Lake Estates
30×50, 30×60 +2 more plots by Vishwa Projects · Addevishwanathapura, Doddaballapur Road, Bengaluru
Addevishwanathapura, Doddaballapur Road, BengaluruOpen on Google Maps (opens in a new tab)
- Under construction
- RERA registered
- plotted
Price: Price on request
Site photo filed with Karnataka RERA Karnataka RERA filing · Source ↗ (opens in a new tab)
Lake Estates at a glance
- Completion (RERA)Jun 2027 ExtendedWas Jun 2025 · Karnataka RERA
- Construction75% built · on pace for Jun 2027RERA filing to 30 Jun 2026; estimate from average pace
- RERA complaints (project)None listedKarnataka RERA · as on 17 Oct 2026
- Approvals filed5 of 9 on RERAKarnataka RERA uploads · 17 Oct 2026
- Nearest metroBagalur Cross · 9.13 km (under construction)Open now: Nagasandra, 15.99 km · straight line · OpenStreetMap, 5 Oct 2026
- Airport driveapprox. 66 min at peak16.34 km straight line · estimate
- Nearest lakeAdde Vishwanathapura Lake · 130 mFrom the RERA map point · OpenStreetMap, 5 Oct 2026
Project summary
Lake Estates is a plotted development by Vishwa Projects in Addevishwanathapura, Bengaluru with 200 plots, registered with Karnataka RERA. The completion date on RERA is 30 Jun 2027.
Facts collected on 17 Oct 2026 from public records — each linked to its source. Free for buyers. If you book through us, the developer pays us a commission.
Lake Estates buyers’ group: join to ask for a group price
No one has joined yet. Be one of the first 10 buyers in this group — the founding members.
Join free. When enough buyers have joined, our agent partner asks Vishwa Projects for a group price — for example a lower price, an easier payment plan or waived charges. Nothing is promised: you see what the developer offers and book directly with the developer if you want to. Free for buyers. If you book through us, the developer pays us a commission.
- Gathering buyers
- Talking to the developer
- Group offer
- Group site visit
- Booking
0 buyers have joined · 0 committed
Committed buyers have confirmed their budget, plot size and timeline with us on a call; developers negotiate with them. Joining is free and never obliges you to buy.
Join the Lake Estates buyers’ groupHow group buying works
See it for yourself
Visit the site with our team, or get a call to clear your questions. Free, no obligation.
Key facts: plot sizes, approval, land and completion
- Plot sizes (feet)
- 30×50, 30×60, 40×50, 40×70
- Plot area
- 1,148 – 4,993 sq ft
- Total plots
- 200
- Layout approved by
- Local Planning Authority
- Land
- Not found in public records yet: land area
- Land conversion orders
- 5
- Completion (extended)
- Jun 2027
- Development (RERA update)
- 75%
Plot sizes (RERA filing)
| Size (feet) | Area | Plots |
|---|---|---|
| 30×50 | 1,500 sq ft | 51 |
| 30×60 | 1,800 sq ft | 4 |
| 40×50 | 2,000 sq ft | 15 |
| 40×70 | 2,800 sq ft | 3 |
| Odd-sized (irregular) | varies | 54 |
Sizes as filed with RERA, converted from metres to feet (9.14 m = 30 ft, 12.19 m = 40 ft). Ask the developer which plots are still unsold.
Approving authority as filed: Local Planing Authority.
Land conversion orders (RERA filing)
| Survey no. | Converted for | Order | By |
|---|---|---|---|
| 46/2 | Residential | No. ALN(NAH)SR/23/2006-07, 25 Feb 2022 | DC Bengaluru |
| 46/3 | Residential | No. ALN(NAH)SR:23/2006-07, 25 Feb 2022 | DC Bengaluru |
| 46/4 | Residential | No. 349997, 12 Aug 2022 | DC Bengaluru |
| 76/7 | Residential | No. ALN(NAH)SR:20/2007-08, 25 Feb 2022 | DC Bengaluru |
| 76/8 | Residential | No. ALN(NAH)SR:21/2007-08, 25 Feb 2022 | DC Bengaluru |
RERA does not cover each plot’s khata. Ask the developer for the khata and title documents and have a lawyer check them before paying an advance.
Lake Estates RERA number and registration details
- RERA number
- PRM/KA/RERA/1251/472/PR/171023/006340
- Registered on
- 17 Oct 2023
- Promised completion
- 30 Jun 2025
- Extended to
- 30 Jun 2027
- RERA status
- New launch
- Plots booked
- Not found in public records yet: plots booked
- Price
- Not found in public records yet: price
- Project type
- Plotted
Summary in plain English
Lake Estates is a plotted layout by Vishwa Projects in Addevishwanathapura, Yelahanka, Bengaluru Urban. The project has 200 plots with sizes ranging from 30×50 ft to 40×70 ft. Completion is scheduled for 30 June 2027.
Written by AI from the RERA record above on 7 Oct 2026. Every number in it was checked against that record; if anything differs, the record wins.
Open space, loans, escrow and other details
- Open space
- Not found in public records yet: open space
- Water and power
- Water source filed with RERA: Local Authority
- Plot loans: approved banks
- Not found in public records yet: bank approvals
- Payment plans
- Not found in public records yet: payment plans
- Maintenance
- Not found in public records yet: maintenance
- Car parking
- Not found in public records yet: car parking charge
- Escrow bank (RERA)
- Axis Bank, Rajajinagar Bengaluru
- Building plan (RERA)
- Local Planing Authority · No. Doddaballapura Planning Authority · dated 20 Jun 2023
- Project cost declared to RERA
- ₹11.5 Cr
Amenities
Lake Estates location and address
- Address
- SY NO. 46/2, 46/3, 46/4, 48/14, 49, 76/7 & 76/8 OF ADDE VISHWANATHAPURA VILLAGE , HESARUGHATTA HOBLI , Yelahanka , Bengaluru Urban, Karnataka - 560064
- Village (RERA)
- Addevishwanathapura
- Locality
- Doddaballapur RoadAlso known as Doddaballapura Road, Doddaballapur Main Road
- PIN code
- 560064
- City
- Bengaluru
- State
- Karnataka
- Coordinates
- 13.18158, 77.55478
Distances to landmarks
Not found in public records yet: landmarksAbout Doddaballapur Road
Not found in public records yet: locality factsCommute times to tech parks and the airport
| To | Straight line | Peak-hour drive (estimate) |
|---|---|---|
| Kempegowda International AirportMap point on OpenStreetMap (opens in a new tab) | 16.34 km | approx. 66 min |
| Manyata Tech ParkMap point on OpenStreetMap (opens in a new tab) | 16.43 km | approx. 67 min |
| KSR Bengaluru City railway station (Majestic)Map point on OpenStreetMap (opens in a new tab) | 22.67 km | approx. 92 min |
| ITPL, Whitefield (main gate)Map point on OpenStreetMap (opens in a new tab) | 29.29 km | approx. 119 min |
| Outer Ring Road tech corridor (RMZ Ecospace, Bellandur)Map point on OpenStreetMap (opens in a new tab) | 31.78 km | approx. 129 min |
| Electronic City Phase 1Map point on OpenStreetMap (opens in a new tab) | 38.79 km | approx. 157 min |
How we calculate
Straight line: from the project’s map point on RERA to the destination’s point on OpenStreetMap.
Peak-hour drive is a rough estimate, not a route: straight line × 1.35 for the road network, at 20 km/h. Real times vary a lot with the route and the hour.
Sources:Source (openstreetmap.org) (opens in a new tab)How we calculate this
Schools and hospitals nearby
Within 2 km
- 7Schools and colleges3 schools, 4 colleges, 0 kindergartens
- 5Hospitals and clinics3 hospitals, 2 clinics
Nearest schools and colleges
- Presidency University Hostel · 1.23 km
- SVITgrounnd · 1.53 km
- Sri Vidya Institute of Technology · 1.59 km
Nearest hospitals and clinics
- Raksha health care · 1.21 km
- Govt hospital,Rajanukunte · 1.27 km
- Rajankunte Hospital · 1.38 km
Places as mapped on OpenStreetMap (amenity=school, college, kindergarten, university; hospital, clinic), counted within 2 km in a straight line of the RERA map point. Volunteers map these, so some places may be missing or closed. Places data © OpenStreetMap contributors, extract of 5 Oct 2026.
Nearest metro station and railway
- Bagalur Cross (ಬಾಗಲೂರು ಕ್ರಾಸ್)Blue Line metro, under construction9.13 km
- Doddajala (ದೊಡ್ಡಜಾಲ)Blue Line metro, under construction9.76 km
- Yelahanka (ಯಲಹಂಕ)Blue Line metro, under construction10.14 km
- Nagasandra (ನಾಗಸಂದ್ರ)Open now — nearest operating metro station15.99 km
- Rajanukunte Nearest railway station1.4 km
Straight-line distances from the RERA map point to the station points mapped on OpenStreetMap; status (open or under construction) as tagged there. Places data © OpenStreetMap contributors, extract of 5 Oct 2026.
Lake and lake-buffer check
The nearest mapped lake is Adde Vishwanathapura Lake, 130 m from the project’s RERA map point.
The site boundary is not published as a shape, so its nearest edge can be closer than this point. Whether any building sits inside a lake buffer can only be checked on the approved plan.
- Adde Vishwanathapura Lake on OpenStreetMap (opens in a new tab) 130 m
- Unnamed lake (mapped on OpenStreetMap) on OpenStreetMap (opens in a new tab) 686 m
- Unnamed lake (mapped on OpenStreetMap) on OpenStreetMap (opens in a new tab) 1,590 m
The buffer rule
Bengaluru’s lake buffer rule has changed over time: the National Green Tribunal ordered a 75 m buffer in May 2016; the Supreme Court set that order aside on 5 March 2019, leaving the 30 m buffer of the Revised Master Plan 2015. Check the current rule and the approved plan before relying on either number.
- LiveLaw: SC sets aside NGT order enlarging buffer zones (2019) (livelaw.in) (opens in a new tab)
- Citizen Matters: Shrinking lake buffers (citizenmatters.in) (opens in a new tab)
Shortest distance from the RERA map point to the mapped water edge (OpenStreetMap water polygons tagged lake or reservoir, or named lake/kere/tank). Mapped shorelines can differ from the revenue-record boundary of a lake. Places data © OpenStreetMap contributors, extract of 5 Oct 2026.
Sources:Source (openstreetmap.org) (opens in a new tab)Source (livelaw.in) (opens in a new tab)Source (citizenmatters.in) (opens in a new tab)How we calculate this
Satellite time-lapse of the site
Satellite photos load when you scroll to them.
Photos from Esri World Imagery Wayback, centred on the project’s map point; dates are the capture dates in Esri’s metadata. Loaded from Esri when you scroll here.
Sources:Source (livingatlas.arcgis.com) (opens in a new tab)
Lake Estates layout plan and plot types as filed
Documents the developer uploaded to Karnataka RERA, shown as filed. Tap a page to see it full size; the full PDF opens on the RERA website.
Approved building plan2 files

Approved Building/Plotting PlanFull PDF on RERA 
DPA Approved Plan Colour.pdfFull PDF on RERA
Approved layout plan3 files

Approved Layout PlanFull PDF on RERA 
Existing Layout PlanFull PDF on RERA 
ADDE VISHWANATHAPURA VILLAGE MAP DEMARCATION.pdfFull PDF on RERA
Layout plan and brochure not published? The developer shares them only on request. We’ll get the brochure, layout plan and current price list for you, free.
Get brochure, layout plan & price| Plot type (as filed) | Area | Plots |
|---|---|---|
| Plot 9.14 m × 15.25 m | — | 51 |
| Plot 9.14 m × 18.29 m | — | 4 |
| Plot 12.13 m × 15.24 m | — | 15 |
| Plot 12.13 m × 21.09 m | — | 3 |
| Odd-shaped plots | — | 54 |
Plot types and counts as filed with Karnataka RERA.
We have not collected the layout plan drawing; the developer’s sales team can share it.
Lake Estates completion date and development status
Promoter’s quarterly update to RERA for Q1 2026-27, submitted 2026-07-15.
Timeline
- 1 Sep 2023Project start date given to RERA
- 17 Oct 2023Registered with Karnataka RERA
- 30 Jun 2025Completion date given at registration
- 30 Jun 2026Section 6 Extension: completion date moved to this date
- 30 Jun 2027Further Extension: completion date moved to this date
Construction pace from RERA quarterly filings
At the average pace so far, construction would reach 100% around Jun 2027 — about 1 month before the completion date on RERA (30 Jun 2027).
At the pace between the 3 quarterly filings we have (65% → 75% in 6 months), it would be around Sep 2027 — about 3 months after the RERA date.
- Filed on RERA
- Average pace since start
- Pace between filings (and 0% assumed at the start date)
- RERA completion date
Quarterly filings
| Quarter | Filed on | Developed | Plots booked |
|---|---|---|---|
| Q1 2026-27to 30 Jun 2026 | 15 Jul 2026 | 75% | — |
| Q4 2025-26to 31 Mar 2026 | 15 Jun 2026 | 70% | — |
| Q3 2025-26to 31 Dec 2025 | 15 Jun 2026 | 65% | — |
How we calculate
Average pace = % built ÷ months since the start date in the RERA record. Here: 75% ÷ 33.9 months (1 Sep 2023 to 30 Jun 2026) = 2.2% a month.
Estimated finish = latest filing date + (100 − % built) ÷ pace = 30 Jun 2026 + 25 ÷ 2.2 = 11.3 months → Jun 2027. This is an estimate, not a date from the builder or RERA.
Pace between filings = (75% − 65%) ÷ 5.9 months = 1.7% a month.
A straight line is a simplification: the builder reports one overall %, which mixes excavation, structure and finishing, and work rarely moves at a constant speed. The % values are the promoter’s own figures filed with RERA, not checked by us. Promoter’s quarterly update to RERA for Q1 2026-27, submitted 2026-07-15.
Sources:Source (rera.karnataka.gov.in) (opens in a new tab)How we calculate this
Approvals and documents checklist
14 rows: approvals. Scroll inside the table to see them all.
| Approval | Authority | Source |
|---|---|---|
| Layout plan | Local Planing Authority · No. Doddaballapura Planning Authority · dated 2023-06-20 | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Land conversion (5 orders) | DC Bengaluru · No. ALN(NAH)SR/23/2006-07 and 4 more · dated 2022-08-12 | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Commencement Certificate | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Electricity Permission Letter | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Water Permission Letter | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Approved Layout Plan | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Approved Building/Plotting Plan | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Approved Section Of Building/Infrastructure Plan of Plotting | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Change of Land Use | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| District Magistrate | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Conversion Certificate under section 95 of the KLR Act 1964 | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| ESCOM/Electricity | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| KWSSB/Water | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| KSPCB | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
Documents uploaded to RERA
- Building or layout plan · Approved drawings from the planning authorityFiled on RERA ✓ — Local Planing Authority · No. Doddaballapura Planning Authority · dated 20 Jun 2023
- Commencement certificate · Permission to start buildingFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
- Environment clearance · SEIAA KarnatakaNot on RERA yet
- Fire NOC · Karnataka Fire and Emergency ServicesNot on RERA yet
- Pollution board consent · KSPCBFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
- Water and sewerage · BWSSBFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
- Electricity · BESCOMFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
- Height clearance · Airports Authority of IndiaNot on RERA yet
- Occupancy certificate (OC) · Issued only when the building is finishedNot on RERA yet — expected at completion
From the documents the promoter uploaded to Karnataka RERA, collected 17 Oct 2026. “Filed” means a document is on RERA — we have not checked its contents or validity. Not every approval applies to every project (for example, smaller projects may not need an environment clearance). The project page on RERA lists each upload.
Lake Estates RERA complaints
No complaints listed on Karnataka RERA for this registration as on Source (rera.karnataka.gov.in) (opens in a new tab)
Court and consumer cases
We list case numbers, courts and outcomes only — never names of private individuals.
About Vishwa Projects
- Promoter type
- Partnership Firm
- Projects on this site
- 1
- RERA complaints against promoter
- 0
- Company number (CIN)
- Not found in public records yet: CIN
From Karnataka RERA, as collected so far (17 Oct 2026). Complaints are those RERA lists against this promoter across all its projects.
Vishwa Projects’s RERA recordVishwa Projects delivery record
- 1Projects in Bengaluru on RERA1 approved registration under Vishwa Projects in Bengaluru Urban and Rural. Source (rera.karnataka.gov.in) (opens in a new tab)
- 200Plots registeredAs stated in each registrations.
- 0RERA complaintsas on Source (rera.karnataka.gov.in) (opens in a new tab)
- 0Complaints per 1,000 plots0 complaints ÷ 200 plots in its 1 registration on Karnataka RERA in Bengaluru.
Sources:Source (rera.karnataka.gov.in) (opens in a new tab)How we calculate this
What’s changed since Jun 2023
- 30 Jun 2027Completion date extended to 30 Jun 2027 Source (rera.karnataka.gov.in) (opens in a new tab)
- 15 Jul 2026Quarterly update filed for Q1 2026-27: 75% built Source (rera.karnataka.gov.in) (opens in a new tab)
- 15 Jun 2026Quarterly update filed for Q3 2025-26: 65% built Source (rera.karnataka.gov.in) (opens in a new tab)
- 15 Jun 2026Quarterly update filed for Q4 2025-26: 70% built Source (rera.karnataka.gov.in) (opens in a new tab)
- 17 Oct 2023Registered with Karnataka RERA (PRM/KA/RERA/1251/472/PR/171023/006340); completion date 30 Jun 2025 Source (rera.karnataka.gov.in) (opens in a new tab)
- 1 Sep 2023Project start date in the RERA record Source (rera.karnataka.gov.in) (opens in a new tab)
- 20 Jun 2023Building plan approved by Local Planing Authority (No. Doddaballapura Planning Authority) Source (rera.karnataka.gov.in) (opens in a new tab)
Newest first. When the RERA crawl sees a new filing, complaint or extension, it is added here with its date.
Plot loan EMI calculator
- Monthly EMI
- —
- Down payment
- —
- Loan amount
- —
- Total interest
- —
A calculation only, from the numbers you enter — not a loan offer.
Lake Estates FAQs
What are the plot sizes at Lake Estates?
Plot sizes are 30×50 ft (1,500 sq ft), 40×50 ft (2,000 sq ft), 30×60 ft (1,800 sq ft), and 40×70 ft (2,800 sq ft). There are also 54 odd-sized plots.
How many plots are in Lake Estates?
The project has 200 plots in total.
When will Lake Estates be completed?
The current completion date on RERA is 30 June 2027.
Has the completion date changed?
Yes. The original completion date was 30 June 2025. A Section 6 Extension moved it to 30 June 2026, and a further extension moved it to 30 June 2027.
What is the RERA registration number for Lake Estates?
The RERA registration number is PRM/KA/RERA/1251/472/PR/171023/006340, registered on 17 October 2023.
Who approved the layout of Lake Estates?
The layout was approved by the Local Planning Authority.
How many land conversion orders were issued for Lake Estates?
5 land conversion orders were issued for the project.
What is the current development status of Lake Estates?
As of Q1 2026-27 (ended 30 June 2026), 75% of the layout has been developed.
Are there any RERA complaints against Lake Estates or Vishwa Projects?
No RERA complaints have been filed on this project or against Vishwa Projects.
Where is Lake Estates located?
Lake Estates is in Addevishwanathapura, Yelahanka taluk, Bengaluru Urban district, PIN code 560064.
Written by AI from the RERA record above on 7 Oct 2026. Answers use only that record; check them against the source before you decide.
Questions about Lake Estates
No questions published yet. Ask the first one: you get an instant answer from this page’s public record, and our team follows up on anything the record does not show.
Bought a plot from Vishwa Projects? Review the developer.
Reviews of Vishwa Projects by verified buyers
No verified reviews of Vishwa Projects yet. If you bought a plot from them, your review helps other buyers.
How reviews work: only buyers and owners can review; we confirm each purchase by phone before publishing, publish positive and negative reviews alike, never accept payment for reviews, and the developer may reply.
Similar projects within 5 km
| Project | Distance | Plots | Completion (RERA) | Developed | Complaints | Price |
|---|---|---|---|---|---|---|
| Raja IraRaja Housing Limited | 1.2 km | 65 | Jun 2026 | — | 0 | Not collected |
| Earth SoulEarth Soul Ventures | 1.8 km | 72 | Dec 2026 | — | 0 | Not collected |
| Chartered BirdsongSukhada Bala | 2 km | 265 | Dec 2028 | 84% | 0 | Not collected |
| Melodies of NorthJade Infra Projects | 3.3 km | 328 | Sep 2027 | 34% | 0 | Not collected |
| KNS WilonaM/S KNS Real Vista LLP | 3.3 km | 23 | Oct 2025 | — | 0 | Not collected |
| Prestige MarigoldAce Realty Ventures | 3.6 km | 1,114 | Nov 2027 | — | 1 | Not collected |
Projects of the same kind within 5 km in a straight line of this project’s RERA map point, nearest first. % built is the promoter’s latest quarterly figure on RERA (shown for single-registration projects); prices are from the developer’s own website where we found one.
Sources and last checked dates
Collected on 17 Oct 2026 by AI research agents reading public pages. Facts are written in our own words. Not found yet: price; court cases; landmarks; specifications; news.
How to check on RERA: On rera.karnataka.gov.in/viewAllProjects, type the registration number in 'Registration No', press Search, then click the 'View Project Details' icon. Complaints open from the 'Complaints / Litigation' icon in the same row. Registration number: PRM/KA/RERA/1251/472/PR/171023/006340.
- RERA record last checked: 17 Oct 2026
- Last change in the record (registration, quarterly filing or complaint): 15 Jul 2026
How this page is made: software builds it from public records (Karnataka RERA filings, OpenStreetMap, the developer’s own website). AI is used only to read filings into fields and to write the plain-English summary and FAQ answers, which are checked against the record. Facts are checked automatically against the RERA filing. Methodology · How we earn · Report an error
More new projects in Doddaballapur Road
Kadatanamale, Doddaballapur RoadUnder constructionRERA registeredBuyers’ group openKNS Wilona
by M/S KNS Real Vista
Price: Price on requestGet brochure & price →
- 30×40, 35×40, 30×50 +1 more
- 1,175 – 2,194 sq ft plots
- Approved by BMRDA
- Oct 2025
RERA not updated since promised Oct 2025 · 23 plots
Be one of the first 10 buyers in this groupFounding members — it’s free
Join group for KNS Wilona
Kakkehalli, Doddaballapur RoadUnder constructionRERA registeredBuyers’ group openJ V Green Valley
by Srinivasulu G
Price: Price on requestGet brochure & price →
- 30×40, 40×50, 40×60
- 904 – 2,935 sq ft plots
- Approved by Doddaballapur Planning Authority
- Dec 2028
115 plots
Be one of the first 10 buyers in this groupFounding members — it’s free
Join group for J V Green Valley
Nellukunte, Doddaballapur RoadUnder constructionRERA registeredBuyers’ group openUnder The Stars
by SSD Housing Nellukunte
Price: Price on requestGet brochure & price →
- 23×45, 30×40, 30×45 +1 more
- 951 – 7,743 sq ft plots
- Approved by Doddaballapur Planning Authority
- Oct 2030
69 plots
Be one of the first 10 buyers in this groupFounding members — it’s free
Join group for Under The Stars