JR STRR Enclave
Plots by JR Housing Developers Pvt Ltd · Chikkagattiganabbe, Hoskote, Bengaluru
Chikkagattiganabbe, Hoskote, BengaluruOpen on Google Maps (opens in a new tab)
- Completion filed with RERA
- RERA registered
- plotted
Plots still available: 24 of 30 plots were unsold when the developer filed completion with RERA (23 Dec 2025). Some may have sold since — join the group and we’ll ask the developer what is left and for a group price.
by JR Housing Developers Pvt Ltd
Price: Price on request
JR STRR Enclave at a glance
- Completion (RERA)Apr 2026Karnataka RERA
- Construction100% builtPromoter’s RERA update · as on 31 Dec 2025
- RERA complaints (project)None listedKarnataka RERA · as on 4 Oct 2026
- Approvals filed3 of 9 on RERAKarnataka RERA uploads · 4 Oct 2026
- Nearest metroWhitefield (Kadugodi) · 6.64 kmstraight line · OpenStreetMap, 5 Oct 2026
- Airport driveapprox. 82 min at peak20.14 km straight line · estimate
- Nearest lakeUnnamed lake · 572 mFrom the RERA map point · OpenStreetMap, 5 Oct 2026
Project summary
JR STRR Enclave is a plotted development by JR Housing Developers Pvt Ltd in Chikkagattiganabbe, Bengaluru with 33 plots, registered with Karnataka RERA. The completion date on RERA is 11 Apr 2026.
Facts collected on 4 Oct 2026 from public records — each linked to its source. Free for buyers. If you book through us, the developer pays us a commission.
JR STRR Enclave buyers’ group: join to ask for a group price
No one has joined yet. Be one of the first 10 buyers in this group — the founding members.
Join free. When enough buyers have joined, our agent partner asks JR Housing Developers Pvt Ltd for a group price — for example a lower price, an easier payment plan or waived charges. Nothing is promised: you see what the developer offers and book directly with the developer if you want to. Free for buyers. If you book through us, the developer pays us a commission.
- Gathering buyers
- Talking to the developer
- Group offer
- Group site visit
- Booking
0 buyers have joined · 0 committed
Committed buyers have confirmed their budget, plot size and timeline with us on a call; developers negotiate with them. Joining is free and never obliges you to buy.
Join the JR STRR Enclave buyers’ groupHow group buying works
See it for yourself
Visit the site with our team, or get a call to clear your questions. Free, no obligation.
Key facts: plot sizes, approval, land and completion
- Plot sizes (feet)
- Not found in public records yet: plot sizes
- Plot area
- 1,285 – 3,060 sq ft
- Total plots
- 33
- Layout approved by
- BMRDA
- Land
- Not found in public records yet: land area
- Land conversion orders
- 5
- Completion (RERA)
- Apr 2026
- Development (RERA update)
- 100%
Approving authority as filed: BMRDA - Bangalore Metropolitan Region Development Authority.
Land conversion orders (RERA filing)
| Survey no. | Converted for | Order | By |
|---|---|---|---|
| 1/2 | Residential | No. 302783, 19 Mar 2022 | DC |
| 1/8 | Residential | No. 302786, 19 Mar 2023 | DC |
| 1/10 | Residential | No. 302788, 19 Mar 2022 | DC |
| 1/11 | Residential | No. 302789, 19 Mar 2022 | DC |
| 1/12 | Residential | No. 302790, 19 Mar 2021 | DC |
RERA does not cover each plot’s khata. Ask the developer for the khata and title documents and have a lawyer check them before paying an advance.
JR STRR Enclave RERA number and registration details
- RERA number
- PRM/KA/RERA/1250/304/PR/050723/006041
- Registered on
- 5 Jul 2023
- Promised completion
- 11 Apr 2026
- Extended to
- No extension recorded
- RERA status
- Completed
- Plots booked
- Not found in public records yet: plots booked
- Price
- Not found in public records yet: price
- Project type
- Plotted
Summary in plain English
JR STRR Enclave is a plotted layout of 33 plots in Chikkagattiganabbe, Hosakote, Bengaluru Rural, developed by JR Housing Developers Pvt Ltd. The layout was approved by BMRDA with 5 land conversion orders. The project is registered with Karnataka RERA and is scheduled for completion on 11 April 2026.
Written by AI from the RERA record above on 7 Oct 2026. Every number in it was checked against that record; if anything differs, the record wins.
Open space, loans, escrow and other details
- Open space
- Not found in public records yet: open space
- Water and power
- Water source filed with RERA: BoreWell
- Plot loans: approved banks
- Not found in public records yet: bank approvals
- Payment plans
- Not found in public records yet: payment plans
- Maintenance
- Not found in public records yet: maintenance
- Car parking
- Not found in public records yet: car parking charge
- Escrow bank (RERA)
- Karnataka Bank Ltd., Nehrunagar Branch, Bangalore
- Building plan (RERA)
- BMRDA - Bangalore Metropolitan Region Development Authority · No. STTTPA/TP/LAO/20/2022-23 · dated 17 Oct 2022
- Project cost declared to RERA
- ₹2.03 Cr
Amenities
JR STRR Enclave location and address
- Address
- Sy no.1/2, 1/8, 1/10, 1/11, 1/12, Chikkagattiganabbe Village, attached to STRR Ring Road, , Doddagattiganabbe village panchayath, Hoskote Taluk , Hosakote , Bengaluru Rural, Karnataka - 562114
- Village (RERA)
- Chikkagattiganabbe
- Locality
- HoskoteAlso known as Hosakote
- PIN code
- 562114
- City
- Bengaluru
- State
- Karnataka
- Coordinates
- 13.04289, 77.79560
Distances to landmarks
Not found in public records yet: landmarksAbout Hoskote
Not found in public records yet: locality factsCommute times to tech parks and the airport
| To | Straight line | Peak-hour drive (estimate) |
|---|---|---|
| ITPL, Whitefield (main gate)Map point on OpenStreetMap (opens in a new tab) | 8.77 km | approx. 36 min |
| Outer Ring Road tech corridor (RMZ Ecospace, Bellandur)Map point on OpenStreetMap (opens in a new tab) | 18.14 km | approx. 73 min |
| Manyata Tech ParkMap point on OpenStreetMap (opens in a new tab) | 19.04 km | approx. 77 min |
| Kempegowda International AirportMap point on OpenStreetMap (opens in a new tab) | 20.14 km | approx. 82 min |
| KSR Bengaluru City railway station (Majestic)Map point on OpenStreetMap (opens in a new tab) | 25.52 km | approx. 103 min |
| Electronic City Phase 1Map point on OpenStreetMap (opens in a new tab) | 25.73 km | approx. 104 min |
How we calculate
Straight line: from the project’s map point on RERA to the destination’s point on OpenStreetMap.
Peak-hour drive is a rough estimate, not a route: straight line × 1.35 for the road network, at 20 km/h. Real times vary a lot with the route and the hour.
Sources:Source (openstreetmap.org) (opens in a new tab)How we calculate this
Schools and hospitals nearby
Within 2 km
- 3Schools and colleges3 schools, 0 colleges, 0 kindergartens
- 0Hospitals and clinics0 hospitals, 0 clinics
Places as mapped on OpenStreetMap (amenity=school, college, kindergarten, university; hospital, clinic), counted within 2 km in a straight line of the RERA map point. Volunteers map these, so some places may be missing or closed. Places data © OpenStreetMap contributors, extract of 5 Oct 2026.
Nearest metro station and railway
- Whitefield (Kadugodi) (ವೈಟ್ಫೀಲ್ಡ್ (ಕಾಡುಗೋಡಿ))Open now — nearest operating metro station6.64 km
- Whitefield (ವೈಟ್ಫೀಲ್ಡ್)Nearest railway station6.36 km
Straight-line distances from the RERA map point to the station points mapped on OpenStreetMap; status (open or under construction) as tagged there. Places data © OpenStreetMap contributors, extract of 5 Oct 2026.
Lake and lake-buffer check
The nearest mapped lake is Unnamed lake (mapped on OpenStreetMap), 572 m from the project’s RERA map point.
The site boundary is not published as a shape, so its nearest edge can be closer than this point. Whether any building sits inside a lake buffer can only be checked on the approved plan.
- Unnamed lake (mapped on OpenStreetMap) on OpenStreetMap (opens in a new tab) 572 m
- Unnamed lake (mapped on OpenStreetMap) on OpenStreetMap (opens in a new tab) 1,076 m
- Unnamed lake (mapped on OpenStreetMap) on OpenStreetMap (opens in a new tab) 1,275 m
The buffer rule
Bengaluru’s lake buffer rule has changed over time: the National Green Tribunal ordered a 75 m buffer in May 2016; the Supreme Court set that order aside on 5 March 2019, leaving the 30 m buffer of the Revised Master Plan 2015. Check the current rule and the approved plan before relying on either number.
- LiveLaw: SC sets aside NGT order enlarging buffer zones (2019) (livelaw.in) (opens in a new tab)
- Citizen Matters: Shrinking lake buffers (citizenmatters.in) (opens in a new tab)
Shortest distance from the RERA map point to the mapped water edge (OpenStreetMap water polygons tagged lake or reservoir, or named lake/kere/tank). Mapped shorelines can differ from the revenue-record boundary of a lake. Places data © OpenStreetMap contributors, extract of 5 Oct 2026.
Sources:Source (openstreetmap.org) (opens in a new tab)Source (livelaw.in) (opens in a new tab)Source (citizenmatters.in) (opens in a new tab)How we calculate this
Satellite time-lapse of the site
Satellite photos load when you scroll to them.
Photos from Esri World Imagery Wayback, centred on the project’s map point; dates are the capture dates in Esri’s metadata. Loaded from Esri when you scroll here.
Sources:Source (livingatlas.arcgis.com) (opens in a new tab)
JR STRR Enclave layout plan and plot types as filed
Layout plan and brochure not published? The developer shares them only on request. We’ll get the brochure, layout plan and current price list for you, free.
Get brochure, layout plan & price| Plot type (as filed) | Area | Plots |
|---|---|---|
| Plots | — | 33 |
Plot types and counts as filed with Karnataka RERA.
We have not collected the layout plan drawing; the developer’s sales team can share it.
JR STRR Enclave completion date and development status
Promoter’s quarterly update to RERA for Q3 2025-26, submitted 2026-01-16.
Timeline
- 1 Apr 2023Project start date given to RERA
- 5 Jul 2023Registered with Karnataka RERA
- 23 Dec 2025Promoter applied to RERA for completion
- 11 Apr 2026Completion date given at registration
Approvals and documents checklist
| Approval | Authority | Source |
|---|---|---|
| Layout plan | BMRDA - Bangalore Metropolitan Region Development Authority · No. STTTPA/TP/LAO/20/2022-23 · dated 2022-10-17 | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Land conversion (5 orders) | DC · No. 302783 and 4 more · dated 2023-03-19 | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Commencement Certificate | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Electricity Permission Letter | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Approved Layout Plan | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Approved Building/Plotting Plan | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Approved Section Of Building/Infrastructure Plan of Plotting | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Conversion Certificate under section 95 of the KLR Act 1964 | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| ESCOM/Electricity | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Approval/NOC under section 14 of the KTCP Act | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
Documents uploaded to RERA
- Building or layout plan · Approved drawings from the planning authorityFiled on RERA ✓ — BMRDA - Bangalore Metropolitan Region Development Authority · No. STTTPA/TP/LAO/20/2022-23 · dated 17 Oct 2022
- Commencement certificate · Permission to start buildingFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
- Environment clearance · SEIAA KarnatakaNot on RERA yet
- Fire NOC · Karnataka Fire and Emergency ServicesNot on RERA yet
- Pollution board consent · KSPCBNot on RERA yet
- Water and sewerage · BWSSBNot on RERA yet
- Electricity · BESCOMFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
- Height clearance · Airports Authority of IndiaNot on RERA yet
- Occupancy certificate (OC) · Issued only when the building is finishedNot on RERA yet — expected at completion
From the documents the promoter uploaded to Karnataka RERA, collected 4 Oct 2026. “Filed” means a document is on RERA — we have not checked its contents or validity. Not every approval applies to every project (for example, smaller projects may not need an environment clearance). The project page on RERA lists each upload.
JR STRR Enclave RERA complaints
No complaints listed on Karnataka RERA for this registration as on Source (rera.karnataka.gov.in) (opens in a new tab)
Court and consumer cases
We list case numbers, courts and outcomes only — never names of private individuals.
About JR Housing Developers Pvt Ltd
- Promoter type
- Company
- Projects on this site
- 4
- RERA complaints against promoter
- 0
- Company number (CIN)
- U07010KA2004PTC035108
From Karnataka RERA, as collected so far (4 Oct 2026). Complaints are those RERA lists against this promoter across all its projects.
JR Housing Developers Pvt Ltd’s RERA recordJR Housing Developers Pvt Ltd delivery record
- 4Projects in Bengaluru on RERA4 approved registrations under JR Housing Developers Pvt Ltd in Bengaluru Urban and Rural. Source (rera.karnataka.gov.in) (opens in a new tab)
- 672Plots registeredAs stated in each registrations.
- 0RERA complaintsas on Source (rera.karnataka.gov.in) (opens in a new tab)
- 0Complaints per 1,000 plots0 complaints ÷ 672 plots in its 4 registrations on Karnataka RERA in Bengaluru.
- 3Completion filed on RERARegistrations where the promoter applied to RERA for completion; 0 with an occupancy certificate on RERA.
- 3 of 3Filed by the date given at registrationMedian gap 0 months (on-time ones count as 0). The completion application can come after handover, so this is an upper bound on lateness.
Completion filed on RERA
| Project | Date at registration | Completion filed | Gap |
|---|---|---|---|
| JR Eastfields | 1 Aug 2026 | 30 Jan 2026 | By the date |
| JR Club Class | 20 Nov 2028 | 19 Jan 2026 | By the date |
| JR STRR Enclave | 11 Apr 2026 | 23 Dec 2025 | By the date |
Measured against the completion date given at registration; many projects had RERA extensions (including the COVID-period extension), shown under the date.
Sources:Source (rera.karnataka.gov.in) (opens in a new tab)How we calculate this
What’s changed since Oct 2022
- 16 Jan 2026Quarterly update filed for Q3 2025-26: 100% built Source (rera.karnataka.gov.in) (opens in a new tab)
- 23 Dec 2025Promoter applied to RERA for completion Source (rera.karnataka.gov.in) (opens in a new tab)
- 5 Jul 2023Registered with Karnataka RERA (PRM/KA/RERA/1250/304/PR/050723/006041); completion date 11 Apr 2026 Source (rera.karnataka.gov.in) (opens in a new tab)
- 1 Apr 2023Project start date in the RERA record Source (rera.karnataka.gov.in) (opens in a new tab)
- 17 Oct 2022Building plan approved by BMRDA - Bangalore Metropolitan Region Development Authority (No. STTTPA/TP/LAO/20/2022-23) Source (rera.karnataka.gov.in) (opens in a new tab)
Newest first. No extension of the completion date is recorded on RERA. When the RERA crawl sees a new filing, complaint or extension, it is added here with its date.
Plot loan EMI calculator
- Monthly EMI
- —
- Down payment
- —
- Loan amount
- —
- Total interest
- —
A calculation only, from the numbers you enter — not a loan offer.
JR STRR Enclave FAQs
What plot sizes are available in JR STRR Enclave?
The plot sizes are not specified in the RERA record.
How many plots are in JR STRR Enclave?
The project has 33 plots.
Who approved the layout for JR STRR Enclave?
BMRDA approved the layout.
How many land conversion orders are there for JR STRR Enclave?
There are 5 land conversion orders for the project.
What is the RERA registration number for JR STRR Enclave?
The RERA registration number is PRM/KA/RERA/1250/304/PR/050723/006041, registered on 5 July 2023.
When will JR STRR Enclave be completed?
The project is scheduled for completion on 11 April 2026.
What is the development status of JR STRR Enclave?
As of Q3 2025-26 (31 December 2025), the layout development is 100% complete.
Are there any RERA complaints against JR STRR Enclave or its developer?
There are no RERA complaints on this project or against JR Housing Developers Pvt Ltd.
Where is JR STRR Enclave located?
The project is in Chikkagattiganabbe, Hosakote taluk, Bengaluru Rural district, PIN code 562114.
How many other projects does the developer have on record?
JR Housing Developers Pvt Ltd has 13 projects in the Bengaluru RERA records.
Written by AI from the RERA record above on 7 Oct 2026. Answers use only that record; check them against the source before you decide.
Questions about JR STRR Enclave
No questions published yet. Ask the first one: you get an instant answer from this page’s public record, and our team follows up on anything the record does not show.
Bought a plot from JR Housing Developers Pvt Ltd? Review the developer.
Reviews of JR Housing Developers Pvt Ltd by verified buyers
No verified reviews of JR Housing Developers Pvt Ltd yet. If you bought a plot from them, your review helps other buyers.
How reviews work: only buyers and owners can review; we confirm each purchase by phone before publishing, publish positive and negative reviews alike, never accept payment for reviews, and the developer may reply.
Similar projects within 5 km
| Project | Distance | Plots | Completion (RERA) | Developed | Complaints | Price |
|---|---|---|---|---|---|---|
| JR One EastJR Housing Developers Pvt Ltd | 1.1 km | 177 | Nov 2028 | 95% | 0 | Not collected |
| Nexon TravenzaNEXON Developers | 1.3 km | 36 | Aug 2031 | 47% | 0 | Not collected |
| SvantaAkkruthi Livespaces LLP | 1.7 km | 259 | Dec 2028 | 25% | 0 | Not collected |
| JR EastfieldsJR Housing Developers Pvt Ltd | 1.8 km | 389 | Aug 2026 | 100% | 0 | Not collected |
| Nexon TravenzaNexon Builders | 1.8 km | 83 | Dec 2031 | 30% | 0 | Not collected |
| V.R Mega TownshipVR Ventures | 2.1 km | 192 | Dec 2027 | 25% | 0 | Not collected |
Projects of the same kind within 5 km in a straight line of this project’s RERA map point, nearest first. % built is the promoter’s latest quarterly figure on RERA (shown for single-registration projects); prices are from the developer’s own website where we found one.
Sources and last checked dates
Collected on 4 Oct 2026 by AI research agents reading public pages. Facts are written in our own words. Not found yet: price; court cases; landmarks; specifications; news.
How to check on RERA: On rera.karnataka.gov.in/viewAllProjects, type the registration number in 'Registration No', press Search, then click the 'View Project Details' icon. Complaints open from the 'Complaints / Litigation' icon in the same row. Registration number: PRM/KA/RERA/1250/304/PR/050723/006041.
- RERA record last checked: 4 Oct 2026
- Last change in the record (registration, quarterly filing or complaint): 16 Jan 2026
How this page is made: software builds it from public records (Karnataka RERA filings, OpenStreetMap, the developer’s own website). AI is used only to read filings into fields and to write the plain-English summary and FAQ answers, which are checked against the record. Facts are checked automatically against the RERA filing. Methodology · How we earn · Report an error
More new projects in Hoskote
Petthanahalli, HoskoteUnder constructionRERA registeredBuyers’ group openJR One East
by JR Housing
Price: Price on requestGet brochure & price →
- Plot sizes not found
- 1,154 – 9,127 sq ft plots
- Approved by BMRDA
- Nov 2028
177 plots
Be one of the first 10 buyers in this groupFounding members — it’s free
Join group for JR One East
Kannurahalli, HoskoteUnder constructionRERA registeredBuyers’ group openV.R Mega Township
by VR Ventures
Price: Price on requestGet brochure & price →
- 30×40, 30×45, 30×50
- 691 – 9,964 sq ft plots
- Approved by Hoskote Planning Authority
- Dec 2027
192 plots
Be one of the first 10 buyers in this groupFounding members — it’s free
Join group for V.R Mega Township
HoskoteUnder constructionRERA registeredBuyers’ group openSidvin Symphony
by Avyanhp Sharayu
Price: Price on requestGet brochure & price →
- 30×40, 30×45, 35×40 +1 more
- 630 – 5,171 sq ft plots
- Approved by BMRDA
- Mar 2026
RERA not updated since promised Mar 2026 · 157 plots
Be one of the first 10 buyers in this groupFounding members — it’s free
Join group for Sidvin Symphony