Skip to content
Log in

Laurel & Maple at Brigade Orchards

1, 2 & 3 BHK apartments by Brigade Enterprises Ltd · Devanahalli, Bengaluru

Devanahalli, BengaluruOpen on Google Maps (opens in a new tab)

  • Under construction
  • RERA registered
  • residential

by Brigade Enterprises Ltd · registered with RERA by BCV Developers Pvt Ltd

Price: Price on request

Get brochure, floor plans & price

Brochure, floor plans and price list for Laurel & Maple at Brigade Orchards

Builders share their brochure, floor plans and price list only on request. Tell us how to reach you and we’ll get them and send them to you, free.

Free for buyers. If you book through us, the builder pays us a commission. How we earn

Project summary

Laurel & Maple at Brigade Orchards is a residential project by Brigade Enterprises Ltd in Devanahalli, Bengaluru with 311 homes, registered with Karnataka RERA. The completion date on RERA is 31 Mar 2030.

Facts collected on 19 Oct 2026 from public records — each linked to its source. Free for buyers. If you book through us, the builder pays us a commission.

Laurel & Maple at Brigade Orchards buyers’ group: join to ask for a group price

No one has joined yet. Be one of the first 10 buyers in this group — the founding members.

Join free. When enough buyers have joined, our agent partner asks Brigade Enterprises Ltd for a group price — for example a lower price, an easier payment plan or waived charges. Nothing is promised: you see what the builder offers and book directly with the builder if you want to. Free for buyers. If you book through us, the builder pays us a commission.

  1. Gathering buyers
  2. Talking to the builder
  3. Group offer
  4. Group site visit
  5. Booking

0 buyers have joined · 0 committed

Committed buyers have confirmed their budget, home type and timeline with us on a call; builders negotiate with them. Joining is free and never obliges you to buy.

Join the Laurel & Maple at Brigade Orchards buyers’ groupHow group buying works

See it for yourself

Visit the site with our team, or get a call to clear your questions. Free, no obligation.

Key facts: home types, towers, land and possession

Updated on 19 Oct 2026
Home types
1 BHK, 2 BHK, 3 BHK
Carpet area
449 – 1,052 sq ft
Towers
2
Floors
8
Total homes
311
Land
2.72 acres
Possession (RERA)
Mar 2030
Built (RERA update)
15%

Laurel & Maple at Brigade Orchards RERA number and registration details

RERA number
PRM/KA/RERA/1250/303/PR/040326/008505
Registered on
4 Mar 2026
Promised completion
31 Mar 2030
Extended to
No extension recorded
RERA status
New launch
Homes booked
125 of 311 as on
Price
Not found in public records yet: price
Project type
Residential

Towers and blocks (RERA filing)

TowerFloorsBasementsHomes
LAUREL82160
Maple82151

A dash (—) means the filing did not state that value.

Sources:Source (rera.karnataka.gov.in) (opens in a new tab)

Summary in plain English

Laurel & Maple at Brigade Orchards is a residential project by BCV Developers Pvt Ltd in Devanahalli with 311 homes across 2 towers of up to 8 floors. The project is registered with RERA and is scheduled to be completed on 31 March 2030.

Written by AI from the RERA record above on 19 Oct 2026. Every number in it was checked against that record; if anything differs, the record wins.

Open space, home loans, escrow and other details

Open space
56.2% of land
Water and power
Water source filed with RERA: Others
Home loans: approved banks
Not found in public records yet: bank approvals
Payment plans
Not found in public records yet: payment plans
Maintenance
Not found in public records yet: maintenance
Car parking
Not found in public records yet: car parking charge
Escrow bank (RERA)
ICICI Bank, Commissariat Road, Bangalore
Building plan (RERA)
Local Planing Authority · No. TMCD/TC/CR/89/2025-26 · dated 11 Feb 2026
Project cost declared to RERA
₹229 Cr

Open area as a share of the land, from the areas filed with RERA (includes driveways and landscaped areas).

Sources:Source (rera.karnataka.gov.in) (opens in a new tab)

Amenities

  • Electricity
  • Club House
  • Community Hall
  • Indoor Sports facility
  • Swimming Pool
  • Gym
  • Power Backup

Amenities and internal works as filed by the promoter with Karnataka RERA; we have not visited the site.

Sources:Source (rera.karnataka.gov.in) (opens in a new tab)

Laurel & Maple at Brigade Orchards location and address

Address
Site No. 24, Khata No. 4368/371/1/371/2/368/6, Survey Nos. 371/1, 371/2 and 368/6 (earlier part of Survey No. 368/1) , Devanahalli Village, Kasaba Hobli, Devanahalli Taluk, Bangalore Rural District , Devanahalli , Bengaluru Rural, Karnataka - 562110
Village (RERA)
Devanahalli
Locality
Devanahalli
PIN code
562110
City
Bengaluru
State
Karnataka
Coordinates
13.23728, 77.72309

Distances to landmarks

Not found in public records yet: landmarks

About Devanahalli

Not found in public records yet: locality facts

Commute times to tech parks and the airport

As on 5 Oct 2026
ToStraight linePeak-hour drive (estimate)
Kempegowda International AirportMap point on OpenStreetMap (opens in a new tab)4.54 kmapprox. 18 min
Manyata Tech ParkMap point on OpenStreetMap (opens in a new tab)23.82 kmapprox. 96 min
ITPL, Whitefield (main gate)Map point on OpenStreetMap (opens in a new tab)27.8 kmapprox. 113 min
KSR Bengaluru City railway station (Majestic)Map point on OpenStreetMap (opens in a new tab)33.26 kmapprox. 135 min
Outer Ring Road tech corridor (RMZ Ecospace, Bellandur)Map point on OpenStreetMap (opens in a new tab)35.16 kmapprox. 142 min
Electronic City Phase 1Map point on OpenStreetMap (opens in a new tab)43.56 kmapprox. 176 min
How we calculate

Straight line: from the project’s map point on RERA to the destination’s point on OpenStreetMap.

Peak-hour drive is a rough estimate, not a route: straight line × 1.35 for the road network, at 20 km/h. Real times vary a lot with the route and the hour.

Sources:Source (openstreetmap.org) (opens in a new tab)How we calculate this

Schools and hospitals nearby

As on 5 Oct 2026

Within 2 km

  • 5Schools and colleges4 schools, 1 colleges, 0 kindergartens
  • 2Hospitals and clinics2 hospitals, 0 clinics

Nearest schools and colleges

  • Brigade Orchard School · 0.64 km
  • Akash International School · 1.51 km
  • Akash Institute of Medical Sciences · 1.61 km

Nearest hospitals and clinics

  • Sri Shirdi Sai Hospital · 1.48 km
  • Manasa Hospital, Devana Halli Town · 1.73 km

Places as mapped on OpenStreetMap (amenity=school, college, kindergarten, university; hospital, clinic), counted within 2 km in a straight line of the RERA map point. Volunteers map these, so some places may be missing or closed. Places data © OpenStreetMap contributors, extract of 5 Oct 2026.

Sources:Source (openstreetmap.org) (opens in a new tab)

Nearest metro station and railway

As on 5 Oct 2026
  • KIAL Terminals (ಕೆಐಎಬಿ ವಿಮಾನ ನಿಲ್ದಾಣ ಟರ್ಮಿನಲ್ಸ್)Blue Line metro, under construction4.49 km
  • Airport City (ವಿಮಾನ ನಿಲ್ದಾಣ ನಗರ)Blue Line metro, under construction5.83 km
  • Doddajala (ದೊಡ್ಡಜಾಲ)Blue Line metro, under construction10.08 km
  • Krishnarajapura (ಕೃಷ್ಣರಾಜಪುರ (ಕೆ.ಆರ್.ಪುರ))Open now — nearest operating metro station26.85 km
  • Devanahalli (ದೇವನಹಳ್ಳಿ)Nearest railway station2.23 km

Straight-line distances from the RERA map point to the station points mapped on OpenStreetMap; status (open or under construction) as tagged there. Places data © OpenStreetMap contributors, extract of 5 Oct 2026.

Sources:Source (openstreetmap.org) (opens in a new tab)

Lake and lake-buffer check

As on 5 Oct 2026

The nearest mapped lake is Unnamed lake (mapped on OpenStreetMap), 170 m from the project’s RERA map point.

The site boundary is not published as a shape, so its nearest edge can be closer than this point. Whether any building sits inside a lake buffer can only be checked on the approved plan.

The buffer rule

Bengaluru’s lake buffer rule has changed over time: the National Green Tribunal ordered a 75 m buffer in May 2016; the Supreme Court set that order aside on 5 March 2019, leaving the 30 m buffer of the Revised Master Plan 2015. Check the current rule and the approved plan before relying on either number.

Shortest distance from the RERA map point to the mapped water edge (OpenStreetMap water polygons tagged lake or reservoir, or named lake/kere/tank). Mapped shorelines can differ from the revenue-record boundary of a lake. Places data © OpenStreetMap contributors, extract of 5 Oct 2026.

Sources:Source (openstreetmap.org) (opens in a new tab)Source (livelaw.in) (opens in a new tab)Source (citizenmatters.in) (opens in a new tab)How we calculate this

Satellite time-lapse of the site

Satellite photos load when you scroll to them.

Photos from Esri World Imagery Wayback, centred on the project’s map point; dates are the capture dates in Esri’s metadata. Loaded from Esri when you scroll here.

Sources:Source (livingatlas.arcgis.com) (opens in a new tab)

Laurel & Maple at Brigade Orchards floor plans, brochure and elevations

Documents the builder uploaded to Karnataka RERA, shown as filed. Tap a page to see it full size; the full PDF opens on the RERA website.

Brochure4 pages

Floor plans9 files

Approved building plan

Home typeCarpet areaHomes
1 bedroom + 1 toilet464 sq ft17
1 bedroom + 1 toilet + powder room509 sq ft24
1 bedroom + 2 toilet694 sq ft2
1 BHK449 – 696 sq ft43
2 bedroom + 2 toilet803 sq ft199
2 BHK723 – 851 sq ft199
3 bedroom + 2 toilet968 sq ft37
3 bedroom + 3 toilet1,052 sq ft32
3 BHK944 – 1,051 sq ft69

Home types, counts and carpet areas as filed with Karnataka RERA (carpet area, not super built-up).

We have not collected floor-plan drawings; the builder’s sales team can share them.

Sources:Source (rera.karnataka.gov.in) (opens in a new tab)

Laurel & Maple at Brigade Orchards possession date and construction status

  • Whole project (promoter’s RERA update)15%

    as on · 125 of 311 homes booked

Promoter’s quarterly update to RERA for Q2 2026-27, submitted 2026-10-15.

By tower (Q2 2026-27)

  • LAUREL7%
  • Maple7%

Units sold and unsold, from RERA (Q2 2026-27)

TypeHomesBookedAvailable
1 BHK433013
2 BHK19962137
3 BHK693336

As reported by the promoter in the quarterly update to RERA, not verified by us.

Timeline

  1. 4 Mar 2026Registered with Karnataka RERA
  2. 15 Mar 2026Project start date given to RERA
  3. 31 Mar 2030Completion date given at registration

Sources:Source (rera.karnataka.gov.in) (opens in a new tab)

Construction pace from RERA quarterly filings

As on 15 Oct 2026

At the average pace so far, construction would reach 100% around Oct 2029 — about 5 months before the completion date on RERA (31 Mar 2030).

At the pace between the 3 quarterly filings we have (12% → 15% in 6 months), it would be around Dec 2040 — about 128 months after the RERA date.

0%25%50%75%100%20272029203120332035203720392041RERA date12%13%15%
  • Filed on RERA
  • Average pace since start
  • Pace between filings (and 0% assumed at the start date)
  • RERA completion date

Quarterly filings

QuarterFiled onBuiltHomes booked
Q2 2026-27to 30 Sep 202615 Oct 202615%125 of 311
Q1 2026-27to 30 Jun 202615 Jul 202613%81 of 311
Q4 2025-26to 31 Mar 202615 Apr 202612%49 of 311
How we calculate

Average pace = % built ÷ months since the start date in the RERA record. Here: 15% ÷ 6.5 months (15 Mar 2026 to 30 Sep 2026) = 2.3% a month.

Estimated finish = latest filing date + (100 − % built) ÷ pace = 30 Sep 2026 + 85 ÷ 2.3 = 37 months → Oct 2029. This is an estimate, not a date from the builder or RERA.

Pace between filings = (15% − 12%) ÷ 6 months = 0.5% a month.

A straight line is a simplification: the builder reports one overall %, which mixes excavation, structure and finishing, and work rarely moves at a constant speed. The % values are the promoter’s own figures filed with RERA, not checked by us. Promoter’s quarterly update to RERA for Q2 2026-27, submitted 2026-10-15.

Sources:Source (rera.karnataka.gov.in) (opens in a new tab)How we calculate this

Approvals and documents checklist

ApprovalAuthoritySource
Building planLocal Planing Authority · No. TMCD/TC/CR/89/2025-26 · dated 2026-02-11Source (rera.karnataka.gov.in) (opens in a new tab)
Land conversion (3 orders)Deputy Commissioner, Bangalore Rural · No. ALN(D)SR:67/2005-06 and 2 more · dated 2010-06-07Source (rera.karnataka.gov.in) (opens in a new tab)
Commencement Certificatescan uploaded to RERASource (rera.karnataka.gov.in) (opens in a new tab)
Approved Building Planscan uploaded to RERASource (rera.karnataka.gov.in) (opens in a new tab)
ESCOM/Electricityscan uploaded to RERASource (rera.karnataka.gov.in) (opens in a new tab)
KWSSB/Waterscan uploaded to RERASource (rera.karnataka.gov.in) (opens in a new tab)
KSPCBscan uploaded to RERASource (rera.karnataka.gov.in) (opens in a new tab)
SEIAAscan uploaded to RERASource (rera.karnataka.gov.in) (opens in a new tab)
Fire Force Departmentscan uploaded to RERASource (rera.karnataka.gov.in) (opens in a new tab)
Airport Authority of Indiascan uploaded to RERASource (rera.karnataka.gov.in) (opens in a new tab)

Documents uploaded to RERA

As on 19 Oct 2026
  • Building or layout plan · Approved drawings from the planning authorityFiled on RERA ✓ — Local Planing Authority · No. TMCD/TC/CR/89/2025-26 · dated 11 Feb 2026
  • Commencement certificate · Permission to start buildingFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
  • Environment clearance · SEIAA KarnatakaFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
  • Fire NOC · Karnataka Fire and Emergency ServicesFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
  • Pollution board consent · KSPCBFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
  • Water and sewerage · BWSSBFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
  • Electricity · BESCOMFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
  • Height clearance · Airports Authority of IndiaFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
  • Occupancy certificate (OC) · Issued only when the building is finishedNot on RERA yet — expected at completion

From the documents the promoter uploaded to Karnataka RERA, collected 19 Oct 2026. “Filed” means a document is on RERA — we have not checked its contents or validity. Not every approval applies to every project (for example, smaller projects may not need an environment clearance). The project page on RERA lists each upload.

Sources:Source (rera.karnataka.gov.in) (opens in a new tab)

Laurel & Maple at Brigade Orchards RERA complaints

No complaints listed on Karnataka RERA for this registration as on Source (rera.karnataka.gov.in) (opens in a new tab)

Court and consumer cases

Not found in public records yet: court cases

We list case numbers, courts and outcomes only — never names of private individuals.

About Brigade Enterprises Ltd

Promoter type
Company
Projects on this site
28
RERA complaints against promoter
44
Company number (CIN)
U45201KA2008PTC045861

From Karnataka RERA, as collected so far (19 Oct 2026). Complaints are those RERA lists against this promoter across all its projects.

Brigade Enterprises Ltd’s RERA record

Brigade Enterprises Ltd delivery record

As on 22 Oct 2026
  • 28Projects in Bengaluru on RERA32 approved registrations under Brigade Enterprises Ltd in Bengaluru Urban and Rural. Source (rera.karnataka.gov.in) (opens in a new tab)
  • 15,990Homes and plots registeredAs stated in 31 of the 32 registrations.
  • 44RERA complaints5 open, 39 disposed. as on Source (rera.karnataka.gov.in) (opens in a new tab)
  • 2.8Complaints per 1,000 homes and plots44 complaints ÷ 15,990 homes and plots in its 32 registrations on Karnataka RERA in Bengaluru.
  • 5Completion filed on RERARegistrations where the promoter applied to RERA for completion; 2 with an occupancy certificate on RERA.
  • 0 of 5Filed by the date given at registrationMedian gap 9.4 months (on-time ones count as 0). The completion application can come after handover, so this is an upper bound on lateness.

What the complaints are about

  • Delay in possession or delay interest18
  • Refund of booking or other money10
  • Construction quality, size or inspection4
  • Registration, sale deed or agreement3
  • Owners' association, amenities or documents2
  • Litigation or title disclosure2
  • Other5

44 complaint subjects as written on RERA, as on . Each subject is sorted into one group by keywords (first match wins: delay, refund, registration, quality, litigation, association); one complaint often raises several issues. Source (rera.karnataka.gov.in) (opens in a new tab)

Completion filed on RERA

ProjectDate at registrationCompletion filedGap
Brigade Northridge NeoOC on RERA31 Mar 2022extended to 30 Sep 202220 May 202650 months after
Brigade BricklaneOC on RERA31 Dec 2021extended to 31 Mar 202316 May 202653 months after
Brigade Oasis - Phase 130 Jun 2025extended to 30 Jun 202613 Apr 20269 months after
Brigade Oasis - Phase 230 Jun 2025extended to 30 Jun 202613 Apr 20269 months after
Brigade Oasis - Phase 330 Jun 2025extended to 30 Jun 202613 Apr 20269 months after

Measured against the completion date given at registration; many projects had RERA extensions (including the COVID-period extension), shown under the date.

Sources:Source (rera.karnataka.gov.in) (opens in a new tab)How we calculate this

What’s changed since Feb 2026

As on 19 Oct 2026
  1. 15 Oct 2026Quarterly update filed for Q2 2026-27: 15% built, 125 of 311 homes booked Source (rera.karnataka.gov.in) (opens in a new tab)
  2. 15 Jul 2026Quarterly update filed for Q1 2026-27: 13% built, 81 of 311 homes booked Source (rera.karnataka.gov.in) (opens in a new tab)
  3. 15 Apr 2026Quarterly update filed for Q4 2025-26: 12% built, 49 of 311 homes booked Source (rera.karnataka.gov.in) (opens in a new tab)
  4. 15 Mar 2026Project start date in the RERA record Source (rera.karnataka.gov.in) (opens in a new tab)
  5. 4 Mar 2026Registered with Karnataka RERA (PRM/KA/RERA/1250/303/PR/040326/008505); completion date 31 Mar 2030 Source (rera.karnataka.gov.in) (opens in a new tab)
  6. 11 Feb 2026Building plan approved by Local Planing Authority (No. TMCD/TC/CR/89/2025-26) Source (rera.karnataka.gov.in) (opens in a new tab)

Newest first. No extension of the completion date is recorded on RERA. When the RERA crawl sees a new filing, complaint or extension, it is added here with its date.

Home loan EMI calculator

No listed price found — enter one to try.

Example only — use your bank’s quote.

Monthly EMI
—
Down payment
—
Loan amount
—
Total interest
—

A calculation only, from the numbers you enter — not a loan offer.

All-in cost: GST, registration and other charges

The calculator loads when you scroll to it.

Assumptions
  • Base price: the builder’s price is not published in a form we could collect — enter it from the cost sheet.
  • GST 5% on the base price and charges — the usual rate for an under-construction home that is not “affordable housing” (1%).
  • Stamp duty about 5.6% and registration 2% — the Karnataka rule (registration was raised from 1% to 2% on 31 Aug 2025). Calculated on the agreement value.
  • Car parking, other charges and the maintenance deposit are not in the public record we collect; enter them from the builder’s cost sheet.
  • Loan on the agreement value (banks usually lend up to 75–90%); EMI is the standard reducing-balance formula. Example rate only — use your bank’s quote.

How we calculate this

Laurel & Maple at Brigade Orchards FAQs

What is the RERA registration number for Laurel & Maple at Brigade Orchards?

The RERA registration number is PRM/KA/RERA/1250/303/PR/040326/008505, registered on 4 March 2026.

Where is Laurel & Maple at Brigade Orchards located?

The project is in Devanahalli, Bengaluru Rural district, PIN code 562110.

How many homes are in Laurel & Maple at Brigade Orchards?

The project has 311 homes across 2 towers.

What home types are available at Laurel & Maple at Brigade Orchards?

Home types include 1 BHK (449 to 696 sq ft carpet area), 2 BHK (723 to 851 sq ft), 2 bedroom + 2 toilet (803 sq ft), 3 BHK (944 to 1,051 sq ft), 3 bedroom + 3 toilet (1,052 sq ft), and 3 bedroom + 2 toilet (968 sq ft).

What is the carpet area range for 2 BHK homes at Laurel & Maple at Brigade Orchards?

The 2 BHK homes have a carpet area range of 723 to 851 sq ft.

When is Laurel & Maple at Brigade Orchards expected to be completed?

The project is scheduled for completion on 31 March 2030.

What is the construction progress of Laurel & Maple at Brigade Orchards?

As of Q2 2026-27 (ended 30 September 2026), the project is 15% complete with 125 homes booked out of 311.

Are there any RERA complaints against Laurel & Maple at Brigade Orchards?

There are no RERA complaints against this project.

How many RERA complaints has BCV Developers Pvt Ltd received across all projects?

BCV Developers Pvt Ltd has 15 RERA complaints across all their projects on record.

How many other projects does BCV Developers Pvt Ltd have in the Bengaluru records?

BCV Developers Pvt Ltd has 9 projects in the Bengaluru RERA records.

Written by AI from the RERA record above on 19 Oct 2026. Answers use only that record; check them against the source before you decide.

Questions about Laurel & Maple at Brigade Orchards

No questions published yet. Ask the first one: you get an instant answer from this page’s public record, and our team follows up on anything the record does not show.

Bought a home from Brigade Enterprises Ltd? Review the builder.

Reviews of Brigade Enterprises Ltd by verified buyers

No verified reviews of Brigade Enterprises Ltd yet. If you bought a home from them, your review helps other buyers.

How reviews work: only buyers and owners can review; we confirm each purchase by phone before publishing, publish positive and negative reviews alike, never accept payment for reviews, and the builder may reply.

Similar projects within 5 km

ProjectDistanceHomesPossession (RERA)BuiltComplaintsPrice
Park Cubix Phase 2Sattva Resi Private Limited0.5 km798Sep 202948%0Not collected
Fairmont at Brigade OrchardsBrigade Enterprises Ltd1 km92Dec 2027100%0Not collected
Ebony at Brigade OrchardsBrigade Enterprises Ltd1.1 km232Mar 202942%0Not collected
Ivory at Brigade OrchardsBrigade Enterprises Ltd1.4 km605Dec 2027extended—2Not collected
MVN Aero OneMF Farmlands Private Limited1.7 km213Dec 2026—0Not collected
Geetanjali Vatika AerocityRatngarbha Ventures Private Limited1.8 km40Oct 2029—0Not collected

Projects of the same kind within 5 km in a straight line of this project’s RERA map point, nearest first. % built is the promoter’s latest quarterly figure on RERA (shown for single-registration projects); prices are from the builder’s own website where we found one.

Sources:Source (rera.karnataka.gov.in) (opens in a new tab)

Sources and last checked dates

  1. Karnataka RERA — project register (search by the registration number) (opens in a new tab)

Collected on 19 Oct 2026 by AI research agents reading public pages. Facts are written in our own words. Not found yet: price; court cases; landmarks; specifications; news.

How to check on RERA: On rera.karnataka.gov.in/viewAllProjects, type the registration number in 'Registration No', press Search, then click the 'View Project Details' icon. Complaints open from the 'Complaints / Litigation' icon in the same row. Registration number: PRM/KA/RERA/1250/303/PR/040326/008505.

  • RERA record last checked: 19 Oct 2026
  • Last change in the record (registration, quarterly filing or complaint): 19 Oct 2026

How this page is made: software builds it from public records (Karnataka RERA filings, OpenStreetMap, the builder’s own website). AI is used only to read filings into fields and to write the plain-English summary and FAQ answers, which are checked against the record. Facts are checked automatically against the RERA filing. Methodology · How we earn · Report an error