Pearl at Brigade Atmosphere
3 & 4 BHK apartments by Brigade Enterprises Ltd · Kurubarakunte, Devanahalli, Bengaluru
Kurubarakunte, Devanahalli, BengaluruOpen on Google Maps (opens in a new tab)
- Under construction
- RERA registered
- RERA not updated: completion promised Dec 2025; no extension or completion filed
- residential
Price: Price on request
Site photo filed with Karnataka RERA Karnataka RERA filing · Source ↗ (opens in a new tab)
Pearl at Brigade Atmosphere at a glance
- Possession (RERA)Dec 2025 Date passedKarnataka RERA
- Construction100% builtPromoter’s RERA update · as on 31 Dec 2025
- Homes booked132 of 264 (50%)RERA update · as on 31 Dec 2025
- RERA complaints (project)None listedKarnataka RERA · as on 12 Oct 2026
- Builder on-time record4 of 10 on time Mostly lateCompleted projects: OC date vs promised date
- Approvals filed1 of 9 on RERAKarnataka RERA uploads · 12 Oct 2026
- Nearest metroKIAL Terminals · 8.09 km (under construction)Open now: Whitefield (Kadugodi), 30.23 km · straight line · OpenStreetMap, 5 Oct 2026
- Airport driveapprox. 33 min at peak8.18 km straight line · estimate
- Nearest lakeUnnamed lake · 1,463 mFrom the RERA map point · OpenStreetMap, 5 Oct 2026
Project summary
Pearl at Brigade Atmosphere is a residential project by Brigade Enterprises Ltd in Kurubarakunte, Bengaluru with 264 homes, registered with Karnataka RERA. The completion date on RERA is 31 Dec 2025.
Facts collected on 12 Oct 2026 from public records — each linked to its source. Free for buyers. If you book through us, the builder pays us a commission.
Pearl at Brigade Atmosphere buyers’ group: join to ask for a group price
No one has joined yet. Be one of the first 10 buyers in this group — the founding members.
Join free. When enough buyers have joined, our agent partner asks Brigade Group for a group price — for example a lower price, an easier payment plan or waived charges. Nothing is promised: you see what the builder offers and book directly with the builder if you want to. Free for buyers. If you book through us, the builder pays us a commission.
- Gathering buyers
- Talking to the builder
- Group offer
- Group site visit
- Booking
0 buyers have joined · 0 committed
Committed buyers have confirmed their budget, home type and timeline with us on a call; builders negotiate with them. Joining is free and never obliges you to buy.
Join the Pearl at Brigade Atmosphere buyers’ groupHow group buying works
See it for yourself
Visit the site with our team, or get a call to clear your questions. Free, no obligation.
Key facts: home types, towers, land and possession
- Home types
- 3 BHK, 4 BHK, Villa
- Carpet area
- 1,814 – 2,648 sq ft
- Towers
- 18
- Floors
- 3
- Total homes
- 264
- Land
- 9.43 acres
- Possession (RERA)
- Dec 2025
- Built (RERA update)
- 100%
Pearl at Brigade Atmosphere RERA number and registration details
- RERA number
- PRM/KA/RERA/1250/303/PR/220207/004671
- Registered on
- 7 Feb 2022
- Promised completion
- 31 Dec 2025
- Extended to
- No extension recorded
- RERA status
- New launch
- Homes booked
- 132 of 264 as on
- Price
- Not found in public records yet: price
- Project type
- Residential
Towers and blocks (RERA filing)
18 rows: towers. Scroll inside the table to see them all.
| Tower | Floors | Basements | Homes |
|---|---|---|---|
| Block - B | 2 | 0 | 2 |
| Block-B1 | 2 | 0 | 2 |
| Cluster - I | 3 | 0 | 8 |
| Cluster - J | 3 | 0 | 8 |
| Cluster - K | 3 | 0 | 8 |
| Cluster - L | 3 | 0 | 8 |
| Cluster - M | 3 | 0 | 8 |
| Cluster - N | 3 | 0 | 8 |
| Cluster - O | 3 | 0 | 8 |
| Cluster - P | 3 | 0 | 8 |
| Cluster - Q | 3 | 0 | 8 |
| Cluster - R | 3 | 0 | 8 |
| Cluster - S | 3 | 0 | 8 |
| Cluster - T | 3 | 0 | 8 |
| Cluster - U | 3 | 0 | 8 |
| Cluster - V | 3 | 0 | 8 |
| Cluster - W | 3 | 0 | 8 |
| Cluster - X | 3 | 0 | 8 |
A dash (—) means the filing did not state that value.
Summary in plain English
Pearl at Brigade Atmosphere is a residential project by Brigade Enterprises Ltd in Kurubarakunte, Devanahalli, with 264 homes across 18 towers of up to 3 floors. The project is registered with Karnataka RERA and scheduled for completion by 31 December 2025.
Written by AI from the RERA record above on 5 Oct 2026. Every number in it was checked against that record; if anything differs, the record wins.
Open space, home loans, escrow and other details
- Open space
- 78.7% of land
- Water and power
- Not found in public records yet: water and power
- Home loans: approved banks
- Not found in public records yet: bank approvals
- Payment plans
- Not found in public records yet: payment plans
- Maintenance
- Not found in public records yet: maintenance
- Car parking
- Not found in public records yet: car parking charge
- Escrow bank (RERA)
- KOTAK MAHINDRA BANK, M.G Road
- Project cost declared to RERA
- ₹140 Cr
Open area as a share of the land, from the areas filed with RERA (includes driveways and landscaped areas).
Amenities
Pearl at Brigade Atmosphere location and address
- Address
- Sy.Nos. 6/1, 6/2, 6/3, 6/4, 7/1, 7/2, 7/3 and 7/4 of Kurubarakunte Village, Kasaba Hobli, , Devanahalli Taluk
- Village (RERA)
- Kurubarakunte
- Locality
- Devanahalli
- PIN code
- 560025
- City
- Bengaluru
- State
- Karnataka
- Coordinates
- 13.26691, 77.73736
Distances to landmarks
Not found in public records yet: landmarksAbout Devanahalli
Not found in public records yet: locality factsCommute times to tech parks and the airport
| To | Straight line | Peak-hour drive (estimate) |
|---|---|---|
| Kempegowda International AirportMap point on OpenStreetMap (opens in a new tab) | 8.18 km | approx. 33 min |
| Manyata Tech ParkMap point on OpenStreetMap (opens in a new tab) | 27.45 km | approx. 111 min |
| ITPL, Whitefield (main gate)Map point on OpenStreetMap (opens in a new tab) | 31.05 km | approx. 126 min |
| KSR Bengaluru City railway station (Majestic)Map point on OpenStreetMap (opens in a new tab) | 36.89 km | approx. 149 min |
| Outer Ring Road tech corridor (RMZ Ecospace, Bellandur)Map point on OpenStreetMap (opens in a new tab) | 38.64 km | approx. 157 min |
| Electronic City Phase 1Map point on OpenStreetMap (opens in a new tab) | 47.05 km | approx. 191 min |
How we calculate
Straight line: from the project’s map point on RERA to the destination’s point on OpenStreetMap.
Peak-hour drive is a rough estimate, not a route: straight line × 1.35 for the road network, at 20 km/h. Real times vary a lot with the route and the hour.
Sources:Source (openstreetmap.org) (opens in a new tab)How we calculate this
Schools and hospitals nearby
Within 2 km
- 2Schools and colleges1 schools, 1 colleges, 0 kindergartens
- 1Hospitals and clinics1 hospitals, 0 clinics
Nearest schools and colleges
- Government First College College, Devanahalli · 1.4 km
Nearest hospitals and clinics
- Government Hospital, Devanahalli · 1.58 km
Places as mapped on OpenStreetMap (amenity=school, college, kindergarten, university; hospital, clinic), counted within 2 km in a straight line of the RERA map point. Volunteers map these, so some places may be missing or closed. Places data © OpenStreetMap contributors, extract of 5 Oct 2026.
Nearest metro station and railway
- KIAL Terminals (ಕೆಐಎಬಿ ವಿಮಾನ ನಿಲ್ದಾಣ ಟರ್ಮಿನಲ್ಸ್)Blue Line metro, under construction8.09 km
- Airport City (ವಿಮಾನ ನಿಲ್ದಾಣ ನಗರ)Blue Line metro, under construction9.37 km
- Doddajala (ದೊಡ್ಡಜಾಲ)Blue Line metro, under construction13.3 km
- Whitefield (Kadugodi) (ವೈಟ್ಫೀಲ್ಡ್ (ಕಾಡುಗೋಡಿ))Open now — nearest operating metro station30.23 km
- Avatihalli (ಅವತಿಹಳ್ಳಿ)Nearest railway station3.75 km
Straight-line distances from the RERA map point to the station points mapped on OpenStreetMap; status (open or under construction) as tagged there. Places data © OpenStreetMap contributors, extract of 5 Oct 2026.
Lake and lake-buffer check
The nearest mapped lake is Unnamed lake (mapped on OpenStreetMap), 1,463 m from the project’s RERA map point.
The site boundary is not published as a shape, so its nearest edge can be closer than this point. Whether any building sits inside a lake buffer can only be checked on the approved plan.
The buffer rule
Bengaluru’s lake buffer rule has changed over time: the National Green Tribunal ordered a 75 m buffer in May 2016; the Supreme Court set that order aside on 5 March 2019, leaving the 30 m buffer of the Revised Master Plan 2015. Check the current rule and the approved plan before relying on either number.
- LiveLaw: SC sets aside NGT order enlarging buffer zones (2019) (livelaw.in) (opens in a new tab)
- Citizen Matters: Shrinking lake buffers (citizenmatters.in) (opens in a new tab)
Shortest distance from the RERA map point to the mapped water edge (OpenStreetMap water polygons tagged lake or reservoir, or named lake/kere/tank). Mapped shorelines can differ from the revenue-record boundary of a lake. Places data © OpenStreetMap contributors, extract of 5 Oct 2026.
Sources:Source (openstreetmap.org) (opens in a new tab)Source (livelaw.in) (opens in a new tab)Source (citizenmatters.in) (opens in a new tab)How we calculate this
Satellite time-lapse of the site
Satellite photos load when you scroll to them.
Photos from Esri World Imagery Wayback, centred on the project’s map point; dates are the capture dates in Esri’s metadata. Loaded from Esri when you scroll here.
Sources:Source (livingatlas.arcgis.com) (opens in a new tab)
Pearl at Brigade Atmosphere home types and carpet areas
Floor plans and brochure not published? The builder shares them only on request. We’ll get the brochure, floor plans and current price list for you, free.
Get brochure, floor plans & price| Home type | Carpet area | Homes |
|---|---|---|
| 3 BHK | 1,814 – 1,829 sq ft | 128 |
| 3b + 3t + study | 1,819 – 1,830 sq ft | 128 |
| 4 BHK | 2,646 sq ft | 2 |
| 4b + 4t | 2,648 sq ft | 4 |
| Villa | 2,646 sq ft | 2 |
Home types, counts and carpet areas as filed with Karnataka RERA (carpet area, not super built-up).
We have not collected floor-plan drawings; the builder’s sales team can share them.
Pearl at Brigade Atmosphere possession date and construction status
Promoter’s quarterly update to RERA for Q3 2025-26, submitted 2026-01-14.
By tower (Q3 2025-26)
Units sold and unsold, from RERA (Q3 2025-26)
| Type | Homes | Booked | Available |
|---|---|---|---|
| VILLA | 2 | 2 | 0 |
| 4 BHK | 2 | 2 | 0 |
| 3 BHK | 128 | 128 | 0 |
As reported by the promoter in the quarterly update to RERA, not verified by us.
Timeline
- 30 Sep 2021Project start date given to RERA
- 7 Feb 2022Registered with Karnataka RERA
- 31 Dec 2025Completion date given at registration
Approvals and documents checklist
| Approval | Authority | Source |
|---|---|---|
| Building plan | BIAPPA - Bangalore Airport Area Planning Authority | Source (rera.karnataka.gov.in) (opens in a new tab) |
Documents uploaded to RERA
- Building or layout plan · Approved drawings from the planning authorityFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
- Commencement certificate · Permission to start buildingNot on RERA yet
- Environment clearance · SEIAA KarnatakaNot on RERA yet
- Fire NOC · Karnataka Fire and Emergency ServicesNot on RERA yet
- Pollution board consent · KSPCBNot on RERA yet
- Water and sewerage · BWSSBNot on RERA yet
- Electricity · BESCOMNot on RERA yet
- Height clearance · Airports Authority of IndiaNot on RERA yet
- Occupancy certificate (OC) · Issued only when the building is finishedNot on RERA yet — expected at completion
From the documents the promoter uploaded to Karnataka RERA, collected 12 Oct 2026. “Filed” means a document is on RERA — we have not checked its contents or validity. Not every approval applies to every project (for example, smaller projects may not need an environment clearance). The project page on RERA lists each upload.
Pearl at Brigade Atmosphere RERA complaints
No complaints listed on Karnataka RERA for this registration as on Source (rera.karnataka.gov.in) (opens in a new tab)
Court and consumer cases
We list case numbers, courts and outcomes only — never names of private individuals.
About Brigade Group
- Founded
- 1986
- Headquarters
- Bengaluru
- Bengaluru projects
- 16
- Delivered on time
- 4 of 10
- RERA complaints
- 44
- Court cases listed
- 3
Brigade Enterprises Limited (CIN L85110KA1995PLC019126) is a listed Bengaluru developer, founded in 1986 and based at the World Trade Center in Malleswaram-Rajajinagar. Karnataka RERA records show its older Bengaluru projects receiving occupancy certificates between 2018 and 2024, some before the original RERA date and several months to about 19 months after it (within extended deadlines). As of 4 October 2026, RERA lists 44 complaints across Brigade Enterprises Ltd projects.
Brigade Group’s full recordBrigade Group delivery record
- 28Projects in Bengaluru on RERA32 approved registrations under Brigade Enterprises Ltd in Bengaluru Urban and Rural. Source (rera.karnataka.gov.in) (opens in a new tab)
- 15,990Homes and plots registeredAs stated in 31 of the 32 registrations.
- 44RERA complaints5 open, 39 disposed. as on Source (rera.karnataka.gov.in) (opens in a new tab)
- 2.8Complaints per 1,000 homes and plots44 complaints ÷ 15,990 homes and plots in its 32 registrations on Karnataka RERA in Bengaluru.
- 5Completion filed on RERARegistrations where the promoter applied to RERA for completion; 2 with an occupancy certificate on RERA.
- 0 of 5Filed by the date given at registrationMedian gap 9.4 months (on-time ones count as 0). The completion application can come after handover, so this is an upper bound on lateness.
- 3Court cases listedFound in public court records; see the list on the builder’s page.
What the complaints are about
44 complaint subjects as written on RERA, as on . Each subject is sorted into one group by keywords (first match wins: delay, refund, registration, quality, litigation, association); one complaint often raises several issues. Source (rera.karnataka.gov.in) (opens in a new tab)
Completion filed on RERA
| Project | Date at registration | Completion filed | Gap |
|---|---|---|---|
| Brigade Northridge NeoOC on RERA | 31 Mar 2022extended to 30 Sep 2022 | 20 May 2026 | 50 months after |
| Brigade BricklaneOC on RERA | 31 Dec 2021extended to 31 Mar 2023 | 16 May 2026 | 53 months after |
| Brigade Oasis - Phase 1 | 30 Jun 2025extended to 30 Jun 2026 | 13 Apr 2026 | 9 months after |
| Brigade Oasis - Phase 2 | 30 Jun 2025extended to 30 Jun 2026 | 13 Apr 2026 | 9 months after |
| Brigade Oasis - Phase 3 | 30 Jun 2025extended to 30 Jun 2026 | 13 Apr 2026 | 9 months after |
Measured against the completion date given at registration; many projects had RERA extensions (including the COVID-period extension), shown under the date.
Handovers we checked by hand
| Project | Promised (at registration) | OC | Result | Source |
|---|---|---|---|---|
| Plumeria Phase 1 at Brigade Meadows | 31 Jul 2018 | 5 Jul 2018 | On time | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Brigade Lakefront - Crimson | 30 Jun 2019 | 28 Dec 2018 | On time | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Plumeria Lifestyle at Brigade Meadows | 30 Sep 2020 | 30 Mar 2020 | On time | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Brigade Woods | 31 Dec 2020 | 1 Feb 2022 | 13 months late | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Brigade Parkside North | 31 Mar 2021 | 15 Mar 2022 | 11 months late | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Brigade Parkside East | 31 Dec 2020 | 9 May 2022 | 16 months late | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Brigade Northridge Neo | 31 Mar 2022 | 13 May 2022 | 1 months late | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Brigade 7 Gardens | 31 Oct 2020 | 4 Jun 2022 | 19 months late | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Brigade Bricklane | 31 Dec 2021 | 10 Oct 2022 | 9 months late | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Brigade Gem | 31 Aug 2024 | 22 Jul 2024 | On time | Source (rera.karnataka.gov.in) (opens in a new tab) |
Sources:Source (rera.karnataka.gov.in) (opens in a new tab)Source (indiankanoon.org) (opens in a new tab)Source (indiankanoon.org) (opens in a new tab)Source (livelaw.in) (opens in a new tab)How we calculate this
What’s changed since Sep 2021
- 14 Jan 2026Quarterly update filed for Q3 2025-26: 100% built, 132 of 132 homes booked Source (rera.karnataka.gov.in) (opens in a new tab)
- 7 Feb 2022Registered with Karnataka RERA (PRM/KA/RERA/1250/303/PR/220207/004671); completion date 31 Dec 2025 Source (rera.karnataka.gov.in) (opens in a new tab)
- 30 Sep 2021Project start date in the RERA record Source (rera.karnataka.gov.in) (opens in a new tab)
Newest first. No extension of the completion date is recorded on RERA. When the RERA crawl sees a new filing, complaint or extension, it is added here with its date.
Home loan EMI calculator
- Monthly EMI
- —
- Down payment
- —
- Loan amount
- —
- Total interest
- —
A calculation only, from the numbers you enter — not a loan offer.
All-in cost: GST, registration and other charges
The calculator loads when you scroll to it.
Assumptions
- Base price: the builder’s price is not published in a form we could collect — enter it from the cost sheet.
- GST 5% on the base price and charges — the usual rate for an under-construction home that is not “affordable housing” (1%).
- Stamp duty about 5.6% and registration 2% — the Karnataka rule (registration was raised from 1% to 2% on 31 Aug 2025). Calculated on the agreement value.
- Car parking, other charges and the maintenance deposit are not in the public record we collect; enter them from the builder’s cost sheet.
- Loan on the agreement value (banks usually lend up to 75–90%); EMI is the standard reducing-balance formula. Example rate only — use your bank’s quote.
Pearl at Brigade Atmosphere FAQs
What is the completion date for Pearl at Brigade Atmosphere?
According to the RERA record, the project completion date is 31 December 2025.
How many homes are in Pearl at Brigade Atmosphere?
The project has 264 homes total.
What home types are available in Pearl at Brigade Atmosphere?
The project offers 3 BHK (128 homes), 3B + 3T + STUDY (128 homes), 4B + 4T (4 homes), VILLA (2 homes), and 4 BHK (2 homes).
What is the carpet area range for homes in Pearl at Brigade Atmosphere?
Carpet areas range from 1,814 sq ft to 2,648 sq ft depending on the home type.
What is the RERA registration number for Pearl at Brigade Atmosphere?
The project registration number is PRM/KA/RERA/1250/303/PR/220207/004671, registered on 7 February 2022.
How many homes have been booked in Pearl at Brigade Atmosphere?
As of Q3 2025-26, 132 homes have been booked out of 264 total.
What is the construction progress for Pearl at Brigade Atmosphere?
As of Q3 2025-26, the project is 100% complete according to the latest quarterly update.
Are there any RERA complaints on Pearl at Brigade Atmosphere?
No complaints are recorded against this project on the RERA register.
Where is Pearl at Brigade Atmosphere located?
The project is located in Kurubarakunte, Devanahalli taluk, Bengaluru Rural district, PIN code 560025.
Who is the builder of Pearl at Brigade Atmosphere?
Brigade Enterprises Ltd is the builder; the company has 38 other projects in the Bengaluru records and 44 complaints against it across all projects on RERA.
Written by AI from the RERA record above on 5 Oct 2026. Answers use only that record; check them against the source before you decide.
Questions about Pearl at Brigade Atmosphere
No questions published yet. Ask the first one: you get an instant answer from this page’s public record, and our team follows up on anything the record does not show.
Bought a home from Brigade Group? Review the builder.
Reviews of Brigade Group by verified buyers
No verified reviews of Brigade Group yet. If you bought a home from them, your review helps other buyers.
How reviews work: only buyers and owners can review; we confirm each purchase by phone before publishing, publish positive and negative reviews alike, never accept payment for reviews, and the builder may reply.
Similar projects within 5 km
| Project | Distance | Homes | Possession (RERA) | Built | Complaints | Price |
|---|---|---|---|---|---|---|
| Birla Trimaya-Phase-IBirla Arnaa LLP | 1.1 km | 544 | Oct 2028 | 66% | 0 | Not collected |
| Kumar PalazzioKumar Vista Properties LLP | 2.1 km | 29 | Mar 2030 | 11% | 0 | Not collected |
| Skanda AuraSkanda Living Space LLP | 2.8 km | 179 | Dec 2031 | 5% | 0 | Not collected |
| Park Cubix Phase 2Sattva Resi Private Limited | 3.4 km | 798 | Sep 2029 | 48% | 0 | Not collected |
| Laurel & Maple at Brigade OrchardsBrigade Enterprises Ltd | 3.6 km | 311 | Mar 2030 | 15% | 0 | Not collected |
| Fairmont at Brigade OrchardsBrigade Enterprises Ltd | 4.7 km | 92 | Dec 2027 | 100% | 0 | Not collected |
Projects of the same kind within 5 km in a straight line of this project’s RERA map point, nearest first. % built is the promoter’s latest quarterly figure on RERA (shown for single-registration projects); prices are from the builder’s own website where we found one.
Sources and last checked dates
Collected on 12 Oct 2026 by AI research agents reading public pages. Facts are written in our own words. Not found yet: price; court cases; landmarks; specifications; news.
How to check on RERA: On rera.karnataka.gov.in/viewAllProjects, type the registration number in 'Registration No', press Search, then click the 'View Project Details' icon. Complaints open from the 'Complaints / Litigation' icon in the same row. Registration number: PRM/KA/RERA/1250/303/PR/220207/004671.
- RERA record last checked: 12 Oct 2026
- Last change in the record (registration, quarterly filing or complaint): 14 Jan 2026
How this page is made: software builds it from public records (Karnataka RERA filings, OpenStreetMap, the builder’s own website). AI is used only to read filings into fields and to write the plain-English summary and FAQ answers, which are checked against the record. Facts are checked automatically against the RERA filing. Methodology · How we earn · Report an error
More new projects in Devanahalli
Mallenahalli, DevanahalliUnder constructionRERA registeredBuyers’ group openBirla Trimaya-Phase-I
by Birla Arnaa
Price: Price on requestGet brochure & price →
- 1 BHK, 2 BHK, 3 BHK
- 473 – 2,042 sq ft
- Oct 2028
544 homes
Be one of the first 10 buyers in this groupFounding members — it’s free
Join group for Birla Trimaya-Phase-I
Guttahalli, DevanahalliUnder constructionRERA registeredBuyers’ group openKumar Palazzio
by Kumar Vista Properties
Price: Price on requestGet brochure & price →
- 4 BHK
- 356 – 360 sq ft
- Mar 2030
29 homes
Be one of the first 10 buyers in this groupFounding members — it’s free
Join group for Kumar Palazzio
DevanahalliUnder constructionRERA registeredBuyers’ group openSkanda Aura
by Skanda Living Space
Price: Price on requestGet brochure & price →
- 2 BHK, 3 BHK
- 635 – 1,319 sq ft
- Dec 2031
179 homes
Be one of the first 10 buyers in this groupFounding members — it’s free
Join group for Skanda Aura