JR Club Class
Plots by JR Housing Developers Pvt Ltd · Lingapura, near Chandapura–Attibele, Bengaluru
Lingapura, near Chandapura–Attibele, BengaluruOpen on Google Maps (opens in a new tab)
- Completion filed with RERA
- RERA registered
- plotted
Plots still available: 72 of 72 plots were unsold when the developer filed completion with RERA (19 Jan 2026). Some may have sold since — join the group and we’ll ask the developer what is left and for a group price.
by JR Housing Developers Pvt Ltd
Price: Price on request
JR Club Class at a glance
- Completion (RERA)Nov 2028Karnataka RERA
- Construction100% builtPromoter’s RERA update · as on 31 Dec 2025
- RERA complaints (project)None listedKarnataka RERA · as on 4 Oct 2026
- Approvals filed4 of 9 on RERAKarnataka RERA uploads · 4 Oct 2026
- Nearest metroDelta Electronics Bommasandra · 6.99 kmstraight line · OpenStreetMap, 5 Oct 2026
- Airport driveapprox. 200 min at peak49.37 km straight line · estimate
- Nearest lakeUnnamed lake · 1,272 mFrom the RERA map point · OpenStreetMap, 5 Oct 2026
Project summary
JR Club Class is a plotted development by JR Housing Developers Pvt Ltd in Lingapura, Bengaluru with 73 plots, registered with Karnataka RERA. The completion date on RERA is 20 Nov 2028.
Facts collected on 4 Oct 2026 from public records — each linked to its source. Free for buyers. If you book through us, the developer pays us a commission.
JR Club Class buyers’ group: join to ask for a group price
No one has joined yet. Be one of the first 10 buyers in this group — the founding members.
Join free. When enough buyers have joined, our agent partner asks JR Housing Developers Pvt Ltd for a group price — for example a lower price, an easier payment plan or waived charges. Nothing is promised: you see what the developer offers and book directly with the developer if you want to. Free for buyers. If you book through us, the developer pays us a commission.
- Gathering buyers
- Talking to the developer
- Group offer
- Group site visit
- Booking
0 buyers have joined · 0 committed
Committed buyers have confirmed their budget, plot size and timeline with us on a call; developers negotiate with them. Joining is free and never obliges you to buy.
Join the JR Club Class buyers’ groupHow group buying works
See it for yourself
Visit the site with our team, or get a call to clear your questions. Free, no obligation.
Key facts: plot sizes, approval, land and completion
- Plot sizes (feet)
- Not found in public records yet: plot sizes
- Plot area
- 1,353 – 5,314 sq ft
- Total plots
- 73
- Layout approved by
- Local Planning Authority
- Land
- Not found in public records yet: land area
- Land conversion orders
- 7
- Completion (RERA)
- Nov 2028
- Development (RERA update)
- 100%
Approving authority as filed: Local Planing Authority.
Land conversion orders (RERA filing)
| Survey no. | Converted for | Order | By |
|---|---|---|---|
| 120/6 | Residential | No. 337986, 26 Aug 2022 | Deputy Commissioner Bengaluru |
| 120/2 | Residential | No. 337983, 26 Aug 2022 | Deputy Commissioner Bengaluru |
| 120/3 | Residential | No. 337988, 26 Aug 2022 | Deputy Commissioner Bengaluru |
| 120/5 | Residential | No. 337985, 26 Aug 2022 | Deputy Commissioner Bengaluru |
| 23/2 | Residential | No. 413339, 23 Nov 2022 | Deputy Commissioner Bengaluru |
| 23/3 | Residential | No. 337989, 26 Aug 2022 | Deputy Commissioner Bengaluru |
| 23/4 | Residential | No. 337990, 26 Aug 2022 | Deputy Commissioner Bengaluru |
RERA does not cover each plot’s khata. Ask the developer for the khata and title documents and have a lawyer check them before paying an advance.
JR Club Class RERA number and registration details
- RERA number
- PRM/KA/RERA/1251/308/PR/210524/006915
- Registered on
- 21 May 2024
- Promised completion
- 20 Nov 2028
- Extended to
- No extension recorded
- RERA status
- Completed
- Plots booked
- Not found in public records yet: plots booked
- Price
- Not found in public records yet: price
- Project type
- Plotted
Summary in plain English
JR Club Class is a plotted layout of 73 plots in Lingapura, Anekal, developed by JR Housing Developers Pvt Ltd. The layout is approved by the Local Planning Authority and registered with Karnataka RERA. Completion is set for 20 November 2028.
Written by AI from the RERA record above on 7 Oct 2026. Every number in it was checked against that record; if anything differs, the record wins.
Open space, loans, escrow and other details
- Open space
- Not found in public records yet: open space
- Water and power
- Water source filed with RERA: Local Authority
- Plot loans: approved banks
- Not found in public records yet: bank approvals
- Payment plans
- Not found in public records yet: payment plans
- Maintenance
- Not found in public records yet: maintenance
- Car parking
- Not found in public records yet: car parking charge
- Escrow bank (RERA)
- Karnataka Bank Ltd., NEHRUNAGAR
- Building plan (RERA)
- Local Planing Authority · No. APA/LAO/88/2022-23 · dated 15 May 2023
- Project cost declared to RERA
- ₹5.61 Cr
Amenities
JR Club Class location and address
- Address
- Sy No. 23/2, 23/3, 23/4, 120/2, 120/3, 120/5, 120/6, Lingapura Village, Kasaba Hobli, Anekal Taluk, Bengaluru Urban Dist , Karnataka , Anekal , Bengaluru Urban, Karnataka - 562105
- Village (RERA)
- Lingapura
- Locality
- Near Chandapura–AttibeleAlso known as Chandapura, Attibele
- PIN code
- 562105
- City
- Bengaluru
- State
- Karnataka
- Coordinates
- 12.75753, 77.67707
Distances to landmarks
Not found in public records yet: landmarksAbout Lingapura
Not found in public records yet: locality factsCommute times to tech parks and the airport
| To | Straight line | Peak-hour drive (estimate) |
|---|---|---|
| Electronic City Phase 1Map point on OpenStreetMap (opens in a new tab) | 10.33 km | approx. 42 min |
| Outer Ring Road tech corridor (RMZ Ecospace, Bellandur)Map point on OpenStreetMap (opens in a new tab) | 18.48 km | approx. 75 min |
| ITPL, Whitefield (main gate)Map point on OpenStreetMap (opens in a new tab) | 26.42 km | approx. 107 min |
| KSR Bengaluru City railway station (Majestic)Map point on OpenStreetMap (opens in a new tab) | 27.16 km | approx. 110 min |
| Manyata Tech ParkMap point on OpenStreetMap (opens in a new tab) | 32.9 km | approx. 133 min |
| Kempegowda International AirportMap point on OpenStreetMap (opens in a new tab) | 49.37 km | approx. 200 min |
How we calculate
Straight line: from the project’s map point on RERA to the destination’s point on OpenStreetMap.
Peak-hour drive is a rough estimate, not a route: straight line × 1.35 for the road network, at 20 km/h. Real times vary a lot with the route and the hour.
Sources:Source (openstreetmap.org) (opens in a new tab)How we calculate this
Nearest metro station and railway
- Delta Electronics Bommasandra (ಡೆಲ್ಟಾ ಎಲೆಕ್ಟ್ರಾನಿಕ್ಸ್ ಬೊಮ್ಮಸಂದ್ರ)Open now — nearest operating metro station6.99 km
- Anekal Road (ಆನೇಕಲ್ ರಸ್ತೆ)Nearest railway station5.23 km
Straight-line distances from the RERA map point to the station points mapped on OpenStreetMap; status (open or under construction) as tagged there. Places data © OpenStreetMap contributors, extract of 5 Oct 2026.
Lake and lake-buffer check
The nearest mapped lake is Unnamed lake (mapped on OpenStreetMap), 1,272 m from the project’s RERA map point.
The site boundary is not published as a shape, so its nearest edge can be closer than this point. Whether any building sits inside a lake buffer can only be checked on the approved plan.
The buffer rule
Bengaluru’s lake buffer rule has changed over time: the National Green Tribunal ordered a 75 m buffer in May 2016; the Supreme Court set that order aside on 5 March 2019, leaving the 30 m buffer of the Revised Master Plan 2015. Check the current rule and the approved plan before relying on either number.
- LiveLaw: SC sets aside NGT order enlarging buffer zones (2019) (livelaw.in) (opens in a new tab)
- Citizen Matters: Shrinking lake buffers (citizenmatters.in) (opens in a new tab)
Shortest distance from the RERA map point to the mapped water edge (OpenStreetMap water polygons tagged lake or reservoir, or named lake/kere/tank). Mapped shorelines can differ from the revenue-record boundary of a lake. Places data © OpenStreetMap contributors, extract of 5 Oct 2026.
Sources:Source (openstreetmap.org) (opens in a new tab)Source (livelaw.in) (opens in a new tab)Source (citizenmatters.in) (opens in a new tab)How we calculate this
Satellite time-lapse of the site
Satellite photos load when you scroll to them.
Photos from Esri World Imagery Wayback, centred on the project’s map point; dates are the capture dates in Esri’s metadata. Loaded from Esri when you scroll here.
Sources:Source (livingatlas.arcgis.com) (opens in a new tab)
JR Club Class layout plan and plot types as filed
Layout plan and brochure not published? The developer shares them only on request. We’ll get the brochure, layout plan and current price list for you, free.
Get brochure, layout plan & price| Plot type (as filed) | Area | Plots |
|---|---|---|
| Plots | — | 73 |
Plot types and counts as filed with Karnataka RERA.
We have not collected the layout plan drawing; the developer’s sales team can share it.
JR Club Class completion date and development status
Promoter’s quarterly update to RERA for Q3 2025-26, submitted 2026-01-16.
Timeline
- 30 Dec 2023Project start date given to RERA
- 21 May 2024Registered with Karnataka RERA
- 19 Jan 2026Promoter applied to RERA for completion
- 20 Nov 2028Completion date given at registration
Approvals and documents checklist
15 rows: approvals. Scroll inside the table to see them all.
| Approval | Authority | Source |
|---|---|---|
| Layout plan | Local Planing Authority · No. APA/LAO/88/2022-23 · dated 2023-05-15 | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Land conversion (7 orders) | Deputy Commissioner Bengaluru · No. 337986 and 6 more · dated 2022-11-23 | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Commencement Certificate | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Electricity Permission Letter | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Water Permission Letter | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Approved Layout Plan | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Approved Building/Plotting Plan | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Approved Section Of Building/Infrastructure Plan of Plotting | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Change of Land Use | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| District Magistrate | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Conversion Certificate under section 95 of the KLR Act 1964 | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| ESCOM/Electricity | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| KWSSB/Water | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Approval/NOC under section 109 of KLR Act 1961 | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Approval/NOC under section 14 of the KTCP Act | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
Documents uploaded to RERA
- Building or layout plan · Approved drawings from the planning authorityFiled on RERA ✓ — Local Planing Authority · No. APA/LAO/88/2022-23 · dated 15 May 2023
- Commencement certificate · Permission to start buildingFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
- Environment clearance · SEIAA KarnatakaNot on RERA yet
- Fire NOC · Karnataka Fire and Emergency ServicesNot on RERA yet
- Pollution board consent · KSPCBNot on RERA yet
- Water and sewerage · BWSSBFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
- Electricity · BESCOMFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
- Height clearance · Airports Authority of IndiaNot on RERA yet
- Occupancy certificate (OC) · Issued only when the building is finishedNot on RERA yet — expected at completion
From the documents the promoter uploaded to Karnataka RERA, collected 4 Oct 2026. “Filed” means a document is on RERA — we have not checked its contents or validity. Not every approval applies to every project (for example, smaller projects may not need an environment clearance). The project page on RERA lists each upload.
JR Club Class RERA complaints
No complaints listed on Karnataka RERA for this registration as on Source (rera.karnataka.gov.in) (opens in a new tab)
Court and consumer cases
We list case numbers, courts and outcomes only — never names of private individuals.
About JR Housing Developers Pvt Ltd
- Promoter type
- Company
- Projects on this site
- 4
- RERA complaints against promoter
- 0
- Company number (CIN)
- U07010KA2004PTC035108
From Karnataka RERA, as collected so far (4 Oct 2026). Complaints are those RERA lists against this promoter across all its projects.
JR Housing Developers Pvt Ltd’s RERA recordJR Housing Developers Pvt Ltd delivery record
- 4Projects in Bengaluru on RERA4 approved registrations under JR Housing Developers Pvt Ltd in Bengaluru Urban and Rural. Source (rera.karnataka.gov.in) (opens in a new tab)
- 672Plots registeredAs stated in each registrations.
- 0RERA complaintsas on Source (rera.karnataka.gov.in) (opens in a new tab)
- 0Complaints per 1,000 plots0 complaints ÷ 672 plots in its 4 registrations on Karnataka RERA in Bengaluru.
- 3Completion filed on RERARegistrations where the promoter applied to RERA for completion; 0 with an occupancy certificate on RERA.
- 3 of 3Filed by the date given at registrationMedian gap 0 months (on-time ones count as 0). The completion application can come after handover, so this is an upper bound on lateness.
Completion filed on RERA
| Project | Date at registration | Completion filed | Gap |
|---|---|---|---|
| JR Eastfields | 1 Aug 2026 | 30 Jan 2026 | By the date |
| JR Club Class | 20 Nov 2028 | 19 Jan 2026 | By the date |
| JR STRR Enclave | 11 Apr 2026 | 23 Dec 2025 | By the date |
Measured against the completion date given at registration; many projects had RERA extensions (including the COVID-period extension), shown under the date.
Sources:Source (rera.karnataka.gov.in) (opens in a new tab)How we calculate this
What’s changed since May 2023
- 19 Jan 2026Promoter applied to RERA for completion Source (rera.karnataka.gov.in) (opens in a new tab)
- 16 Jan 2026Quarterly update filed for Q3 2025-26: 100% built Source (rera.karnataka.gov.in) (opens in a new tab)
- 21 May 2024Registered with Karnataka RERA (PRM/KA/RERA/1251/308/PR/210524/006915); completion date 20 Nov 2028 Source (rera.karnataka.gov.in) (opens in a new tab)
- 30 Dec 2023Project start date in the RERA record Source (rera.karnataka.gov.in) (opens in a new tab)
- 15 May 2023Building plan approved by Local Planing Authority (No. APA/LAO/88/2022-23) Source (rera.karnataka.gov.in) (opens in a new tab)
Newest first. No extension of the completion date is recorded on RERA. When the RERA crawl sees a new filing, complaint or extension, it is added here with its date.
Plot loan EMI calculator
- Monthly EMI
- —
- Down payment
- —
- Loan amount
- —
- Total interest
- —
A calculation only, from the numbers you enter — not a loan offer.
JR Club Class FAQs
What plot sizes are available in JR Club Class?
Plot sizes are not specified in the RERA record.
How many plots are in the JR Club Class layout?
The layout has 73 plots.
Which authority approved the JR Club Class layout?
The layout is approved by the Local Planning Authority.
How many land conversion orders are on record for JR Club Class?
There are 7 land conversion orders on record.
What is the RERA registration number for JR Club Class?
The RERA registration number is PRM/KA/RERA/1251/308/PR/210524/006915, registered on 21 May 2024.
When will JR Club Class be completed?
The completion date on RERA is 20 November 2028.
What is the development progress of JR Club Class?
As of Q3 2025-26 (31 December 2025), the layout development is 100% complete.
Are there any complaints against JR Club Class on RERA?
There are no complaints on record for this project or against the developer across all projects.
Where is JR Club Class located?
JR Club Class is in Lingapura, Anekal taluk, Bengaluru Urban district, PIN code 562105.
How many other projects does JR Housing Developers have on RERA record?
JR Housing Developers has 13 projects in the Bengaluru RERA records.
Written by AI from the RERA record above on 7 Oct 2026. Answers use only that record; check them against the source before you decide.
Questions about JR Club Class
No questions published yet. Ask the first one: you get an instant answer from this page’s public record, and our team follows up on anything the record does not show.
Bought a plot from JR Housing Developers Pvt Ltd? Review the developer.
Reviews of JR Housing Developers Pvt Ltd by verified buyers
No verified reviews of JR Housing Developers Pvt Ltd yet. If you bought a plot from them, your review helps other buyers.
How reviews work: only buyers and owners can review; we confirm each purchase by phone before publishing, publish positive and negative reviews alike, never accept payment for reviews, and the developer may reply.
Similar projects within 5 km
| Project | Distance | Plots | Completion (RERA) | Developed | Complaints | Price |
|---|---|---|---|---|---|---|
| KBR EstatesKBR Infratech Limited | 1.4 km | 99 | Mar 2030 | 90% | 0 | Not collected |
| TBC La PicassoTBC Homes Infra Corp | 1.7 km | 43 | Oct 2027 | — | 0 | Not collected |
| KNS Anagha Phase - IIKNS Infrastructure Private Limited | 2.1 km | 69 | Mar 2026 | 100% | 0 | Not collected |
| Grand Lavasa P2TBC Homes Infra Corp | 2.4 km | 12 | Feb 2027 | — | 0 | Not collected |
| Profound Lake FrontM/S ProfoundDevelopers | 2.5 km | 61 | Dec 2028 | 100% | 0 | Not collected |
| The DistrictNaville Estates LLP | 3.1 km | 226 | Nov 2026 | 91% | 0 | Not collected |
Projects of the same kind within 5 km in a straight line of this project’s RERA map point, nearest first. % built is the promoter’s latest quarterly figure on RERA (shown for single-registration projects); prices are from the developer’s own website where we found one.
Sources and last checked dates
Collected on 4 Oct 2026 by AI research agents reading public pages. Facts are written in our own words. Not found yet: price; court cases; landmarks; specifications; news.
How to check on RERA: On rera.karnataka.gov.in/viewAllProjects, type the registration number in 'Registration No', press Search, then click the 'View Project Details' icon. Complaints open from the 'Complaints / Litigation' icon in the same row. Registration number: PRM/KA/RERA/1251/308/PR/210524/006915.
- RERA record last checked: 4 Oct 2026
- Last change in the record (registration, quarterly filing or complaint): 16 Jan 2026
How this page is made: software builds it from public records (Karnataka RERA filings, OpenStreetMap, the developer’s own website). AI is used only to read filings into fields and to write the plain-English summary and FAQ answers, which are checked against the record. Facts are checked automatically against the RERA filing. Methodology · How we earn · Report an error
More new projects nearby
Rajapura, near Chandapura–AttibeleUnder constructionRERA registeredBuyers’ group openKBR Estates
by KBR Infratech
Price: Price on requestGet brochure & price →
- 35×40, 30×50, 35×50
- 713 – 2,696 sq ft plots
- Approved by Anekal Planning Authority
- Mar 2030
99 plots
Be one of the first 10 buyers in this groupFounding members — it’s free
Join group for KBR Estates
Doddahagde, near Chandapura–AttibeleUnder constructionRERA registeredBuyers’ group openTBC La Picasso
by TBC Homes Infra Corp
Price: Price on requestGet brochure & price →
- 35×40, 40×40, 35×50 +3 more
- 1,400 – 2,696 sq ft plots
- Approved by Anekal Planning Authority
- Oct 2027
43 plots
Be one of the first 10 buyers in this groupFounding members — it’s free
Join group for TBC La Picasso
HaragaddeUnder constructionRERA registeredBuyers’ group openKNS Anagha Phase - II
by KNS Infrastructure
Price: Price on requestGet brochure & price →
- 30×40, 30×50
- 1,199 – 5,644 sq ft plots
- Approved by BBMP
- Mar 2026
RERA not updated since promised Mar 2026 · 69 plots
Be one of the first 10 buyers in this groupFounding members — it’s free
Join group for KNS Anagha Phase - II