GR Sitara at a glance
- Possession (RERA)Dec 2026Karnataka RERA
- Construction100% builtPromoter’s RERA update · as on 30 Sep 2026
- Homes booked250 of 250 (100%)RERA update · as on 30 Sep 2026
- RERA complaints (project)1 complaintKarnataka RERA · as on 12 Oct 2026
- Approvals filed5 of 9 on RERAKarnataka RERA uploads · 12 Oct 2026
- Nearest metroBeratena Agrahara · 2.73 kmstraight line · OpenStreetMap, 5 Oct 2026
- Airport driveapprox. 145 min at peak35.7 km straight line · estimate
- Nearest lakeChoodasandra Lake · 574 mFrom the RERA map point · OpenStreetMap, 5 Oct 2026
Project summary
GR Sitara is a residential project by GR Constructions in Rayasandra, Bengaluru with 250 homes, registered with Karnataka RERA. The completion date on RERA is 31 Dec 2026.
Facts collected on 12 Oct 2026 from public records — each linked to its source. Free for buyers. If you book through us, the builder pays us a commission.
GR Sitara buyers’ group: join to ask for a group price
No one has joined yet. Be one of the first 10 buyers in this group — the founding members.
Join free. When enough buyers have joined, our agent partner asks GR Constructions for a group price — for example a lower price, an easier payment plan or waived charges. Nothing is promised: you see what the builder offers and book directly with the builder if you want to. Free for buyers. If you book through us, the builder pays us a commission.
- Gathering buyers
- Talking to the builder
- Group offer
- Group site visit
- Booking
0 buyers have joined · 0 committed
Committed buyers have confirmed their budget, home type and timeline with us on a call; builders negotiate with them. Joining is free and never obliges you to buy.
Join the GR Sitara buyers’ groupHow group buying works
See it for yourself
Visit the site with our team, or get a call to clear your questions. Free, no obligation.
Key facts: home types, towers, land and possession
- Home types
- 3 BHK
- Carpet area
- 874 – 1,118 sq ft
- Towers
- 11
- Floors
- 5
- Total homes
- 250
- Land
- 3.02 acres
- Possession (RERA)
- Dec 2026
- Built (RERA update)
- 100%
GR Sitara RERA number and registration details
- RERA number
- PRM/KA/RERA/1251/308/PR/110422/004824
- Registered on
- 11 Apr 2022
- Promised completion
- 31 Dec 2026
- Extended to
- No extension recorded
- RERA status
- New launch
- Homes booked
- 250 of 250 as on
- Price
- Not found in public records yet: price
- Project type
- Residential
Towers and blocks (RERA filing)
11 rows: towers. Scroll inside the table to see them all.
| Tower | Floors | Basements | Homes |
|---|---|---|---|
| Block A | 5 | 2 | 40 |
| Block B | 5 | 2 | 30 |
| Block C | 5 | 1 | 20 |
| BLock D | 5 | 1 | 20 |
| Block E | 5 | 1 | 20 |
| Block F | 5 | 1 | 20 |
| Block G | 5 | 2 | 20 |
| Block H | 5 | 2 | 20 |
| Block I | 5 | 2 | 20 |
| Block J | 5 | 2 | 20 |
| Block K | 5 | 2 | 20 |
A dash (—) means the filing did not state that value.
Summary in plain English
GR Sitara is a residential project by GR Constructions in Rayasandra, Anekal, with 250 homes across 11 towers of up to 5 floors each. The project is registered on RERA with a completion date of 31 December 2026.
Written by AI from the RERA record above on 5 Oct 2026. Every number in it was checked against that record; if anything differs, the record wins.
Open space, home loans, escrow and other details
- Open space
- 54.3% of land
- Water and power
- Water source filed with RERA: BoreWell,Local Authority
- Home loans: approved banks
- Not found in public records yet: bank approvals
- Payment plans
- Not found in public records yet: payment plans
- Maintenance
- Not found in public records yet: maintenance
- Car parking
- Not found in public records yet: car parking charge
- Escrow bank (RERA)
- STATE BANK OF INDIA, MYSORE BANK CIRCLE
- Building plan (RERA)
- BDA - Bangalore Development Authority · No. BDA/LP/AS/AA-1/TS-4/PURVA/15/21-22 · dated 11 Oct 2021
- Project cost declared to RERA
- ₹137 Cr
Open area as a share of the land, from the areas filed with RERA (includes driveways and landscaped areas).
Amenities
- Electricity
- CCTV Surveillance
- Club House
- Community Hall
- Outdoor Sports facility
- Indoor Sports facility
- Swimming Pool
- Gym
- Power Backup
- Water and Sanitation
Amenities and internal works as filed by the promoter with Karnataka RERA; we have not visited the site.
GR Sitara location and address
- Address
- Sy no:9/3 and 10/4 Rayasandra Village, , Sarjapura Hobli, Anekal Taluk, Bangalore , Anekal , Bengaluru Urban, Karnataka - 560099
- Village (RERA)
- Rayasandra
- Locality
- Near Harlur RoadAlso known as Haralur Road, Harlur
- PIN code
- 560099
- City
- Bengaluru
- State
- Karnataka
- Coordinates
- 12.88087, 77.67607
Distances to landmarks
Not found in public records yet: landmarksAbout Rayasandra
Not found in public records yet: locality factsCommute times to tech parks and the airport
| To | Straight line | Peak-hour drive (estimate) |
|---|---|---|
| Electronic City Phase 1Map point on OpenStreetMap (opens in a new tab) | 3.67 km | approx. 15 min |
| Outer Ring Road tech corridor (RMZ Ecospace, Bellandur)Map point on OpenStreetMap (opens in a new tab) | 4.8 km | approx. 19 min |
| ITPL, Whitefield (main gate)Map point on OpenStreetMap (opens in a new tab) | 13.63 km | approx. 55 min |
| KSR Bengaluru City railway station (Majestic)Map point on OpenStreetMap (opens in a new tab) | 15.82 km | approx. 64 min |
| Manyata Tech ParkMap point on OpenStreetMap (opens in a new tab) | 19.57 km | approx. 79 min |
| Kempegowda International AirportMap point on OpenStreetMap (opens in a new tab) | 35.7 km | approx. 145 min |
How we calculate
Straight line: from the project’s map point on RERA to the destination’s point on OpenStreetMap.
Peak-hour drive is a rough estimate, not a route: straight line × 1.35 for the road network, at 20 km/h. Real times vary a lot with the route and the hour.
Sources:Source (openstreetmap.org) (opens in a new tab)How we calculate this
Schools and hospitals nearby
Within 2 km
- 15Schools and colleges13 schools, 2 colleges, 0 kindergartens
- 1Hospitals and clinics0 hospitals, 1 clinics
Nearest schools and colleges
- Notre Dame Academy · 0.47 km
- New Shanthiniketan Eng Convent · 0.75 km
- Amrita International Vidyalayam · 0.93 km
Nearest hospitals and clinics
- Harmony Wellness Concepts Center · 1.07 km
Places as mapped on OpenStreetMap (amenity=school, college, kindergarten, university; hospital, clinic), counted within 2 km in a straight line of the RERA map point. Volunteers map these, so some places may be missing or closed. Places data © OpenStreetMap contributors, extract of 5 Oct 2026.
Nearest metro station and railway
- Beratena Agrahara (ಬೆರಟೇನ ಅಗ್ರಹಾರ)Open now — nearest operating metro station2.73 km
- Carmelaram (ಕರ್ಮೇಲರಮ್)Nearest railway station4.37 km
Straight-line distances from the RERA map point to the station points mapped on OpenStreetMap; status (open or under construction) as tagged there. Places data © OpenStreetMap contributors, extract of 5 Oct 2026.
Lake and lake-buffer check
The nearest mapped lake is Choodasandra Lake, 574 m from the project’s RERA map point.
The site boundary is not published as a shape, so its nearest edge can be closer than this point. Whether any building sits inside a lake buffer can only be checked on the approved plan.
- Choodasandra Lake on OpenStreetMap (opens in a new tab) 574 m
- Unnamed lake (mapped on OpenStreetMap) on OpenStreetMap (opens in a new tab) 740 m
- Rayasandra Lake on OpenStreetMap (opens in a new tab) (ರಾಯಸಂದ್ರ ಕೆರೆ)842 m
The buffer rule
Bengaluru’s lake buffer rule has changed over time: the National Green Tribunal ordered a 75 m buffer in May 2016; the Supreme Court set that order aside on 5 March 2019, leaving the 30 m buffer of the Revised Master Plan 2015. Check the current rule and the approved plan before relying on either number.
- LiveLaw: SC sets aside NGT order enlarging buffer zones (2019) (livelaw.in) (opens in a new tab)
- Citizen Matters: Shrinking lake buffers (citizenmatters.in) (opens in a new tab)
Shortest distance from the RERA map point to the mapped water edge (OpenStreetMap water polygons tagged lake or reservoir, or named lake/kere/tank). Mapped shorelines can differ from the revenue-record boundary of a lake. Places data © OpenStreetMap contributors, extract of 5 Oct 2026.
Sources:Source (openstreetmap.org) (opens in a new tab)Source (livelaw.in) (opens in a new tab)Source (citizenmatters.in) (opens in a new tab)How we calculate this
Satellite time-lapse of the site
Satellite photos load when you scroll to them.
Photos from Esri World Imagery Wayback, centred on the project’s map point; dates are the capture dates in Esri’s metadata. Loaded from Esri when you scroll here.
Sources:Source (livingatlas.arcgis.com) (opens in a new tab)
GR Sitara floor plans, brochure and elevations
Documents the builder uploaded to Karnataka RERA, shown as filed. Tap a page to see it full size; the full PDF opens on the RERA website.
Brochure2 files

BrochureFull PDF on RERA 



BROCHUREFiled 22 Jan 2022 · Full PDF on RERA 


Approved building plan7 pages

Sanction Plan AllFiled 22 Jan 2022 · Full PDF on RERA
Approved layout plan2 files

Approved Layout PlanFull PDF on RERA 
Existing Layout PlanFull PDF on RERA
| Home type | Carpet area | Homes |
|---|---|---|
| 3 BHK | 874 – 1,118 sq ft | 250 |
| Apartment | 943 sq ft | 250 |
Home types, counts and carpet areas as filed with Karnataka RERA (carpet area, not super built-up).
We have not collected floor-plan drawings; the builder’s sales team can share them.
GR Sitara possession date and construction status
Promoter’s quarterly update to RERA for Q2 2026-27, submitted 2026-10-02.
By tower (Q2 2026-27)
Units sold and unsold, from RERA (Q2 2026-27)
| Type | Homes | Booked | Available |
|---|---|---|---|
| 3 BHK | 250 | 250 | 0 |
As reported by the promoter in the quarterly update to RERA, not verified by us.
Timeline
- 20 Jan 2022Project start date given to RERA
- 11 Apr 2022Registered with Karnataka RERA
- 31 Dec 2026Completion date given at registration
Approvals and documents checklist
14 rows: approvals. Scroll inside the table to see them all.
| Approval | Authority | Source |
|---|---|---|
| Building plan | BDA - Bangalore Development Authority · No. BDA/LP/AS/AA-1/TS-4/PURVA/15/21-22 · dated 2021-10-11 | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Land conversion | DC · No. ALN(ASH)SR/38/2015-16 · dated 2010-10-30 | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Commencement Certificate | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Water Permission Letter | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Approved Layout Plan | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Approved Building/Plotting Plan | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Approved Section Of Building/Infrastructure Plan of Plotting | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Change of Land Use | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Conversion Certificate under section 95 of the KLR Act 1964 | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| KWSSB/Water | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Approval/NOC under section 109 of KLR Act 1961 | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Approval/NOC under section 14 of the KTCP Act | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| KSPCB | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| SEIAA | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
Documents uploaded to RERA
- Building or layout plan · Approved drawings from the planning authorityFiled on RERA ✓ — BDA - Bangalore Development Authority · No. BDA/LP/AS/AA-1/TS-4/PURVA/15/21-22 · dated 11 Oct 2021
- Commencement certificate · Permission to start buildingFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
- Environment clearance · SEIAA KarnatakaFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
- Fire NOC · Karnataka Fire and Emergency ServicesNot on RERA yet
- Pollution board consent · KSPCBFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
- Water and sewerage · BWSSBFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
- Electricity · BESCOMNot on RERA yet
- Height clearance · Airports Authority of IndiaNot on RERA yet
- Occupancy certificate (OC) · Issued only when the building is finishedNot on RERA yet — expected at completion
From the documents the promoter uploaded to Karnataka RERA, collected 12 Oct 2026. “Filed” means a document is on RERA — we have not checked its contents or validity. Not every approval applies to every project (for example, smaller projects may not need an environment clearance). The project page on RERA lists each upload.
GR Sitara RERA complaints and orders
1 complaint as on Source (rera.karnataka.gov.in) (opens in a new tab)
| Complaint ref | Filed | Subject | Status | Source |
|---|---|---|---|---|
| 00746/2024 | 19 Aug 2024 | fraud and inaccurate parking allotment after taking money | Disposed | Source (rera.karnataka.gov.in) (opens in a new tab) |
Court and consumer cases
We list case numbers, courts and outcomes only — never names of private individuals.
About GR Constructions
- Promoter type
- Partnership Firm
- Projects on this site
- 1
- RERA complaints against promoter
- 0
- Company number (CIN)
- Not found in public records yet: CIN
From Karnataka RERA, as collected so far (12 Oct 2026). Complaints are those RERA lists against this promoter across all its projects.
GR Constructions’s RERA recordGR Constructions delivery record
- 1Projects in Bengaluru on RERA1 approved registration under GR Constructions in Bengaluru Urban and Rural. Source (rera.karnataka.gov.in) (opens in a new tab)
- 250Homes registeredAs stated in each registrations.
- 0RERA complaintsas on Source (rera.karnataka.gov.in) (opens in a new tab)
- 0Complaints per 1,000 homes0 complaints ÷ 250 homes in its 1 registration on Karnataka RERA in Bengaluru.
Sources:Source (rera.karnataka.gov.in) (opens in a new tab)How we calculate this
What’s changed since Oct 2021
- 2 Oct 2026Quarterly update filed for Q2 2026-27: 100% built, 250 of 250 homes booked Source (rera.karnataka.gov.in) (opens in a new tab)
- 15 Jul 2026Quarterly update filed for Q1 2026-27: 100% built, 249 of 250 homes booked Source (rera.karnataka.gov.in) (opens in a new tab)
- 13 Apr 2026Quarterly update filed for Q4 2025-26: 100% built, 246 of 250 homes booked Source (rera.karnataka.gov.in) (opens in a new tab)
- 20 Feb 2026Quarterly update filed for Q3 2025-26: 100% built, 246 of 250 homes booked Source (rera.karnataka.gov.in) (opens in a new tab)
- 19 Aug 2024Complaint 00746/2024 filed with RERA: “fraud and inaccurate parking allotment after taking money” — now disposed Source (rera.karnataka.gov.in) (opens in a new tab)
- 11 Apr 2022Registered with Karnataka RERA (PRM/KA/RERA/1251/308/PR/110422/004824); completion date 31 Dec 2026 Source (rera.karnataka.gov.in) (opens in a new tab)
- 20 Jan 2022Project start date in the RERA record Source (rera.karnataka.gov.in) (opens in a new tab)
- 11 Oct 2021Building plan approved by BDA - Bangalore Development Authority (No. BDA/LP/AS/AA-1/TS-4/PURVA/15/21-22) Source (rera.karnataka.gov.in) (opens in a new tab)
Newest first. No extension of the completion date is recorded on RERA. When the RERA crawl sees a new filing, complaint or extension, it is added here with its date.
Home loan EMI calculator
- Monthly EMI
- —
- Down payment
- —
- Loan amount
- —
- Total interest
- —
A calculation only, from the numbers you enter — not a loan offer.
All-in cost: GST, registration and other charges
The calculator loads when you scroll to it.
Assumptions
- Base price: the builder’s price is not published in a form we could collect — enter it from the cost sheet.
- GST 5% on the base price and charges — the usual rate for an under-construction home that is not “affordable housing” (1%).
- Stamp duty about 5.6% and registration 2% — the Karnataka rule (registration was raised from 1% to 2% on 31 Aug 2025). Calculated on the agreement value.
- Car parking, other charges and the maintenance deposit are not in the public record we collect; enter them from the builder’s cost sheet.
- Loan on the agreement value (banks usually lend up to 75–90%); EMI is the standard reducing-balance formula. Example rate only — use your bank’s quote.
GR Sitara FAQs
What is the completion date for GR Sitara?
The RERA completion date is 31 December 2026.
How many homes are there in GR Sitara?
There are 250 homes in the project.
What types of homes does GR Sitara have?
The project has 250 apartments with carpet area of 943 sq ft and 250 three-bedroom homes with carpet area between 874 and 1,118 sq ft.
What is the RERA registration number for GR Sitara?
The registration number is PRM/KA/RERA/1251/308/PR/110422/004824, registered on 11 April 2022.
How many towers does GR Sitara have?
The project has 11 towers, each up to 5 floors.
Where is GR Sitara located?
GR Sitara is in Rayasandra, Anekal taluk, Bengaluru Urban district, PIN code 560099.
What is the construction progress of GR Sitara?
As of Q2 2026-27, construction is 100% complete, with all 250 homes booked.
How many RERA complaints are there for GR Sitara?
There is 1 RERA complaint on this project.
What is GR Constructions' record on RERA?
The builder has 1 complaint across all projects and 2 projects registered in the Bengaluru RERA records.
Which bank holds the escrow for GR Sitara?
State Bank of India holds the escrow account for the project.
Written by AI from the RERA record above on 5 Oct 2026. Answers use only that record; check them against the source before you decide.
Questions about GR Sitara
No questions published yet. Ask the first one: you get an instant answer from this page’s public record, and our team follows up on anything the record does not show.
Bought a home from GR Constructions? Review the builder.
Reviews of GR Constructions by verified buyers
No verified reviews of GR Constructions yet. If you bought a home from them, your review helps other buyers.
How reviews work: only buyers and owners can review; we confirm each purchase by phone before publishing, publish positive and negative reviews alike, never accept payment for reviews, and the builder may reply.
Similar projects within 5 km
| Project | Distance | Homes | Possession (RERA) | Built | Complaints | Price |
|---|---|---|---|---|---|---|
| GR SwaraRanke Infra LLP | 0.5 km | 57 | Jan 2029 | 43% | 0 | Not collected |
| Oracle SunriseVijaya Bhaskara Constructions | 0.5 km | 80 | Mar 2026extended | 100% | 0 | Not collected |
| GRC ShreekrishGRC Infra | 0.6 km | 244 | Dec 2026 | 100% | 0 | Not collected |
| GRC SavoraGRC Infra | 0.7 km | 150 | Mar 2029 | 8% | 0 | Not collected |
| HavenLodha Developers Limited | 1.1 km | 452 | Jun 2030 | — | 0 | from ₹2.99 Crabout ₹23,200/sq ft carpet |
| Assetz Inspira Melodies of Life ApartmentsIinspira Worldcity Projects Private Limited | 1.3 km | 204 | Nov 2030 | 16% | 0 | Not collected |
Projects of the same kind within 5 km in a straight line of this project’s RERA map point, nearest first. % built is the promoter’s latest quarterly figure on RERA (shown for single-registration projects); prices are from the builder’s own website where we found one.
Sources and last checked dates
Collected on 12 Oct 2026 by AI research agents reading public pages. Facts are written in our own words. Not found yet: price; court cases; landmarks; specifications; news.
How to check on RERA: On rera.karnataka.gov.in/viewAllProjects, type the registration number in 'Registration No', press Search, then click the 'View Project Details' icon. Complaints open from the 'Complaints / Litigation' icon in the same row. Registration number: PRM/KA/RERA/1251/308/PR/110422/004824.
- RERA record last checked: 12 Oct 2026
- Last change in the record (registration, quarterly filing or complaint): 2 Oct 2026
How this page is made: software builds it from public records (Karnataka RERA filings, OpenStreetMap, the builder’s own website). AI is used only to read filings into fields and to write the plain-English summary and FAQ answers, which are checked against the record. Facts are checked automatically against the RERA filing. Methodology · How we earn · Report an error
More new projects nearby
Rayasandra, near Harlur RoadReady to moveRERA registeredBuyers’ group openOracle Sunrise
by Vijaya Bhaskara Constructions
Price: Price on requestGet brochure & price →
- 2 BHK, 3 BHK
- 523 – 856 sq ft
- Mar 2026 (extended)
80 homes
Be one of the first 10 buyers in this groupFounding members — it’s free
Join group for Oracle Sunrise
Rayasandra, near Kodathi–CarmelaramUnder constructionRERA registeredBuyers’ group openJRC Wild Woods
by JRC
Price: Price on requestGet brochure & price →
- 1 BHK, 2 BHK, 3 BHK
- 638 – 1,571 sq ft
- Nov 2028
3 phases on RERA · 638 homes
Be one of the first 10 buyers in this groupFounding members — it’s free
Join group for JRC Wild Woods
Rayasandra, DevanahalliUnder constructionRERA registeredBuyers’ group openMVN Aero One T5 & T6
by MF Farmlands
Price: Price on requestGet brochure & price →
- 1 BHK, 2 BHK
- 440 – 850 sq ft
- Jul 2027
137 homes
Be one of the first 10 buyers in this groupFounding members — it’s free
Join group for MVN Aero One T5 & T6