Irise at a glance
- Completion (RERA)Jan 2029Karnataka RERA
- Construction84% built · on pace for Mar 2027RERA filing to 30 Sep 2026; estimate from average pace
- RERA complaints (project)None listedKarnataka RERA · as on 16 Oct 2026
- Approvals filed4 of 9 on RERAKarnataka RERA uploads · 16 Oct 2026
- Nearest metroHopefarm Channasandra · 7.03 kmstraight line · OpenStreetMap, 5 Oct 2026
- Airport driveapprox. 124 min at peak30.64 km straight line · estimate
- Nearest lakeUnnamed lake · 1,194 mFrom the RERA map point · OpenStreetMap, 5 Oct 2026
Project summary
Irise is a plotted development by M/s. Upstate United in Muthasandra, Bengaluru with 166 plots, registered with Karnataka RERA. The completion date on RERA is 15 Jan 2029.
Facts collected on 16 Oct 2026 from public records — each linked to its source. Free for buyers. If you book through us, the developer pays us a commission.
Irise buyers’ group: join to ask for a group price
No one has joined yet. Be one of the first 10 buyers in this group — the founding members.
Join free. When enough buyers have joined, our agent partner asks M/s. Upstate United for a group price — for example a lower price, an easier payment plan or waived charges. Nothing is promised: you see what the developer offers and book directly with the developer if you want to. Free for buyers. If you book through us, the developer pays us a commission.
- Gathering buyers
- Talking to the developer
- Group offer
- Group site visit
- Booking
0 buyers have joined · 0 committed
Committed buyers have confirmed their budget, plot size and timeline with us on a call; developers negotiate with them. Joining is free and never obliges you to buy.
Join the Irise buyers’ groupHow group buying works
See it for yourself
Visit the site with our team, or get a call to clear your questions. Free, no obligation.
Key facts: plot sizes, approval, land and completion
- Plot sizes (feet)
- 30×50, 40×60
- Plot area
- 776 – 76,058 sq ft
- Total plots
- 166
- Layout approved by
- Local Planning Authority
- Land
- Not found in public records yet: land area
- Land conversion orders
- 47
- Completion (RERA)
- Jan 2029
- Development (RERA update)
- 84%
Plot sizes (RERA filing)
| Size (feet) | Area | Plots |
|---|---|---|
| 30×50 | 1,500 sq ft | 15 |
| 40×60 | 2,400 sq ft | 2 |
| Odd-sized (irregular) | varies | 125 |
Sizes as filed with RERA, converted from metres to feet (9.14 m = 30 ft, 12.19 m = 40 ft). Ask the developer which plots are still unsold.
Approving authority as filed: Local Planing Authority.
Land conversion orders (RERA filing)
47 rows: land conversion orders. Scroll inside the table to see them all.
| Survey no. | Converted for | Order | By |
|---|---|---|---|
| 103/2 | Residential | No. 276394, 7 Jan 2022 | Deputy Commisioner office Bengaluru Rural |
| 103/10 | Residential | No. 291403, 3 Feb 2022 | Deputy Commisioner office Bengaluru Rural |
| 104/6B | Residential | No. 275684, 7 Jan 2022 | Deputy Commisioner office Bengaluru Rural |
| 105/1 | Residential | No. 275697, 7 Jan 2022 | Deputy Commissioner office Bengaluru Rural |
| 105/2 | Residential | No. 241845, 31 Aug 2021 | Deputy Commisioner office Bengaluru Rural |
| 105/5 | Residential | No. 275700, 7 Jan 2022 | Deputy Commisioner office Bengaluru Rural |
| 105/6 | Residential | No. 275696, 13 Jan 2022 | Deputy Commisioner office Bengaluru Rural |
| 105/7 | Residential | No. 332676, 25 Apr 2022 | Deputy Commisioner office Bengaluru Rural |
| 105/8 | Residential | No. 297940, 12 Apr 2022 | Deputy Commisioner office Bengaluru Rural |
| 106/1 | Residential | No. 290503, 7 Jan 2022 | Deputy Commisioner office Bengaluru Rural |
| 106/3 | Residential | No. 290499, 19 Jan 2022 | Deputy Commisioner office Bengaluru Rural |
| 106/4 | Residential | No. 290498, 7 Jan 2022 | Deputy Commisioner office Bengaluru Rural |
| 106/5 | Residential | No. 290488, 7 Jan 2022 | Deputy Commisioner office Bengaluru Rural |
| 106/6 | Residential | No. 290483, 7 Jan 2022 | Deputy Commisioner office Bengaluru Rural |
| 106/7 | Residential | No. 290492, 7 Jan 2022 | Deputy Commisioner office Bengaluru Rural |
| 107/1 | Residential | No. 289080, 7 Jan 2022 | Deputy Commisioner office Bengaluru Rural |
| 107/2 | Residential | No. 289081, 7 Jan 2022 | Deputy Commisioner office Bengaluru Rural |
| 108/2 | Residential | No. 277930, 7 Jan 2022 | Deputy Commisioner office Bengaluru Rural |
| 126/3A | Residential | No. 332012, 25 Apr 2022 | Deputy Commisioner office Bengaluru Rural |
| 126/3B | Residential | No. 332767, 25 Apr 2022 | Deputy Commisioner office Bengaluru Rural |
| 133/7 | Residential | No. 277030, 7 Jan 2022 | Deputy Commisioner office Bengaluru Rural |
| 133/9 | Residential | No. 277032, 7 Jan 2022 | Deputy Commisioner office Bengaluru Rural |
| 133/10 | Residential | No. 277035, 7 Jan 2022 | Deputy Commisioner office Bengaluru Rural |
| 133/11 | Residential | No. 277037, 7 Jan 2022 | Deputy Commisioner office Bengaluru Rural |
| 133/13 | Residential | No. 277041, 7 Jan 2022 | Deputy Commisioner office Bengaluru Rural |
| 103/3 | Residential | No. 484289, 7 Nov 2023 | D C Office, Bengaluru |
| 103/5 | Residential | No. 483291, 3 Aug 2023 | D C Office, Bengaluru Rural Dist |
| 103/6 | Residential | No. 345416, 11 Aug 2022 | D C Office, Bengaluru Rural Dist |
| 103/7 | Residential | No. 332021, 25 Apr 2022 | D C Office, Bengaluru Rural Dist |
| 103/8 | Residential | No. 340731, 5 Sep 2022 | D C Office, Bengaluru Rural Dist |
| 103/9 | Residential | No. 332024, 5 Apr 2022 | D C Office, Bengaluru Rural Dist |
| 104/4A | Residential | No. 289774, 7 Jan 2022 | D C Office, Bengaluru Rural Dist |
| 104/4B | Residential | No. 241840, 31 Aug 2021 | D C Office, Bengaluru Rural Dist |
| 104/6A | Residential | No. 406189, 31 Oct 2022 | D C Office, Bengaluru Rural Dist |
| 105/3 | Residential | No. 332675, 11 Aug 2022 | D C Office, Bengaluru Rural Dist |
| 124/3 | Residential | No. 706845, 3 Dec 2024 | D C Office, Bengaluru Rural Dist |
| 124/4 | Residential | No. 292696, 12 Apr 2022 | D C Office, Bengaluru Rural Dist |
| 124/5 | Residential | No. 340822, 11 Aug 2022 | D C Office, Bengaluru Rural Dist |
| 125/1 | Residential | No. 292695, 12 Apr 2022 | D C Office, Bengaluru Rural Dist |
| 125/2A | Residential | No. 303924, 4 Aug 2022 | D C Office, Bengaluru Rural Dist |
| 125/2B | Residential | No. 277044, 12 Apr 2022 | D C Office, Bengaluru Rural Dist |
| 125/3 | Residential | No. 277054, 7 Jan 2022 | D C Office, Bengaluru Rural Dist |
| 125/5 | Residential | No. 277050, 18 Feb 2022 | 277050 |
| 125/6 | Residential | No. 277059, 7 Jan 2022 | D C Office, Bengaluru Rural Dist |
| 126/2 | Residential | No. 689654, 9 Sep 2024 | D C Office, Bengaluru Rural Dist |
| 126/5 | Residential | No. 288771, 7 Jan 2022 | D C Office, Bengaluru Rural Dist |
| 127/3 | Residential | No. 290505, 8 Apr 2022 | D C Office, Bengaluru Rural Dist |
RERA does not cover each plot’s khata. Ask the developer for the khata and title documents and have a lawyer check them before paying an advance.
Irise RERA number and registration details
- RERA number
- PRM/KA/RERA/1250/304/PR/031125/008212
- Registered on
- 3 Nov 2025
- Promised completion
- 15 Jan 2029
- Extended to
- No extension recorded
- RERA status
- Under construction
- Plots booked
- Not found in public records yet: plots booked
- Price
- Not found in public records yet: price
- Project type
- Plotted
Summary in plain English
Irise is a plotted layout of 166 plots in Muthasandra, Hosakote, developed by M/s. Upstate United. The layout has been approved by the Local Planning Authority with 47 land conversion orders. The project completion date on RERA is 15 January 2029.
Written by AI from the RERA record above on 16 Oct 2026. Every number in it was checked against that record; if anything differs, the record wins.
Open space, loans, escrow and other details
- Open space
- Not found in public records yet: open space
- Water and power
- Water source filed with RERA: Local Authority
- Plot loans: approved banks
- Not found in public records yet: bank approvals
- Payment plans
- Not found in public records yet: payment plans
- Maintenance
- Not found in public records yet: maintenance
- Car parking
- Not found in public records yet: car parking charge
- Escrow bank (RERA)
- Axis Bank, Kadubisanahalli
- Building plan (RERA)
- Local Planing Authority · No. LAO/14/2022-23/332 · dated 17 May 2025
- Project cost declared to RERA
- ₹83.4 Cr
Amenities
Irise location and address
- Address
- Sy No. 103/2,3,5,5,6,7,8,9,10, 104/4A,4B, 6A, 6B, 105/1,2,3, 5, 6,7,8, 106/1,3, 4,5,6,7, 107/1,2, 108/2, 124/3,4,5, 125/1,2A,2B,3,5,6 , 126/2,3A,3B,5, 127/3, 133/7,9,10,11,13, of Muthasandra Village , Hosakote , Bengaluru Rural, Karnataka - 560087
- Village (RERA)
- Muthasandra
- Locality
- Near WhitefieldAlso known as ITPL
- PIN code
- 560087
- City
- Bengaluru
- State
- Karnataka
- Coordinates
- 12.94058, 77.79758
Distances to landmarks
Not found in public records yet: landmarksAbout Muthasandra
Not found in public records yet: locality factsCommute times to tech parks and the airport
| To | Straight line | Peak-hour drive (estimate) |
|---|---|---|
| ITPL, Whitefield (main gate)Map point on OpenStreetMap (opens in a new tab) | 8.33 km | approx. 34 min |
| Outer Ring Road tech corridor (RMZ Ecospace, Bellandur)Map point on OpenStreetMap (opens in a new tab) | 12.75 km | approx. 52 min |
| Electronic City Phase 1Map point on OpenStreetMap (opens in a new tab) | 17.57 km | approx. 71 min |
| Manyata Tech ParkMap point on OpenStreetMap (opens in a new tab) | 22.67 km | approx. 92 min |
| KSR Bengaluru City railway station (Majestic)Map point on OpenStreetMap (opens in a new tab) | 25.06 km | approx. 101 min |
| Kempegowda International AirportMap point on OpenStreetMap (opens in a new tab) | 30.64 km | approx. 124 min |
How we calculate
Straight line: from the project’s map point on RERA to the destination’s point on OpenStreetMap.
Peak-hour drive is a rough estimate, not a route: straight line × 1.35 for the road network, at 20 km/h. Real times vary a lot with the route and the hour.
Sources:Source (openstreetmap.org) (opens in a new tab)How we calculate this
Schools and hospitals nearby
Within 2 km
- 2Schools and colleges2 schools, 0 colleges, 0 kindergartens
- 0Hospitals and clinics0 hospitals, 0 clinics
Places as mapped on OpenStreetMap (amenity=school, college, kindergarten, university; hospital, clinic), counted within 2 km in a straight line of the RERA map point. Volunteers map these, so some places may be missing or closed. Places data © OpenStreetMap contributors, extract of 5 Oct 2026.
Nearest metro station and railway
- Hopefarm Channasandra (ಹೋಪ್ ಫಾರ್ಮ್ ಚನ್ನಸಂದ್ರ)Open now — nearest operating metro station7.03 km
- Devangonthi (ದೇವನಗೊಂದಿ)Nearest railway station6.16 km
Straight-line distances from the RERA map point to the station points mapped on OpenStreetMap; status (open or under construction) as tagged there. Places data © OpenStreetMap contributors, extract of 5 Oct 2026.
Lake and lake-buffer check
The nearest mapped lake is Unnamed lake (mapped on OpenStreetMap), 1,194 m from the project’s RERA map point.
The site boundary is not published as a shape, so its nearest edge can be closer than this point. Whether any building sits inside a lake buffer can only be checked on the approved plan.
- Unnamed lake (mapped on OpenStreetMap) on OpenStreetMap (opens in a new tab) 1,194 m
- Unnamed lake (mapped on OpenStreetMap) on OpenStreetMap (opens in a new tab) 1,770 m
The buffer rule
Bengaluru’s lake buffer rule has changed over time: the National Green Tribunal ordered a 75 m buffer in May 2016; the Supreme Court set that order aside on 5 March 2019, leaving the 30 m buffer of the Revised Master Plan 2015. Check the current rule and the approved plan before relying on either number.
- LiveLaw: SC sets aside NGT order enlarging buffer zones (2019) (livelaw.in) (opens in a new tab)
- Citizen Matters: Shrinking lake buffers (citizenmatters.in) (opens in a new tab)
Shortest distance from the RERA map point to the mapped water edge (OpenStreetMap water polygons tagged lake or reservoir, or named lake/kere/tank). Mapped shorelines can differ from the revenue-record boundary of a lake. Places data © OpenStreetMap contributors, extract of 5 Oct 2026.
Sources:Source (openstreetmap.org) (opens in a new tab)Source (livelaw.in) (opens in a new tab)Source (citizenmatters.in) (opens in a new tab)How we calculate this
Satellite time-lapse of the site
Satellite photos load when you scroll to them.
Photos from Esri World Imagery Wayback, centred on the project’s map point; dates are the capture dates in Esri’s metadata. Loaded from Esri when you scroll here.
Sources:Source (livingatlas.arcgis.com) (opens in a new tab)
Irise layout plan and plot types as filed
Documents the developer uploaded to Karnataka RERA, shown as filed. Tap a page to see it full size; the full PDF opens on the RERA website.
Approved layout plan3 files

Approved Layout PlanFull PDF on RERA 
Approved Building/Plotting PlanFull PDF on RERA 
Existing Layout PlanFull PDF on RERA
Layout plan and brochure not published? The developer shares them only on request. We’ll get the brochure, layout plan and current price list for you, free.
Get brochure, layout plan & price| Plot type (as filed) | Area | Plots |
|---|---|---|
| 9.14*15.18 | — | 3 |
| 9.14*15.46 | — | 12 |
| 9.144*15.32 | — | 16 |
| 9.144*21.7 | — | 11 |
| 12.19*18.29 | — | 2 |
| Odd-shaped plots | — | 125 |
Plot types and counts as filed with Karnataka RERA.
We have not collected the layout plan drawing; the developer’s sales team can share it.
Irise completion date and development status
Promoter’s quarterly update to RERA for Q2 2026-27, submitted 2026-10-15.
Timeline
- 15 May 2024Project start date given to RERA
- 3 Nov 2025Registered with Karnataka RERA
- 15 Jan 2029Completion date given at registration
Construction pace from RERA quarterly filings
At the average pace so far, construction would reach 100% around Mar 2027 — about 22 months before the completion date on RERA (15 Jan 2029).
At the pace between the 4 quarterly filings we have (52% → 84% in 9 months), it would be around Feb 2027 — about 23 months before the RERA date.
- Filed on RERA
- Average pace since start
- Pace between filings (and 0% assumed at the start date)
- RERA completion date
Quarterly filings
| Quarter | Filed on | Developed | Plots booked |
|---|---|---|---|
| Q2 2026-27to 30 Sep 2026 | 15 Oct 2026 | 84% | — |
| Q1 2026-27to 30 Jun 2026 | 14 Jul 2026 | 80% | — |
| Q4 2025-26to 31 Mar 2026 | 15 Apr 2026 | 77% | — |
| Q3 2025-26to 31 Dec 2025 | 22 Jan 2026 | 52% | — |
How we calculate
Average pace = % built ÷ months since the start date in the RERA record. Here: 84% ÷ 28.5 months (15 May 2024 to 30 Sep 2026) = 2.9% a month.
Estimated finish = latest filing date + (100 − % built) ÷ pace = 30 Sep 2026 + 16 ÷ 2.9 = 5.4 months → Mar 2027. This is an estimate, not a date from the builder or RERA.
Pace between filings = (84% − 52%) ÷ 9 months = 3.6% a month.
A straight line is a simplification: the builder reports one overall %, which mixes excavation, structure and finishing, and work rarely moves at a constant speed. The % values are the promoter’s own figures filed with RERA, not checked by us. Promoter’s quarterly update to RERA for Q2 2026-27, submitted 2026-10-15.
Sources:Source (rera.karnataka.gov.in) (opens in a new tab)How we calculate this
Approvals and documents checklist
| Approval | Authority | Source |
|---|---|---|
| Layout plan | Local Planing Authority · No. LAO/14/2022-23/332 · dated 2025-05-17 | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Land conversion (47 orders) | Deputy Commisioner office Bengaluru Rural · No. 276394 and 46 more · dated 2024-12-03 | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Commencement Certificate | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Water Permission Letter | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Approved Layout Plan | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Approved Building/Plotting Plan | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Conversion Certificate under section 95 of the KLR Act 1964 | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| KWSSB/Water | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| KSPCB | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
Documents uploaded to RERA
- Building or layout plan · Approved drawings from the planning authorityFiled on RERA ✓ — Local Planing Authority · No. LAO/14/2022-23/332 · dated 17 May 2025
- Commencement certificate · Permission to start buildingFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
- Environment clearance · SEIAA KarnatakaNot on RERA yet
- Fire NOC · Karnataka Fire and Emergency ServicesNot on RERA yet
- Pollution board consent · KSPCBFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
- Water and sewerage · BWSSBFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
- Electricity · BESCOMNot on RERA yet
- Height clearance · Airports Authority of IndiaNot on RERA yet
- Occupancy certificate (OC) · Issued only when the building is finishedNot on RERA yet — expected at completion
From the documents the promoter uploaded to Karnataka RERA, collected 16 Oct 2026. “Filed” means a document is on RERA — we have not checked its contents or validity. Not every approval applies to every project (for example, smaller projects may not need an environment clearance). The project page on RERA lists each upload.
Irise RERA complaints
No complaints listed on Karnataka RERA for this registration as on Source (rera.karnataka.gov.in) (opens in a new tab)
Court and consumer cases
We list case numbers, courts and outcomes only — never names of private individuals.
About M/s. Upstate United
- Promoter type
- Partnership Firm
- Projects on this site
- 1
- RERA complaints against promoter
- 0
- Company number (CIN)
- Not found in public records yet: CIN
From Karnataka RERA, as collected so far (16 Oct 2026). Complaints are those RERA lists against this promoter across all its projects.
M/s. Upstate United’s RERA recordM/s. Upstate United delivery record
- 1Projects in Bengaluru on RERA1 approved registration under M/s. Upstate United in Bengaluru Urban and Rural. Source (rera.karnataka.gov.in) (opens in a new tab)
- 166Plots registeredAs stated in each registrations.
- 0RERA complaintsas on Source (rera.karnataka.gov.in) (opens in a new tab)
- 0Complaints per 1,000 plots0 complaints ÷ 166 plots in its 1 registration on Karnataka RERA in Bengaluru.
Sources:Source (rera.karnataka.gov.in) (opens in a new tab)How we calculate this
What’s changed since May 2024
- 15 Oct 2026Quarterly update filed for Q2 2026-27: 84% built Source (rera.karnataka.gov.in) (opens in a new tab)
- 14 Jul 2026Quarterly update filed for Q1 2026-27: 80% built Source (rera.karnataka.gov.in) (opens in a new tab)
- 15 Apr 2026Quarterly update filed for Q4 2025-26: 77% built Source (rera.karnataka.gov.in) (opens in a new tab)
- 22 Jan 2026Quarterly update filed for Q3 2025-26: 52% built Source (rera.karnataka.gov.in) (opens in a new tab)
- 3 Nov 2025Registered with Karnataka RERA (PRM/KA/RERA/1250/304/PR/031125/008212); completion date 15 Jan 2029 Source (rera.karnataka.gov.in) (opens in a new tab)
- 17 May 2025Building plan approved by Local Planing Authority (No. LAO/14/2022-23/332) Source (rera.karnataka.gov.in) (opens in a new tab)
- 15 May 2024Project start date in the RERA record Source (rera.karnataka.gov.in) (opens in a new tab)
Newest first. No extension of the completion date is recorded on RERA. When the RERA crawl sees a new filing, complaint or extension, it is added here with its date.
Plot loan EMI calculator
- Monthly EMI
- —
- Down payment
- —
- Loan amount
- —
- Total interest
- —
A calculation only, from the numbers you enter — not a loan offer.
Irise FAQs
What is Irise?
Irise is a plotted layout with 166 plots in Muthasandra, Hosakote, Bengaluru Rural.
How many plots does Irise have?
Irise has 166 plots: 15 plots of 30×50 ft (1,500 sq ft each), 2 plots of 40×60 ft (2,400 sq ft each), and 125 plots of other sizes not specified in the RERA record.
What are the plot sizes in Irise?
The RERA record lists 30×50 ft plots (1,500 sq ft) and 40×60 ft plots (2,400 sq ft). The remaining 125 plots have sizes not specified in the RERA record.
Who is the developer of Irise?
Irise is developed by M/s. Upstate United, registered as a Partnership Firm.
What is the RERA registration number for Irise?
The RERA registration number is PRM/KA/RERA/1250/304/PR/031125/008212, registered on 3 November 2025.
When will Irise be completed?
The completion date on RERA is 15 January 2029.
What is the development status of Irise?
As of Q2 2026-27 (ended 30 September 2026), the layout is 84% developed.
Where is Irise located?
Irise is located in Muthasandra, Hosakote taluk, Bengaluru Rural district, PIN code 560087.
Has Irise received layout approval?
Yes, the layout has been approved by the Local Planning Authority, and 47 land conversion orders have been granted.
Are there any RERA complaints against Irise or the developer?
No RERA complaints have been filed against Irise, and no complaints have been filed against M/s. Upstate United in the RERA records.
Written by AI from the RERA record above on 16 Oct 2026. Answers use only that record; check them against the source before you decide.
Questions about Irise
No questions published yet. Ask the first one: you get an instant answer from this page’s public record, and our team follows up on anything the record does not show.
Bought a plot from M/s. Upstate United? Review the developer.
Reviews of M/s. Upstate United by verified buyers
No verified reviews of M/s. Upstate United yet. If you bought a plot from them, your review helps other buyers.
How reviews work: only buyers and owners can review; we confirm each purchase by phone before publishing, publish positive and negative reviews alike, never accept payment for reviews, and the developer may reply.
Similar projects within 5 km
| Project | Distance | Plots | Completion (RERA) | Developed | Complaints | Price |
|---|---|---|---|---|---|---|
| Adithya Paradise -5Paradise Homes | 1.1 km | 156 | Jun 2027 | 100% | 0 | Not collected |
| Adithya Homes Paradise Phase-4Adithya Homes | 1.3 km | 85 | Jun 2026 | 100% | 0 | Not collected |
| Anthill SilverfieldsAnthill Projects LLP | 1.9 km | 211 | Mar 2027 | 80% | 0 | Not collected |
| Sai Metro City 9th PhaseSai Reniit Projects Pvt Ltd | 2.5 km | 129 | Nov 2026 | — | 0 | Not collected |
| TattvamYellow Stone Developers | 2.6 km | 240 | May 2027 | 75% | 0 | Not collected |
| Gold Star LayoutA Iqbal Khan | 3.1 km | 138 | Dec 2025 | 100% | 0 | Not collected |
Projects of the same kind within 5 km in a straight line of this project’s RERA map point, nearest first. % built is the promoter’s latest quarterly figure on RERA (shown for single-registration projects); prices are from the developer’s own website where we found one.
Sources and last checked dates
Collected on 16 Oct 2026 by AI research agents reading public pages. Facts are written in our own words. Not found yet: price; court cases; landmarks; specifications; news.
How to check on RERA: On rera.karnataka.gov.in/viewAllProjects, type the registration number in 'Registration No', press Search, then click the 'View Project Details' icon. Complaints open from the 'Complaints / Litigation' icon in the same row. Registration number: PRM/KA/RERA/1250/304/PR/031125/008212.
- RERA record last checked: 16 Oct 2026
- Last change in the record (registration, quarterly filing or complaint): 16 Oct 2026
How this page is made: software builds it from public records (Karnataka RERA filings, OpenStreetMap, the developer’s own website). AI is used only to read filings into fields and to write the plain-English summary and FAQ answers, which are checked against the record. Facts are checked automatically against the RERA filing. Methodology · How we earn · Report an error
More new projects nearby
Bellikere, near VarthurUnder constructionRERA registeredBuyers’ group openAdithya Paradise -5
by Paradise Homes
Price: Price on requestGet brochure & price →
- 30×40, 30×45, 30×50 +1 more
- 700 – 2,498 sq ft plots
- Approved by BMRDA
- Jun 2027
156 plots
Be one of the first 10 buyers in this groupFounding members — it’s free
Join group for Adithya Paradise -5
Bellikere, near VarthurUnder constructionRERA registeredBuyers’ group openAdithya Homes Paradise Phase-4
by Adithya Homes
Price: Price on requestGet brochure & price →
- 30×40, 35×40, 40×40
- 829 – 1,844 sq ft plots
- Approved by BMRDA
- Jun 2026
RERA not updated since promised Jun 2026 · 85 plots
Be one of the first 10 buyers in this groupFounding members — it’s free
Join group for Adithya Homes Paradise Phase-4
Bellikere, HoskoteUnder constructionRERA registeredBuyers’ group openAnthill Silverfields
by Anthill
Price: Price on requestGet brochure & price →
- 30×40, 34×40, 30×50 +5 more
- 740 – 5,965 sq ft plots
- Approved by BMRDA
- Mar 2027
211 plots
Be one of the first 10 buyers in this groupFounding members — it’s free
Join group for Anthill Silverfields