Heritage Enclave
30×40, 40×40 +1 more plots by IG3 Infra Limited · Mallenahalli, Bellary Road (Airport Road), Bengaluru
Mallenahalli, Bellary Road (Airport Road), BengaluruOpen on Google Maps (opens in a new tab)
- Under construction
- RERA registered
- plotted
Price: Price on request
Site photo filed with Karnataka RERA Karnataka RERA filing · Source ↗ (opens in a new tab)
Heritage Enclave at a glance
- Completion (RERA)Dec 2029Karnataka RERA
- Construction21% built · on pace for Apr 2028RERA filing to 30 Sep 2026; estimate from average pace
- RERA complaints (project)None listedKarnataka RERA · as on 16 Oct 2026
- Approvals filed3 of 9 on RERAKarnataka RERA uploads · 16 Oct 2026
- Nearest metroDoddajala · 1.91 km (under construction)Open now: Krishnarajapura, 21.11 km · straight line · OpenStreetMap, 5 Oct 2026
- Airport driveapprox. 19 min at peak4.74 km straight line · estimate
- Nearest lakeUnnamed lake · 763 mFrom the RERA map point · OpenStreetMap, 5 Oct 2026
Project summary
Heritage Enclave is a plotted development by IG3 Infra Limited in Mallenahalli, Bengaluru with 118 plots, registered with Karnataka RERA. The completion date on RERA is 15 Dec 2029.
Facts collected on 16 Oct 2026 from public records — each linked to its source. Free for buyers. If you book through us, the developer pays us a commission.
Heritage Enclave buyers’ group: join to ask for a group price
No one has joined yet. Be one of the first 10 buyers in this group — the founding members.
Join free. When enough buyers have joined, our agent partner asks IG3 Infra Limited for a group price — for example a lower price, an easier payment plan or waived charges. Nothing is promised: you see what the developer offers and book directly with the developer if you want to. Free for buyers. If you book through us, the developer pays us a commission.
- Gathering buyers
- Talking to the developer
- Group offer
- Group site visit
- Booking
0 buyers have joined · 0 committed
Committed buyers have confirmed their budget, plot size and timeline with us on a call; developers negotiate with them. Joining is free and never obliges you to buy.
Join the Heritage Enclave buyers’ groupHow group buying works
See it for yourself
Visit the site with our team, or get a call to clear your questions. Free, no obligation.
Key facts: plot sizes, approval, land and completion
- Plot sizes (feet)
- 30×40, 40×40, 40×50
- Plot area
- 1,163 – 8,722 sq ft
- Total plots
- 118
- Layout approved by
- BIAAPA
- Land
- Not found in public records yet: land area
- Land conversion orders
- 3
- Completion (RERA)
- Dec 2029
- Development (RERA update)
- 21%
Plot sizes (RERA filing)
| Size (feet) | Area | Plots |
|---|---|---|
| 30×40 | 1,200 sq ft | 89 |
| 40×40 | 1,600 sq ft | 8 |
| 40×50 | 2,000 sq ft | 9 |
| Odd-sized (irregular) | varies | 12 |
Sizes as filed with RERA, converted from metres to feet (9.14 m = 30 ft, 12.19 m = 40 ft). Ask the developer which plots are still unsold.
Approving authority as filed: BIAPPA - Bangalore Airport Area Planning Authority.
Land conversion orders (RERA filing)
| Survey no. | Converted for | Order | By |
|---|---|---|---|
| 37/9 | Commercial | No. ALN(Devanahalli)CR.28/04-05, 11 Sep 2007 | Deputy Commissioner, Bangalore Rural |
| 37/12 | Commercial | No. ALN(Devanahalli)CR.29/04-05, 11 Sep 2007 | Deputy Commissioner, Bangalore Rural |
| 37/14 | Residential | No. ALN(Devanahalli)SR.73/91-92, 17 May 2004 | Deputy Commissioner, Bangalore Rural |
RERA does not cover each plot’s khata. Ask the developer for the khata and title documents and have a lawyer check them before paying an advance.
Heritage Enclave RERA number and registration details
- RERA number
- PRM/KA/RERA/1250/303/PR/080626/008704
- Registered on
- 8 Jun 2026
- Promised completion
- 15 Dec 2029
- Extended to
- No extension recorded
- RERA status
- Under construction
- Plots booked
- Not found in public records yet: plots booked
- Price
- Not found in public records yet: price
- Project type
- Plotted
Summary in plain English
Heritage Enclave is a plotted layout by IG3 Infra Limited in Mallenahalli, Devanahalli, with 118 plots. The layout is registered with Karnataka RERA and is scheduled for completion on 15 December 2029.
Written by AI from the RERA record above on 17 Oct 2026. Every number in it was checked against that record; if anything differs, the record wins.
Open space, loans, escrow and other details
- Open space
- Not found in public records yet: open space
- Water and power
- Water source filed with RERA: BoreWell,Local Authority
- Plot loans: approved banks
- Not found in public records yet: bank approvals
- Payment plans
- Not found in public records yet: payment plans
- Maintenance
- Not found in public records yet: maintenance
- Car parking
- Not found in public records yet: car parking charge
- Escrow bank (RERA)
- STATE BANK OF INDIA, Hudson Circle, Bangalore
- Building plan (RERA)
- BIAPPA - Bangalore Airport Area Planning Authority · No. BIAAPA/TP/LAO/93/2025-26 · dated 18 Dec 2025
- Project cost declared to RERA
- ₹45.37 Cr
Amenities
Heritage Enclave location and address
- Address
- Sy No 37/9, 37/12 and 37/14 of Akkalenahalli-Mallenahalli Village , Kasaba Hobli , Devanahalli , Bengaluru Rural, Karnataka - 562129
- Village (RERA)
- Mallenahalli
- Locality
- Bellary Road (Airport Road)Also known as Airport Road, International Airport Road, Bellary Road, NH 44
- PIN code
- 562129
- City
- Bengaluru
- State
- Karnataka
- Coordinates
- 13.18914, 77.66224
Distances to landmarks
Not found in public records yet: landmarksAbout Bellary Road (Airport Road)
Not found in public records yet: locality factsCommute times to tech parks and the airport
| To | Straight line | Peak-hour drive (estimate) |
|---|---|---|
| Kempegowda International AirportMap point on OpenStreetMap (opens in a new tab) | 4.74 km | approx. 19 min |
| Manyata Tech ParkMap point on OpenStreetMap (opens in a new tab) | 16.34 km | approx. 66 min |
| ITPL, Whitefield (main gate)Map point on OpenStreetMap (opens in a new tab) | 23.85 km | approx. 97 min |
| KSR Bengaluru City railway station (Majestic)Map point on OpenStreetMap (opens in a new tab) | 25.52 km | approx. 103 min |
| Outer Ring Road tech corridor (RMZ Ecospace, Bellandur)Map point on OpenStreetMap (opens in a new tab) | 29.59 km | approx. 120 min |
| Electronic City Phase 1Map point on OpenStreetMap (opens in a new tab) | 37.75 km | approx. 153 min |
How we calculate
Straight line: from the project’s map point on RERA to the destination’s point on OpenStreetMap.
Peak-hour drive is a rough estimate, not a route: straight line × 1.35 for the road network, at 20 km/h. Real times vary a lot with the route and the hour.
Sources:Source (openstreetmap.org) (opens in a new tab)How we calculate this
Schools and hospitals nearby
Within 2 km
- 3Schools and colleges1 schools, 2 colleges, 0 kindergartens
- 0Hospitals and clinics0 hospitals, 0 clinics
Nearest schools and colleges
- IIBS Bengaluru Airport Campus · 1.4 km
- Akash Global College of Management & Science · 1.61 km
- NAFL North Urbana · 1.95 km
Places as mapped on OpenStreetMap (amenity=school, college, kindergarten, university; hospital, clinic), counted within 2 km in a straight line of the RERA map point. Volunteers map these, so some places may be missing or closed. Places data © OpenStreetMap contributors, extract of 5 Oct 2026.
Nearest metro station and railway
- Doddajala (ದೊಡ್ಡಜಾಲ)Blue Line metro, under construction1.91 km
- Airport City (ವಿಮಾನ ನಿಲ್ದಾಣ ನಗರ)Blue Line metro, under construction2.87 km
- KIAL Terminals (ಕೆಐಎಬಿ ವಿಮಾನ ನಿಲ್ದಾಣ ಟರ್ಮಿನಲ್ಸ್)Blue Line metro, under construction5.58 km
- Krishnarajapura (ಕೃಷ್ಣರಾಜಪುರ (ಕೆ.ಆರ್.ಪುರ))Open now — nearest operating metro station21.11 km
- Doddajala Nearest railway station2.49 km
Straight-line distances from the RERA map point to the station points mapped on OpenStreetMap; status (open or under construction) as tagged there. Places data © OpenStreetMap contributors, extract of 5 Oct 2026.
Lines under construction near here
- 6 Aug 2026Namma Metro Blue Line, Phase 2B (KR Pura – Hebbal – Yelahanka – Kempegowda Airport, 38.44 km). Under construction; reported 72% complete overall, with the remaining work targeted for June 2027 and phased opening through 2027. Nearest: Doddajala, about 1.91 km straight-line. — Business Today. News report quoting BMRCL; the airport line has slipped before. Read (businesstoday.in) (opens in a new tab)
Sources:Source (businesstoday.in) (opens in a new tab)Source (openstreetmap.org) (opens in a new tab)
Lake and lake-buffer check
The nearest mapped lake is Unnamed lake (mapped on OpenStreetMap), 763 m from the project’s RERA map point.
The site boundary is not published as a shape, so its nearest edge can be closer than this point. Whether any building sits inside a lake buffer can only be checked on the approved plan.
- Unnamed lake (mapped on OpenStreetMap) on OpenStreetMap (opens in a new tab) 763 m
- Unnamed lake (mapped on OpenStreetMap) on OpenStreetMap (opens in a new tab) 1,845 m
- Doddajala Kere on OpenStreetMap (opens in a new tab) (ದೊಡ್ಡಜಾಲ ಕೆರೆ)1,918 m
The buffer rule
Bengaluru’s lake buffer rule has changed over time: the National Green Tribunal ordered a 75 m buffer in May 2016; the Supreme Court set that order aside on 5 March 2019, leaving the 30 m buffer of the Revised Master Plan 2015. Check the current rule and the approved plan before relying on either number.
- LiveLaw: SC sets aside NGT order enlarging buffer zones (2019) (livelaw.in) (opens in a new tab)
- Citizen Matters: Shrinking lake buffers (citizenmatters.in) (opens in a new tab)
Shortest distance from the RERA map point to the mapped water edge (OpenStreetMap water polygons tagged lake or reservoir, or named lake/kere/tank). Mapped shorelines can differ from the revenue-record boundary of a lake. Places data © OpenStreetMap contributors, extract of 5 Oct 2026.
Sources:Source (openstreetmap.org) (opens in a new tab)Source (livelaw.in) (opens in a new tab)Source (citizenmatters.in) (opens in a new tab)How we calculate this
Satellite time-lapse of the site
Satellite photos load when you scroll to them.
Photos from Esri World Imagery Wayback, centred on the project’s map point; dates are the capture dates in Esri’s metadata. Loaded from Esri when you scroll here.
Sources:Source (livingatlas.arcgis.com) (opens in a new tab)
Heritage Enclave layout plan and plot types as filed
Documents the developer uploaded to Karnataka RERA, shown as filed. Tap a page to see it full size; the full PDF opens on the RERA website.
Approved layout plan

Approved Layout Plan/Demarcation PlanFull PDF on RERA
Layout plan and brochure not published? The developer shares them only on request. We’ll get the brochure, layout plan and current price list for you, free.
Get brochure, layout plan & price| Plot type (as filed) | Area | Plots |
|---|---|---|
| Plot 9 m × 12 m | — | 89 |
| Plot 12 m × 12 m | — | 8 |
| Plot 12 m × 15 m | — | 9 |
| Odd-shaped plots | — | 12 |
Plot types and counts as filed with Karnataka RERA.
We have not collected the layout plan drawing; the developer’s sales team can share it.
Heritage Enclave completion date and development status
Promoter’s quarterly update to RERA for Q2 2026-27, submitted 2026-10-15.
Timeline
- 2 May 2026Project start date given to RERA
- 8 Jun 2026Registered with Karnataka RERA
- 15 Dec 2029Completion date given at registration
Construction pace from RERA quarterly filings
At the average pace so far, construction would reach 100% around Apr 2028 — about 20 months before the completion date on RERA (15 Dec 2029).
At the pace between the 2 quarterly filings we have (16% → 21% in 3 months), it would be around Sep 2030 — about 9 months after the RERA date.
- Filed on RERA
- Average pace since start
- Pace between filings (and 0% assumed at the start date)
- RERA completion date
Quarterly filings
| Quarter | Filed on | Developed | Plots booked |
|---|---|---|---|
| Q2 2026-27to 30 Sep 2026 | 15 Oct 2026 | 21% | — |
| Q1 2026-27to 30 Jun 2026 | 15 Jul 2026 | 16% | — |
How we calculate
Average pace = % built ÷ months since the start date in the RERA record. Here: 21% ÷ 5 months (2 May 2026 to 30 Sep 2026) = 4.2% a month.
Estimated finish = latest filing date + (100 − % built) ÷ pace = 30 Sep 2026 + 79 ÷ 4.2 = 18.7 months → Apr 2028. This is an estimate, not a date from the builder or RERA.
Pace between filings = (21% − 16%) ÷ 3 months = 1.7% a month.
A straight line is a simplification: the builder reports one overall %, which mixes excavation, structure and finishing, and work rarely moves at a constant speed. The % values are the promoter’s own figures filed with RERA, not checked by us. Promoter’s quarterly update to RERA for Q2 2026-27, submitted 2026-10-15.
Sources:Source (rera.karnataka.gov.in) (opens in a new tab)How we calculate this
Approvals and documents checklist
| Approval | Authority | Source |
|---|---|---|
| Layout plan | BIAPPA - Bangalore Airport Area Planning Authority · No. BIAAPA/TP/LAO/93/2025-26 · dated 2025-12-18 | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Land conversion (3 orders) | Deputy Commissioner, Bangalore Rural · No. ALN(Devanahalli)CR.28/04-05 and 2 more · dated 2007-09-11 | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Approved Layout Plan/Demarcation Plan | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| NOC from ESCOMs | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| NOC for Water | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
Documents uploaded to RERA
- Building or layout plan · Approved drawings from the planning authorityFiled on RERA ✓ — BIAPPA - Bangalore Airport Area Planning Authority · No. BIAAPA/TP/LAO/93/2025-26 · dated 18 Dec 2025
- Commencement certificate · Permission to start buildingNot on RERA yet
- Environment clearance · SEIAA KarnatakaNot on RERA yet
- Fire NOC · Karnataka Fire and Emergency ServicesNot on RERA yet
- Pollution board consent · KSPCBNot on RERA yet
- Water and sewerage · BWSSBFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
- Electricity · BESCOMFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
- Height clearance · Airports Authority of IndiaNot on RERA yet
- Occupancy certificate (OC) · Issued only when the building is finishedNot on RERA yet — expected at completion
From the documents the promoter uploaded to Karnataka RERA, collected 16 Oct 2026. “Filed” means a document is on RERA — we have not checked its contents or validity. Not every approval applies to every project (for example, smaller projects may not need an environment clearance). The project page on RERA lists each upload.
Heritage Enclave RERA complaints
No complaints listed on Karnataka RERA for this registration as on Source (rera.karnataka.gov.in) (opens in a new tab)
Court and consumer cases
We list case numbers, courts and outcomes only — never names of private individuals.
About IG3 Infra Limited
- Promoter type
- Company
- Projects on this site
- 2
- RERA complaints against promoter
- 0
- Company number (CIN)
- U45203TN2004PLC052443
From Karnataka RERA, as collected so far (16 Oct 2026). Complaints are those RERA lists against this promoter across all its projects.
IG3 Infra Limited’s RERA recordIG3 Infra Limited delivery record
- 2Projects in Bengaluru on RERA2 approved registrations under IG3 Infra Limited in Bengaluru Urban and Rural. Source (rera.karnataka.gov.in) (opens in a new tab)
- 407Plots registeredAs stated in each registrations.
- 0RERA complaintsas on Source (rera.karnataka.gov.in) (opens in a new tab)
- 0Complaints per 1,000 plots0 complaints ÷ 407 plots in its 2 registrations on Karnataka RERA in Bengaluru.
Sources:Source (rera.karnataka.gov.in) (opens in a new tab)How we calculate this
What’s changed since Dec 2025
- 15 Oct 2026Quarterly update filed for Q2 2026-27: 21% built Source (rera.karnataka.gov.in) (opens in a new tab)
- 15 Jul 2026Quarterly update filed for Q1 2026-27: 16% built Source (rera.karnataka.gov.in) (opens in a new tab)
- 8 Jun 2026Registered with Karnataka RERA (PRM/KA/RERA/1250/303/PR/080626/008704); completion date 15 Dec 2029 Source (rera.karnataka.gov.in) (opens in a new tab)
- 2 May 2026Project start date in the RERA record Source (rera.karnataka.gov.in) (opens in a new tab)
- 18 Dec 2025Building plan approved by BIAPPA - Bangalore Airport Area Planning Authority (No. BIAAPA/TP/LAO/93/2025-26) Source (rera.karnataka.gov.in) (opens in a new tab)
Newest first. No extension of the completion date is recorded on RERA. When the RERA crawl sees a new filing, complaint or extension, it is added here with its date.
Plot loan EMI calculator
- Monthly EMI
- —
- Down payment
- —
- Loan amount
- —
- Total interest
- —
A calculation only, from the numbers you enter — not a loan offer.
Heritage Enclave FAQs
What plot sizes are available in Heritage Enclave?
The project has plots in three standard sizes: 30×40 feet (1,200 sq ft), 40×50 feet (2,000 sq ft), and 40×40 feet (1,600 sq ft). There are also 12 odd-sized plots.
How many plots are in Heritage Enclave?
The project has 118 plots: 89 plots of 30×40 feet, 9 plots of 40×50 feet, 8 plots of 40×40 feet, and 12 odd-sized plots.
What is the RERA registration number for Heritage Enclave?
The RERA registration number is PRM/KA/RERA/1250/303/PR/080626/008704, registered on 8 June 2026.
When will Heritage Enclave be completed?
The completion date on RERA is 15 December 2029.
Which authority approved the layout for Heritage Enclave?
The layout was approved by BIAAPA (Bangalore International Airport Area Planning Authority).
How many land conversion orders are in place for Heritage Enclave?
There are 3 land conversion orders for the project.
What is the development progress of Heritage Enclave?
As of Q2 2026-27 (ended 30 September 2026), the layout development is 21% complete.
Are there any RERA complaints against Heritage Enclave or IG3 Infra Limited?
There are no RERA complaints on this project or against IG3 Infra Limited across all their projects on record.
Where is Heritage Enclave located?
The project is in Mallenahalli, Devanahalli taluk, Bengaluru Rural district, PIN code 562129.
How many projects does IG3 Infra Limited have on RERA record?
IG3 Infra Limited has 2 projects registered with Karnataka RERA.
Written by AI from the RERA record above on 17 Oct 2026. Answers use only that record; check them against the source before you decide.
Questions about Heritage Enclave
No questions published yet. Ask the first one: you get an instant answer from this page’s public record, and our team follows up on anything the record does not show.
Bought a plot from IG3 Infra Limited? Review the developer.
Reviews of IG3 Infra Limited by verified buyers
No verified reviews of IG3 Infra Limited yet. If you bought a plot from them, your review helps other buyers.
How reviews work: only buyers and owners can review; we confirm each purchase by phone before publishing, publish positive and negative reviews alike, never accept payment for reviews, and the developer may reply.
Similar projects within 5 km
| Project | Distance | Plots | Completion (RERA) | Developed | Complaints | Price |
|---|---|---|---|---|---|---|
| Ekta ElementsIg3 Infra Limited | 0.4 km | 289 | Dec 2027 | 41% | 0 | Not collected |
| SwaramSmart Value Homes (Peenya Project) Private Limited | 0.5 km | 182 | Mar 2026extended | — | 0 | Not collected |
| Vedam By Essem18Essem18 Ventures LLP | 0.5 km | 113 | Mar 2027 | 98% | 0 | Not collected |
| RaagamSmart Value Homes (Peenya Project) Private Limited | 1 km | 583 | Jun 2028 | — | 0 | Not collected |
| Pinakini Life Spaces Phase 1Sse Projects Pvt Ltd | 1.6 km | 81 | Dec 2029 | 14% | 0 | Not collected |
| Konig Pearl County 1Konig Homes | 3.1 km | 74 | Dec 2028 | 60% | 0 | Not collected |
Projects of the same kind within 5 km in a straight line of this project’s RERA map point, nearest first. % built is the promoter’s latest quarterly figure on RERA (shown for single-registration projects); prices are from the developer’s own website where we found one.
Sources and last checked dates
Collected on 16 Oct 2026 by AI research agents reading public pages. Facts are written in our own words. Not found yet: price; court cases; landmarks; specifications; news.
How to check on RERA: On rera.karnataka.gov.in/viewAllProjects, type the registration number in 'Registration No', press Search, then click the 'View Project Details' icon. Complaints open from the 'Complaints / Litigation' icon in the same row. Registration number: PRM/KA/RERA/1250/303/PR/080626/008704.
- RERA record last checked: 16 Oct 2026
- Last change in the record (registration, quarterly filing or complaint): 16 Oct 2026
How this page is made: software builds it from public records (Karnataka RERA filings, OpenStreetMap, the developer’s own website). AI is used only to read filings into fields and to write the plain-English summary and FAQ answers, which are checked against the record. Facts are checked automatically against the RERA filing. Methodology · How we earn · Report an error
More new projects in Bellary Road (Airport Road)
Mallenahalli, Bellary Road (Airport Road)Under constructionRERA registeredBuyers’ group openEkta Elements
by Ig3 Infra
Price: Price on requestGet brochure & price →
- 30×40, 40×40, 40×50 +1 more
- 1,074 – 40,013 sq ft plots
- Approved by BIAAPA
- Dec 2027
289 plots
Be one of the first 10 buyers in this groupFounding members — it’s free
Join group for Ekta Elements
Mallenahalli, Bellary Road (Airport Road)Under constructionRERA registeredBuyers’ group openSwaram
by Smart Value Homes (Peenya Project)
Price: Price on requestGet brochure & price →
- 30×40, 30×50, 40×50 +1 more
- 904 – 14,238 sq ft plots
- Approved by BIAAPA
- Mar 2026 (extended)
RERA not updated since promised Mar 2026 · 2 phases on RERA · 182 plots
Be one of the first 10 buyers in this groupFounding members — it’s free
Join group for Swaram
Doddajala, Bellary Road (Airport Road)Under constructionRERA registeredBuyers’ group openVedam By Essem18
by Essem18 Ventures
Price: Price on requestGet brochure & price →
- 30×40, 30×50, 30×60
- 769 – 24,293 sq ft plots
- Approved by BIAAPA
- Mar 2027
113 plots
Be one of the first 10 buyers in this groupFounding members — it’s free
Join group for Vedam By Essem18