Mythri Sankalp DKM
2 & 3 BHK apartments by Mythri Builders · Halehalli, near Old Madras Road, Bengaluru
Halehalli, near Old Madras Road, BengaluruOpen on Google Maps (opens in a new tab)
- Under construction
- RERA registered
- residential
Price: Price on request
Site photo filed with Karnataka RERA Karnataka RERA filing · Source ↗ (opens in a new tab)
Mythri Sankalp DKM at a glance
- Possession (RERA)Dec 2027Karnataka RERA
- Construction70% built · on pace for Jun 2027RERA filing to 30 Sep 2026; estimate from average pace
- Homes booked57 of 101 (56%)RERA update · as on 30 Sep 2026
- RERA complaints (project)None listedKarnataka RERA · as on 20 Oct 2026
- Approvals filed7 of 9 on RERAKarnataka RERA uploads · 20 Oct 2026
- Nearest metroSingayyanapalya · 4.14 kmstraight line · OpenStreetMap, 5 Oct 2026
- Airport driveapprox. 76 min at peak18.65 km straight line · estimate
- Nearest lakeBhattarahalli Lake · 1,183 mFrom the RERA map point · OpenStreetMap, 5 Oct 2026
Project summary
Mythri Sankalp DKM is a residential project by Mythri Builders in Halehalli, Bengaluru with 101 homes, registered with Karnataka RERA. The completion date on RERA is 31 Dec 2027.
Facts collected on 20 Oct 2026 from public records — each linked to its source. Free for buyers. If you book through us, the builder pays us a commission.
Mythri Sankalp DKM buyers’ group: join to ask for a group price
No one has joined yet. Be one of the first 10 buyers in this group — the founding members.
Join free. When enough buyers have joined, our agent partner asks Mythri Builders for a group price — for example a lower price, an easier payment plan or waived charges. Nothing is promised: you see what the builder offers and book directly with the builder if you want to. Free for buyers. If you book through us, the builder pays us a commission.
- Gathering buyers
- Talking to the builder
- Group offer
- Group site visit
- Booking
0 buyers have joined · 0 committed
Committed buyers have confirmed their budget, home type and timeline with us on a call; builders negotiate with them. Joining is free and never obliges you to buy.
Join the Mythri Sankalp DKM buyers’ groupHow group buying works
See it for yourself
Visit the site with our team, or get a call to clear your questions. Free, no obligation.
Key facts: home types, towers, land and possession
- Home types
- 2 BHK, 3 BHK
- Carpet area
- 763 – 971 sq ft
- Towers
- 1
- Floors
- 4
- Total homes
- 101
- Land
- 1.18 acres
- Possession (RERA)
- Dec 2027
- Built (RERA update)
- 70%
Mythri Sankalp DKM RERA number and registration details
- RERA number
- PRM/KA/RERA/1251/446/PR/070425/007653
- Registered on
- 7 Apr 2025
- Promised completion
- 31 Dec 2027
- Extended to
- No extension recorded
- RERA status
- Under construction
- Homes booked
- 57 of 101 as on
- Price
- Not found in public records yet: price
- Project type
- Residential
Towers and blocks (RERA filing)
| Tower | Floors | Basements | Homes |
|---|---|---|---|
| Mythri Sankalp DKM | 4 | 0 | 101 |
A dash (—) means the filing did not state that value.
Summary in plain English
Mythri Sankalp DKM is a residential project by Mythri Builders in Halehalli, Bengaluru East. The project has 101 homes across 1 tower with a maximum of 4 floors. Completion is scheduled for 31 December 2027.
Written by AI from the RERA record above on 20 Oct 2026. Every number in it was checked against that record; if anything differs, the record wins.
Open space, home loans, escrow and other details
- Open space
- 21.2% of land
- Water and power
- Water source filed with RERA: BoreWell,BWSSB
- Home loans: approved banks
- Not found in public records yet: bank approvals
- Payment plans
- Not found in public records yet: payment plans
- Maintenance
- Not found in public records yet: maintenance
- Car parking
- Not found in public records yet: car parking charge
- Escrow bank (RERA)
- KOTAK MAHINDRA BANK, K R Puram, Bhattarahalli
- Building plan (RERA)
- BDA - Bangalore Development Authority · No. bangalore development authority/plan sanction/Engineer Member/Engineer Officer-2/Techincal Assistance-3/North/22/2024-25 · dated 8 Jan 2025
- Project cost declared to RERA
- ₹49.26 Cr
Open area as a share of the land, from the areas filed with RERA (includes driveways and landscaped areas).
Amenities
- Electricity
- Club House
- Indoor Sports facility
- Swimming Pool
- Gym
- Parks
- Power Backup
Amenities and internal works as filed by the promoter with Karnataka RERA; we have not visited the site.
Mythri Sankalp DKM location and address
- Address
- Survey 59/5, 59/6, and 59/7 , Halehalli Village, Bidarahalli Hobli, Bangalore East Taluk , Bengaluru East , Bengaluru Urban, Karnataka - 560049
- Village (RERA)
- Halehalli
- Locality
- Near Old Madras RoadAlso known as OMR, Old Madras Road
- PIN code
- 560049
- City
- Bengaluru
- State
- Karnataka
- Coordinates
- 13.03303, 77.70038
Distances to landmarks
Not found in public records yet: landmarksAbout Halehalli
Not found in public records yet: locality factsCommute times to tech parks and the airport
| To | Straight line | Peak-hour drive (estimate) |
|---|---|---|
| ITPL, Whitefield (main gate)Map point on OpenStreetMap (opens in a new tab) | 6.47 km | approx. 26 min |
| Manyata Tech ParkMap point on OpenStreetMap (opens in a new tab) | 8.88 km | approx. 36 min |
| Outer Ring Road tech corridor (RMZ Ecospace, Bellandur)Map point on OpenStreetMap (opens in a new tab) | 12.33 km | approx. 50 min |
| KSR Bengaluru City railway station (Majestic)Map point on OpenStreetMap (opens in a new tab) | 15.43 km | approx. 62 min |
| Kempegowda International AirportMap point on OpenStreetMap (opens in a new tab) | 18.65 km | approx. 76 min |
| Electronic City Phase 1Map point on OpenStreetMap (opens in a new tab) | 20.75 km | approx. 84 min |
How we calculate
Straight line: from the project’s map point on RERA to the destination’s point on OpenStreetMap.
Peak-hour drive is a rough estimate, not a route: straight line × 1.35 for the road network, at 20 km/h. Real times vary a lot with the route and the hour.
Sources:Source (openstreetmap.org) (opens in a new tab)How we calculate this
Schools and hospitals nearby
Within 2 km
- 27Schools and colleges18 schools, 9 colleges, 0 kindergartens
- 11Hospitals and clinics4 hospitals, 7 clinics
Nearest schools and colleges
- Birla Open Minds International School · 0.27 km
- Diamond PU College · 0.36 km
- Indusridge PU College · 0.38 km
Nearest hospitals and clinics
- Vijaya Lakshmi Clinic · 1.21 km
- Health Plus Multi Speciality Hospital · 1.24 km
- GSR Dental & Health Care · 1.36 km
Places as mapped on OpenStreetMap (amenity=school, college, kindergarten, university; hospital, clinic), counted within 2 km in a straight line of the RERA map point. Volunteers map these, so some places may be missing or closed. Places data © OpenStreetMap contributors, extract of 5 Oct 2026.
Nearest metro station and railway
- Singayyanapalya (ಸಿಂಗಯ್ಯನಪಾಳ್ಯ)Open now — nearest operating metro station4.14 km
- Krishnarajapuram (ಕೃಷ್ಣರಾಜಪುರ)Nearest railway station4.51 km
Straight-line distances from the RERA map point to the station points mapped on OpenStreetMap; status (open or under construction) as tagged there. Places data © OpenStreetMap contributors, extract of 5 Oct 2026.
Lake and lake-buffer check
The nearest mapped lake is Bhattarahalli Lake, 1,183 m from the project’s RERA map point.
The site boundary is not published as a shape, so its nearest edge can be closer than this point. Whether any building sits inside a lake buffer can only be checked on the approved plan.
- Bhattarahalli Lake on OpenStreetMap (opens in a new tab) 1,183 m
- Unnamed lake (mapped on OpenStreetMap) on OpenStreetMap (opens in a new tab) 1,455 m
- Unnamed lake (mapped on OpenStreetMap) on OpenStreetMap (opens in a new tab) 1,457 m
The buffer rule
Bengaluru’s lake buffer rule has changed over time: the National Green Tribunal ordered a 75 m buffer in May 2016; the Supreme Court set that order aside on 5 March 2019, leaving the 30 m buffer of the Revised Master Plan 2015. Check the current rule and the approved plan before relying on either number.
- LiveLaw: SC sets aside NGT order enlarging buffer zones (2019) (livelaw.in) (opens in a new tab)
- Citizen Matters: Shrinking lake buffers (citizenmatters.in) (opens in a new tab)
Shortest distance from the RERA map point to the mapped water edge (OpenStreetMap water polygons tagged lake or reservoir, or named lake/kere/tank). Mapped shorelines can differ from the revenue-record boundary of a lake. Places data © OpenStreetMap contributors, extract of 5 Oct 2026.
Sources:Source (openstreetmap.org) (opens in a new tab)Source (livelaw.in) (opens in a new tab)Source (citizenmatters.in) (opens in a new tab)How we calculate this
Satellite time-lapse of the site
Satellite photos load when you scroll to them.
Photos from Esri World Imagery Wayback, centred on the project’s map point; dates are the capture dates in Esri’s metadata. Loaded from Esri when you scroll here.
Sources:Source (livingatlas.arcgis.com) (opens in a new tab)
Mythri Sankalp DKM home types and carpet areas
Documents the builder uploaded to Karnataka RERA, shown as filed. Tap a page to see it full size; the full PDF opens on the RERA website.
Approved building plan

Approved Building PlanFull PDF on RERA
Floor plans and brochure not published? The builder shares them only on request. We’ll get the brochure, floor plans and current price list for you, free.
Get brochure, floor plans & price| Home type | Carpet area | Homes |
|---|---|---|
| 2 BHK | 763 – 793 sq ft | 64 |
| 3 BHK | 852 – 971 sq ft | 37 |
Home types, counts and carpet areas as filed with Karnataka RERA (carpet area, not super built-up).
We have not collected floor-plan drawings; the builder’s sales team can share them.
Mythri Sankalp DKM possession date and construction status
Promoter’s quarterly update to RERA for Q2 2026-27, submitted 2026-10-14.
Units sold and unsold, from RERA (Q2 2026-27)
| Type | Homes | Booked | Available |
|---|---|---|---|
| 2 BHK | 64 | 36 | 28 |
| 3 BHK | 37 | 21 | 16 |
As reported by the promoter in the quarterly update to RERA, not verified by us.
Timeline
- 8 Jan 2025Project start date given to RERA
- 7 Apr 2025Registered with Karnataka RERA
- 31 Dec 2027Completion date given at registration
Construction pace from RERA quarterly filings
At the average pace so far, construction would reach 100% around Jun 2027 — about 6 months before the completion date on RERA (31 Dec 2027).
At the pace between the 4 quarterly filings we have (19% → 70% in 9 months), it would be around Mar 2027 — about 10 months before the RERA date.
- Filed on RERA
- Average pace since start
- Pace between filings (and 0% assumed at the start date)
- RERA completion date
Quarterly filings
| Quarter | Filed on | Built | Homes booked |
|---|---|---|---|
| Q2 2026-27to 30 Sep 2026 | 14 Oct 2026 | 70% | 57 of 101 |
| Q1 2026-27to 30 Jun 2026 | 14 Jul 2026 | 50% | 57 of 101 |
| Q4 2025-26to 31 Mar 2026 | 14 Apr 2026 | 30% | 50 of 101 |
| Q3 2025-26to 31 Dec 2025 | 26 Jan 2026 | 19% | 41 of 101 |
How we calculate
Average pace = % built ÷ months since the start date in the RERA record. Here: 70% ÷ 20.7 months (8 Jan 2025 to 30 Sep 2026) = 3.4% a month.
Estimated finish = latest filing date + (100 − % built) ÷ pace = 30 Sep 2026 + 30 ÷ 3.4 = 8.9 months → Jun 2027. This is an estimate, not a date from the builder or RERA.
Pace between filings = (70% − 19%) ÷ 9 months = 5.7% a month.
A straight line is a simplification: the builder reports one overall %, which mixes excavation, structure and finishing, and work rarely moves at a constant speed. The % values are the promoter’s own figures filed with RERA, not checked by us. Promoter’s quarterly update to RERA for Q2 2026-27, submitted 2026-10-14.
Sources:Source (rera.karnataka.gov.in) (opens in a new tab)How we calculate this
Approvals and documents checklist
| Approval | Authority | Source |
|---|---|---|
| Building plan | BDA - Bangalore Development Authority · No. bangalore development authority/plan sanction/Engineer Member/Engineer Officer-2/Techincal Assistance-3/North/22/2024-25 · dated 2025-01-08 | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Land conversion (3 orders) | District Commissioner, Bangalore Urban · No. ALN(EBB)SR/111/21-22 and 2 more · dated 2022-01-07 | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Commencement Certificate | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Approved Building Plan | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| ESCOM/Electricity | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| KWSSB/Water | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| KSPCB | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| SEIAA | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Airport Authority of India | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
Documents uploaded to RERA
- Building or layout plan · Approved drawings from the planning authorityFiled on RERA ✓ — BDA - Bangalore Development Authority · No. bangalore development authority/plan sanction/Engineer Member/Engineer Officer-2/Techincal Assistance-3/North/22/2024-25 · dated 8 Jan 2025
- Commencement certificate · Permission to start buildingFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
- Environment clearance · SEIAA KarnatakaFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
- Fire NOC · Karnataka Fire and Emergency ServicesNot on RERA yet
- Pollution board consent · KSPCBFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
- Water and sewerage · BWSSBFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
- Electricity · BESCOMFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
- Height clearance · Airports Authority of IndiaFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
- Occupancy certificate (OC) · Issued only when the building is finishedNot on RERA yet — expected at completion
From the documents the promoter uploaded to Karnataka RERA, collected 20 Oct 2026. “Filed” means a document is on RERA — we have not checked its contents or validity. Not every approval applies to every project (for example, smaller projects may not need an environment clearance). The project page on RERA lists each upload.
Mythri Sankalp DKM RERA complaints
No complaints listed on Karnataka RERA for this registration as on Source (rera.karnataka.gov.in) (opens in a new tab)
Court and consumer cases
We list case numbers, courts and outcomes only — never names of private individuals.
About Mythri Builders
- Promoter type
- Partnership Firm
- Projects on this site
- 5
- RERA complaints against promoter
- 0
- Company number (CIN)
- Not found in public records yet: CIN
From Karnataka RERA, as collected so far (20 Oct 2026). Complaints are those RERA lists against this promoter across all its projects.
Mythri Builders’s RERA recordMythri Builders delivery record
- 5Projects in Bengaluru on RERA5 approved registrations under Mythri Builders in Bengaluru Urban and Rural. Source (rera.karnataka.gov.in) (opens in a new tab)
- 1,100Homes registeredAs stated in each registrations.
- 0RERA complaintsas on Source (rera.karnataka.gov.in) (opens in a new tab)
- 0Complaints per 1,000 homes0 complaints ÷ 1,100 homes in its 5 registrations on Karnataka RERA in Bengaluru.
- 1Completion filed on RERARegistrations where the promoter applied to RERA for completion; 1 with an occupancy certificate on RERA.
- 1 of 1Filed by the date given at registrationMedian gap 0 months (on-time ones count as 0). The completion application can come after handover, so this is an upper bound on lateness.
Completion filed on RERA
| Project | Date at registration | Completion filed | Gap |
|---|---|---|---|
| Mythri SignatureOC on RERA | 30 Jun 2026 | 5 Feb 2026 | By the date |
Measured against the completion date given at registration; many projects had RERA extensions (including the COVID-period extension), shown under the date.
Sources:Source (rera.karnataka.gov.in) (opens in a new tab)How we calculate this
What’s changed since Jan 2025
- 14 Oct 2026Quarterly update filed for Q2 2026-27: 70% built, 57 of 101 homes booked Source (rera.karnataka.gov.in) (opens in a new tab)
- 14 Jul 2026Quarterly update filed for Q1 2026-27: 50% built, 57 of 101 homes booked Source (rera.karnataka.gov.in) (opens in a new tab)
- 14 Apr 2026Quarterly update filed for Q4 2025-26: 30% built, 50 of 101 homes booked Source (rera.karnataka.gov.in) (opens in a new tab)
- 26 Jan 2026Quarterly update filed for Q3 2025-26: 19% built, 41 of 101 homes booked Source (rera.karnataka.gov.in) (opens in a new tab)
- 7 Apr 2025Registered with Karnataka RERA (PRM/KA/RERA/1251/446/PR/070425/007653); completion date 31 Dec 2027 Source (rera.karnataka.gov.in) (opens in a new tab)
- 8 Jan 2025Building plan approved by BDA - Bangalore Development Authority (No. bangalore development authority/plan sanction/Engineer Member/Engineer Officer-2/Techincal Assistance-3/North/22/2024-25) Source (rera.karnataka.gov.in) (opens in a new tab)
- 8 Jan 2025Project start date in the RERA record Source (rera.karnataka.gov.in) (opens in a new tab)
Newest first. No extension of the completion date is recorded on RERA. When the RERA crawl sees a new filing, complaint or extension, it is added here with its date.
Home loan EMI calculator
- Monthly EMI
- —
- Down payment
- —
- Loan amount
- —
- Total interest
- —
A calculation only, from the numbers you enter — not a loan offer.
All-in cost: GST, registration and other charges
The calculator loads when you scroll to it.
Assumptions
- Base price: the builder’s price is not published in a form we could collect — enter it from the cost sheet.
- GST 5% on the base price and charges — the usual rate for an under-construction home that is not “affordable housing” (1%).
- Stamp duty about 5.6% and registration 2% — the Karnataka rule (registration was raised from 1% to 2% on 31 Aug 2025). Calculated on the agreement value.
- Car parking, other charges and the maintenance deposit are not in the public record we collect; enter them from the builder’s cost sheet.
- Loan on the agreement value (banks usually lend up to 75–90%); EMI is the standard reducing-balance formula. Example rate only — use your bank’s quote.
Mythri Sankalp DKM FAQs
What is the RERA registration number for Mythri Sankalp DKM?
The RERA registration number is PRM/KA/RERA/1251/446/PR/070425/007653, registered on 7 April 2025.
How many homes are in Mythri Sankalp DKM and what types are available?
There are 101 homes: 64 units of 2 BHK (carpet area 763-793 sq ft) and 37 units of 3 BHK (carpet area 852-971 sq ft).
When will Mythri Sankalp DKM be completed?
The completion date on RERA is 31 December 2027.
What is the construction progress of Mythri Sankalp DKM?
As of Q2 2026-27 (quarter ended 30 September 2026), the project is 70% complete.
How many homes have been booked in Mythri Sankalp DKM?
As of Q2 2026-27, 57 homes have been booked out of 101 homes.
Where is Mythri Sankalp DKM located?
The project is in Halehalli, Bengaluru East taluk, district Bengaluru Urban, with PIN code 560049.
Are there any RERA complaints against Mythri Sankalp DKM?
There are no RERA complaints on this project registration.
What is the escrow bank for Mythri Sankalp DKM?
The escrow bank is Kotak Mahindra Bank.
How many other projects does Mythri Builders have on the RERA record?
Mythri Builders has 7 projects in the RERA Bengaluru records.
Are there any complaints against Mythri Builders?
There are no RERA complaints against Mythri Builders across all their projects on record.
Written by AI from the RERA record above on 20 Oct 2026. Answers use only that record; check them against the source before you decide.
Questions about Mythri Sankalp DKM
No questions published yet. Ask the first one: you get an instant answer from this page’s public record, and our team follows up on anything the record does not show.
Bought a home from Mythri Builders? Review the builder.
Reviews of Mythri Builders by verified buyers
No verified reviews of Mythri Builders yet. If you bought a home from them, your review helps other buyers.
How reviews work: only buyers and owners can review; we confirm each purchase by phone before publishing, publish positive and negative reviews alike, never accept payment for reviews, and the builder may reply.
Similar projects within 5 km
| Project | Distance | Homes | Possession (RERA) | Built | Complaints | Price |
|---|---|---|---|---|---|---|
| DS Max Sky ShubhamDS Max Properties Private Limited | 0.5 km | 713 | Mar 2027 | 100% | 3 | Not collected |
| Ekaa By SummitSummit Realty | 0.7 km | 59 | Dec 2026extended | 85% | 0 | Not collected |
| LVS ParadiseLVS Builders and Developers | 0.7 km | 84 | Dec 2025 | 100% | 0 | Not collected |
| DRK BellagioM/s DRK PROJECTS | 0.8 km | 76 | Jun 2028 | 8% | 0 | Not collected |
| Samhita Serene MTBSamhita Estates LLP | 0.8 km | 484 | Dec 2026 | — | 2 | Not collected |
| LVS GreenwoodsLVS Builders LLP | 0.9 km | 138 | Jun 2027 | 34% | 0 | Not collected |
Projects of the same kind within 5 km in a straight line of this project’s RERA map point, nearest first. % built is the promoter’s latest quarterly figure on RERA (shown for single-registration projects); prices are from the builder’s own website where we found one.
Sources and last checked dates
Collected on 20 Oct 2026 by AI research agents reading public pages. Facts are written in our own words. Not found yet: price; court cases; landmarks; specifications; news.
How to check on RERA: On rera.karnataka.gov.in/viewAllProjects, type the registration number in 'Registration No', press Search, then click the 'View Project Details' icon. Complaints open from the 'Complaints / Litigation' icon in the same row. Registration number: PRM/KA/RERA/1251/446/PR/070425/007653.
- RERA record last checked: 20 Oct 2026
- Last change in the record (registration, quarterly filing or complaint): 20 Oct 2026
How this page is made: software builds it from public records (Karnataka RERA filings, OpenStreetMap, the builder’s own website). AI is used only to read filings into fields and to write the plain-English summary and FAQ answers, which are checked against the record. Facts are checked automatically against the RERA filing. Methodology · How we earn · Report an error
More new projects nearby
Kithaganur, near Old Madras RoadReady to moveRERA registeredBuyers’ group openDS Max Sky Shubham
by DS Max Properties
Price: Price on requestGet brochure & price →
- 2 BHK, 3 BHK
- 635 – 950 sq ft
- Mar 2027
713 homes · 3 RERA complaints
Be one of the first 10 buyers in this groupFounding members — it’s free
Join group for DS Max Sky Shubham
Kithaganur, near Old Madras RoadUnder constructionRERA registeredBuyers’ group openEkaa By Summit
by Summit Realty
Price: Price on requestGet brochure & price →
- 2 BHK, 3 BHK
- 724 – 1,144 sq ft
- Dec 2026 (extended)
59 homes
Be one of the first 10 buyers in this groupFounding members — it’s free
Join group for Ekaa By Summit
Kihaganur, near Old Madras RoadReady to moveRERA registeredBuyers’ group openLVS Paradise
by LVS Builders and
Price: Price on requestGet brochure & price →
- 2 BHK, 3 BHK
- 770 – 1,072 sq ft
- Dec 2025
84 homes
Be one of the first 10 buyers in this groupFounding members — it’s free
Join group for LVS Paradise