Sri Sai Nandana Crystal
2 & 3 BHK apartments by Sri Sai Nandana Builders · Chambenahalli, Dommasandra, Bengaluru
Chambenahalli, Dommasandra, BengaluruOpen on Google Maps (opens in a new tab)
- Under construction
- RERA registered
- residential
Price: Price on request
Site photo filed with Karnataka RERA Karnataka RERA filing · Source ↗ (opens in a new tab)
Sri Sai Nandana Crystal at a glance
- Possession (RERA)Dec 2030Karnataka RERA
- Construction78% built · on pace for Jan 2027RERA filing to 30 Sep 2026; estimate from average pace
- Homes booked29 of 44 (66%)RERA update · as on 30 Sep 2026
- RERA complaints (project)None listedKarnataka RERA · as on 20 Oct 2026
- Approvals filed4 of 9 on RERAKarnataka RERA uploads · 20 Oct 2026
- Nearest metroEmbassy Tech Village Kadubeesanahalli · 10.05 km (under construction)Open now: Huskur Road, 10.09 km · straight line · OpenStreetMap, 5 Oct 2026
- Airport driveapprox. 148 min at peak36.44 km straight line · estimate
- Nearest lakeYamare Lake · 351 mFrom the RERA map point · OpenStreetMap, 5 Oct 2026
Project summary
Sri Sai Nandana Crystal is a residential project by Sri Sai Nandana Builders in Chambenahalli, Bengaluru with 44 homes, registered with Karnataka RERA. The completion date on RERA is 31 Dec 2030.
Facts collected on 20 Oct 2026 from public records — each linked to its source. Free for buyers. If you book through us, the builder pays us a commission.
Sri Sai Nandana Crystal buyers’ group: join to ask for a group price
No one has joined yet. Be one of the first 10 buyers in this group — the founding members.
Join free. When enough buyers have joined, our agent partner asks Sri Sai Nandana Builders for a group price — for example a lower price, an easier payment plan or waived charges. Nothing is promised: you see what the builder offers and book directly with the builder if you want to. Free for buyers. If you book through us, the builder pays us a commission.
- Gathering buyers
- Talking to the builder
- Group offer
- Group site visit
- Booking
0 buyers have joined · 0 committed
Committed buyers have confirmed their budget, home type and timeline with us on a call; builders negotiate with them. Joining is free and never obliges you to buy.
Join the Sri Sai Nandana Crystal buyers’ groupHow group buying works
See it for yourself
Visit the site with our team, or get a call to clear your questions. Free, no obligation.
Key facts: home types, towers, land and possession
- Home types
- 2 BHK, 3 BHK
- Carpet area
- 700 – 1,057 sq ft
- Towers
- 1
- Floors
- 3
- Total homes
- 44
- Land
- 0.62 acres
- Possession (RERA)
- Dec 2030
- Built (RERA update)
- 78%
Sri Sai Nandana Crystal RERA number and registration details
- RERA number
- PRM/KA/RERA/1251/308/PR/220825/008023
- Registered on
- 22 Aug 2025
- Promised completion
- 31 Dec 2030
- Extended to
- No extension recorded
- RERA status
- New launch
- Homes booked
- 29 of 44 as on
- Price
- Not found in public records yet: price
- Project type
- Residential
Towers and blocks (RERA filing)
| Tower | Floors | Basements | Homes |
|---|---|---|---|
| Tower 1 | 3 | 0 | 44 |
A dash (—) means the filing did not state that value.
Summary in plain English
Sri Sai Nandana Crystal is a residential project by Sri Sai Nandana Builders with 44 homes in Chambenahalli, Anekal. The single tower has 3 floors with 3 BHK and 2 BHK homes. The completion date on RERA is 31 December 2030.
Written by AI from the RERA record above on 20 Oct 2026. Every number in it was checked against that record; if anything differs, the record wins.
Open space, home loans, escrow and other details
- Open space
- 45.6% of land
- Water and power
- Water source filed with RERA: Local Authority
- Home loans: approved banks
- Not found in public records yet: bank approvals
- Payment plans
- Not found in public records yet: payment plans
- Maintenance
- Not found in public records yet: maintenance
- Car parking
- Not found in public records yet: car parking charge
- Escrow bank (RERA)
- FEDERAL BANK OF INDIA, Banglore/ Banashankari
- Building plan (RERA)
- Anekal Planning Authority · No. CC/53/2025-26 · dated 22 Jul 2025
- Project cost declared to RERA
- ₹34.39 Cr
Open area as a share of the land, from the areas filed with RERA (includes driveways and landscaped areas).
Amenities
- Electricity
- CCTV Surveillance
- Water and Sanitation
Amenities and internal works as filed by the promoter with Karnataka RERA; we have not visited the site.
Sri Sai Nandana Crystal location and address
- Address
- Situated at Sy no 85/4 , Property No.2873/85/4 ,E Khatha No. 150200100100223720 , Chambenahalli Village , Sarjapura Hobli , Anekal , Bengaluru Urban, Karnataka - 562125
- Village (RERA)
- Chambenahalli
- Locality
- Dommasandra
- PIN code
- 562125
- City
- Bengaluru
- State
- Karnataka
- Coordinates
- 12.87781, 77.76161
Distances to landmarks
Not found in public records yet: landmarksAbout Dommasandra
Not found in public records yet: locality factsCommute times to tech parks and the airport
| To | Straight line | Peak-hour drive (estimate) |
|---|---|---|
| Outer Ring Road tech corridor (RMZ Ecospace, Bellandur)Map point on OpenStreetMap (opens in a new tab) | 10.1 km | approx. 41 min |
| Electronic City Phase 1Map point on OpenStreetMap (opens in a new tab) | 10.93 km | approx. 44 min |
| ITPL, Whitefield (main gate)Map point on OpenStreetMap (opens in a new tab) | 12.48 km | approx. 51 min |
| KSR Bengaluru City railway station (Majestic)Map point on OpenStreetMap (opens in a new tab) | 23.62 km | approx. 96 min |
| Manyata Tech ParkMap point on OpenStreetMap (opens in a new tab) | 24.38 km | approx. 99 min |
| Kempegowda International AirportMap point on OpenStreetMap (opens in a new tab) | 36.44 km | approx. 148 min |
How we calculate
Straight line: from the project’s map point on RERA to the destination’s point on OpenStreetMap.
Peak-hour drive is a rough estimate, not a route: straight line × 1.35 for the road network, at 20 km/h. Real times vary a lot with the route and the hour.
Sources:Source (openstreetmap.org) (opens in a new tab)How we calculate this
Schools and hospitals nearby
Within 2 km
- 7Schools and colleges4 schools, 3 colleges, 0 kindergartens
- 6Hospitals and clinics3 hospitals, 3 clinics
Nearest schools and colleges
- International School Of Management Excellence · 0.28 km
- Oakridge International School · 1.49 km
- The International School Bangalore · 1.85 km
Nearest hospitals and clinics
- Thyrocare · 0.18 km
- Balaji Nursing Home · 0.81 km
- Sri Lakshmi Multi Speciality Hospital · 1.14 km
Places as mapped on OpenStreetMap (amenity=school, college, kindergarten, university; hospital, clinic), counted within 2 km in a straight line of the RERA map point. Volunteers map these, so some places may be missing or closed. Places data © OpenStreetMap contributors, extract of 5 Oct 2026.
Nearest metro station and railway
- Embassy Tech Village Kadubeesanahalli (ಕಾಡುಬೀಸನಹಳ್ಳಿ)Blue Line metro, under construction10.05 km
- Huskur Road (ಹುಸ್ಕೂರು ರಸ್ತೆ)Open now — nearest operating metro station10.09 km
- Huskuru (ಹುಸ್ಕೂರ್)Nearest railway station5.89 km
Straight-line distances from the RERA map point to the station points mapped on OpenStreetMap; status (open or under construction) as tagged there. Places data © OpenStreetMap contributors, extract of 5 Oct 2026.
Lake and lake-buffer check
The nearest mapped lake is Yamare Lake, 351 m from the project’s RERA map point.
The site boundary is not published as a shape, so its nearest edge can be closer than this point. Whether any building sits inside a lake buffer can only be checked on the approved plan.
- Yamare Lake on OpenStreetMap (opens in a new tab) 351 m
- Thiagalara Chowdenahalli Lake on OpenStreetMap (opens in a new tab) 668 m
- Sompura Lake on OpenStreetMap (opens in a new tab) 859 m
The buffer rule
Bengaluru’s lake buffer rule has changed over time: the National Green Tribunal ordered a 75 m buffer in May 2016; the Supreme Court set that order aside on 5 March 2019, leaving the 30 m buffer of the Revised Master Plan 2015. Check the current rule and the approved plan before relying on either number.
- LiveLaw: SC sets aside NGT order enlarging buffer zones (2019) (livelaw.in) (opens in a new tab)
- Citizen Matters: Shrinking lake buffers (citizenmatters.in) (opens in a new tab)
Shortest distance from the RERA map point to the mapped water edge (OpenStreetMap water polygons tagged lake or reservoir, or named lake/kere/tank). Mapped shorelines can differ from the revenue-record boundary of a lake. Places data © OpenStreetMap contributors, extract of 5 Oct 2026.
Sources:Source (openstreetmap.org) (opens in a new tab)Source (livelaw.in) (opens in a new tab)Source (citizenmatters.in) (opens in a new tab)How we calculate this
Satellite time-lapse of the site
Satellite photos load when you scroll to them.
Photos from Esri World Imagery Wayback, centred on the project’s map point; dates are the capture dates in Esri’s metadata. Loaded from Esri when you scroll here.
Sources:Source (livingatlas.arcgis.com) (opens in a new tab)
Sri Sai Nandana Crystal floor plans, brochure and elevations
Documents the builder uploaded to Karnataka RERA, shown as filed. Tap a page to see it full size; the full PDF opens on the RERA website.
Brochure

BrochureFull PDF on RERA
Approved building plan3 pages

Approved Building PlanFull PDF on RERA
| Home type | Carpet area | Homes |
|---|---|---|
| 2 BHK | 700 – 795 sq ft | 12 |
| 3 BHK | 876 – 1,057 sq ft | 32 |
Home types, counts and carpet areas as filed with Karnataka RERA (carpet area, not super built-up).
We have not collected floor-plan drawings; the builder’s sales team can share them.
Sri Sai Nandana Crystal possession date and construction status
Promoter’s quarterly update to RERA for Q2 2026-27, submitted 2026-10-15.
Units sold and unsold, from RERA (Q2 2026-27)
| Type | Homes | Booked | Available |
|---|---|---|---|
| 2 BHK | 12 | 10 | 2 |
| 3 BHK | 32 | 19 | 13 |
As reported by the promoter in the quarterly update to RERA, not verified by us.
Timeline
- 30 Jul 2025Project start date given to RERA
- 22 Aug 2025Registered with Karnataka RERA
- 31 Dec 2030Completion date given at registration
Construction pace from RERA quarterly filings
At the average pace so far, construction would reach 100% around Jan 2027 — about 47 months before the completion date on RERA (31 Dec 2030).
At the pace between the 4 quarterly filings we have (14% → 78% in 9 months), it would be around Jan 2027 — about 48 months before the RERA date.
- Filed on RERA
- Average pace since start
- Pace between filings (and 0% assumed at the start date)
- RERA completion date
Quarterly filings
| Quarter | Filed on | Built | Homes booked |
|---|---|---|---|
| Q2 2026-27to 30 Sep 2026 | 15 Oct 2026 | 78% | 29 of 44 |
| Q1 2026-27to 30 Jun 2026 | 15 Jul 2026 | 56% | 16 of 44 |
| Q4 2025-26to 31 Mar 2026 | 15 Apr 2026 | 35% | 7 of 44 |
| Q3 2025-26to 31 Dec 2025 | 14 Jan 2026 | 14% | 7 of 44 |
How we calculate
Average pace = % built ÷ months since the start date in the RERA record. Here: 78% ÷ 14 months (30 Jul 2025 to 30 Sep 2026) = 5.6% a month.
Estimated finish = latest filing date + (100 − % built) ÷ pace = 30 Sep 2026 + 22 ÷ 5.6 = 4 months → Jan 2027. This is an estimate, not a date from the builder or RERA.
Pace between filings = (78% − 14%) ÷ 9 months = 7.1% a month.
A straight line is a simplification: the builder reports one overall %, which mixes excavation, structure and finishing, and work rarely moves at a constant speed. The % values are the promoter’s own figures filed with RERA, not checked by us. Promoter’s quarterly update to RERA for Q2 2026-27, submitted 2026-10-15.
Sources:Source (rera.karnataka.gov.in) (opens in a new tab)How we calculate this
Approvals and documents checklist
| Approval | Authority | Source |
|---|---|---|
| Building plan | Anekal Planning Authority · No. CC/53/2025-26 · dated 2025-07-22 | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Land conversion | DC office Banglore · No. 413169 · dated 2022-11-10 | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Commencement Certificate | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Approved Building Plan | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| ESCOM/Electricity | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| KWSSB/Water | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
Documents uploaded to RERA
- Building or layout plan · Approved drawings from the planning authorityFiled on RERA ✓ — Anekal Planning Authority · No. CC/53/2025-26 · dated 22 Jul 2025
- Commencement certificate · Permission to start buildingFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
- Environment clearance · SEIAA KarnatakaNot on RERA yet
- Fire NOC · Karnataka Fire and Emergency ServicesNot on RERA yet
- Pollution board consent · KSPCBNot on RERA yet
- Water and sewerage · BWSSBFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
- Electricity · BESCOMFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
- Height clearance · Airports Authority of IndiaNot on RERA yet
- Occupancy certificate (OC) · Issued only when the building is finishedNot on RERA yet — expected at completion
From the documents the promoter uploaded to Karnataka RERA, collected 20 Oct 2026. “Filed” means a document is on RERA — we have not checked its contents or validity. Not every approval applies to every project (for example, smaller projects may not need an environment clearance). The project page on RERA lists each upload.
Sri Sai Nandana Crystal RERA complaints
No complaints listed on Karnataka RERA for this registration as on Source (rera.karnataka.gov.in) (opens in a new tab)
Court and consumer cases
We list case numbers, courts and outcomes only — never names of private individuals.
About Sri Sai Nandana Builders
- Promoter type
- Partnership Firm
- Projects on this site
- 2
- RERA complaints against promoter
- 0
- Company number (CIN)
- Not found in public records yet: CIN
From Karnataka RERA, as collected so far (20 Oct 2026). Complaints are those RERA lists against this promoter across all its projects.
Sri Sai Nandana Builders’s RERA recordSri Sai Nandana Builders delivery record
- 2Projects in Bengaluru on RERA2 approved registrations under Sri Sai Nandana Builders in Bengaluru Urban and Rural. Source (rera.karnataka.gov.in) (opens in a new tab)
- 152Homes registeredAs stated in each registrations.
- 0RERA complaintsas on Source (rera.karnataka.gov.in) (opens in a new tab)
- 0Complaints per 1,000 homes0 complaints ÷ 152 homes in its 2 registrations on Karnataka RERA in Bengaluru.
Sources:Source (rera.karnataka.gov.in) (opens in a new tab)How we calculate this
What’s changed since Jul 2025
- 15 Oct 2026Quarterly update filed for Q2 2026-27: 78% built, 29 of 44 homes booked Source (rera.karnataka.gov.in) (opens in a new tab)
- 15 Jul 2026Quarterly update filed for Q1 2026-27: 56% built, 16 of 44 homes booked Source (rera.karnataka.gov.in) (opens in a new tab)
- 15 Apr 2026Quarterly update filed for Q4 2025-26: 35% built, 7 of 44 homes booked Source (rera.karnataka.gov.in) (opens in a new tab)
- 14 Jan 2026Quarterly update filed for Q3 2025-26: 14% built, 7 of 44 homes booked Source (rera.karnataka.gov.in) (opens in a new tab)
- 22 Aug 2025Registered with Karnataka RERA (PRM/KA/RERA/1251/308/PR/220825/008023); completion date 31 Dec 2030 Source (rera.karnataka.gov.in) (opens in a new tab)
- 30 Jul 2025Project start date in the RERA record Source (rera.karnataka.gov.in) (opens in a new tab)
- 22 Jul 2025Building plan approved by Anekal Planning Authority (No. CC/53/2025-26) Source (rera.karnataka.gov.in) (opens in a new tab)
Newest first. No extension of the completion date is recorded on RERA. When the RERA crawl sees a new filing, complaint or extension, it is added here with its date.
Home loan EMI calculator
- Monthly EMI
- —
- Down payment
- —
- Loan amount
- —
- Total interest
- —
A calculation only, from the numbers you enter — not a loan offer.
All-in cost: GST, registration and other charges
The calculator loads when you scroll to it.
Assumptions
- Base price: the builder’s price is not published in a form we could collect — enter it from the cost sheet.
- GST 5% on the base price and charges — the usual rate for an under-construction home that is not “affordable housing” (1%).
- Stamp duty about 5.6% and registration 2% — the Karnataka rule (registration was raised from 1% to 2% on 31 Aug 2025). Calculated on the agreement value.
- Car parking, other charges and the maintenance deposit are not in the public record we collect; enter them from the builder’s cost sheet.
- Loan on the agreement value (banks usually lend up to 75–90%); EMI is the standard reducing-balance formula. Example rate only — use your bank’s quote.
Sri Sai Nandana Crystal FAQs
What is Sri Sai Nandana Crystal?
Sri Sai Nandana Crystal is a residential project by Sri Sai Nandana Builders located in Chambenahalli, Anekal, with 44 homes in one tower.
How many homes are in Sri Sai Nandana Crystal and what types?
The project has 44 homes: 32 homes of 3 BHK type and 12 homes of 2 BHK type.
What is the carpet area range in Sri Sai Nandana Crystal?
The 3 BHK homes have carpet area from 876 to 1,057 sq ft, and the 2 BHK homes from 700 to 795 sq ft.
When will Sri Sai Nandana Crystal be completed?
The completion date on RERA is 31 December 2030.
What is the RERA registration number for Sri Sai Nandana Crystal?
The RERA registration number is PRM/KA/RERA/1251/308/PR/220825/008023, registered on 22 August 2025.
How many homes are booked in Sri Sai Nandana Crystal?
As of Q2 2026-27 ending 30 September 2026, 29 homes are booked out of 44.
What is the construction progress of Sri Sai Nandana Crystal?
As of Q2 2026-27 ending 30 September 2026, the project is 78% complete.
Are there any RERA complaints on Sri Sai Nandana Crystal?
There are no RERA complaints on this project.
Where is Sri Sai Nandana Crystal located?
Sri Sai Nandana Crystal is in Chambenahalli, Anekal taluk, Bengaluru Urban district, PIN 562125.
What is Sri Sai Nandana Builders' track record?
Sri Sai Nandana Builders is a Partnership Firm with 2 projects on our Bengaluru records and no RERA complaints against the builder.
Written by AI from the RERA record above on 20 Oct 2026. Answers use only that record; check them against the source before you decide.
Questions about Sri Sai Nandana Crystal
No questions published yet. Ask the first one: you get an instant answer from this page’s public record, and our team follows up on anything the record does not show.
Bought a home from Sri Sai Nandana Builders? Review the builder.
Reviews of Sri Sai Nandana Builders by verified buyers
No verified reviews of Sri Sai Nandana Builders yet. If you bought a home from them, your review helps other buyers.
How reviews work: only buyers and owners can review; we confirm each purchase by phone before publishing, publish positive and negative reviews alike, never accept payment for reviews, and the builder may reply.
Similar projects within 5 km
| Project | Distance | Homes | Possession (RERA) | Built | Complaints | Price |
|---|---|---|---|---|---|---|
| Meridian ParkPrestige Projects Private Limited | 0.4 km | 2,900 | Aug 2026extended | — | 7 | Not collected |
| ElanzaLodha Developers Limited | 0.5 km | 698 | Sep 2031 | 2% | 0 | from ₹2.45 Crabout ₹23,400/sq ft carpet |
| Sri Nandana GalaxySri Nandana Builders | 0.7 km | 80 | Dec 2026 | 100% | 0 | Not collected |
| Srinis PristineSrinivasa Constructions | 0.7 km | 76 | Dec 2028 | 74% | 0 | Not collected |
| Nambiar District 25Nambiar EnsembleResidential Projects LLP | 0.8 km | 2,814 | Feb 2032 | — | 2 | Not collected |
| Sri Sai ViharSri Sai Ventures | 0.9 km | 88 | Nov 2028 | 95% | 0 | Not collected |
Projects of the same kind within 5 km in a straight line of this project’s RERA map point, nearest first. % built is the promoter’s latest quarterly figure on RERA (shown for single-registration projects); prices are from the builder’s own website where we found one.
Sources and last checked dates
Collected on 20 Oct 2026 by AI research agents reading public pages. Facts are written in our own words. Not found yet: price; court cases; landmarks; specifications; news.
How to check on RERA: On rera.karnataka.gov.in/viewAllProjects, type the registration number in 'Registration No', press Search, then click the 'View Project Details' icon. Complaints open from the 'Complaints / Litigation' icon in the same row. Registration number: PRM/KA/RERA/1251/308/PR/220825/008023.
- RERA record last checked: 20 Oct 2026
- Last change in the record (registration, quarterly filing or complaint): 20 Oct 2026
How this page is made: software builds it from public records (Karnataka RERA filings, OpenStreetMap, the builder’s own website). AI is used only to read filings into fields and to write the plain-English summary and FAQ answers, which are checked against the record. Facts are checked automatically against the RERA filing. Methodology · How we earn · Report an error
More new projects in Dommasandra
Valagere Kallahalli, DommasandraReady to moveRERA registeredBuyers’ group openMeridian Park
by Prestige
Price: Price on requestGet brochure & price →
- 2 BHK, 3 BHK
- 838 – 1,359 sq ft
- Aug 2026 (extended)
3 phases on RERA · 2,900 homes · 7 RERA complaints
Be one of the first 10 buyers in this groupFounding members — it’s free
Join group for Meridian Park
Yamare, DommasandraUnder constructionRERA registeredBuyers’ group openElanza
by Lodha
Price: Price on requestGet brochure & price →
- 1 BHK, 2 BHK, 3 BHK, 4 BHK
- 321 – 1,982 sq ft
- Sep 2031
698 homes
Be one of the first 10 buyers in this groupFounding members — it’s free
Join group for Elanza
Chambenahalli, DommasandraUnder constructionRERA registeredBuyers’ group openSri Nandana Galaxy
by Sri Nandana Builders
Price: Price on requestGet brochure & price →
- 2 BHK, 3 BHK
- 641 – 974 sq ft
- Dec 2026
80 homes
Be one of the first 10 buyers in this groupFounding members — it’s free
Join group for Sri Nandana Galaxy