GRC Shreekrish
2 & 3 BHK apartments by GRC Infra · Choodasandra, near Harlur Road, Bengaluru
Choodasandra, near Harlur Road, BengaluruOpen on Google Maps (opens in a new tab)
- Under construction
- RERA registered
- residential
by GRC Infra
Price: Price on request
Site photo filed with Karnataka RERA Karnataka RERA filing · Source ↗ (opens in a new tab)
GRC Shreekrish at a glance
- Possession (RERA)Dec 2026Karnataka RERA
- Construction100% builtPromoter’s RERA update · as on 30 Sep 2026
- Homes booked130 of 244 (53%)RERA update · as on 30 Sep 2026
- RERA complaints (project)None listedKarnataka RERA · as on 22 Oct 2026
- Approvals filed4 of 9 on RERAKarnataka RERA uploads · 22 Oct 2026
- Nearest metroBeratena Agrahara · 3.37 kmstraight line · OpenStreetMap, 5 Oct 2026
- Airport driveapprox. 143 min at peak35.21 km straight line · estimate
- Nearest lakeChoodasandra Lake · 82 mFrom the RERA map point · OpenStreetMap, 5 Oct 2026
Project summary
GRC Shreekrish is a residential project by GRC Infra in Choodasandra, Bengaluru with 244 homes, registered with Karnataka RERA. The completion date on RERA is 31 Dec 2026.
Facts collected on 22 Oct 2026 from public records — each linked to its source. Free for buyers. If you book through us, the builder pays us a commission.
GRC Shreekrish buyers’ group: join to ask for a group price
No one has joined yet. Be one of the first 10 buyers in this group — the founding members.
Join free. When enough buyers have joined, our agent partner asks GRC Infra for a group price — for example a lower price, an easier payment plan or waived charges. Nothing is promised: you see what the builder offers and book directly with the builder if you want to. Free for buyers. If you book through us, the builder pays us a commission.
- Gathering buyers
- Talking to the builder
- Group offer
- Group site visit
- Booking
0 buyers have joined · 0 committed
Committed buyers have confirmed their budget, home type and timeline with us on a call; builders negotiate with them. Joining is free and never obliges you to buy.
Join the GRC Shreekrish buyers’ groupHow group buying works
See it for yourself
Visit the site with our team, or get a call to clear your questions. Free, no obligation.
Key facts: home types, towers, land and possession
- Home types
- 2 BHK, 2.5 BHK, 3 BHK
- Carpet area
- 674 – 1,038 sq ft
- Towers
- 2
- Floors
- 4
- Total homes
- 244
- Land
- 3.57 acres
- Possession (RERA)
- Dec 2026
- Built (RERA update)
- 100%
GRC Shreekrish RERA number and registration details
- RERA number
- PRM/KA/RERA/1251/308/PR/020922/005199
- Registered on
- 2 Sep 2022
- Promised completion
- 31 Dec 2026
- Extended to
- No extension recorded
- RERA status
- New launch
- Homes booked
- 130 of 244 as on
- Price
- Not found in public records yet: price
- Project type
- Residential
Towers and blocks (RERA filing)
| Tower | Floors | Basements | Homes |
|---|---|---|---|
| A | 4 | 1 | 94 |
| B | 4 | 1 | 150 |
A dash (—) means the filing did not state that value.
Summary in plain English
GRC Shreekrish is a residential project by GRC Infra in Choodasandra, Anekal, with 244 homes across 2 towers. The project includes 3 BHK, 2 BHK, and 2.5 BHK flats, registered with RERA on 2 September 2022. The completion date is 31 December 2026.
Written by AI from the RERA record above on 22 Oct 2026. Every number in it was checked against that record; if anything differs, the record wins.
Open space, home loans, escrow and other details
- Open space
- 63.8% of land
- Water and power
- Water source filed with RERA: BoreWell
- Home loans: approved banks
- Not found in public records yet: bank approvals
- Payment plans
- Not found in public records yet: payment plans
- Maintenance
- Not found in public records yet: maintenance
- Car parking
- Not found in public records yet: car parking charge
- Escrow bank (RERA)
- STATE BANK OF INDIA, BASAVANAGUDI
- Building plan (RERA)
- BDA - Bangalore Development Authority · No. LP NO NM/AS/AA-1/TS-PURVA/17/2021-22 · dated 16 Dec 2021
- Project cost declared to RERA
- ₹97.09 Cr
Open area as a share of the land, from the areas filed with RERA (includes driveways and landscaped areas).
Amenities
- Electricity
- CCTV Surveillance
- Club House
- Outdoor Sports facility
- Indoor Sports facility
- Swimming Pool
- Gym
- Power Backup
Amenities and internal works as filed by the promoter with Karnataka RERA; we have not visited the site.
GRC Shreekrish location and address
- Address
- Sy 46, Choodasandra village, sarjapur hobli, Anekal taluk, bangalore , Banglore 560099 , Anekal , Bengaluru Urban, Karnataka - 560099
- Village (RERA)
- Choodasandra
- Locality
- Near Harlur RoadAlso known as Haralur Road, Harlur
- PIN code
- 560099
- City
- Bengaluru
- State
- Karnataka
- Coordinates
- 12.88500, 77.68016
Distances to landmarks
Not found in public records yet: landmarksAbout Choodasandra
Not found in public records yet: locality factsCommute times to tech parks and the airport
| To | Straight line | Peak-hour drive (estimate) |
|---|---|---|
| Electronic City Phase 1Map point on OpenStreetMap (opens in a new tab) | 4.26 km | approx. 17 min |
| Outer Ring Road tech corridor (RMZ Ecospace, Bellandur)Map point on OpenStreetMap (opens in a new tab) | 4.31 km | approx. 17 min |
| ITPL, Whitefield (main gate)Map point on OpenStreetMap (opens in a new tab) | 13.01 km | approx. 53 min |
| KSR Bengaluru City railway station (Majestic)Map point on OpenStreetMap (opens in a new tab) | 15.84 km | approx. 64 min |
| Manyata Tech ParkMap point on OpenStreetMap (opens in a new tab) | 19.28 km | approx. 78 min |
| Kempegowda International AirportMap point on OpenStreetMap (opens in a new tab) | 35.21 km | approx. 143 min |
How we calculate
Straight line: from the project’s map point on RERA to the destination’s point on OpenStreetMap.
Peak-hour drive is a rough estimate, not a route: straight line × 1.35 for the road network, at 20 km/h. Real times vary a lot with the route and the hour.
Sources:Source (openstreetmap.org) (opens in a new tab)How we calculate this
Schools and hospitals nearby
Within 2 km
- 18Schools and colleges15 schools, 3 colleges, 0 kindergartens
- 3Hospitals and clinics1 hospitals, 2 clinics
Nearest schools and colleges
- Notre Dame Academy · 0.2 km
- Amrita International Vidyalayam · 0.43 km
- Narayana · 1.18 km
Nearest hospitals and clinics
- Harmony Wellness Concepts Center · 0.93 km
- Esthetix Orthodontic and Cosmetic Dental Clinic · 1.76 km
- Aarogya Hastha Hospital · 1.8 km
Places as mapped on OpenStreetMap (amenity=school, college, kindergarten, university; hospital, clinic), counted within 2 km in a straight line of the RERA map point. Volunteers map these, so some places may be missing or closed. Places data © OpenStreetMap contributors, extract of 5 Oct 2026.
Nearest metro station and railway
- Beratena Agrahara (ಬೆರಟೇನ ಅಗ್ರಹಾರ)Open now — nearest operating metro station3.37 km
- Carmelaram (ಕರ್ಮೇಲರಮ್)Nearest railway station3.73 km
Straight-line distances from the RERA map point to the station points mapped on OpenStreetMap; status (open or under construction) as tagged there. Places data © OpenStreetMap contributors, extract of 5 Oct 2026.
Lake and lake-buffer check
The nearest mapped lake is Choodasandra Lake, 82 m from the project’s RERA map point.
The site may be next to the lake. The RERA point is one approximate spot and the site boundary is not published as a shape — check the approved plan for the lake buffer.
- Choodasandra Lake on OpenStreetMap (opens in a new tab) 82 m
- Gattahalli Lake on OpenStreetMap (opens in a new tab) (ಗಟ್ಟಹಳ್ಳಿ ಕೆರೆ)1,165 m
- Rayasandra Lake on OpenStreetMap (opens in a new tab) (ರಾಯಸಂದ್ರ ಕೆರೆ)1,257 m
The buffer rule
Bengaluru’s lake buffer rule has changed over time: the National Green Tribunal ordered a 75 m buffer in May 2016; the Supreme Court set that order aside on 5 March 2019, leaving the 30 m buffer of the Revised Master Plan 2015. Check the current rule and the approved plan before relying on either number.
- LiveLaw: SC sets aside NGT order enlarging buffer zones (2019) (livelaw.in) (opens in a new tab)
- Citizen Matters: Shrinking lake buffers (citizenmatters.in) (opens in a new tab)
Shortest distance from the RERA map point to the mapped water edge (OpenStreetMap water polygons tagged lake or reservoir, or named lake/kere/tank). Mapped shorelines can differ from the revenue-record boundary of a lake. Places data © OpenStreetMap contributors, extract of 5 Oct 2026.
Sources:Source (openstreetmap.org) (opens in a new tab)Source (livelaw.in) (opens in a new tab)Source (citizenmatters.in) (opens in a new tab)How we calculate this
Satellite time-lapse of the site
Satellite photos load when you scroll to them.
Photos from Esri World Imagery Wayback, centred on the project’s map point; dates are the capture dates in Esri’s metadata. Loaded from Esri when you scroll here.
Sources:Source (livingatlas.arcgis.com) (opens in a new tab)
GRC Shreekrish floor plans, brochure and elevations
Documents the builder uploaded to Karnataka RERA, shown as filed. Tap a page to see it full size; the full PDF opens on the RERA website.
Brochure7 pages

brochure shreekrishFiled 4 Apr 2022 · Full PDF on RERA 





Approved building plan4 files

Approved Building/Plotting PlanFull PDF on RERA 
Area Development Plan Of Project AreaFull PDF on RERA 
sanction plan (1)Filed 4 Apr 2022 · Full PDF on RERA 
sanction plan (1)Filed 4 Apr 2022 · Full PDF on RERA
Approved layout plan3 files

Approved Layout PlanFull PDF on RERA 
Existing Layout PlanFull PDF on RERA 
Layout PlanFiled 14 May 2022 · Full PDF on RERA
| Home type | Carpet area | Homes |
|---|---|---|
| 2 BHK | 674 – 820 sq ft | 79 |
| 2.5 BHK | 796 – 896 sq ft | 40 |
| 3 BHK | 828 – 1,018 sq ft | 125 |
| Flats | 1,038 sq ft | 244 |
Home types, counts and carpet areas as filed with Karnataka RERA (carpet area, not super built-up).
We have not collected floor-plan drawings; the builder’s sales team can share them.
GRC Shreekrish possession date and construction status
Promoter’s quarterly update to RERA for Q2 2026-27, submitted 2026-10-15.
By tower (Q2 2026-27)
Units sold and unsold, from RERA (Q2 2026-27)
| Type | Homes | Booked | Available |
|---|---|---|---|
| 2 BHK | 79 | 38 | 41 |
| 2.5 BHK | 40 | 24 | 16 |
| 3 BHK | 125 | 68 | 57 |
As reported by the promoter in the quarterly update to RERA, not verified by us.
Timeline
- 20 Feb 2022Project start date given to RERA
- 2 Sep 2022Registered with Karnataka RERA
- 31 Dec 2026Completion date given at registration
Approvals and documents checklist
| Approval | Authority | Source |
|---|---|---|
| Building plan | BDA - Bangalore Development Authority · No. LP NO NM/AS/AA-1/TS-PURVA/17/2021-22 · dated 2021-12-16 | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Land conversion | DC Office · No. LCCP101562/2021 ALN(ASH)SR86 2020 2021 · dated 2021-02-16 | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Commencement Certificate | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Water Permission Letter | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Approved Layout Plan | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Approved Building/Plotting Plan | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Approved Section Of Building/Infrastructure Plan of Plotting | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Conversion Certificate under section 95 of the KLR Act 1964 | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| KWSSB/Water | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| KSPCB | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
Documents uploaded to RERA
- Building or layout plan · Approved drawings from the planning authorityFiled on RERA ✓ — BDA - Bangalore Development Authority · No. LP NO NM/AS/AA-1/TS-PURVA/17/2021-22 · dated 16 Dec 2021
- Commencement certificate · Permission to start buildingFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
- Environment clearance · SEIAA KarnatakaNot on RERA yet
- Fire NOC · Karnataka Fire and Emergency ServicesNot on RERA yet
- Pollution board consent · KSPCBFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
- Water and sewerage · BWSSBFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
- Electricity · BESCOMNot on RERA yet
- Height clearance · Airports Authority of IndiaNot on RERA yet
- Occupancy certificate (OC) · Issued only when the building is finishedNot on RERA yet — expected at completion
From the documents the promoter uploaded to Karnataka RERA, collected 22 Oct 2026. “Filed” means a document is on RERA — we have not checked its contents or validity. Not every approval applies to every project (for example, smaller projects may not need an environment clearance). The project page on RERA lists each upload.
GRC Shreekrish RERA complaints
No complaints listed on Karnataka RERA for this registration as on Source (rera.karnataka.gov.in) (opens in a new tab)
Court and consumer cases
We list case numbers, courts and outcomes only — never names of private individuals.
About GRC Infra
- Promoter type
- Partnership Firm
- Projects on this site
- 4
- RERA complaints against promoter
- 1
- Company number (CIN)
- Not found in public records yet: CIN
From Karnataka RERA, as collected so far (22 Oct 2026). Complaints are those RERA lists against this promoter across all its projects.
GRC Infra’s RERA recordGRC Infra delivery record
- 4Projects in Bengaluru on RERA6 approved registrations under GRC Infra in Bengaluru Urban and Rural. Source (rera.karnataka.gov.in) (opens in a new tab)
- 1,070Homes registeredAs stated in each registrations.
- 1RERA complaints0 open, 1 disposed. as on Source (rera.karnataka.gov.in) (opens in a new tab)
- 0.9Complaints per 1,000 homes1 complaints ÷ 1,070 homes in its 6 registrations on Karnataka RERA in Bengaluru.
What the complaints are about
1 complaint subject as written on RERA, as on . Each subject is sorted into one group by keywords (first match wins: delay, refund, registration, quality, litigation, association); one complaint often raises several issues. Source (rera.karnataka.gov.in) (opens in a new tab)
Sources:Source (rera.karnataka.gov.in) (opens in a new tab)How we calculate this
What’s changed since Dec 2021
- 15 Oct 2026Quarterly update filed for Q2 2026-27: 100% built, 130 of 244 homes booked Source (rera.karnataka.gov.in) (opens in a new tab)
- 27 Sep 2026Quarterly update filed for Q1 2026-27: 96% built, 128 of 244 homes booked Source (rera.karnataka.gov.in) (opens in a new tab)
- 23 Jul 2026Quarterly update filed for Q4 2025-26: 91% built, 125 of 244 homes booked Source (rera.karnataka.gov.in) (opens in a new tab)
- 17 Mar 2026Quarterly update filed for Q3 2025-26: 87% built, 125 of 244 homes booked Source (rera.karnataka.gov.in) (opens in a new tab)
- 2 Sep 2022Registered with Karnataka RERA (PRM/KA/RERA/1251/308/PR/020922/005199); completion date 31 Dec 2026 Source (rera.karnataka.gov.in) (opens in a new tab)
- 20 Feb 2022Project start date in the RERA record Source (rera.karnataka.gov.in) (opens in a new tab)
- 16 Dec 2021Building plan approved by BDA - Bangalore Development Authority (No. LP NO NM/AS/AA-1/TS-PURVA/17/2021-22) Source (rera.karnataka.gov.in) (opens in a new tab)
Newest first. No extension of the completion date is recorded on RERA. When the RERA crawl sees a new filing, complaint or extension, it is added here with its date.
Home loan EMI calculator
- Monthly EMI
- —
- Down payment
- —
- Loan amount
- —
- Total interest
- —
A calculation only, from the numbers you enter — not a loan offer.
All-in cost: GST, registration and other charges
The calculator loads when you scroll to it.
Assumptions
- Base price: the builder’s price is not published in a form we could collect — enter it from the cost sheet.
- GST 5% on the base price and charges — the usual rate for an under-construction home that is not “affordable housing” (1%).
- Stamp duty about 5.6% and registration 2% — the Karnataka rule (registration was raised from 1% to 2% on 31 Aug 2025). Calculated on the agreement value.
- Car parking, other charges and the maintenance deposit are not in the public record we collect; enter them from the builder’s cost sheet.
- Loan on the agreement value (banks usually lend up to 75–90%); EMI is the standard reducing-balance formula. Example rate only — use your bank’s quote.
GRC Shreekrish FAQs
When will GRC Shreekrish be completed?
The project completion date on RERA is 31 December 2026.
What is the RERA registration number for GRC Shreekrish?
The RERA registration number is PRM/KA/RERA/1251/308/PR/020922/005199.
How many homes are in GRC Shreekrish?
The project has 244 homes across 2 towers.
What home types are available in GRC Shreekrish?
The project offers 3 BHK (125 homes, 828 to 1,018 carpet sq ft), 2 BHK (79 homes, 674 to 820 carpet sq ft), and 2.5 BHK (40 homes, 796 to 896 carpet sq ft).
What is the carpet area of homes in GRC Shreekrish?
Carpet areas range from 674 sq ft (2 BHK minimum) to 1,038 sq ft (3 BHK maximum).
Where is GRC Shreekrish located?
The project is in Choodasandra, Anekal taluk, Bengaluru Urban district, PIN code 560099.
How many homes are booked in GRC Shreekrish?
As of Q2 2026-27 (ended 30 September 2026), 130 homes are booked out of 244.
Are there any RERA complaints against GRC Shreekrish?
There are no RERA complaints on this project registration.
How many towers does GRC Shreekrish have?
The project has 2 towers, each with a maximum of 4 floors.
What is the construction progress of GRC Shreekrish?
As of Q2 2026-27, the project is 100% complete.
Written by AI from the RERA record above on 22 Oct 2026. Answers use only that record; check them against the source before you decide.
Questions about GRC Shreekrish
No questions published yet. Ask the first one: you get an instant answer from this page’s public record, and our team follows up on anything the record does not show.
Bought a home from GRC Infra? Review the builder.
Reviews of GRC Infra by verified buyers
No verified reviews of GRC Infra yet. If you bought a home from them, your review helps other buyers.
How reviews work: only buyers and owners can review; we confirm each purchase by phone before publishing, publish positive and negative reviews alike, never accept payment for reviews, and the builder may reply.
Similar projects within 5 km
| Project | Distance | Homes | Possession (RERA) | Built | Complaints | Price |
|---|---|---|---|---|---|---|
| GRC SavoraGRC Infra | 0.2 km | 150 | Mar 2029 | 8% | 0 | Not collected |
| GR SwaraRanke Infra LLP | 0.2 km | 57 | Jan 2029 | 43% | 0 | Not collected |
| GR SitaraGR Constructions | 0.6 km | 250 | Dec 2026 | 100% | 1 | Not collected |
| Assetz Inspira Melodies of Life ApartmentsIinspira Worldcity Projects Private Limited | 0.7 km | 204 | Nov 2030 | 16% | 0 | Not collected |
| Oracle SunriseVijaya Bhaskara Constructions | 0.9 km | 80 | Mar 2026extended | 100% | 0 | Not collected |
| HavenLodha Developers Limited | 1 km | 452 | Jun 2030 | — | 0 | from ₹2.99 Crabout ₹23,200/sq ft carpet |
Projects of the same kind within 5 km in a straight line of this project’s RERA map point, nearest first. % built is the promoter’s latest quarterly figure on RERA (shown for single-registration projects); prices are from the builder’s own website where we found one.
Sources and last checked dates
Collected on 22 Oct 2026 by AI research agents reading public pages. Facts are written in our own words. Not found yet: price; court cases; landmarks; specifications; news.
How to check on RERA: On rera.karnataka.gov.in/viewAllProjects, type the registration number in 'Registration No', press Search, then click the 'View Project Details' icon. Complaints open from the 'Complaints / Litigation' icon in the same row. Registration number: PRM/KA/RERA/1251/308/PR/020922/005199.
- RERA record last checked: 22 Oct 2026
- Last change in the record (registration, quarterly filing or complaint): 22 Oct 2026
How this page is made: software builds it from public records (Karnataka RERA filings, OpenStreetMap, the builder’s own website). AI is used only to read filings into fields and to write the plain-English summary and FAQ answers, which are checked against the record. Facts are checked automatically against the RERA filing. Methodology · How we earn · Report an error
More new projects nearby
Choodasandra, near Harlur RoadUnder constructionRERA registeredBuyers’ group openGRC Savora
by GRC Infra
Price: Price on requestGet brochure & price →
- Types not found
- 914 – 1,170 sq ft
- Mar 2029
150 homes
Be one of the first 10 buyers in this groupFounding members — it’s free
Join group for GRC Savora
Choodasandra, near Harlur RoadUnder constructionRERA registeredBuyers’ group openGR Swara
by Ranke Infra
Price: Price on requestGet brochure & price →
- 4 BHK, Villa
- 3,043 – 3,316 sq ft
- Jan 2029
57 homes
Be one of the first 10 buyers in this groupFounding members — it’s free
Join group for GR Swara
Choodasandra, near Kodathi–CarmelaramUnder constructionRERA registeredBuyers’ group openAssetz Inspira Melodies of Life Apartments
by Iinspira Worldcity
Price: Price on requestGet brochure & price →
- 3 BHK
- 1,183 – 1,207 sq ft
- Nov 2030
204 homes
Be one of the first 10 buyers in this groupFounding members — it’s free
Join group for Assetz Inspira Melodies of Life Apartments