Skip to content
Log in

KGF Ozone Nest

30×40, 30×45 +2 more plots by Afnan Construction · Shivakote, near Hesaraghatta Road, Bengaluru

Shivakote, near Hesaraghatta Road, BengaluruOpen on Google Maps (opens in a new tab)

  • Under construction
  • RERA registered
  • plotted

by Afnan Construction

Price: Price on request

Get brochure, layout plan & price

Brochure, layout plan and price list for KGF Ozone Nest

Developers share their brochure, layout plan and price list only on request. Tell us how to reach you and we’ll get them and send them to you, free.

Free for buyers. If you book through us, the developer pays us a commission. How we earn

Project summary

KGF Ozone Nest is a plotted development by Afnan Construction in Shivakote, Bengaluru with 328 plots, registered with Karnataka RERA. The completion date on RERA is 31 Jan 2028.

Facts collected on 16 Oct 2026 from public records — each linked to its source. Free for buyers. If you book through us, the developer pays us a commission.

KGF Ozone Nest buyers’ group: join to ask for a group price

No one has joined yet. Be one of the first 10 buyers in this group — the founding members.

Join free. When enough buyers have joined, our agent partner asks Afnan Construction for a group price — for example a lower price, an easier payment plan or waived charges. Nothing is promised: you see what the developer offers and book directly with the developer if you want to. Free for buyers. If you book through us, the developer pays us a commission.

  1. Gathering buyers
  2. Talking to the developer
  3. Group offer
  4. Group site visit
  5. Booking

0 buyers have joined · 0 committed

Committed buyers have confirmed their budget, plot size and timeline with us on a call; developers negotiate with them. Joining is free and never obliges you to buy.

Join the KGF Ozone Nest buyers’ groupHow group buying works

See it for yourself

Visit the site with our team, or get a call to clear your questions. Free, no obligation.

Key facts: plot sizes, approval, land and completion

Updated on 16 Oct 2026
Plot sizes (feet)
30×40, 30×45, 30×50, 40×60
Plot area
500 – 3,470 sq ft
Total plots
328
Layout approved by
BDA
Land
Not found in public records yet: land area
Land conversion orders
1
Completion (RERA)
Jan 2028
Development (RERA update)
60%

Plot sizes (RERA filing)

Size (feet)AreaPlots
30×401,200 sq ft58
30×451,350 sq ft25
30×501,500 sq ft117
40×602,400 sq ft19
Odd-sized (irregular)varies76
Commercial—1
EWS—33

Sizes as filed with RERA, converted from metres to feet (9.14 m = 30 ft, 12.19 m = 40 ft). Ask the developer which plots are still unsold.

Approving authority as filed: BDA - Bangalore Development Authority.

Land conversion orders (RERA filing)

Survey no.Converted forOrderBy
95ResidentialNo. CR/44/07-08, 15 Dec 2015DC office Bengaluru

RERA does not cover each plot’s khata. Ask the developer for the khata and title documents and have a lawyer check them before paying an advance.

KGF Ozone Nest RERA number and registration details

RERA number
PRM/KA/RERA/1251/472/PR/230725/007948
Registered on
23 Jul 2025
Promised completion
31 Jan 2028
Extended to
No extension recorded
RERA status
Under construction
Plots booked
Not found in public records yet: plots booked
Price
Not found in public records yet: price
Project type
Plotted

Sources:Source (rera.karnataka.gov.in) (opens in a new tab)

Summary in plain English

KGF Ozone Nest is a plotted layout by Afnan Construction in Shivakote, Yelahanka, with 328 plots across various sizes. The layout is approved by BDA and registered with Karnataka RERA. Completion is set for 31 January 2028.

Written by AI from the RERA record above on 16 Oct 2026. Every number in it was checked against that record; if anything differs, the record wins.

Open space, loans, escrow and other details

Open space
Not found in public records yet: open space
Water and power
Water source filed with RERA: Local Authority
Plot loans: approved banks
Not found in public records yet: bank approvals
Payment plans
Not found in public records yet: payment plans
Maintenance
Not found in public records yet: maintenance
Car parking
Not found in public records yet: car parking charge
Escrow bank (RERA)
HDFC, Millers Road
Building plan (RERA)
BDA - Bangalore Development Authority · No. BDA/TPM/PRL-02/23-24/2532/2024-25 · dated 3 Jan 2025
Project cost declared to RERA
₹54.6 Cr

Sources:Source (rera.karnataka.gov.in) (opens in a new tab)

Amenities

Not found in public records yet: amenities

KGF Ozone Nest location and address

Address
Sy no 95 of Shivakote Village , Hesaragatta Hobli, , Yelahanka , Bengaluru Urban, Karnataka - 560089
Village (RERA)
Shivakote
Locality
Near Hesaraghatta RoadAlso known as Hesaraghatta Main Road, Hessarghatta Road
PIN code
560089
City
Bengaluru
State
Karnataka
Coordinates
13.12411, 77.50923

Distances to landmarks

Not found in public records yet: landmarks

About Shivakote

Not found in public records yet: locality facts

Commute times to tech parks and the airport

As on 5 Oct 2026
ToStraight linePeak-hour drive (estimate)
Manyata Tech ParkMap point on OpenStreetMap (opens in a new tab)14.66 kmapprox. 59 min
KSR Bengaluru City railway station (Majestic)Map point on OpenStreetMap (opens in a new tab)17.49 kmapprox. 71 min
Kempegowda International AirportMap point on OpenStreetMap (opens in a new tab)22.79 kmapprox. 92 min
ITPL, Whitefield (main gate)Map point on OpenStreetMap (opens in a new tab)29.04 kmapprox. 118 min
Outer Ring Road tech corridor (RMZ Ecospace, Bellandur)Map point on OpenStreetMap (opens in a new tab)29.05 kmapprox. 118 min
Electronic City Phase 1Map point on OpenStreetMap (opens in a new tab)34.87 kmapprox. 141 min
How we calculate

Straight line: from the project’s map point on RERA to the destination’s point on OpenStreetMap.

Peak-hour drive is a rough estimate, not a route: straight line × 1.35 for the road network, at 20 km/h. Real times vary a lot with the route and the hour.

Sources:Source (openstreetmap.org) (opens in a new tab)How we calculate this

Schools and hospitals nearby

As on 5 Oct 2026

Within 2 km

  • 7Schools and colleges3 schools, 4 colleges, 0 kindergartens
  • 0Hospitals and clinics0 hospitals, 0 clinics

Nearest schools and colleges

  • Gopalan National School · 0.82 km
  • St. Philomena's School · 1.9 km
  • Indian Institute of Horticultural Research · 1.98 km

Places as mapped on OpenStreetMap (amenity=school, college, kindergarten, university; hospital, clinic), counted within 2 km in a straight line of the RERA map point. Volunteers map these, so some places may be missing or closed. Places data © OpenStreetMap contributors, extract of 5 Oct 2026.

Sources:Source (openstreetmap.org) (opens in a new tab)

Nearest metro station and railway

As on 5 Oct 2026
  • Chikkabidarakallu (ಚಿಕ್ಕಬಿದರಕಲ್ಲು)Open now — nearest operating metro station8.31 km
  • Soladevanahalli (ಸೋಲದೇವನಹಳ್ಳಿ)Nearest railway station4.21 km

Straight-line distances from the RERA map point to the station points mapped on OpenStreetMap; status (open or under construction) as tagged there. Places data © OpenStreetMap contributors, extract of 5 Oct 2026.

Sources:Source (openstreetmap.org) (opens in a new tab)

Lake and lake-buffer check

As on 5 Oct 2026

The nearest mapped lake is Unnamed lake (mapped on OpenStreetMap), 921 m from the project’s RERA map point.

The site boundary is not published as a shape, so its nearest edge can be closer than this point. Whether any building sits inside a lake buffer can only be checked on the approved plan.

The buffer rule

Bengaluru’s lake buffer rule has changed over time: the National Green Tribunal ordered a 75 m buffer in May 2016; the Supreme Court set that order aside on 5 March 2019, leaving the 30 m buffer of the Revised Master Plan 2015. Check the current rule and the approved plan before relying on either number.

Shortest distance from the RERA map point to the mapped water edge (OpenStreetMap water polygons tagged lake or reservoir, or named lake/kere/tank). Mapped shorelines can differ from the revenue-record boundary of a lake. Places data © OpenStreetMap contributors, extract of 5 Oct 2026.

Sources:Source (openstreetmap.org) (opens in a new tab)Source (livelaw.in) (opens in a new tab)Source (citizenmatters.in) (opens in a new tab)How we calculate this

Satellite time-lapse of the site

Satellite photos load when you scroll to them.

Photos from Esri World Imagery Wayback, centred on the project’s map point; dates are the capture dates in Esri’s metadata. Loaded from Esri when you scroll here.

Sources:Source (livingatlas.arcgis.com) (opens in a new tab)

KGF Ozone Nest layout plan and plot types as filed

Documents the developer uploaded to Karnataka RERA, shown as filed. Tap a page to see it full size; the full PDF opens on the RERA website.

Brochure

Approved layout plan2 files

Plot type (as filed)AreaPlots
9.14 m * 13.71 m—25
9.14 m * odd sites—3
9.14 m *12.19 m—58
9.14 m *15.24 m—117
12.19m*18.29 m—19
Commercial—1
Ews sites—33
Odd-shaped plots—73
Park & open spaces—7
Public utilities—1
Road—5

Plot types and counts as filed with Karnataka RERA.

We have not collected the layout plan drawing; the developer’s sales team can share it.

Sources:Source (rera.karnataka.gov.in) (opens in a new tab)

KGF Ozone Nest completion date and development status

  • Whole project (promoter’s RERA update)60%

    as on

Promoter’s quarterly update to RERA for Q4 2025-26, submitted 2026-07-20.

Timeline

  1. 5 Jan 2025Project start date given to RERA
  2. 23 Jul 2025Registered with Karnataka RERA
  3. 31 Jan 2028Completion date given at registration

Sources:Source (rera.karnataka.gov.in) (opens in a new tab)

Construction pace from RERA quarterly filings

As on 20 Jul 2026

At the average pace so far, construction would reach 100% around Jan 2027 — about 12 months before the completion date on RERA (31 Jan 2028).

At the pace between the 2 quarterly filings we have (50% → 60% in 3 months), it would be around Mar 2027 — about 10 months before the RERA date.

0%25%50%75%100%202620272028RERA date50%60%
  • Filed on RERA
  • Average pace since start
  • Pace between filings (and 0% assumed at the start date)
  • RERA completion date

Quarterly filings

QuarterFiled onDevelopedPlots booked
Q4 2025-26to 31 Mar 202620 Jul 202660%—
Q3 2025-26to 31 Dec 202516 Feb 202650%—
How we calculate

Average pace = % built ÷ months since the start date in the RERA record. Here: 60% ÷ 14.8 months (5 Jan 2025 to 31 Mar 2026) = 4.1% a month.

Estimated finish = latest filing date + (100 − % built) ÷ pace = 31 Mar 2026 + 40 ÷ 4.1 = 9.9 months → Jan 2027. This is an estimate, not a date from the builder or RERA.

Pace between filings = (60% − 50%) ÷ 3 months = 3.4% a month.

A straight line is a simplification: the builder reports one overall %, which mixes excavation, structure and finishing, and work rarely moves at a constant speed. The % values are the promoter’s own figures filed with RERA, not checked by us. Promoter’s quarterly update to RERA for Q4 2025-26, submitted 2026-07-20.

Sources:Source (rera.karnataka.gov.in) (opens in a new tab)How we calculate this

Approvals and documents checklist

ApprovalAuthoritySource
Layout planBDA - Bangalore Development Authority · No. BDA/TPM/PRL-02/23-24/2532/2024-25 · dated 2025-01-03Source (rera.karnataka.gov.in) (opens in a new tab)
Land conversionDC office Bengaluru · No. CR/44/07-08 · dated 2015-12-15Source (rera.karnataka.gov.in) (opens in a new tab)
Approved Layout Plan/Demarcation Planscan uploaded to RERASource (rera.karnataka.gov.in) (opens in a new tab)
NOC from ESCOMsscan uploaded to RERASource (rera.karnataka.gov.in) (opens in a new tab)
NOC for Waterscan uploaded to RERASource (rera.karnataka.gov.in) (opens in a new tab)
KSPCB (If Applicable)scan uploaded to RERASource (rera.karnataka.gov.in) (opens in a new tab)

Documents uploaded to RERA

As on 16 Oct 2026
  • Building or layout plan · Approved drawings from the planning authorityFiled on RERA ✓ — BDA - Bangalore Development Authority · No. BDA/TPM/PRL-02/23-24/2532/2024-25 · dated 3 Jan 2025
  • Commencement certificate · Permission to start buildingNot on RERA yet
  • Environment clearance · SEIAA KarnatakaNot on RERA yet
  • Fire NOC · Karnataka Fire and Emergency ServicesNot on RERA yet
  • Pollution board consent · KSPCBFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
  • Water and sewerage · BWSSBFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
  • Electricity · BESCOMFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
  • Height clearance · Airports Authority of IndiaNot on RERA yet
  • Occupancy certificate (OC) · Issued only when the building is finishedNot on RERA yet — expected at completion

From the documents the promoter uploaded to Karnataka RERA, collected 16 Oct 2026. “Filed” means a document is on RERA — we have not checked its contents or validity. Not every approval applies to every project (for example, smaller projects may not need an environment clearance). The project page on RERA lists each upload.

Sources:Source (rera.karnataka.gov.in) (opens in a new tab)

KGF Ozone Nest RERA complaints

No complaints listed on Karnataka RERA for this registration as on Source (rera.karnataka.gov.in) (opens in a new tab)

Court and consumer cases

Not found in public records yet: court cases

We list case numbers, courts and outcomes only — never names of private individuals.

About Afnan Construction

Promoter type
Proprietorship
Projects on this site
1
RERA complaints against promoter
0
Company number (CIN)
Not found in public records yet: CIN

From Karnataka RERA, as collected so far (16 Oct 2026). Complaints are those RERA lists against this promoter across all its projects.

Afnan Construction’s RERA record

Afnan Construction delivery record

As on 16 Oct 2026

Sources:Source (rera.karnataka.gov.in) (opens in a new tab)How we calculate this

What’s changed since Jan 2025

As on 16 Oct 2026
  1. 20 Jul 2026Quarterly update filed for Q4 2025-26: 60% built Source (rera.karnataka.gov.in) (opens in a new tab)
  2. 16 Feb 2026Quarterly update filed for Q3 2025-26: 50% built Source (rera.karnataka.gov.in) (opens in a new tab)
  3. 23 Jul 2025Registered with Karnataka RERA (PRM/KA/RERA/1251/472/PR/230725/007948); completion date 31 Jan 2028 Source (rera.karnataka.gov.in) (opens in a new tab)
  4. 5 Jan 2025Project start date in the RERA record Source (rera.karnataka.gov.in) (opens in a new tab)
  5. 3 Jan 2025Building plan approved by BDA - Bangalore Development Authority (No. BDA/TPM/PRL-02/23-24/2532/2024-25) Source (rera.karnataka.gov.in) (opens in a new tab)

Newest first. No extension of the completion date is recorded on RERA. When the RERA crawl sees a new filing, complaint or extension, it is added here with its date.

Plot loan EMI calculator

No listed price found — enter one to try.

Example only — use your bank’s quote.

Monthly EMI
—
Down payment
—
Loan amount
—
Total interest
—

A calculation only, from the numbers you enter — not a loan offer.

KGF Ozone Nest FAQs

What plot sizes are available in KGF Ozone Nest?

Plots come in sizes of 30×50 sq ft (117 plots), 30×40 sq ft (58 plots), 30×45 sq ft (25 plots), and 40×60 sq ft (19 plots). There are also 76 odd-sized plots, 33 EWS plots, and 1 commercial plot.

How many plots are in KGF Ozone Nest?

The project has a total of 328 plots.

Which authority approved the layout for KGF Ozone Nest?

The layout is approved by BDA (Bangalore Development Authority).

What is the RERA registration number for KGF Ozone Nest?

The project is registered with RERA under number PRM/KA/RERA/1251/472/PR/230725/007948.

When will KGF Ozone Nest be completed?

The completion date on RERA is 31 January 2028.

What is the development progress of KGF Ozone Nest?

As of Q4 2025-26 (quarter ended 31 March 2026), the layout is 60% developed.

Are there any RERA complaints against KGF Ozone Nest or the developer?

There are no complaints on this project or against the developer Afnan Construction on record with Karnataka RERA.

Where is KGF Ozone Nest located?

The project is in Shivakote, Yelahanka taluk, Bengaluru Urban district, PIN code 560089.

How many land conversion orders were issued for KGF Ozone Nest?

One land conversion order was issued for the project.

Who is the escrow bank for KGF Ozone Nest?

HDFC is the escrow bank for the project.

Written by AI from the RERA record above on 16 Oct 2026. Answers use only that record; check them against the source before you decide.

Questions about KGF Ozone Nest

No questions published yet. Ask the first one: you get an instant answer from this page’s public record, and our team follows up on anything the record does not show.

Bought a plot from Afnan Construction? Review the developer.

Reviews of Afnan Construction by verified buyers

No verified reviews of Afnan Construction yet. If you bought a plot from them, your review helps other buyers.

How reviews work: only buyers and owners can review; we confirm each purchase by phone before publishing, publish positive and negative reviews alike, never accept payment for reviews, and the developer may reply.

Similar projects within 5 km

ProjectDistancePlotsCompletion (RERA)DevelopedComplaintsPrice
Earthis AkashEarthis Akash Reality LLP1 km159Dec 2025—0Not collected
ManidvipaD R Developers1.8 km295Mar 202785%0Not collected
Fresh as a DaisyHNG Developers1.9 km118Dec 202891%0Not collected

Projects of the same kind within 5 km in a straight line of this project’s RERA map point, nearest first. % built is the promoter’s latest quarterly figure on RERA (shown for single-registration projects); prices are from the developer’s own website where we found one.

Sources:Source (rera.karnataka.gov.in) (opens in a new tab)

Sources and last checked dates

  1. Karnataka RERA — project register (search by the registration number) (opens in a new tab)

Collected on 16 Oct 2026 by AI research agents reading public pages. Facts are written in our own words. Not found yet: price; court cases; landmarks; specifications; news.

How to check on RERA: On rera.karnataka.gov.in/viewAllProjects, type the registration number in 'Registration No', press Search, then click the 'View Project Details' icon. Complaints open from the 'Complaints / Litigation' icon in the same row. Registration number: PRM/KA/RERA/1251/472/PR/230725/007948.

  • RERA record last checked: 16 Oct 2026
  • Last change in the record (registration, quarterly filing or complaint): 20 Jul 2026

How this page is made: software builds it from public records (Karnataka RERA filings, OpenStreetMap, the developer’s own website). AI is used only to read filings into fields and to write the plain-English summary and FAQ answers, which are checked against the record. Facts are checked automatically against the RERA filing. Methodology · How we earn · Report an error

More new projects nearby

  • Earthis Akash: Site photo filed with Karnataka RERAKondashettihalli, near Hesaraghatta RoadUnder constructionRERA registeredBuyers’ group open

    Earthis Akash

    by Earthis Akash Reality

    Price: Price on requestGet brochure & price →

    • 20×40, 25×40, 30×40 +2 more
    • 800 – 8,399 sq ft plots
    • Approved by BDA
    • Dec 2025

    RERA not updated since promised Dec 2025 · 159 plots

    Be one of the first 10 buyers in this groupFounding members — it’s free

    Join group for Earthis Akash
  • Manidvipa: Site photo filed with Karnataka RERAMavallipura, YelahankaUnder constructionRERA registeredBuyers’ group open

    Manidvipa

    by D R Developers

    Price: Price on requestGet brochure & price →

    • 30×40, 30×50, 30×58 +5 more
    • 801 – 34,855 sq ft plots
    • Approved by BDA
    • Mar 2027

    295 plots

    Be one of the first 10 buyers in this groupFounding members — it’s free

    Join group for Manidvipa