Laurel & Maple at Brigade Orchards
1, 2 & 3 BHK apartments by Brigade Enterprises Ltd · Devanahalli, Bengaluru
Devanahalli, BengaluruOpen on Google Maps (opens in a new tab)
- Under construction
- RERA registered
- residential
by Brigade Enterprises Ltd · registered with RERA by BCV Developers Pvt Ltd
Price: Price on request
Site photo filed with Karnataka RERA Karnataka RERA filing · Source ↗ (opens in a new tab)
Laurel & Maple at Brigade Orchards at a glance
- Possession (RERA)Mar 2030Karnataka RERA
- Construction15% built · on pace for Oct 2029RERA filing to 30 Sep 2026; estimate from average pace
- Homes booked125 of 311 (40%)RERA update · as on 30 Sep 2026
- RERA complaints (project)None listedKarnataka RERA · as on 19 Oct 2026
- Approvals filed8 of 9 on RERAKarnataka RERA uploads · 19 Oct 2026
- Nearest metroKIAL Terminals · 4.49 km (under construction)Open now: Krishnarajapura, 26.85 km · straight line · OpenStreetMap, 5 Oct 2026
- Airport driveapprox. 18 min at peak4.54 km straight line · estimate
- Nearest lakeUnnamed lake · 170 mFrom the RERA map point · OpenStreetMap, 5 Oct 2026
Project summary
Laurel & Maple at Brigade Orchards is a residential project by Brigade Enterprises Ltd in Devanahalli, Bengaluru with 311 homes, registered with Karnataka RERA. The completion date on RERA is 31 Mar 2030.
Facts collected on 19 Oct 2026 from public records — each linked to its source. Free for buyers. If you book through us, the builder pays us a commission.
Laurel & Maple at Brigade Orchards buyers’ group: join to ask for a group price
No one has joined yet. Be one of the first 10 buyers in this group — the founding members.
Join free. When enough buyers have joined, our agent partner asks Brigade Enterprises Ltd for a group price — for example a lower price, an easier payment plan or waived charges. Nothing is promised: you see what the builder offers and book directly with the builder if you want to. Free for buyers. If you book through us, the builder pays us a commission.
- Gathering buyers
- Talking to the builder
- Group offer
- Group site visit
- Booking
0 buyers have joined · 0 committed
Committed buyers have confirmed their budget, home type and timeline with us on a call; builders negotiate with them. Joining is free and never obliges you to buy.
Join the Laurel & Maple at Brigade Orchards buyers’ groupHow group buying works
See it for yourself
Visit the site with our team, or get a call to clear your questions. Free, no obligation.
Key facts: home types, towers, land and possession
- Home types
- 1 BHK, 2 BHK, 3 BHK
- Carpet area
- 449 – 1,052 sq ft
- Towers
- 2
- Floors
- 8
- Total homes
- 311
- Land
- 2.72 acres
- Possession (RERA)
- Mar 2030
- Built (RERA update)
- 15%
Laurel & Maple at Brigade Orchards RERA number and registration details
- RERA number
- PRM/KA/RERA/1250/303/PR/040326/008505
- Registered on
- 4 Mar 2026
- Promised completion
- 31 Mar 2030
- Extended to
- No extension recorded
- RERA status
- New launch
- Homes booked
- 125 of 311 as on
- Price
- Not found in public records yet: price
- Project type
- Residential
Towers and blocks (RERA filing)
| Tower | Floors | Basements | Homes |
|---|---|---|---|
| LAUREL | 8 | 2 | 160 |
| Maple | 8 | 2 | 151 |
A dash (—) means the filing did not state that value.
Summary in plain English
Laurel & Maple at Brigade Orchards is a residential project by BCV Developers Pvt Ltd in Devanahalli with 311 homes across 2 towers of up to 8 floors. The project is registered with RERA and is scheduled to be completed on 31 March 2030.
Written by AI from the RERA record above on 19 Oct 2026. Every number in it was checked against that record; if anything differs, the record wins.
Open space, home loans, escrow and other details
- Open space
- 56.2% of land
- Water and power
- Water source filed with RERA: Others
- Home loans: approved banks
- Not found in public records yet: bank approvals
- Payment plans
- Not found in public records yet: payment plans
- Maintenance
- Not found in public records yet: maintenance
- Car parking
- Not found in public records yet: car parking charge
- Escrow bank (RERA)
- ICICI Bank, Commissariat Road, Bangalore
- Building plan (RERA)
- Local Planing Authority · No. TMCD/TC/CR/89/2025-26 · dated 11 Feb 2026
- Project cost declared to RERA
- ₹229 Cr
Open area as a share of the land, from the areas filed with RERA (includes driveways and landscaped areas).
Amenities
- Electricity
- Club House
- Community Hall
- Indoor Sports facility
- Swimming Pool
- Gym
- Power Backup
Amenities and internal works as filed by the promoter with Karnataka RERA; we have not visited the site.
Laurel & Maple at Brigade Orchards location and address
- Address
- Site No. 24, Khata No. 4368/371/1/371/2/368/6, Survey Nos. 371/1, 371/2 and 368/6 (earlier part of Survey No. 368/1) , Devanahalli Village, Kasaba Hobli, Devanahalli Taluk, Bangalore Rural District , Devanahalli , Bengaluru Rural, Karnataka - 562110
- Village (RERA)
- Devanahalli
- Locality
- Devanahalli
- PIN code
- 562110
- City
- Bengaluru
- State
- Karnataka
- Coordinates
- 13.23728, 77.72309
Distances to landmarks
Not found in public records yet: landmarksAbout Devanahalli
Not found in public records yet: locality factsCommute times to tech parks and the airport
| To | Straight line | Peak-hour drive (estimate) |
|---|---|---|
| Kempegowda International AirportMap point on OpenStreetMap (opens in a new tab) | 4.54 km | approx. 18 min |
| Manyata Tech ParkMap point on OpenStreetMap (opens in a new tab) | 23.82 km | approx. 96 min |
| ITPL, Whitefield (main gate)Map point on OpenStreetMap (opens in a new tab) | 27.8 km | approx. 113 min |
| KSR Bengaluru City railway station (Majestic)Map point on OpenStreetMap (opens in a new tab) | 33.26 km | approx. 135 min |
| Outer Ring Road tech corridor (RMZ Ecospace, Bellandur)Map point on OpenStreetMap (opens in a new tab) | 35.16 km | approx. 142 min |
| Electronic City Phase 1Map point on OpenStreetMap (opens in a new tab) | 43.56 km | approx. 176 min |
How we calculate
Straight line: from the project’s map point on RERA to the destination’s point on OpenStreetMap.
Peak-hour drive is a rough estimate, not a route: straight line × 1.35 for the road network, at 20 km/h. Real times vary a lot with the route and the hour.
Sources:Source (openstreetmap.org) (opens in a new tab)How we calculate this
Schools and hospitals nearby
Within 2 km
- 5Schools and colleges4 schools, 1 colleges, 0 kindergartens
- 2Hospitals and clinics2 hospitals, 0 clinics
Nearest schools and colleges
- Brigade Orchard School · 0.64 km
- Akash International School · 1.51 km
- Akash Institute of Medical Sciences · 1.61 km
Nearest hospitals and clinics
- Sri Shirdi Sai Hospital · 1.48 km
- Manasa Hospital, Devana Halli Town · 1.73 km
Places as mapped on OpenStreetMap (amenity=school, college, kindergarten, university; hospital, clinic), counted within 2 km in a straight line of the RERA map point. Volunteers map these, so some places may be missing or closed. Places data © OpenStreetMap contributors, extract of 5 Oct 2026.
Nearest metro station and railway
- KIAL Terminals (ಕೆಐಎಬಿ ವಿಮಾನ ನಿಲ್ದಾಣ ಟರ್ಮಿನಲ್ಸ್)Blue Line metro, under construction4.49 km
- Airport City (ವಿಮಾನ ನಿಲ್ದಾಣ ನಗರ)Blue Line metro, under construction5.83 km
- Doddajala (ದೊಡ್ಡಜಾಲ)Blue Line metro, under construction10.08 km
- Krishnarajapura (ಕೃಷ್ಣರಾಜಪುರ (ಕೆ.ಆರ್.ಪುರ))Open now — nearest operating metro station26.85 km
- Devanahalli (ದೇವನಹಳ್ಳಿ)Nearest railway station2.23 km
Straight-line distances from the RERA map point to the station points mapped on OpenStreetMap; status (open or under construction) as tagged there. Places data © OpenStreetMap contributors, extract of 5 Oct 2026.
Lake and lake-buffer check
The nearest mapped lake is Unnamed lake (mapped on OpenStreetMap), 170 m from the project’s RERA map point.
The site boundary is not published as a shape, so its nearest edge can be closer than this point. Whether any building sits inside a lake buffer can only be checked on the approved plan.
- Unnamed lake (mapped on OpenStreetMap) on OpenStreetMap (opens in a new tab) 170 m
- Unnamed lake (mapped on OpenStreetMap) on OpenStreetMap (opens in a new tab) 1,793 m
The buffer rule
Bengaluru’s lake buffer rule has changed over time: the National Green Tribunal ordered a 75 m buffer in May 2016; the Supreme Court set that order aside on 5 March 2019, leaving the 30 m buffer of the Revised Master Plan 2015. Check the current rule and the approved plan before relying on either number.
- LiveLaw: SC sets aside NGT order enlarging buffer zones (2019) (livelaw.in) (opens in a new tab)
- Citizen Matters: Shrinking lake buffers (citizenmatters.in) (opens in a new tab)
Shortest distance from the RERA map point to the mapped water edge (OpenStreetMap water polygons tagged lake or reservoir, or named lake/kere/tank). Mapped shorelines can differ from the revenue-record boundary of a lake. Places data © OpenStreetMap contributors, extract of 5 Oct 2026.
Sources:Source (openstreetmap.org) (opens in a new tab)Source (livelaw.in) (opens in a new tab)Source (citizenmatters.in) (opens in a new tab)How we calculate this
Satellite time-lapse of the site
Satellite photos load when you scroll to them.
Photos from Esri World Imagery Wayback, centred on the project’s map point; dates are the capture dates in Esri’s metadata. Loaded from Esri when you scroll here.
Sources:Source (livingatlas.arcgis.com) (opens in a new tab)
Laurel & Maple at Brigade Orchards floor plans, brochure and elevations
Documents the builder uploaded to Karnataka RERA, shown as filed. Tap a page to see it full size; the full PDF opens on the RERA website.
Brochure4 pages

BrochureFull PDF on RERA 


Floor plans9 files

Typical Floor Plan.pdfFull PDF on RERA 
First Floor Plan.pdfFull PDF on RERA 
Fourth Floor Plan.pdfFull PDF on RERA 
Ground Floor Plan.pdfFull PDF on RERA 
Second Floor Plan.pdfFull PDF on RERA 
Third Floor Plan.pdfFull PDF on RERA 
Basement 1 Floor Plan.pdfFull PDF on RERA 
Basement 2 Floor Plan.pdfFull PDF on RERA 
Terrace Floor Plan.pdfFull PDF on RERA
Approved building plan

Approved Building PlanFull PDF on RERA
| Home type | Carpet area | Homes |
|---|---|---|
| 1 bedroom + 1 toilet | 464 sq ft | 17 |
| 1 bedroom + 1 toilet + powder room | 509 sq ft | 24 |
| 1 bedroom + 2 toilet | 694 sq ft | 2 |
| 1 BHK | 449 – 696 sq ft | 43 |
| 2 bedroom + 2 toilet | 803 sq ft | 199 |
| 2 BHK | 723 – 851 sq ft | 199 |
| 3 bedroom + 2 toilet | 968 sq ft | 37 |
| 3 bedroom + 3 toilet | 1,052 sq ft | 32 |
| 3 BHK | 944 – 1,051 sq ft | 69 |
Home types, counts and carpet areas as filed with Karnataka RERA (carpet area, not super built-up).
We have not collected floor-plan drawings; the builder’s sales team can share them.
Laurel & Maple at Brigade Orchards possession date and construction status
Promoter’s quarterly update to RERA for Q2 2026-27, submitted 2026-10-15.
By tower (Q2 2026-27)
Units sold and unsold, from RERA (Q2 2026-27)
| Type | Homes | Booked | Available |
|---|---|---|---|
| 1 BHK | 43 | 30 | 13 |
| 2 BHK | 199 | 62 | 137 |
| 3 BHK | 69 | 33 | 36 |
As reported by the promoter in the quarterly update to RERA, not verified by us.
Timeline
- 4 Mar 2026Registered with Karnataka RERA
- 15 Mar 2026Project start date given to RERA
- 31 Mar 2030Completion date given at registration
Construction pace from RERA quarterly filings
At the average pace so far, construction would reach 100% around Oct 2029 — about 5 months before the completion date on RERA (31 Mar 2030).
At the pace between the 3 quarterly filings we have (12% → 15% in 6 months), it would be around Dec 2040 — about 128 months after the RERA date.
- Filed on RERA
- Average pace since start
- Pace between filings (and 0% assumed at the start date)
- RERA completion date
Quarterly filings
| Quarter | Filed on | Built | Homes booked |
|---|---|---|---|
| Q2 2026-27to 30 Sep 2026 | 15 Oct 2026 | 15% | 125 of 311 |
| Q1 2026-27to 30 Jun 2026 | 15 Jul 2026 | 13% | 81 of 311 |
| Q4 2025-26to 31 Mar 2026 | 15 Apr 2026 | 12% | 49 of 311 |
How we calculate
Average pace = % built ÷ months since the start date in the RERA record. Here: 15% ÷ 6.5 months (15 Mar 2026 to 30 Sep 2026) = 2.3% a month.
Estimated finish = latest filing date + (100 − % built) ÷ pace = 30 Sep 2026 + 85 ÷ 2.3 = 37 months → Oct 2029. This is an estimate, not a date from the builder or RERA.
Pace between filings = (15% − 12%) ÷ 6 months = 0.5% a month.
A straight line is a simplification: the builder reports one overall %, which mixes excavation, structure and finishing, and work rarely moves at a constant speed. The % values are the promoter’s own figures filed with RERA, not checked by us. Promoter’s quarterly update to RERA for Q2 2026-27, submitted 2026-10-15.
Sources:Source (rera.karnataka.gov.in) (opens in a new tab)How we calculate this
Approvals and documents checklist
| Approval | Authority | Source |
|---|---|---|
| Building plan | Local Planing Authority · No. TMCD/TC/CR/89/2025-26 · dated 2026-02-11 | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Land conversion (3 orders) | Deputy Commissioner, Bangalore Rural · No. ALN(D)SR:67/2005-06 and 2 more · dated 2010-06-07 | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Commencement Certificate | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Approved Building Plan | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| ESCOM/Electricity | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| KWSSB/Water | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| KSPCB | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| SEIAA | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Fire Force Department | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Airport Authority of India | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
Documents uploaded to RERA
- Building or layout plan · Approved drawings from the planning authorityFiled on RERA ✓ — Local Planing Authority · No. TMCD/TC/CR/89/2025-26 · dated 11 Feb 2026
- Commencement certificate · Permission to start buildingFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
- Environment clearance · SEIAA KarnatakaFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
- Fire NOC · Karnataka Fire and Emergency ServicesFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
- Pollution board consent · KSPCBFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
- Water and sewerage · BWSSBFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
- Electricity · BESCOMFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
- Height clearance · Airports Authority of IndiaFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
- Occupancy certificate (OC) · Issued only when the building is finishedNot on RERA yet — expected at completion
From the documents the promoter uploaded to Karnataka RERA, collected 19 Oct 2026. “Filed” means a document is on RERA — we have not checked its contents or validity. Not every approval applies to every project (for example, smaller projects may not need an environment clearance). The project page on RERA lists each upload.
Laurel & Maple at Brigade Orchards RERA complaints
No complaints listed on Karnataka RERA for this registration as on Source (rera.karnataka.gov.in) (opens in a new tab)
Court and consumer cases
We list case numbers, courts and outcomes only — never names of private individuals.
About Brigade Enterprises Ltd
- Promoter type
- Company
- Projects on this site
- 28
- RERA complaints against promoter
- 44
- Company number (CIN)
- U45201KA2008PTC045861
From Karnataka RERA, as collected so far (19 Oct 2026). Complaints are those RERA lists against this promoter across all its projects.
Brigade Enterprises Ltd’s RERA recordBrigade Enterprises Ltd delivery record
- 28Projects in Bengaluru on RERA32 approved registrations under Brigade Enterprises Ltd in Bengaluru Urban and Rural. Source (rera.karnataka.gov.in) (opens in a new tab)
- 15,990Homes and plots registeredAs stated in 31 of the 32 registrations.
- 44RERA complaints5 open, 39 disposed. as on Source (rera.karnataka.gov.in) (opens in a new tab)
- 2.8Complaints per 1,000 homes and plots44 complaints ÷ 15,990 homes and plots in its 32 registrations on Karnataka RERA in Bengaluru.
- 5Completion filed on RERARegistrations where the promoter applied to RERA for completion; 2 with an occupancy certificate on RERA.
- 0 of 5Filed by the date given at registrationMedian gap 9.4 months (on-time ones count as 0). The completion application can come after handover, so this is an upper bound on lateness.
What the complaints are about
44 complaint subjects as written on RERA, as on . Each subject is sorted into one group by keywords (first match wins: delay, refund, registration, quality, litigation, association); one complaint often raises several issues. Source (rera.karnataka.gov.in) (opens in a new tab)
Completion filed on RERA
| Project | Date at registration | Completion filed | Gap |
|---|---|---|---|
| Brigade Northridge NeoOC on RERA | 31 Mar 2022extended to 30 Sep 2022 | 20 May 2026 | 50 months after |
| Brigade BricklaneOC on RERA | 31 Dec 2021extended to 31 Mar 2023 | 16 May 2026 | 53 months after |
| Brigade Oasis - Phase 1 | 30 Jun 2025extended to 30 Jun 2026 | 13 Apr 2026 | 9 months after |
| Brigade Oasis - Phase 2 | 30 Jun 2025extended to 30 Jun 2026 | 13 Apr 2026 | 9 months after |
| Brigade Oasis - Phase 3 | 30 Jun 2025extended to 30 Jun 2026 | 13 Apr 2026 | 9 months after |
Measured against the completion date given at registration; many projects had RERA extensions (including the COVID-period extension), shown under the date.
Sources:Source (rera.karnataka.gov.in) (opens in a new tab)How we calculate this
What’s changed since Feb 2026
- 15 Oct 2026Quarterly update filed for Q2 2026-27: 15% built, 125 of 311 homes booked Source (rera.karnataka.gov.in) (opens in a new tab)
- 15 Jul 2026Quarterly update filed for Q1 2026-27: 13% built, 81 of 311 homes booked Source (rera.karnataka.gov.in) (opens in a new tab)
- 15 Apr 2026Quarterly update filed for Q4 2025-26: 12% built, 49 of 311 homes booked Source (rera.karnataka.gov.in) (opens in a new tab)
- 15 Mar 2026Project start date in the RERA record Source (rera.karnataka.gov.in) (opens in a new tab)
- 4 Mar 2026Registered with Karnataka RERA (PRM/KA/RERA/1250/303/PR/040326/008505); completion date 31 Mar 2030 Source (rera.karnataka.gov.in) (opens in a new tab)
- 11 Feb 2026Building plan approved by Local Planing Authority (No. TMCD/TC/CR/89/2025-26) Source (rera.karnataka.gov.in) (opens in a new tab)
Newest first. No extension of the completion date is recorded on RERA. When the RERA crawl sees a new filing, complaint or extension, it is added here with its date.
Home loan EMI calculator
- Monthly EMI
- —
- Down payment
- —
- Loan amount
- —
- Total interest
- —
A calculation only, from the numbers you enter — not a loan offer.
All-in cost: GST, registration and other charges
The calculator loads when you scroll to it.
Assumptions
- Base price: the builder’s price is not published in a form we could collect — enter it from the cost sheet.
- GST 5% on the base price and charges — the usual rate for an under-construction home that is not “affordable housing” (1%).
- Stamp duty about 5.6% and registration 2% — the Karnataka rule (registration was raised from 1% to 2% on 31 Aug 2025). Calculated on the agreement value.
- Car parking, other charges and the maintenance deposit are not in the public record we collect; enter them from the builder’s cost sheet.
- Loan on the agreement value (banks usually lend up to 75–90%); EMI is the standard reducing-balance formula. Example rate only — use your bank’s quote.
Laurel & Maple at Brigade Orchards FAQs
What is the RERA registration number for Laurel & Maple at Brigade Orchards?
The RERA registration number is PRM/KA/RERA/1250/303/PR/040326/008505, registered on 4 March 2026.
Where is Laurel & Maple at Brigade Orchards located?
The project is in Devanahalli, Bengaluru Rural district, PIN code 562110.
How many homes are in Laurel & Maple at Brigade Orchards?
The project has 311 homes across 2 towers.
What home types are available at Laurel & Maple at Brigade Orchards?
Home types include 1 BHK (449 to 696 sq ft carpet area), 2 BHK (723 to 851 sq ft), 2 bedroom + 2 toilet (803 sq ft), 3 BHK (944 to 1,051 sq ft), 3 bedroom + 3 toilet (1,052 sq ft), and 3 bedroom + 2 toilet (968 sq ft).
What is the carpet area range for 2 BHK homes at Laurel & Maple at Brigade Orchards?
The 2 BHK homes have a carpet area range of 723 to 851 sq ft.
When is Laurel & Maple at Brigade Orchards expected to be completed?
The project is scheduled for completion on 31 March 2030.
What is the construction progress of Laurel & Maple at Brigade Orchards?
As of Q2 2026-27 (ended 30 September 2026), the project is 15% complete with 125 homes booked out of 311.
Are there any RERA complaints against Laurel & Maple at Brigade Orchards?
There are no RERA complaints against this project.
How many RERA complaints has BCV Developers Pvt Ltd received across all projects?
BCV Developers Pvt Ltd has 15 RERA complaints across all their projects on record.
How many other projects does BCV Developers Pvt Ltd have in the Bengaluru records?
BCV Developers Pvt Ltd has 9 projects in the Bengaluru RERA records.
Written by AI from the RERA record above on 19 Oct 2026. Answers use only that record; check them against the source before you decide.
Questions about Laurel & Maple at Brigade Orchards
No questions published yet. Ask the first one: you get an instant answer from this page’s public record, and our team follows up on anything the record does not show.
Bought a home from Brigade Enterprises Ltd? Review the builder.
Reviews of Brigade Enterprises Ltd by verified buyers
No verified reviews of Brigade Enterprises Ltd yet. If you bought a home from them, your review helps other buyers.
How reviews work: only buyers and owners can review; we confirm each purchase by phone before publishing, publish positive and negative reviews alike, never accept payment for reviews, and the builder may reply.
Similar projects within 5 km
| Project | Distance | Homes | Possession (RERA) | Built | Complaints | Price |
|---|---|---|---|---|---|---|
| Park Cubix Phase 2Sattva Resi Private Limited | 0.5 km | 798 | Sep 2029 | 48% | 0 | Not collected |
| Fairmont at Brigade OrchardsBrigade Enterprises Ltd | 1 km | 92 | Dec 2027 | 100% | 0 | Not collected |
| Ebony at Brigade OrchardsBrigade Enterprises Ltd | 1.1 km | 232 | Mar 2029 | 42% | 0 | Not collected |
| Ivory at Brigade OrchardsBrigade Enterprises Ltd | 1.4 km | 605 | Dec 2027extended | — | 2 | Not collected |
| MVN Aero OneMF Farmlands Private Limited | 1.7 km | 213 | Dec 2026 | — | 0 | Not collected |
| Geetanjali Vatika AerocityRatngarbha Ventures Private Limited | 1.8 km | 40 | Oct 2029 | — | 0 | Not collected |
Projects of the same kind within 5 km in a straight line of this project’s RERA map point, nearest first. % built is the promoter’s latest quarterly figure on RERA (shown for single-registration projects); prices are from the builder’s own website where we found one.
Sources and last checked dates
Collected on 19 Oct 2026 by AI research agents reading public pages. Facts are written in our own words. Not found yet: price; court cases; landmarks; specifications; news.
How to check on RERA: On rera.karnataka.gov.in/viewAllProjects, type the registration number in 'Registration No', press Search, then click the 'View Project Details' icon. Complaints open from the 'Complaints / Litigation' icon in the same row. Registration number: PRM/KA/RERA/1250/303/PR/040326/008505.
- RERA record last checked: 19 Oct 2026
- Last change in the record (registration, quarterly filing or complaint): 19 Oct 2026
How this page is made: software builds it from public records (Karnataka RERA filings, OpenStreetMap, the builder’s own website). AI is used only to read filings into fields and to write the plain-English summary and FAQ answers, which are checked against the record. Facts are checked automatically against the RERA filing. Methodology · How we earn · Report an error
More new projects in Devanahalli
all Devanahalli, DevanahalliArtist’s impressionUnder constructionRERA registeredBuyers’ group openPark Cubix Phase 2
by Sattva Resi
Price: Price on requestGet brochure & price →
- Studio, 1 BHK, 2 BHK, 2.5 BHK, +1 more
- 276 – 1,103 sq ft
- Sep 2029
798 homes
Be one of the first 10 buyers in this groupFounding members — it’s free
Join group for Park Cubix Phase 2
Rayasandra, DevanahalliUnder constructionRERA registeredBuyers’ group openFairmont at Brigade Orchards
by Brigade Enterprises
Price: Price on requestGet brochure & price →
- 3 BHK, 4 BHK
- 1,243 – 1,453 sq ft
- Dec 2027
92 homes
Be one of the first 10 buyers in this groupFounding members — it’s free
Join group for Fairmont at Brigade Orchards
Rayasandra, DevanahalliUnder constructionRERA registeredBuyers’ group openEbony at Brigade Orchards
by Brigade Enterprises
Price: Price on requestGet brochure & price →
- 3 BHK, 4 BHK
- 1,055 – 1,518 sq ft
- Mar 2029
232 homes
Be one of the first 10 buyers in this groupFounding members — it’s free
Join group for Ebony at Brigade Orchards