Skip to content
Log in

Sai Metro City 9th Phase

30×50 plots by Sai Reniit Projects Pvt Ltd · Kugur, near Sarjapur, Bengaluru

Kugur, near Sarjapur, BengaluruOpen on Google Maps (opens in a new tab)

  • Under construction
  • RERA registered
  • plotted

by Sai Reniit Projects Pvt Ltd

Price: Price on request

Get brochure, layout plan & price

Brochure, layout plan and price list for Sai Metro City 9th Phase

Developers share their brochure, layout plan and price list only on request. Tell us how to reach you and we’ll get them and send them to you, free.

Free for buyers. If you book through us, the developer pays us a commission. How we earn

Project summary

Sai Metro City 9th Phase is a plotted development by Sai Reniit Projects Pvt Ltd in Kugur, Bengaluru with 129 plots, registered with Karnataka RERA. The completion date on RERA is 14 Nov 2026.

Facts collected on 16 Oct 2026 from public records — each linked to its source. Free for buyers. If you book through us, the developer pays us a commission.

Sai Metro City 9th Phase buyers’ group: join to ask for a group price

No one has joined yet. Be one of the first 10 buyers in this group — the founding members.

Join free. When enough buyers have joined, our agent partner asks Sai Reniit Projects Pvt Ltd for a group price — for example a lower price, an easier payment plan or waived charges. Nothing is promised: you see what the developer offers and book directly with the developer if you want to. Free for buyers. If you book through us, the developer pays us a commission.

  1. Gathering buyers
  2. Talking to the developer
  3. Group offer
  4. Group site visit
  5. Booking

0 buyers have joined · 0 committed

Committed buyers have confirmed their budget, plot size and timeline with us on a call; developers negotiate with them. Joining is free and never obliges you to buy.

Join the Sai Metro City 9th Phase buyers’ groupHow group buying works

See it for yourself

Visit the site with our team, or get a call to clear your questions. Free, no obligation.

Key facts: plot sizes, approval, land and completion

Updated on 16 Oct 2026
Plot sizes (feet)
30×50
Plot area
1,311 – 2,815 sq ft
Total plots
129
Layout approved by
BMRDA
Land
Not found in public records yet: land area
Land conversion orders
6
Completion (RERA)
Nov 2026
Development (RERA update)
Not found in public records yet: development progress

Plot sizes (RERA filing)

Size (feet)AreaPlots
30×501,500 sq ft129

Sizes as filed with RERA, converted from metres to feet (9.14 m = 30 ft, 12.19 m = 40 ft). Ask the developer which plots are still unsold.

Approving authority as filed: BMRDA - Bangalore Metropolitan Region Development Authority.

Land conversion orders (RERA filing)

Survey no.Converted forOrderBy
98/5ResidentialNo. 297984, 23 Feb 2022Deputy commissioner
29/3ResidentialNo. 540793, 16 Oct 2023DEPUTY COMMISSIONER
29/4 - 05 GUNTASResidentialNo. ALN(A)(AS)SR.33/2012-13, 12 Jun 2013DEPUTY COMMISSIONER
29/4 - 09 GUNTASResidentialNo. ALN(A)(S)SR.34/2012-13, 12 Jun 2013DEPUTY COMMISSIONER
30/2 - 2 ACRE 19 GUNTASResidentialNo. ALN(A)(S)CR.304/2013-14, 18 Aug 2014DEPUTY COMMISSIONER
30/2 -- 2 ACRE 29 GUNTASResidentialNo. ALN(A)(S)SR.32/2012-13, 12 Jun 2013DEPUTY COMMISSIONER

RERA does not cover each plot’s khata. Ask the developer for the khata and title documents and have a lawyer check them before paying an advance.

Sai Metro City 9th Phase RERA number and registration details

RERA number
PRM/KA/RERA/1251/308/PR/030126/008379
Registered on
3 Jan 2026
Promised completion
14 Nov 2026
Extended to
No extension recorded
RERA status
Under construction
Plots booked
Not found in public records yet: plots booked
Price
Not found in public records yet: price
Project type
Plotted

Sources:Source (rera.karnataka.gov.in) (opens in a new tab)

Summary in plain English

Sai Metro City 9th Phase is a plotted layout by Sai Reniit Projects Pvt Ltd in Kugur, Anekal, Bengaluru Urban. The project has 129 plots of 30×50 feet (1,500 sq ft each). The layout is scheduled for completion on 14 November 2026.

Written by AI from the RERA record above on 7 Oct 2026. Every number in it was checked against that record; if anything differs, the record wins.

Open space, loans, escrow and other details

Open space
Not found in public records yet: open space
Water and power
Water source filed with RERA: BoreWell,Local Authority
Plot loans: approved banks
Not found in public records yet: bank approvals
Payment plans
Not found in public records yet: payment plans
Maintenance
Not found in public records yet: maintenance
Car parking
Not found in public records yet: car parking charge
Escrow bank (RERA)
FEDERAL BANK OF INDIA, HSR Layout branch
Building plan (RERA)
BMRDA - Bangalore Metropolitan Region Development Authority · No. APA/LAO69/2023-24 · dated 5 Mar 2024
Project cost declared to RERA
₹51 Cr

Sources:Source (rera.karnataka.gov.in) (opens in a new tab)

Amenities

Not found in public records yet: amenities

Sai Metro City 9th Phase location and address

Address
Sy. Nos.29/3, 29/4, 30/2 & 98/5 of Chikkanahallil-Kamanahalli & Kugur Village , Sarjapura Hobli , Anekal , Bengaluru Urban, Karnataka - 562125
Village (RERA)
Kugur
Locality
Near SarjapurAlso known as Sarjapura
PIN code
562125
City
Bengaluru
State
Karnataka
Coordinates
12.91927, 77.80403

Distances to landmarks

Not found in public records yet: landmarks

About Kugur

Not found in public records yet: locality facts

Commute times to tech parks and the airport

As on 5 Oct 2026
ToStraight linePeak-hour drive (estimate)
ITPL, Whitefield (main gate)Map point on OpenStreetMap (opens in a new tab)10.46 kmapprox. 42 min
Outer Ring Road tech corridor (RMZ Ecospace, Bellandur)Map point on OpenStreetMap (opens in a new tab)13.32 kmapprox. 54 min
Electronic City Phase 1Map point on OpenStreetMap (opens in a new tab)16.94 kmapprox. 69 min
Manyata Tech ParkMap point on OpenStreetMap (opens in a new tab)24.57 kmapprox. 99 min
KSR Bengaluru City railway station (Majestic)Map point on OpenStreetMap (opens in a new tab)26.24 kmapprox. 106 min
Kempegowda International AirportMap point on OpenStreetMap (opens in a new tab)33.11 kmapprox. 134 min
How we calculate

Straight line: from the project’s map point on RERA to the destination’s point on OpenStreetMap.

Peak-hour drive is a rough estimate, not a route: straight line × 1.35 for the road network, at 20 km/h. Real times vary a lot with the route and the hour.

Sources:Source (openstreetmap.org) (opens in a new tab)How we calculate this

Schools and hospitals nearby

As on 5 Oct 2026

Within 2 km

  • 3Schools and colleges3 schools, 0 colleges, 0 kindergartens
  • 0Hospitals and clinics0 hospitals, 0 clinics

Places as mapped on OpenStreetMap (amenity=school, college, kindergarten, university; hospital, clinic), counted within 2 km in a straight line of the RERA map point. Volunteers map these, so some places may be missing or closed. Places data © OpenStreetMap contributors, extract of 5 Oct 2026.

Sources:Source (openstreetmap.org) (opens in a new tab)

Nearest metro station and railway

As on 5 Oct 2026
  • Hopefarm Channasandra (ಹೋಪ್ ಫಾರ್ಮ್ ಚನ್ನಸಂದ್ರ)Open now — nearest operating metro station9.31 km
  • Devangonthi (ದೇವನಗೊಂದಿ)Nearest railway station7.9 km

Straight-line distances from the RERA map point to the station points mapped on OpenStreetMap; status (open or under construction) as tagged there. Places data © OpenStreetMap contributors, extract of 5 Oct 2026.

Sources:Source (openstreetmap.org) (opens in a new tab)

Lake and lake-buffer check

As on 5 Oct 2026

The nearest mapped lake is Unnamed lake (mapped on OpenStreetMap), 661 m from the project’s RERA map point.

The site boundary is not published as a shape, so its nearest edge can be closer than this point. Whether any building sits inside a lake buffer can only be checked on the approved plan.

The buffer rule

Bengaluru’s lake buffer rule has changed over time: the National Green Tribunal ordered a 75 m buffer in May 2016; the Supreme Court set that order aside on 5 March 2019, leaving the 30 m buffer of the Revised Master Plan 2015. Check the current rule and the approved plan before relying on either number.

Shortest distance from the RERA map point to the mapped water edge (OpenStreetMap water polygons tagged lake or reservoir, or named lake/kere/tank). Mapped shorelines can differ from the revenue-record boundary of a lake. Places data © OpenStreetMap contributors, extract of 5 Oct 2026.

Sources:Source (openstreetmap.org) (opens in a new tab)Source (livelaw.in) (opens in a new tab)Source (citizenmatters.in) (opens in a new tab)How we calculate this

Satellite time-lapse of the site

Satellite photos load when you scroll to them.

Photos from Esri World Imagery Wayback, centred on the project’s map point; dates are the capture dates in Esri’s metadata. Loaded from Esri when you scroll here.

Sources:Source (livingatlas.arcgis.com) (opens in a new tab)

Sai Metro City 9th Phase layout plan and plot types as filed

Documents the developer uploaded to Karnataka RERA, shown as filed. Tap a page to see it full size; the full PDF opens on the RERA website.

Brochure4 pages

Approved layout plan2 files

Plot type (as filed)AreaPlots
30x50= 98 sites & 31 odd sites—129

Plot types and counts as filed with Karnataka RERA.

We have not collected the layout plan drawing; the developer’s sales team can share it.

Sources:Source (rera.karnataka.gov.in) (opens in a new tab)

Sai Metro City 9th Phase completion date and development status

Not found in public records yet: construction progress

Timeline

  1. 14 Nov 2024Project start date given to RERA
  2. 3 Jan 2026Registered with Karnataka RERA
  3. 14 Nov 2026Completion date given at registration

Approvals and documents checklist

20 rows: approvals. Scroll inside the table to see them all.

ApprovalAuthoritySource
Layout planBMRDA - Bangalore Metropolitan Region Development Authority · No. APA/LAO69/2023-24 · dated 2024-03-05Source (rera.karnataka.gov.in) (opens in a new tab)
Land conversion (6 orders)Deputy commissioner · No. 297984 and 5 more · dated 2023-10-16Source (rera.karnataka.gov.in) (opens in a new tab)
Commencement Certificatescan uploaded to RERASource (rera.karnataka.gov.in) (opens in a new tab)
Electricity Permission Letterscan uploaded to RERASource (rera.karnataka.gov.in) (opens in a new tab)
Water Permission Letterscan uploaded to RERASource (rera.karnataka.gov.in) (opens in a new tab)
Approved Layout Planscan uploaded to RERASource (rera.karnataka.gov.in) (opens in a new tab)
Approved Building/Plotting Planscan uploaded to RERASource (rera.karnataka.gov.in) (opens in a new tab)
Approved Section Of Building/Infrastructure Plan of Plottingscan uploaded to RERASource (rera.karnataka.gov.in) (opens in a new tab)
Change of Land Usescan uploaded to RERASource (rera.karnataka.gov.in) (opens in a new tab)
District Magistratescan uploaded to RERASource (rera.karnataka.gov.in) (opens in a new tab)
Conversion Certificate under section 95 of the KLR Act 1964scan uploaded to RERASource (rera.karnataka.gov.in) (opens in a new tab)
ESCOM/Electricityscan uploaded to RERASource (rera.karnataka.gov.in) (opens in a new tab)
KWSSB/Waterscan uploaded to RERASource (rera.karnataka.gov.in) (opens in a new tab)
Approval/NOC under section 109 of KLR Act 1961scan uploaded to RERASource (rera.karnataka.gov.in) (opens in a new tab)
Approval/NOC under section 14 of the KTCP Actscan uploaded to RERASource (rera.karnataka.gov.in) (opens in a new tab)
Fire Force Departmentscan uploaded to RERASource (rera.karnataka.gov.in) (opens in a new tab)
Airport Authority of Indiascan uploaded to RERASource (rera.karnataka.gov.in) (opens in a new tab)
KSPCBscan uploaded to RERASource (rera.karnataka.gov.in) (opens in a new tab)
SEIAAscan uploaded to RERASource (rera.karnataka.gov.in) (opens in a new tab)
NOC in case of building proposals abutting to neighbouring propertiesscan uploaded to RERASource (rera.karnataka.gov.in) (opens in a new tab)

Documents uploaded to RERA

As on 16 Oct 2026
  • Building or layout plan · Approved drawings from the planning authorityFiled on RERA ✓ — BMRDA - Bangalore Metropolitan Region Development Authority · No. APA/LAO69/2023-24 · dated 5 Mar 2024
  • Commencement certificate · Permission to start buildingFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
  • Environment clearance · SEIAA KarnatakaFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
  • Fire NOC · Karnataka Fire and Emergency ServicesFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
  • Pollution board consent · KSPCBFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
  • Water and sewerage · BWSSBFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
  • Electricity · BESCOMFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
  • Height clearance · Airports Authority of IndiaFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
  • Occupancy certificate (OC) · Issued only when the building is finishedNot on RERA yet — expected at completion

From the documents the promoter uploaded to Karnataka RERA, collected 16 Oct 2026. “Filed” means a document is on RERA — we have not checked its contents or validity. Not every approval applies to every project (for example, smaller projects may not need an environment clearance). The project page on RERA lists each upload.

Sources:Source (rera.karnataka.gov.in) (opens in a new tab)

Sai Metro City 9th Phase RERA complaints

No complaints listed on Karnataka RERA for this registration as on Source (rera.karnataka.gov.in) (opens in a new tab)

Court and consumer cases

Not found in public records yet: court cases

We list case numbers, courts and outcomes only — never names of private individuals.

About Sai Reniit Projects Pvt Ltd

Promoter type
Company
Projects on this site
1
RERA complaints against promoter
3
Company number (CIN)
U70100KA2013PTC072016

From Karnataka RERA, as collected so far (16 Oct 2026). Complaints are those RERA lists against this promoter across all its projects.

Sai Reniit Projects Pvt Ltd’s RERA record

Sai Reniit Projects Pvt Ltd delivery record

As on 17 Oct 2026

What the complaints are about

  • Registration, sale deed or agreement2
  • Refund of booking or other money1

3 complaint subjects as written on RERA, as on . Each subject is sorted into one group by keywords (first match wins: delay, refund, registration, quality, litigation, association); one complaint often raises several issues. Source (rera.karnataka.gov.in) (opens in a new tab)

Sources:Source (rera.karnataka.gov.in) (opens in a new tab)How we calculate this

What’s changed since Mar 2024

As on 16 Oct 2026
  1. 3 Jan 2026Registered with Karnataka RERA (PRM/KA/RERA/1251/308/PR/030126/008379); completion date 14 Nov 2026 Source (rera.karnataka.gov.in) (opens in a new tab)
  2. 14 Nov 2024Project start date in the RERA record Source (rera.karnataka.gov.in) (opens in a new tab)
  3. 5 Mar 2024Building plan approved by BMRDA - Bangalore Metropolitan Region Development Authority (No. APA/LAO69/2023-24) Source (rera.karnataka.gov.in) (opens in a new tab)

Newest first. No extension of the completion date is recorded on RERA. When the RERA crawl sees a new filing, complaint or extension, it is added here with its date.

Plot loan EMI calculator

No listed price found — enter one to try.

Example only — use your bank’s quote.

Monthly EMI
—
Down payment
—
Loan amount
—
Total interest
—

A calculation only, from the numbers you enter — not a loan offer.

Sai Metro City 9th Phase FAQs

What is the size of each plot in Sai Metro City 9th Phase?

Each plot is 30×50 feet, with an area of 1,500 sq ft.

How many plots are in Sai Metro City 9th Phase?

The project has 129 plots.

Who approved the layout for Sai Metro City 9th Phase?

The layout was approved by BMRDA (Bangalore Metropolitan Region Development Authority).

How many land conversion orders has the project received?

The project has 6 land conversion orders.

What is the RERA registration number for Sai Metro City 9th Phase?

The RERA registration number is PRM/KA/RERA/1251/308/PR/030126/008379, registered on 3 January 2026.

When will Sai Metro City 9th Phase be completed?

The layout is scheduled for completion on 14 November 2026.

Are there any RERA complaints against Sai Metro City 9th Phase?

There are no RERA complaints on this project.

How many RERA complaints has the developer, Sai Reniit Projects Pvt Ltd, received across all projects?

The developer has 3 RERA complaints across all projects on record.

How many other projects does Sai Reniit Projects Pvt Ltd have in the Bengaluru records?

The developer has 6 projects in total on record with Karnataka RERA for Bengaluru.

Where is Sai Metro City 9th Phase located?

The project is in Kugur, Anekal taluk, Bengaluru Urban district, PIN code 562125.

Written by AI from the RERA record above on 7 Oct 2026. Answers use only that record; check them against the source before you decide.

Questions about Sai Metro City 9th Phase

No questions published yet. Ask the first one: you get an instant answer from this page’s public record, and our team follows up on anything the record does not show.

Bought a plot from Sai Reniit Projects Pvt Ltd? Review the developer.

Reviews of Sai Reniit Projects Pvt Ltd by verified buyers

No verified reviews of Sai Reniit Projects Pvt Ltd yet. If you bought a plot from them, your review helps other buyers.

How reviews work: only buyers and owners can review; we confirm each purchase by phone before publishing, publish positive and negative reviews alike, never accept payment for reviews, and the developer may reply.

Similar projects within 5 km

ProjectDistancePlotsCompletion (RERA)DevelopedComplaintsPrice
Anthill SilverfieldsAnthill Projects LLP0.9 km211Mar 202780%0Not collected
Adithya Homes Paradise Phase-4Adithya Homes1.4 km85Jun 2026100%0Not collected
Adithya Paradise -5Paradise Homes1.5 km156Jun 2027100%0Not collected
V R Royal HomesVR Builders And Developers1.6 km106Dec 202761%1Not collected
Lavender MeadowsTerrafem Group LLP2.1 km137Dec 2025—1Not collected
IriseM/s. Upstate United2.5 km166Jan 202984%0Not collected

Projects of the same kind within 5 km in a straight line of this project’s RERA map point, nearest first. % built is the promoter’s latest quarterly figure on RERA (shown for single-registration projects); prices are from the developer’s own website where we found one.

Sources:Source (rera.karnataka.gov.in) (opens in a new tab)

Sources and last checked dates

  1. Karnataka RERA — project register (search by the registration number) (opens in a new tab)

Collected on 16 Oct 2026 by AI research agents reading public pages. Facts are written in our own words. Not found yet: price; court cases; landmarks; specifications; news.

How to check on RERA: On rera.karnataka.gov.in/viewAllProjects, type the registration number in 'Registration No', press Search, then click the 'View Project Details' icon. Complaints open from the 'Complaints / Litigation' icon in the same row. Registration number: PRM/KA/RERA/1251/308/PR/030126/008379.

  • RERA record last checked: 16 Oct 2026
  • Last change in the record (registration, quarterly filing or complaint): 3 Jan 2026

How this page is made: software builds it from public records (Karnataka RERA filings, OpenStreetMap, the developer’s own website). AI is used only to read filings into fields and to write the plain-English summary and FAQ answers, which are checked against the record. Facts are checked automatically against the RERA filing. Methodology · How we earn · Report an error

More new projects nearby