnataka.gov.in/viewAllProjects, type the registration number in 'Registration No', press Search, then click the 'View Project Details' icon. Complaints open from the 'Complaints / Litigation' icon in the same row. Registration number: PRM/KA/RERA/1250/303/PR/290126/008435.

  • RERA record last checked: 4 Oct 2026
  • Last change in the record (registration, quarterly filing or complaint): 29 Jan 2026

How this page is made: software builds it from public records (Karnataka RERA filings, OpenStreetMap, the developer’s own website). AI is used only to read filings into fields and to write the plain-English summary and FAQ answers, which are checked against the record. Facts are checked automatically against the RERA filing. Methodology · How we earn · Report an error