Greenbay
30×45 plots by Pionier Pproject · Gattahalli, near Kodathi–Carmelaram, Bengaluru
Gattahalli, near Kodathi–Carmelaram, BengaluruOpen on Google Maps (opens in a new tab)
- Under construction
- RERA registered
- plotted
Price: Price on request
Site photo filed with Karnataka RERA Karnataka RERA filing · Source ↗ (opens in a new tab)
Greenbay at a glance
- Completion (RERA)May 2028Karnataka RERA
- RERA complaints (project)None listedKarnataka RERA · as on 17 Oct 2026
- Approvals filed5 of 9 on RERAKarnataka RERA uploads · 17 Oct 2026
- Nearest metroInfosys Foundation Konappana Agrahara · 3.91 kmstraight line · OpenStreetMap, 5 Oct 2026
- Airport driveapprox. 150 min at peak36.92 km straight line · estimate
- Nearest lakeGattahalli Lake · 692 mFrom the RERA map point · OpenStreetMap, 5 Oct 2026
Project summary
Greenbay is a plotted development by Pionier Pproject in Gattahalli, Bengaluru with 32 plots, registered with Karnataka RERA. The completion date on RERA is 14 May 2028.
Facts collected on 17 Oct 2026 from public records — each linked to its source. Free for buyers. If you book through us, the developer pays us a commission.
Greenbay buyers’ group: join to ask for a group price
No one has joined yet. Be one of the first 10 buyers in this group — the founding members.
Join free. When enough buyers have joined, our agent partner asks Pionier Pproject for a group price — for example a lower price, an easier payment plan or waived charges. Nothing is promised: you see what the developer offers and book directly with the developer if you want to. Free for buyers. If you book through us, the developer pays us a commission.
- Gathering buyers
- Talking to the developer
- Group offer
- Group site visit
- Booking
0 buyers have joined · 0 committed
Committed buyers have confirmed their budget, plot size and timeline with us on a call; developers negotiate with them. Joining is free and never obliges you to buy.
Join the Greenbay buyers’ groupHow group buying works
See it for yourself
Visit the site with our team, or get a call to clear your questions. Free, no obligation.
Key facts: plot sizes, approval, land and completion
- Plot sizes (feet)
- 30×45
- Plot area
- 918 – 1,371 sq ft
- Total plots
- 32
- Layout approved by
- BDA
- Land
- Not found in public records yet: land area
- Land conversion orders
- 1
- Completion (RERA)
- May 2028
- Development (RERA update)
- Not found in public records yet: development progress
Plot sizes (RERA filing)
| Size (feet) | Area | Plots |
|---|---|---|
| 30×45 | 1,350 sq ft | 12 |
| Odd-sized (irregular) | varies | 17 |
| EWS | — | 3 |
Sizes as filed with RERA, converted from metres to feet (9.14 m = 30 ft, 12.19 m = 40 ft). Ask the developer which plots are still unsold.
Approving authority as filed: BDA - Bangalore Development Authority.
Land conversion orders (RERA filing)
| Survey no. | Converted for | Order | By |
|---|---|---|---|
| 38/1 | Residential | No. ALN A SH SR 02 2012 13, 23 Apr 2012 | D C |
RERA does not cover each plot’s khata. Ask the developer for the khata and title documents and have a lawyer check them before paying an advance.
Greenbay RERA number and registration details
- RERA number
- PRM/KA/RERA/1251/308/PR/300523/005963
- Registered on
- 30 May 2023
- Promised completion
- 14 May 2028
- Extended to
- No extension recorded
- RERA status
- New launch
- Plots booked
- Not found in public records yet: plots booked
- Price
- Not found in public records yet: price
- Project type
- Plotted
Summary in plain English
Greenbay is a plotted layout in Gattahalli, Anekal, developed by Pionier Pproject. The layout has 32 plots. The RERA completion date is 14 May 2028.
Written by AI from the RERA record above on 7 Oct 2026. Every number in it was checked against that record; if anything differs, the record wins.
Open space, loans, escrow and other details
- Open space
- Not found in public records yet: open space
- Water and power
- Water source filed with RERA: Local Authority
- Plot loans: approved banks
- Not found in public records yet: bank approvals
- Payment plans
- Not found in public records yet: payment plans
- Maintenance
- Not found in public records yet: maintenance
- Car parking
- Not found in public records yet: car parking charge
- Escrow bank (RERA)
- KOTAK MAHINDRA BANK, M G Road
- Building plan (RERA)
- BDA - Bangalore Development Authority · No. BDA/TPM/PRL 63/2022-23/330M · dated 11 May 2023
- Project cost declared to RERA
- ₹20.83 Cr
Amenities
Greenbay location and address
- Address
- SY. NO. 38/1, GATTAHALLI VILLAGE, SARJAPURA HOBLI, , ANEKAL TALUK, BENGALURU URBAN , Anekal , Bengaluru Urban, Karnataka - 560100
- Village (RERA)
- Gattahalli
- Locality
- Near Kodathi–CarmelaramAlso known as Kodathi, Carmelaram
- PIN code
- 560100
- City
- Bengaluru
- State
- Karnataka
- Coordinates
- 12.86879, 77.69901
Distances to landmarks
Not found in public records yet: landmarksAbout Gattahalli
Not found in public records yet: locality factsCommute times to tech parks and the airport
| To | Straight line | Peak-hour drive (estimate) |
|---|---|---|
| Electronic City Phase 1Map point on OpenStreetMap (opens in a new tab) | 4.26 km | approx. 17 min |
| Outer Ring Road tech corridor (RMZ Ecospace, Bellandur)Map point on OpenStreetMap (opens in a new tab) | 6.4 km | approx. 26 min |
| ITPL, Whitefield (main gate)Map point on OpenStreetMap (opens in a new tab) | 13.87 km | approx. 56 min |
| KSR Bengaluru City railway station (Majestic)Map point on OpenStreetMap (opens in a new tab) | 18.57 km | approx. 75 min |
| Manyata Tech ParkMap point on OpenStreetMap (opens in a new tab) | 21.71 km | approx. 88 min |
| Kempegowda International AirportMap point on OpenStreetMap (opens in a new tab) | 36.92 km | approx. 150 min |
How we calculate
Straight line: from the project’s map point on RERA to the destination’s point on OpenStreetMap.
Peak-hour drive is a rough estimate, not a route: straight line × 1.35 for the road network, at 20 km/h. Real times vary a lot with the route and the hour.
Sources:Source (openstreetmap.org) (opens in a new tab)How we calculate this
Schools and hospitals nearby
Within 2 km
- 7Schools and colleges5 schools, 2 colleges, 0 kindergartens
- 0Hospitals and clinics0 hospitals, 0 clinics
Nearest schools and colleges
- Edenbridge International School · 1.22 km
- Vidya Shri College · 1.67 km
- Bangalore Technological Institute · 1.83 km
Places as mapped on OpenStreetMap (amenity=school, college, kindergarten, university; hospital, clinic), counted within 2 km in a straight line of the RERA map point. Volunteers map these, so some places may be missing or closed. Places data © OpenStreetMap contributors, extract of 5 Oct 2026.
Nearest metro station and railway
- Infosys Foundation Konappana Agrahara (ಇನ್ಫೋಸಿಸ್ ಫೌಂಡೇಶನ್ ಕೊನಪ್ಪನ ಅಗ್ರಹಾರ)Open now — nearest operating metro station3.91 km
- Huskuru (ಹುಸ್ಕೂರ್)Nearest railway station1.59 km
Straight-line distances from the RERA map point to the station points mapped on OpenStreetMap; status (open or under construction) as tagged there. Places data © OpenStreetMap contributors, extract of 5 Oct 2026.
Lake and lake-buffer check
The nearest mapped lake is Gattahalli Lake, 692 m from the project’s RERA map point.
The site boundary is not published as a shape, so its nearest edge can be closer than this point. Whether any building sits inside a lake buffer can only be checked on the approved plan.
- Gattahalli Lake on OpenStreetMap (opens in a new tab) (ಗಟ್ಟಹಳ್ಳಿ ಕೆರೆ)692 m
- Unnamed lake (mapped on OpenStreetMap) on OpenStreetMap (opens in a new tab) 1,134 m
- Huskur Lake on OpenStreetMap (opens in a new tab) (ಹುಸ್ಕೂರು ಕೆರೆ)1,216 m
The buffer rule
Bengaluru’s lake buffer rule has changed over time: the National Green Tribunal ordered a 75 m buffer in May 2016; the Supreme Court set that order aside on 5 March 2019, leaving the 30 m buffer of the Revised Master Plan 2015. Check the current rule and the approved plan before relying on either number.
- LiveLaw: SC sets aside NGT order enlarging buffer zones (2019) (livelaw.in) (opens in a new tab)
- Citizen Matters: Shrinking lake buffers (citizenmatters.in) (opens in a new tab)
Shortest distance from the RERA map point to the mapped water edge (OpenStreetMap water polygons tagged lake or reservoir, or named lake/kere/tank). Mapped shorelines can differ from the revenue-record boundary of a lake. Places data © OpenStreetMap contributors, extract of 5 Oct 2026.
Sources:Source (openstreetmap.org) (opens in a new tab)Source (livelaw.in) (opens in a new tab)Source (citizenmatters.in) (opens in a new tab)How we calculate this
Satellite time-lapse of the site
Satellite photos load when you scroll to them.
Photos from Esri World Imagery Wayback, centred on the project’s map point; dates are the capture dates in Esri’s metadata. Loaded from Esri when you scroll here.
Sources:Source (livingatlas.arcgis.com) (opens in a new tab)
Greenbay layout plan and plot types as filed
Documents the developer uploaded to Karnataka RERA, shown as filed. Tap a page to see it full size; the full PDF opens on the RERA website.
Brochure

BrochureFull PDF on RERA
Approved building plan3 files

Approved Building/Plotting PlanFull PDF on RERA 
Area Development Plan Of Project AreaFull PDF on RERA 
Approved Plan 38-1 Blue Print.pdfFull PDF on RERA
Approved layout plan2 files

Approved Layout PlanFull PDF on RERA 
Existing Layout PlanFull PDF on RERA
| Plot type (as filed) | Area | Plots |
|---|---|---|
| Plot 9.14 m × 13.71 m | — | 12 |
| Ews | — | 3 |
| Odd | — | 17 |
Plot types and counts as filed with Karnataka RERA.
We have not collected the layout plan drawing; the developer’s sales team can share it.
Greenbay completion date and development status
Timeline
- 15 May 2023Project start date given to RERA
- 30 May 2023Registered with Karnataka RERA
- 14 May 2028Completion date given at registration
Approvals and documents checklist
14 rows: approvals. Scroll inside the table to see them all.
| Approval | Authority | Source |
|---|---|---|
| Layout plan | BDA - Bangalore Development Authority · No. BDA/TPM/PRL 63/2022-23/330M · dated 2023-05-11 | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Land conversion | D C · No. ALN A SH SR 02 2012 13 · dated 2012-04-23 | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Commencement Certificate | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Electricity Permission Letter | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Water Permission Letter | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Approved Layout Plan | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Approved Building/Plotting Plan | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Approved Section Of Building/Infrastructure Plan of Plotting | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Change of Land Use | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Conversion Certificate under section 95 of the KLR Act 1964 | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| ESCOM/Electricity | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| KWSSB/Water | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Approval/NOC under section 109 of KLR Act 1961 | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| SEIAA | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
Documents uploaded to RERA
- Building or layout plan · Approved drawings from the planning authorityFiled on RERA ✓ — BDA - Bangalore Development Authority · No. BDA/TPM/PRL 63/2022-23/330M · dated 11 May 2023
- Commencement certificate · Permission to start buildingFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
- Environment clearance · SEIAA KarnatakaFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
- Fire NOC · Karnataka Fire and Emergency ServicesNot on RERA yet
- Pollution board consent · KSPCBNot on RERA yet
- Water and sewerage · BWSSBFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
- Electricity · BESCOMFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
- Height clearance · Airports Authority of IndiaNot on RERA yet
- Occupancy certificate (OC) · Issued only when the building is finishedNot on RERA yet — expected at completion
From the documents the promoter uploaded to Karnataka RERA, collected 17 Oct 2026. “Filed” means a document is on RERA — we have not checked its contents or validity. Not every approval applies to every project (for example, smaller projects may not need an environment clearance). The project page on RERA lists each upload.
Greenbay RERA complaints
No complaints listed on Karnataka RERA for this registration as on Source (rera.karnataka.gov.in) (opens in a new tab)
Court and consumer cases
We list case numbers, courts and outcomes only — never names of private individuals.
About Pionier Pproject
- Promoter type
- Partnership Firm
- Projects on this site
- 7
- RERA complaints against promoter
- 38
- Company number (CIN)
- Not found in public records yet: CIN
From Karnataka RERA, as collected so far (17 Oct 2026). Complaints are those RERA lists against this promoter across all its projects.
Pionier Pproject’s RERA recordPionier Pproject delivery record
- 7Projects in Bengaluru on RERA8 approved registrations under Pionier Pproject in Bengaluru Urban and Rural. Source (rera.karnataka.gov.in) (opens in a new tab)
- 336Plots registeredAs stated in each registrations.
- 38RERA complaints1 open, 37 disposed. as on Source (rera.karnataka.gov.in) (opens in a new tab)
- 113.1Complaints per 1,000 plots38 complaints ÷ 336 plots in its 8 registrations on Karnataka RERA in Bengaluru.
What the complaints are about
38 complaint subjects as written on RERA, as on . Each subject is sorted into one group by keywords (first match wins: delay, refund, registration, quality, litigation, association); one complaint often raises several issues. Source (rera.karnataka.gov.in) (opens in a new tab)
Sources:Source (rera.karnataka.gov.in) (opens in a new tab)How we calculate this
What’s changed since May 2023
- 30 May 2023Registered with Karnataka RERA (PRM/KA/RERA/1251/308/PR/300523/005963); completion date 14 May 2028 Source (rera.karnataka.gov.in) (opens in a new tab)
- 15 May 2023Project start date in the RERA record Source (rera.karnataka.gov.in) (opens in a new tab)
- 11 May 2023Building plan approved by BDA - Bangalore Development Authority (No. BDA/TPM/PRL 63/2022-23/330M) Source (rera.karnataka.gov.in) (opens in a new tab)
Newest first. No extension of the completion date is recorded on RERA. When the RERA crawl sees a new filing, complaint or extension, it is added here with its date.
Plot loan EMI calculator
- Monthly EMI
- —
- Down payment
- —
- Loan amount
- —
- Total interest
- —
A calculation only, from the numbers you enter — not a loan offer.
Greenbay FAQs
How many plots are in Greenbay?
Greenbay has 32 plots in total.
What are the plot sizes in Greenbay?
The layout has 12 plots of 30×45 feet (1,350 sq ft each), 17 odd-sized plots, and 3 EWS plots. The exact sizes of the odd-sized plots are not in the RERA record.
Who approved the layout for Greenbay?
The Bangalore Development Authority (BDA) approved the layout.
How many land conversion orders are there for Greenbay?
There is 1 land conversion order on record for Greenbay.
What is the RERA registration number for Greenbay?
The RERA registration number is PRM/KA/RERA/1251/308/PR/300523/005963, registered on 30 May 2023.
When will Greenbay be completed?
The RERA completion date is 14 May 2028.
How many complaints have been filed against Greenbay on RERA?
There are 0 complaints on this project.
Where is Greenbay located?
Greenbay is in Gattahalli, Anekal taluk, Bengaluru Urban district, PIN code 560100.
How many projects has the developer Pionier Pproject registered on RERA in Bengaluru?
Pionier Pproject has 11 projects in the Bengaluru RERA records.
How many RERA complaints are there against Pionier Pproject across all projects?
There are 38 complaints against Pionier Pproject across all their projects on RERA.
Written by AI from the RERA record above on 7 Oct 2026. Answers use only that record; check them against the source before you decide.
Questions about Greenbay
No questions published yet. Ask the first one: you get an instant answer from this page’s public record, and our team follows up on anything the record does not show.
Bought a plot from Pionier Pproject? Review the developer.
Reviews of Pionier Pproject by verified buyers
No verified reviews of Pionier Pproject yet. If you bought a plot from them, your review helps other buyers.
How reviews work: only buyers and owners can review; we confirm each purchase by phone before publishing, publish positive and negative reviews alike, never accept payment for reviews, and the developer may reply.
Similar projects within 5 km
| Project | Distance | Plots | Completion (RERA) | Developed | Complaints | Price |
|---|---|---|---|---|---|---|
| Pionier DaffodilPionier PProject | 0.3 km | 29 | Dec 2027 | — | 0 | Not collected |
| Adarsh Forest GlenAkarshak Realty Private Limited | 0.6 km | 214 | Nov 2027 | 12% | 0 | Not collected |
| ElementsPionier PProject | 0.9 km | 38 | Oct 2027 | — | 2 | Not collected |
| MayfairreM/s. Pionier PProject | 0.9 km | 112 | Dec 2026 | — | 26 | Not collected |
| Central AvenueM/s. Pionier PProject | 1 km | 46 | Nov 2027 | — | 2 | Not collected |
| Lakecity Phase 1M/s. Elite Estates | 1.2 km | 124 | Dec 2030 | — | 6 | Not collected |
Projects of the same kind within 5 km in a straight line of this project’s RERA map point, nearest first. % built is the promoter’s latest quarterly figure on RERA (shown for single-registration projects); prices are from the developer’s own website where we found one.
Sources and last checked dates
Collected on 17 Oct 2026 by AI research agents reading public pages. Facts are written in our own words. Not found yet: price; court cases; landmarks; specifications; news.
How to check on RERA: On rera.karnataka.gov.in/viewAllProjects, type the registration number in 'Registration No', press Search, then click the 'View Project Details' icon. Complaints open from the 'Complaints / Litigation' icon in the same row. Registration number: PRM/KA/RERA/1251/308/PR/300523/005963.
- RERA record last checked: 17 Oct 2026
- Last change in the record (registration, quarterly filing or complaint): 30 May 2023
How this page is made: software builds it from public records (Karnataka RERA filings, OpenStreetMap, the developer’s own website). AI is used only to read filings into fields and to write the plain-English summary and FAQ answers, which are checked against the record. Facts are checked automatically against the RERA filing. Methodology · How we earn · Report an error
More new projects nearby
Gattahalli, near Kodathi–CarmelaramUnder constructionRERA registeredBuyers’ group openPionier Daffodil
by Pionier PProject
Price: Price on requestGet brochure & price →
- Odd-sized plots
- 1,112 – 2,007 sq ft plots
- Approved by BDA
- Dec 2027
29 plots
Be one of the first 10 buyers in this groupFounding members — it’s free
Join group for Pionier Daffodil
GattahalliUnder constructionRERA registeredBuyers’ group openCentral Avenue
by M/s. Pionier PProject
Price: Price on requestGet brochure & price →
- 30×40
- 541 – 1,714 sq ft plots
- Approved by BDA
- Nov 2027
2 phases on RERA · 46 plots · 2 RERA complaints
Be one of the first 10 buyers in this groupFounding members — it’s free
Join group for Central Avenue
Gattihalli, near Kodathi–CarmelaramUnder constructionRERA registeredBuyers’ group openAdarsh Forest Glen
by Akarshak Realty
Price: Price on requestGet brochure & price →
- 20×30, 20×41, 30×30 +8 more
- 600 – 3,342 sq ft plots
- Approved by BDA
- Nov 2027
214 plots
Be one of the first 10 buyers in this groupFounding members — it’s free
Join group for Adarsh Forest Glen