Millionaire Tower
1, 2 & 3 BHK mixed-use project by Artismo · Chikkajala, Bellary Road (Airport Road), Bengaluru
Chikkajala, Bellary Road (Airport Road), BengaluruOpen on Google Maps (opens in a new tab)
- Under construction
- RERA registered
- mixed
by Artismo
Price: Price on request
Site photo filed with Karnataka RERA Karnataka RERA filing · Source ↗ (opens in a new tab)
Millionaire Tower at a glance
- Possession (RERA)Sep 2029Karnataka RERA
- Construction21% built · on pace for Jan 2037 88 mo after RERA dateRERA filing to 30 Sep 2026; estimate from average pace
- Homes booked67 of 283 (24%)RERA update · as on 30 Sep 2026
- RERA complaints (project)None listedKarnataka RERA · as on 17 Oct 2026
- Approvals filed8 of 9 on RERAKarnataka RERA uploads · 17 Oct 2026
- Nearest metroDoddajala · 2.53 km (under construction)Open now: Yeshwantpur, 18.51 km · straight line · OpenStreetMap, 5 Oct 2026
- Airport driveapprox. 34 min at peak8.47 km straight line · estimate
- Nearest lakeChikkajala Lake · 538 mFrom the RERA map point · OpenStreetMap, 5 Oct 2026
Project summary
Millionaire Tower is a mixed-use project by Artismo in Chikkajala, Bengaluru with 283 homes, registered with Karnataka RERA. The completion date on RERA is 30 Sep 2029.
Facts collected on 17 Oct 2026 from public records — each linked to its source. Free for buyers. If you book through us, the builder pays us a commission.
Millionaire Tower buyers’ group: join to ask for a group price
No one has joined yet. Be one of the first 10 buyers in this group — the founding members.
Join free. When enough buyers have joined, our agent partner asks Artismo for a group price — for example a lower price, an easier payment plan or waived charges. Nothing is promised: you see what the builder offers and book directly with the builder if you want to. Free for buyers. If you book through us, the builder pays us a commission.
- Gathering buyers
- Talking to the builder
- Group offer
- Group site visit
- Booking
0 buyers have joined · 0 committed
Committed buyers have confirmed their budget, home type and timeline with us on a call; builders negotiate with them. Joining is free and never obliges you to buy.
Join the Millionaire Tower buyers’ groupHow group buying works
See it for yourself
Visit the site with our team, or get a call to clear your questions. Free, no obligation.
Key facts: home types, towers, land and possession
- Home types
- 1 BHK, 2.5 BHK, 3 BHK
- Carpet area
- 263 – 13,669 sq ft
- Towers
- 3
- Floors
- 19
- Total homes
- 283
- Land
- 4.02 acres
- Possession (RERA)
- Sep 2029
- Built (RERA update)
- 21%
Millionaire Tower RERA number and registration details
- RERA number
- PRM/KA/RERA/1251/472/PR/200224/006640
- Registered on
- 20 Feb 2024
- Promised completion
- 30 Sep 2029
- Extended to
- No extension recorded
- RERA status
- New launch
- Homes booked
- 67 of 283 as on
- Price
- Not found in public records yet: price
- Project type
- Mixed
Towers and blocks (RERA filing)
| Tower | Floors | Basements | Homes |
|---|---|---|---|
| MILLIONAIRE TOWER EAST | 19 | 2 | 80 |
| MILLIONAIRE TOWER WEST | 19 | 2 | 100 |
| MILLIONAIRE TOWER BUSINESS | 15 | 2 | 103 |
A dash (—) means the filing did not state that value.
Summary in plain English
Millionaire Tower is a mixed-use project by Artismo in Chikkajala, Yelahanka, comprising 3 towers with 283 homes across 19 floors. The project is expected to be completed on 30 September 2029.
Written by AI from the RERA record above on 17 Oct 2026. Every number in it was checked against that record; if anything differs, the record wins.
Open space, home loans, escrow and other details
- Open space
- 82.7% of land
- Water and power
- Water source filed with RERA: BoreWell,Local Authority
- Home loans: approved banks
- Not found in public records yet: bank approvals
- Payment plans
- Not found in public records yet: payment plans
- Maintenance
- Not found in public records yet: maintenance
- Car parking
- Not found in public records yet: car parking charge
- Escrow bank (RERA)
- IDFC FIRST BANK, BANNERGHATTA
- Building plan (RERA)
- BIAPPA - Bangalore Airport Area Planning Authority · No. TP/70/2022-23 · dated 3 Mar 2023
- Project cost declared to RERA
- ₹158 Cr
Open area as a share of the land, from the areas filed with RERA (includes driveways and landscaped areas).
Amenities
- Electricity
- CCTV Surveillance
- Club House
- Community Hall
- Outdoor Sports facility
- Indoor Sports facility
- Swimming Pool
- Gym
- Parks
- Power Backup
- Water and Sanitation
- LIBRARY
- DOCTOR’S ROOM
- PANTRY / STORE
- HEALTH CLUB
- TOILETS / CHANGE
- CRECHE
- LOUNGE
- CIRCULATION
Amenities and internal works as filed by the promoter with Karnataka RERA; we have not visited the site.
Millionaire Tower location and address
- Address
- SY NO.S: 77/6, 77/7, 77/9, 77/15, 77/16 & 77/17, PID NO. 150200203101100791 , CHIKKAJALA VILLAGE, JALA HOBLI , Yelahanka , Bengaluru Urban, Karnataka - 562157
- Village (RERA)
- Chikkajala
- Locality
- Bellary Road (Airport Road)Also known as Airport Road, International Airport Road, Bellary Road, NH 44
- PIN code
- 562157
- City
- Bengaluru
- State
- Karnataka
- Coordinates
- 13.16834, 77.63364
Distances to landmarks
Not found in public records yet: landmarksAbout Bellary Road (Airport Road)
Not found in public records yet: locality factsCommute times to tech parks and the airport
| To | Straight line | Peak-hour drive (estimate) |
|---|---|---|
| Kempegowda International AirportMap point on OpenStreetMap (opens in a new tab) | 8.47 km | approx. 34 min |
| Manyata Tech ParkMap point on OpenStreetMap (opens in a new tab) | 13.45 km | approx. 54 min |
| KSR Bengaluru City railway station (Majestic)Map point on OpenStreetMap (opens in a new tab) | 22.26 km | approx. 90 min |
| ITPL, Whitefield (main gate)Map point on OpenStreetMap (opens in a new tab) | 23.04 km | approx. 93 min |
| Outer Ring Road tech corridor (RMZ Ecospace, Bellandur)Map point on OpenStreetMap (opens in a new tab) | 27.69 km | approx. 112 min |
| Electronic City Phase 1Map point on OpenStreetMap (opens in a new tab) | 35.6 km | approx. 144 min |
How we calculate
Straight line: from the project’s map point on RERA to the destination’s point on OpenStreetMap.
Peak-hour drive is a rough estimate, not a route: straight line × 1.35 for the road network, at 20 km/h. Real times vary a lot with the route and the hour.
Sources:Source (openstreetmap.org) (opens in a new tab)How we calculate this
Schools and hospitals nearby
Within 2 km
- 6Schools and colleges3 schools, 3 colleges, 0 kindergartens
- 2Hospitals and clinics2 hospitals, 0 clinics
Nearest schools and colleges
- Sri Venkateshwara College of Engineering - SVCE · 0.95 km
- Katherine Public School · 1.2 km
- Sri Revanna Siddeshwara Institute of Technology · 1.4 km
Nearest hospitals and clinics
- N.R.V Hospital · 0.74 km
- Lakshmi Hospital · 1.47 km
Places as mapped on OpenStreetMap (amenity=school, college, kindergarten, university; hospital, clinic), counted within 2 km in a straight line of the RERA map point. Volunteers map these, so some places may be missing or closed. Places data © OpenStreetMap contributors, extract of 5 Oct 2026.
Nearest metro station and railway
- Doddajala (ದೊಡ್ಡಜಾಲ)Blue Line metro, under construction2.53 km
- Bagalur Cross (ಬಾಗಲೂರು ಕ್ರಾಸ್)Blue Line metro, under construction6.03 km
- Airport City (ವಿಮಾನ ನಿಲ್ದಾಣ ನಗರ)Blue Line metro, under construction6.67 km
- Yeshwantpur (ಯಶವಂತಪುರ)Open now — nearest operating metro station18.51 km
- Doddajala Nearest railway station1.58 km
Straight-line distances from the RERA map point to the station points mapped on OpenStreetMap; status (open or under construction) as tagged there. Places data © OpenStreetMap contributors, extract of 5 Oct 2026.
Lake and lake-buffer check
The nearest mapped lake is Chikkajala Lake, 538 m from the project’s RERA map point.
The site boundary is not published as a shape, so its nearest edge can be closer than this point. Whether any building sits inside a lake buffer can only be checked on the approved plan.
- Chikkajala Lake on OpenStreetMap (opens in a new tab) (ಚಿಕ್ಕಜಾಲ ಕೆರೆ)538 m
- Kadiganahalli Tank on OpenStreetMap (opens in a new tab) 819 m
- Doddajala Kere on OpenStreetMap (opens in a new tab) (ದೊಡ್ಡಜಾಲ ಕೆರೆ)1,235 m
The buffer rule
Bengaluru’s lake buffer rule has changed over time: the National Green Tribunal ordered a 75 m buffer in May 2016; the Supreme Court set that order aside on 5 March 2019, leaving the 30 m buffer of the Revised Master Plan 2015. Check the current rule and the approved plan before relying on either number.
- LiveLaw: SC sets aside NGT order enlarging buffer zones (2019) (livelaw.in) (opens in a new tab)
- Citizen Matters: Shrinking lake buffers (citizenmatters.in) (opens in a new tab)
Shortest distance from the RERA map point to the mapped water edge (OpenStreetMap water polygons tagged lake or reservoir, or named lake/kere/tank). Mapped shorelines can differ from the revenue-record boundary of a lake. Places data © OpenStreetMap contributors, extract of 5 Oct 2026.
Sources:Source (openstreetmap.org) (opens in a new tab)Source (livelaw.in) (opens in a new tab)Source (citizenmatters.in) (opens in a new tab)How we calculate this
Satellite time-lapse of the site
Satellite photos load when you scroll to them.
Photos from Esri World Imagery Wayback, centred on the project’s map point; dates are the capture dates in Esri’s metadata. Loaded from Esri when you scroll here.
Sources:Source (livingatlas.arcgis.com) (opens in a new tab)
Millionaire Tower floor plans, brochure and elevations
Documents the builder uploaded to Karnataka RERA, shown as filed. Tap a page to see it full size; the full PDF opens on the RERA website.
Floor plans19 pages

Approved Building/Plotting PlanFull PDF on RERA
Approved layout plan3 files

Approved Layout PlanFull PDF on RERA 
Existing Layout PlanFull PDF on RERA 
SITE AREA - Phase 1 & 2 DemarcationsFiled 6 Jan 2024 · Full PDF on RERA
| Home type | Carpet area | Homes |
|---|---|---|
| 1 BHK | 263 – 336 sq ft | 98 |
| 2.5 BHK | 826 – 971 sq ft | 60 |
| 3 BHK | 1,023 – 1,221 sq ft | 120 |
| Commercial | 13,501 – 13,669 sq ft | 5 |
Home types, counts and carpet areas as filed with Karnataka RERA (carpet area, not super built-up).
We have not collected floor-plan drawings; the builder’s sales team can share them.
Millionaire Tower possession date and construction status
Promoter’s quarterly update to RERA for Q2 2026-27, submitted 2026-10-14.
By tower (Q2 2026-27)
Units sold and unsold, from RERA (Q2 2026-27)
| Type | Homes | Booked | Available |
|---|---|---|---|
| 3 BHK | 120 | 34 | 86 |
| 2.5 BHK | 60 | 33 | 27 |
| 1 BHK | 98 | 0 | 98 |
| COMMERCIAL | 5 | 0 | 5 |
As reported by the promoter in the quarterly update to RERA, not verified by us.
Timeline
- 1 Jan 2024Project start date given to RERA
- 20 Feb 2024Registered with Karnataka RERA
- 30 Sep 2029Completion date given at registration
Construction pace from RERA quarterly filings
At the average pace so far, construction would reach 100% around Jan 2037 — about 88 months after the completion date on RERA (30 Sep 2029).
At the pace between the 4 quarterly filings we have (12% → 21% in 9 months), it would be around Apr 2033 — about 43 months after the RERA date.
- Filed on RERA
- Average pace since start
- Pace between filings (and 0% assumed at the start date)
- RERA completion date
Quarterly filings
| Quarter | Filed on | Built | Homes booked |
|---|---|---|---|
| Q2 2026-27to 30 Sep 2026 | 14 Oct 2026 | 21% | 67 of 283 |
| Q1 2026-27to 30 Jun 2026 | 14 Jul 2026 | 20% | 67 of 283 |
| Q4 2025-26to 31 Mar 2026 | 14 Apr 2026 | 16% | 67 of 283 |
| Q3 2025-26to 31 Dec 2025 | 12 Jan 2026 | 12% | 66 of 283 |
How we calculate
Average pace = % built ÷ months since the start date in the RERA record. Here: 21% ÷ 33 months (1 Jan 2024 to 30 Sep 2026) = 0.6% a month.
Estimated finish = latest filing date + (100 − % built) ÷ pace = 30 Sep 2026 + 79 ÷ 0.6 = 124 months → Jan 2037. This is an estimate, not a date from the builder or RERA.
Pace between filings = (21% − 12%) ÷ 9 months = 1% a month.
A straight line is a simplification: the builder reports one overall %, which mixes excavation, structure and finishing, and work rarely moves at a constant speed. The % values are the promoter’s own figures filed with RERA, not checked by us. Promoter’s quarterly update to RERA for Q2 2026-27, submitted 2026-10-14.
Sources:Source (rera.karnataka.gov.in) (opens in a new tab)How we calculate this
Approvals and documents checklist
14 rows: approvals. Scroll inside the table to see them all.
| Approval | Authority | Source |
|---|---|---|
| Building plan | BIAPPA - Bangalore Airport Area Planning Authority · No. TP/70/2022-23 · dated 2023-03-03 | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Land conversion (6 orders) | The Deputy Commissioner, Bangalore District · No. ALN(JALA) SR 24/2018-19 and 5 more · dated 2019-05-28 | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Commencement Certificate | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Electricity Permission Letter | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Water Permission Letter | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Approved Layout Plan | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Approved Building/Plotting Plan | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Approved Section Of Building/Infrastructure Plan of Plotting | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| ESCOM/Electricity | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| KWSSB/Water | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Fire Force Department | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Airport Authority of India | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| KSPCB | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| SEIAA | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
Documents uploaded to RERA
- Building or layout plan · Approved drawings from the planning authorityFiled on RERA ✓ — BIAPPA - Bangalore Airport Area Planning Authority · No. TP/70/2022-23 · dated 3 Mar 2023
- Commencement certificate · Permission to start buildingFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
- Environment clearance · SEIAA KarnatakaFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
- Fire NOC · Karnataka Fire and Emergency ServicesFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
- Pollution board consent · KSPCBFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
- Water and sewerage · BWSSBFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
- Electricity · BESCOMFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
- Height clearance · Airports Authority of IndiaFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
- Occupancy certificate (OC) · Issued only when the building is finishedNot on RERA yet — expected at completion
From the documents the promoter uploaded to Karnataka RERA, collected 17 Oct 2026. “Filed” means a document is on RERA — we have not checked its contents or validity. Not every approval applies to every project (for example, smaller projects may not need an environment clearance). The project page on RERA lists each upload.
Millionaire Tower RERA complaints
No complaints listed on Karnataka RERA for this registration as on Source (rera.karnataka.gov.in) (opens in a new tab)
Court and consumer cases
We list case numbers, courts and outcomes only — never names of private individuals.
About Artismo
- Promoter type
- Partnership Firm
- Projects on this site
- 1
- RERA complaints against promoter
- 0
- Company number (CIN)
- Not found in public records yet: CIN
From Karnataka RERA, as collected so far (17 Oct 2026). Complaints are those RERA lists against this promoter across all its projects.
Artismo’s RERA recordArtismo delivery record
- 1Projects in Bengaluru on RERA1 approved registration under Artismo in Bengaluru Urban and Rural. Source (rera.karnataka.gov.in) (opens in a new tab)
- 283Homes registeredAs stated in each registrations.
- 0RERA complaintsas on Source (rera.karnataka.gov.in) (opens in a new tab)
- 0Complaints per 1,000 homes0 complaints ÷ 283 homes in its 1 registration on Karnataka RERA in Bengaluru.
Sources:Source (rera.karnataka.gov.in) (opens in a new tab)How we calculate this
What’s changed since Mar 2023
- 14 Oct 2026Quarterly update filed for Q2 2026-27: 21% built, 67 of 283 homes booked Source (rera.karnataka.gov.in) (opens in a new tab)
- 14 Jul 2026Quarterly update filed for Q1 2026-27: 20% built, 67 of 283 homes booked Source (rera.karnataka.gov.in) (opens in a new tab)
- 14 Apr 2026Quarterly update filed for Q4 2025-26: 16% built, 67 of 283 homes booked Source (rera.karnataka.gov.in) (opens in a new tab)
- 12 Jan 2026Quarterly update filed for Q3 2025-26: 12% built, 66 of 283 homes booked Source (rera.karnataka.gov.in) (opens in a new tab)
- 20 Feb 2024Registered with Karnataka RERA (PRM/KA/RERA/1251/472/PR/200224/006640); completion date 30 Sep 2029 Source (rera.karnataka.gov.in) (opens in a new tab)
- 1 Jan 2024Project start date in the RERA record Source (rera.karnataka.gov.in) (opens in a new tab)
- 3 Mar 2023Building plan approved by BIAPPA - Bangalore Airport Area Planning Authority (No. TP/70/2022-23) Source (rera.karnataka.gov.in) (opens in a new tab)
Newest first. No extension of the completion date is recorded on RERA. When the RERA crawl sees a new filing, complaint or extension, it is added here with its date.
Home loan EMI calculator
- Monthly EMI
- —
- Down payment
- —
- Loan amount
- —
- Total interest
- —
A calculation only, from the numbers you enter — not a loan offer.
All-in cost: GST, registration and other charges
The calculator loads when you scroll to it.
Assumptions
- Base price: the builder’s price is not published in a form we could collect — enter it from the cost sheet.
- GST 5% on the base price and charges — the usual rate for an under-construction home that is not “affordable housing” (1%).
- Stamp duty about 5.6% and registration 2% — the Karnataka rule (registration was raised from 1% to 2% on 31 Aug 2025). Calculated on the agreement value.
- Car parking, other charges and the maintenance deposit are not in the public record we collect; enter them from the builder’s cost sheet.
- Loan on the agreement value (banks usually lend up to 75–90%); EMI is the standard reducing-balance formula. Example rate only — use your bank’s quote.
Millionaire Tower FAQs
What is the completion date for Millionaire Tower?
The project is scheduled for completion on 30 September 2029 as per the RERA record.
How many homes are there in Millionaire Tower?
The project has a total of 283 homes.
What home types are available in Millionaire Tower?
The project offers 1 BHK (98 homes), 2.5 BHK (60 homes), 3 BHK (120 homes), and 5 commercial units.
What are the carpet area ranges in Millionaire Tower?
1 BHK homes range from 263 to 336 sq ft, 2.5 BHK homes range from 826 to 971 sq ft, 3 BHK homes range from 1,023 to 1,221 sq ft, and commercial units range from 13,501 to 13,669 sq ft.
What is the RERA registration number for Millionaire Tower?
The RERA registration number is PRM/KA/RERA/1251/472/PR/200224/006640.
Where is Millionaire Tower located?
The project is in Chikkajala, Yelahanka taluk, Bengaluru Urban district, PIN code 562157.
How many towers are in Millionaire Tower?
The project comprises 3 towers with a maximum of 19 floors.
What is the construction progress of Millionaire Tower?
As of Q2 2026-27, the project is 21% complete with 67 homes booked out of 283.
Are there any RERA complaints against Millionaire Tower?
There are no complaints on this project and no complaints against the builder Artismo in the RERA record.
Which bank handles the escrow account for Millionaire Tower?
IDFC FIRST BANK handles the escrow account for this project.
Written by AI from the RERA record above on 17 Oct 2026. Answers use only that record; check them against the source before you decide.
Questions about Millionaire Tower
No questions published yet. Ask the first one: you get an instant answer from this page’s public record, and our team follows up on anything the record does not show.
Bought a home from Artismo? Review the builder.
Reviews of Artismo by verified buyers
No verified reviews of Artismo yet. If you bought a home from them, your review helps other buyers.
How reviews work: only buyers and owners can review; we confirm each purchase by phone before publishing, publish positive and negative reviews alike, never accept payment for reviews, and the builder may reply.
Similar projects within 5 km
| Project | Distance | Homes | Possession (RERA) | Built | Complaints | Price |
|---|---|---|---|---|---|---|
| Northern Lights by Puravankara KVNPuravankara Limited | 3.6 km | 2,433 | Dec 2030 | — | 0 | Not collected |
Projects of the same kind within 5 km in a straight line of this project’s RERA map point, nearest first. % built is the promoter’s latest quarterly figure on RERA (shown for single-registration projects); prices are from the builder’s own website where we found one.
Sources and last checked dates
Collected on 17 Oct 2026 by AI research agents reading public pages. Facts are written in our own words. Not found yet: price; court cases; landmarks; specifications; news.
How to check on RERA: On rera.karnataka.gov.in/viewAllProjects, type the registration number in 'Registration No', press Search, then click the 'View Project Details' icon. Complaints open from the 'Complaints / Litigation' icon in the same row. Registration number: PRM/KA/RERA/1251/472/PR/200224/006640.
- RERA record last checked: 17 Oct 2026
- Last change in the record (registration, quarterly filing or complaint): 17 Oct 2026
How this page is made: software builds it from public records (Karnataka RERA filings, OpenStreetMap, the builder’s own website). AI is used only to read filings into fields and to write the plain-English summary and FAQ answers, which are checked against the record. Facts are checked automatically against the RERA filing. Methodology · How we earn · Report an error
More new projects in Bellary Road (Airport Road)
- Bettahalasuru, Bellary Road (Airport Road)Ready to moveRERA registeredBuyers’ group open
After the Rain
by Total Environment Building Systems
Price: Price on requestGet brochure & price →
- 1 BHK, 4 BHK
- 280 – 4,058 sq ft
- Sep 2024 (extended)
2 phases on RERA · 383 homes · 9 RERA complaints
Be one of the first 10 buyers in this groupFounding members — it’s free
Join group for After the Rain
BagalurUnder constructionRERA registeredBuyers’ group openNorthern Lights by Puravankara KVN
by Puravankara
Price: Price on requestGet brochure & price →
- 1 BHK, 2 BHK, 3 BHK, 4 BHK
- 80 – 2,332 sq ft
- Dec 2030
2 phases on RERA · 2,433 homes
Be one of the first 10 buyers in this groupFounding members — it’s free
Join group for Northern Lights by Puravankara KVN
Bagluru, BagalurUnder constructionRERA registeredBuyers’ group openDioro & Beryl at Brigade El Dorado
by Brigade Enterprises
Price: Price on requestGet brochure & price →
- 1 BHK, 2 BHK, 3 BHK
- 120 – 61,866 sq ft
- Jun 2028
1,325 homes
Be one of the first 10 buyers in this groupFounding members — it’s free
Join group for Dioro & Beryl at Brigade El Dorado