Birla Trimaya-Phase-I
1, 2 & 3 BHK apartments by Birla Arnaa LLP · Mallenahalli, Devanahalli, Bengaluru
Mallenahalli, Devanahalli, BengaluruOpen on Google Maps (opens in a new tab)
- Under construction
- RERA registered
- residential
Price: Price on request
Site photo filed with Karnataka RERA Karnataka RERA filing · Source ↗ (opens in a new tab)
Birla Trimaya-Phase-I at a glance
- Possession (RERA)Oct 2028Karnataka RERA
- Construction66% built · on pace for Mar 2028RERA filing to 30 Sep 2026; estimate from average pace
- Homes booked556 bookedRERA lists 544 homes; figures as filed · RERA update · as on 30 Sep 2026
- RERA complaints (project)None listedKarnataka RERA · as on 22 Oct 2026
- Approvals filed8 of 9 on RERAKarnataka RERA uploads · 22 Oct 2026
- Nearest metroKIAL Terminals · 8.99 km (under construction)Open now: Whitefield (Kadugodi), 31.33 km · straight line · OpenStreetMap, 5 Oct 2026
- Airport driveapprox. 36 min at peak8.99 km straight line · estimate
Project summary
Birla Trimaya-Phase-I is a residential project by Birla Arnaa LLP in Mallenahalli, Bengaluru with 544 homes, registered with Karnataka RERA. The completion date on RERA is 31 Oct 2028.
Facts collected on 22 Oct 2026 from public records — each linked to its source. Free for buyers. If you book through us, the builder pays us a commission.
Birla Trimaya-Phase-I buyers’ group: join to ask for a group price
No one has joined yet. Be one of the first 10 buyers in this group — the founding members.
Join free. When enough buyers have joined, our agent partner asks Birla Arnaa LLP for a group price — for example a lower price, an easier payment plan or waived charges. Nothing is promised: you see what the builder offers and book directly with the builder if you want to. Free for buyers. If you book through us, the builder pays us a commission.
- Gathering buyers
- Talking to the builder
- Group offer
- Group site visit
- Booking
0 buyers have joined · 0 committed
Committed buyers have confirmed their budget, home type and timeline with us on a call; builders negotiate with them. Joining is free and never obliges you to buy.
Join the Birla Trimaya-Phase-I buyers’ groupHow group buying works
See it for yourself
Visit the site with our team, or get a call to clear your questions. Free, no obligation.
Key facts: home types, towers, land and possession
- Home types
- 1 BHK, 2 BHK, 3 BHK
- Carpet area
- 473 – 2,042 sq ft
- Towers
- 8
- Floors
- 12
- Total homes
- 544
- Land
- 5.77 acres
- Possession (RERA)
- Oct 2028
- Built (RERA update)
- 66%
Birla Trimaya-Phase-I RERA number and registration details
- RERA number
- PRM/KA/RERA/1250/303/PR/300823/006200
- Registered on
- 30 Aug 2023
- Promised completion
- 31 Oct 2028
- Extended to
- No extension recorded
- RERA status
- New launch
- Homes booked
- 556 of 544 as on
- Price
- Not found in public records yet: price
- Project type
- Residential
Towers and blocks (RERA filing)
| Tower | Floors | Basements | Homes |
|---|---|---|---|
| 14 | 12 | 1 | 71 |
| 15 | 11 | 1 | 71 |
| 16 | 11 | 1 | 95 |
| 18 | 11 | 1 | 71 |
| 19 | 11 | 1 | 71 |
| 20 | 11 | 1 | 71 |
| 21 | 11 | 1 | 94 |
| 31A | 3 | 1 | 12 |
A dash (—) means the filing did not state that value.
Summary in plain English
Birla Trimaya-Phase-I is a residential project by Birla Arnaa LLP in Mallenahalli, Devanahalli, with 544 homes across 8 towers of up to 12 floors. The project is registered with Karnataka RERA and scheduled for completion on 31 October 2028.
Written by AI from the RERA record above on 22 Oct 2026. Every number in it was checked against that record; if anything differs, the record wins.
Open space, home loans, escrow and other details
- Open space
- 64.9% of land
- Water and power
- Water source filed with RERA: BoreWell,Local Authority
- Home loans: approved banks
- Not found in public records yet: bank approvals
- Payment plans
- Not found in public records yet: payment plans
- Maintenance
- Not found in public records yet: maintenance
- Car parking
- Not found in public records yet: car parking charge
- Escrow bank (RERA)
- ICICI Bank, Commissariat Road
- Building plan (RERA)
- BIAPPA - Bangalore Airport Area Planning Authority · No. BIAAPA/TP/LPO/DP/56/2022-23 · dated 25 Jan 2023
- Project cost declared to RERA
- ₹463 Cr
Open area as a share of the land, from the areas filed with RERA (includes driveways and landscaped areas).
Amenities
- Electricity
- Outdoor Sports facility
- Indoor Sports facility
- Swimming Pool
- Gym
Amenities and internal works as filed by the promoter with Karnataka RERA; we have not visited the site.
Birla Trimaya-Phase-I location and address
- Address
- Survey nos. 2, 3/2, 6, 7, 8/1, 8/2, 8/3, 9/1, 9/2, 9/3, 10, 11, 12/1, 12/2, 12/3, (old Sy. No. 12/2) 13/1, 13/2, 14/1B, 15/1, 16, 17, 19, , 20/1 (old Sy. No. 20), 20/2 (old Sy. No. 20) 25, 37/4 and 37/7, situated at Akkalenahalli- Mallenahalli Village, Kasaba Hobli, Devanahalli Taluk, , Devanahalli , Bengaluru Rural, Karnataka - 562110
- Village (RERA)
- Mallenahalli
- Locality
- Devanahalli
- PIN code
- 562110
- City
- Bengaluru
- State
- Karnataka
- Coordinates
- 13.27651, 77.73341
Distances to landmarks
Not found in public records yet: landmarksAbout Devanahalli
Not found in public records yet: locality factsCommute times to tech parks and the airport
| To | Straight line | Peak-hour drive (estimate) |
|---|---|---|
| Kempegowda International AirportMap point on OpenStreetMap (opens in a new tab) | 8.99 km | approx. 36 min |
| Manyata Tech ParkMap point on OpenStreetMap (opens in a new tab) | 28.21 km | approx. 114 min |
| ITPL, Whitefield (main gate)Map point on OpenStreetMap (opens in a new tab) | 32.12 km | approx. 130 min |
| KSR Bengaluru City railway station (Majestic)Map point on OpenStreetMap (opens in a new tab) | 37.62 km | approx. 152 min |
| Outer Ring Road tech corridor (RMZ Ecospace, Bellandur)Map point on OpenStreetMap (opens in a new tab) | 39.63 km | approx. 161 min |
| Electronic City Phase 1Map point on OpenStreetMap (opens in a new tab) | 48.04 km | approx. 195 min |
How we calculate
Straight line: from the project’s map point on RERA to the destination’s point on OpenStreetMap.
Peak-hour drive is a rough estimate, not a route: straight line × 1.35 for the road network, at 20 km/h. Real times vary a lot with the route and the hour.
Sources:Source (openstreetmap.org) (opens in a new tab)How we calculate this
Schools and hospitals nearby
Within 2 km
- 1Schools and colleges1 schools, 0 colleges, 0 kindergartens
- 0Hospitals and clinics0 hospitals, 0 clinics
Places as mapped on OpenStreetMap (amenity=school, college, kindergarten, university; hospital, clinic), counted within 2 km in a straight line of the RERA map point. Volunteers map these, so some places may be missing or closed. Places data © OpenStreetMap contributors, extract of 5 Oct 2026.
Nearest metro station and railway
- KIAL Terminals (ಕೆಐಎಬಿ ವಿಮಾನ ನಿಲ್ದಾಣ ಟರ್ಮಿನಲ್ಸ್)Blue Line metro, under construction8.99 km
- Airport City (ವಿಮಾನ ನಿಲ್ದಾಣ ನಗರ)Blue Line metro, under construction10.04 km
- Doddajala (ದೊಡ್ಡಜಾಲ)Blue Line metro, under construction13.73 km
- Whitefield (Kadugodi) (ವೈಟ್ಫೀಲ್ಡ್ (ಕಾಡುಗೋಡಿ))Open now — nearest operating metro station31.33 km
- Avatihalli (ಅವತಿಹಳ್ಳಿ)Nearest railway station2.61 km
Straight-line distances from the RERA map point to the station points mapped on OpenStreetMap; status (open or under construction) as tagged there. Places data © OpenStreetMap contributors, extract of 5 Oct 2026.
Satellite time-lapse of the site
Satellite photos load when you scroll to them.
Photos from Esri World Imagery Wayback, centred on the project’s map point; dates are the capture dates in Esri’s metadata. Loaded from Esri when you scroll here.
Sources:Source (livingatlas.arcgis.com) (opens in a new tab)
Birla Trimaya-Phase-I home types and carpet areas
Documents the builder uploaded to Karnataka RERA, shown as filed. Tap a page to see it full size; the full PDF opens on the RERA website.
Approved layout plan

Approved Layout PlanFull PDF on RERA
Floor plans and brochure not published? The builder shares them only on request. We’ll get the brochure, floor plans and current price list for you, free.
Get brochure, floor plans & price| Home type | Carpet area | Homes |
|---|---|---|
| 1 BHK | 473 – 489 sq ft | 70 |
| 2 BHK | 746 – 790 sq ft | 167 |
| 3 BHK | 900 – 2,042 sq ft | 319 |
| Apartments | 481 sq ft | 544 |
Home types, counts and carpet areas as filed with Karnataka RERA (carpet area, not super built-up).
We have not collected floor-plan drawings; the builder’s sales team can share them.
Birla Trimaya-Phase-I possession date and construction status
Promoter’s quarterly update to RERA for Q2 2026-27, submitted 2026-10-15.
By tower (Q2 2026-27)
Units sold and unsold, from RERA (Q2 2026-27)
| Type | Homes | Booked | Available |
|---|---|---|---|
| 2 BHK | 167 | 167 | 0 |
| 3 BHK | 319 | 319 | 0 |
| 1 BHK | 70 | 70 | 0 |
As reported by the promoter in the quarterly update to RERA, not verified by us.
Timeline
- 30 Aug 2023Registered with Karnataka RERA
- 1 Nov 2023Project start date given to RERA
- 31 Oct 2028Completion date given at registration
Construction pace from RERA quarterly filings
At the average pace so far, construction would reach 100% around Mar 2028 — about 7 months before the completion date on RERA (31 Oct 2028).
At the pace between the 4 quarterly filings we have (58% → 66% in 9 months), it would be around Dec 2029 — about 13 months after the RERA date.
- Filed on RERA
- Average pace since start
- Pace between filings (and 0% assumed at the start date)
- RERA completion date
Quarterly filings
| Quarter | Filed on | Built | Homes booked |
|---|---|---|---|
| Q2 2026-27to 30 Sep 2026 | 15 Oct 2026 | 66% | 556 of 556 |
| Q1 2026-27to 30 Jun 2026 | 13 Jul 2026 | 63% | 555 of 556 |
| Q4 2025-26to 31 Mar 2026 | 14 Apr 2026 | 61% | 554 of 556 |
| Q3 2025-26to 31 Dec 2025 | 14 Jan 2026 | 58% | 554 of 556 |
How we calculate
Average pace = % built ÷ months since the start date in the RERA record. Here: 66% ÷ 35 months (1 Nov 2023 to 30 Sep 2026) = 1.9% a month.
Estimated finish = latest filing date + (100 − % built) ÷ pace = 30 Sep 2026 + 34 ÷ 1.9 = 18 months → Mar 2028. This is an estimate, not a date from the builder or RERA.
Pace between filings = (66% − 58%) ÷ 9 months = 0.9% a month.
A straight line is a simplification: the builder reports one overall %, which mixes excavation, structure and finishing, and work rarely moves at a constant speed. The % values are the promoter’s own figures filed with RERA, not checked by us. Promoter’s quarterly update to RERA for Q2 2026-27, submitted 2026-10-15.
Sources:Source (rera.karnataka.gov.in) (opens in a new tab)How we calculate this
Approvals and documents checklist
17 rows: approvals. Scroll inside the table to see them all.
| Approval | Authority | Source |
|---|---|---|
| Building plan | BIAPPA - Bangalore Airport Area Planning Authority · No. BIAAPA/TP/LPO/DP/56/2022-23 · dated 2023-01-25 | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Land conversion (16 orders) | Deputy Comissioner · No. ALN(DE)/SR/33/2004-05 and 15 more · dated 2023-05-08 | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Commencement Certificate | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Electricity Permission Letter | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Water Permission Letter | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Approved Layout Plan | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Approved Building/Plotting Plan | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Approved Section Of Building/Infrastructure Plan of Plotting | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Change of Land Use | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| District Magistrate | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Conversion Certificate under section 95 of the KLR Act 1964 | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| ESCOM/Electricity | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| KWSSB/Water | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Fire Force Department | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Airport Authority of India | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| KSPCB | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| SEIAA | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
Documents uploaded to RERA
- Building or layout plan · Approved drawings from the planning authorityFiled on RERA ✓ — BIAPPA - Bangalore Airport Area Planning Authority · No. BIAAPA/TP/LPO/DP/56/2022-23 · dated 25 Jan 2023
- Commencement certificate · Permission to start buildingFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
- Environment clearance · SEIAA KarnatakaFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
- Fire NOC · Karnataka Fire and Emergency ServicesFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
- Pollution board consent · KSPCBFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
- Water and sewerage · BWSSBFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
- Electricity · BESCOMFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
- Height clearance · Airports Authority of IndiaFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
- Occupancy certificate (OC) · Issued only when the building is finishedNot on RERA yet — expected at completion
From the documents the promoter uploaded to Karnataka RERA, collected 22 Oct 2026. “Filed” means a document is on RERA — we have not checked its contents or validity. Not every approval applies to every project (for example, smaller projects may not need an environment clearance). The project page on RERA lists each upload.
Birla Trimaya-Phase-I RERA complaints
No complaints listed on Karnataka RERA for this registration as on Source (rera.karnataka.gov.in) (opens in a new tab)
Court and consumer cases
We list case numbers, courts and outcomes only — never names of private individuals.
About Birla Arnaa LLP
- Promoter type
- Partnership Firm
- Projects on this site
- 2
- RERA complaints against promoter
- 0
- Company number (CIN)
- Not found in public records yet: CIN
From Karnataka RERA, as collected so far (22 Oct 2026). Complaints are those RERA lists against this promoter across all its projects.
Birla Arnaa LLP’s RERA recordBirla Arnaa LLP delivery record
- 2Projects in Bengaluru on RERA4 approved registrations under Birla Arnaa LLP in Bengaluru Urban and Rural. Source (rera.karnataka.gov.in) (opens in a new tab)
- 2,028Homes registeredAs stated in each registrations.
- 0RERA complaintsas on Source (rera.karnataka.gov.in) (opens in a new tab)
- 0Complaints per 1,000 homes0 complaints ÷ 2,028 homes in its 4 registrations on Karnataka RERA in Bengaluru.
Sources:Source (rera.karnataka.gov.in) (opens in a new tab)How we calculate this
What’s changed since Jan 2023
- 15 Oct 2026Quarterly update filed for Q2 2026-27: 66% built, 556 of 556 homes booked Source (rera.karnataka.gov.in) (opens in a new tab)
- 13 Jul 2026Quarterly update filed for Q1 2026-27: 63% built, 555 of 556 homes booked Source (rera.karnataka.gov.in) (opens in a new tab)
- 14 Apr 2026Quarterly update filed for Q4 2025-26: 61% built, 554 of 556 homes booked Source (rera.karnataka.gov.in) (opens in a new tab)
- 14 Jan 2026Quarterly update filed for Q3 2025-26: 58% built, 554 of 556 homes booked Source (rera.karnataka.gov.in) (opens in a new tab)
- 1 Nov 2023Project start date in the RERA record Source (rera.karnataka.gov.in) (opens in a new tab)
- 30 Aug 2023Registered with Karnataka RERA (PRM/KA/RERA/1250/303/PR/300823/006200); completion date 31 Oct 2028 Source (rera.karnataka.gov.in) (opens in a new tab)
- 25 Jan 2023Building plan approved by BIAPPA - Bangalore Airport Area Planning Authority (No. BIAAPA/TP/LPO/DP/56/2022-23) Source (rera.karnataka.gov.in) (opens in a new tab)
Newest first. No extension of the completion date is recorded on RERA. When the RERA crawl sees a new filing, complaint or extension, it is added here with its date.
Home loan EMI calculator
- Monthly EMI
- —
- Down payment
- —
- Loan amount
- —
- Total interest
- —
A calculation only, from the numbers you enter — not a loan offer.
All-in cost: GST, registration and other charges
The calculator loads when you scroll to it.
Assumptions
- Base price: the builder’s price is not published in a form we could collect — enter it from the cost sheet.
- GST 5% on the base price and charges — the usual rate for an under-construction home that is not “affordable housing” (1%).
- Stamp duty about 5.6% and registration 2% — the Karnataka rule (registration was raised from 1% to 2% on 31 Aug 2025). Calculated on the agreement value.
- Car parking, other charges and the maintenance deposit are not in the public record we collect; enter them from the builder’s cost sheet.
- Loan on the agreement value (banks usually lend up to 75–90%); EMI is the standard reducing-balance formula. Example rate only — use your bank’s quote.
Birla Trimaya-Phase-I FAQs
What is the RERA registration number for Birla Trimaya-Phase-I?
The RERA registration number is PRM/KA/RERA/1250/303/PR/300823/006200, registered on 30 August 2023.
When will Birla Trimaya-Phase-I be completed?
The completion date on RERA is 31 October 2028.
What home types are available in Birla Trimaya-Phase-I?
The project offers 1 BHK (70 homes, 473-489 carpet sq ft), 2 BHK (167 homes, 746-790 carpet sq ft), and 3 BHK (319 homes, 900-2,042 carpet sq ft).
How many homes are in Birla Trimaya-Phase-I?
The project has 544 homes across 8 towers.
What is the carpet area range in Birla Trimaya-Phase-I?
Carpet areas range from 473 sq ft for 1 BHK homes to 2,042 sq ft for 3 BHK homes.
What is the construction progress of Birla Trimaya-Phase-I?
As of Q2 2026-27 (quarter ended 30 September 2026), the project is 66% complete with 556 homes booked.
Where is Birla Trimaya-Phase-I located?
The project is in Mallenahalli, Devanahalli taluk, Bengaluru Rural district, PIN code 562110.
Are there any RERA complaints on Birla Trimaya-Phase-I?
There are no RERA complaints on this project.
What is the builder's track record?
Birla Arnaa LLP has no RERA complaints across its projects, and has 2 projects in the Bengaluru RERA records.
Which bank holds the escrow for Birla Trimaya-Phase-I?
ICICI Bank holds the escrow for this project.
Written by AI from the RERA record above on 22 Oct 2026. Answers use only that record; check them against the source before you decide.
Questions about Birla Trimaya-Phase-I
No questions published yet. Ask the first one: you get an instant answer from this page’s public record, and our team follows up on anything the record does not show.
Bought a home from Birla Arnaa LLP? Review the builder.
Reviews of Birla Arnaa LLP by verified buyers
No verified reviews of Birla Arnaa LLP yet. If you bought a home from them, your review helps other buyers.
How reviews work: only buyers and owners can review; we confirm each purchase by phone before publishing, publish positive and negative reviews alike, never accept payment for reviews, and the builder may reply.
Similar projects within 5 km
| Project | Distance | Homes | Possession (RERA) | Built | Complaints | Price |
|---|---|---|---|---|---|---|
| Pearl at Brigade AtmosphereBrigade Enterprises Ltd | 1.1 km | 264 | Dec 2025 | 100% | 0 | Not collected |
| Kumar PalazzioKumar Vista Properties LLP | 1.8 km | 29 | Mar 2030 | 11% | 0 | Not collected |
| Skanda AuraSkanda Living Space LLP | 3.2 km | 179 | Dec 2031 | 5% | 0 | Not collected |
| Park Cubix Phase 2Sattva Resi Private Limited | 4.2 km | 798 | Sep 2029 | 48% | 0 | Not collected |
| Laurel & Maple at Brigade OrchardsBrigade Enterprises Ltd | 4.5 km | 311 | Mar 2030 | 15% | 0 | Not collected |
Projects of the same kind within 5 km in a straight line of this project’s RERA map point, nearest first. % built is the promoter’s latest quarterly figure on RERA (shown for single-registration projects); prices are from the builder’s own website where we found one.
Sources and last checked dates
Collected on 22 Oct 2026 by AI research agents reading public pages. Facts are written in our own words. Not found yet: price; court cases; landmarks; specifications; news.
How to check on RERA: On rera.karnataka.gov.in/viewAllProjects, type the registration number in 'Registration No', press Search, then click the 'View Project Details' icon. Complaints open from the 'Complaints / Litigation' icon in the same row. Registration number: PRM/KA/RERA/1250/303/PR/300823/006200.
- RERA record last checked: 22 Oct 2026
- Last change in the record (registration, quarterly filing or complaint): 22 Oct 2026
How this page is made: software builds it from public records (Karnataka RERA filings, OpenStreetMap, the builder’s own website). AI is used only to read filings into fields and to write the plain-English summary and FAQ answers, which are checked against the record. Facts are checked automatically against the RERA filing. Methodology · How we earn · Report an error
More new projects in Devanahalli
Kurubarakunte, DevanahalliUnder constructionRERA registeredBuyers’ group openPearl at Brigade Atmosphere
by Brigade Enterprises
Price: Price on requestGet brochure & price →
- 3 BHK, 4 BHK, Villa
- 1,814 – 2,648 sq ft
- Dec 2025
RERA not updated since promised Dec 2025 · 264 homes
Be one of the first 10 buyers in this groupFounding members — it’s free
Join group for Pearl at Brigade Atmosphere
Guttahalli, DevanahalliUnder constructionRERA registeredBuyers’ group openKumar Palazzio
by Kumar Vista Properties
Price: Price on requestGet brochure & price →
- 4 BHK
- 356 – 360 sq ft
- Mar 2030
29 homes
Be one of the first 10 buyers in this groupFounding members — it’s free
Join group for Kumar Palazzio
DevanahalliUnder constructionRERA registeredBuyers’ group openSkanda Aura
by Skanda Living Space
Price: Price on requestGet brochure & price →
- 2 BHK, 3 BHK
- 635 – 1,319 sq ft
- Dec 2031
179 homes
Be one of the first 10 buyers in this groupFounding members — it’s free
Join group for Skanda Aura