Pavani Mirabilia

1, 2, 3 & 4 BHK apartments by Sai Sravanthi Infra Projects Pvt Ltd · Seegehalli, near Old Madras Road, Bengaluru

Seegehalli, near Old Madras Road, BengaluruOpen on Google Maps (opens in a new tab)

  • Under construction
  • RERA registered
  • residential

by Sai Sravanthi Infra Projects Pvt Ltd

Price: Price on request

Get brochure, floor plans & price

Brochure, floor plans and price list for Pavani Mirabilia

Builders share their brochure, floor plans and price list only on request. Tell us how to reach you and we’ll get them and send them to you, free.

Free for buyers. If you book through us, the builder pays us a commission. How we earn

Project summary

Pavani Mirabilia is a residential project by Sai Sravanthi Infra Projects Pvt Ltd in Seegehalli, Bengaluru with 1,624 homes, registered with Karnataka RERA. The completion date on RERA is 22 Dec 2027. It is registered in 3 phases.

Facts collected on 22 Oct 2026 from public records — each linked to its source. Free for buyers. If you book through us, the builder pays us a commission.

Pavani Mirabilia buyers’ group: join to ask for a group price

No one has joined yet. Be one of the first 10 buyers in this group — the founding members.

Join free. When enough buyers have joined, our agent partner asks Sai Sravanthi Infra Projects Pvt Ltd for a group price — for example a lower price, an easier payment plan or waived charges. Nothing is promised: you see what the builder offers and book directly with the builder if you want to. Free for buyers. If you book through us, the builder pays us a commission.

  1. Gathering buyers
  2. Talking to the builder
  3. Group offer
  4. Group site visit
  5. Booking

0 buyers have joined · 0 committed

Committed buyers have confirmed their budget, home type and timeline with us on a call; builders negotiate with them. Joining is free and never obliges you to buy.

Join the Pavani Mirabilia buyers’ groupHow group buying works

See it for yourself

Visit the site with our team, or get a call to clear your questions. Free, no obligation.

Key facts: home types, towers, land and possession

Updated on 22 Oct 2026
Home types
1 BHK, 2 BHK, 3 BHK, 4 BHK
Carpet area
393 – 1,560 sq ft
Towers
10
Floors
19
Total homes
1,624
Land
19.04 acres
Possession (extended)
Dec 2027
Built (RERA update)
Not found in public records yet: construction progress

Pavani Mirabilia RERA number and registration details

RERA number
PRM/KA/RERA/1251/446/PR/120922/005235
Registered on
12 Sep 2022
Promised completion
3 Mar 2031
Extended to
22 Dec 2027
RERA status
New launch
Homes booked
Not found in public records yet: homes booked
Price
Not found in public records yet: price
Project type
Residential

3 RERA registrations (one per phase) are shown together on this page; dates above are the latest across phases.

Phases and RERA numbers

PhaseRERA numberPromised completionHomesStatusSource
Phase IPRM/KA/RERA/1251/446/PR/120922/00523525 May 20281,006New launchSource (rera.karnataka.gov.in) (opens in a new tab)
Phase-IIPRM/KA/RERA/1251/446/PR/200224/00664122 Dec 2026Extended to 22 Dec 2027379Under constructionSource (rera.karnataka.gov.in) (opens in a new tab)
Phase IIIPRM/KA/RERA/1251/446/PR/240626/0087503 Mar 2031239New launchSource (rera.karnataka.gov.in) (opens in a new tab)

Towers and blocks (RERA filing)

TowerPhaseFloorsBasementsHomes
TOWER APhase I192158
TOWER BPhase I192158
TOWER CPhase I192238
TOWER DPhase I192238
TOWER HPhase I19280
TOWER JPhase I192236
TOWER EPhase-II192238
TOWER GPhase-II192138
TOWER IPhase-II19280
TOWER FPhase III192239

A dash (—) means the filing did not state that value.

Sources:Source (rera.karnataka.gov.in) (opens in a new tab)

Summary in plain English

Pavani Mirabilia is a residential project by Sai Sravanthi Infra Projects Pvt Ltd in Bengaluru East with 1,624 homes across three phases. Phase I has 1,006 homes in 6 towers, Phase II has 379 homes in 3 towers, and Phase III has 239 homes in 1 tower. Completion dates range from 25 May 2028 for Phase I to 3 March 2031 for Phase III.

Written by AI from the RERA record above on 21 Oct 2026. Every number in it was checked against that record; if anything differs, the record wins.

Open space, home loans, escrow and other details

Open space
Not found in public records yet: open space
Water and power
Water source filed with RERA: Local Authority, BoreWell, BoreWell,Local Authority
Home loans: approved banks
Not found in public records yet: bank approvals
Payment plans
Not found in public records yet: payment plans
Maintenance
Not found in public records yet: maintenance
Car parking
Not found in public records yet: car parking charge
Escrow bank (RERA) · Phase I
HDFC, Richmond Road
Escrow bank (RERA) · Phase-II
STATE BANK OF INDIA, AECS LAYOUT BRANCH
Escrow bank (RERA) · Phase III
HDFC, WHITEFIELD,AECS LAYOUT

Sources:Source (rera.karnataka.gov.in) (opens in a new tab)

Amenities

  • Electricity
  • CCTV Surveillance
  • Club House
  • Community Hall
  • Outdoor Sports facility
  • Indoor Sports facility
  • Swimming Pool
  • Gym
  • Parks
  • Power Backup
  • Water and Sanitation

Amenities and internal works as filed by the promoter with Karnataka RERA; we have not visited the site.

Sources:Source (rera.karnataka.gov.in) (opens in a new tab)

Pavani Mirabilia location and address

Address
Sy No. 22,23 & 124 SEGEHALLI , BANGALORE , Bengaluru East , Bengaluru Urban, Karnataka - 560049
Village (RERA)
Seegehalli
Locality
Near Old Madras RoadAlso known as OMR, Old Madras Road
PIN code
560049
City
Bengaluru
State
Karnataka
Coordinates
13.01715, 77.76233

Distances to landmarks

Not found in public records yet: landmarks

About Seegehalli

Not found in public records yet: locality facts

Commute times to tech parks and the airport

As on 5 Oct 2026
ToStraight linePeak-hour drive (estimate)
ITPL, Whitefield (main gate)Map point on OpenStreetMap (opens in a new tab)4.22 kmapprox. 17 min
Outer Ring Road tech corridor (RMZ Ecospace, Bellandur)Map point on OpenStreetMap (opens in a new tab)13.61 kmapprox. 55 min
Manyata Tech ParkMap point on OpenStreetMap (opens in a new tab)15.81 kmapprox. 64 min
KSR Bengaluru City railway station (Majestic)Map point on OpenStreetMap (opens in a new tab)21.33 kmapprox. 86 min
Kempegowda International AirportMap point on OpenStreetMap (opens in a new tab)21.36 kmapprox. 86 min
Electronic City Phase 1Map point on OpenStreetMap (opens in a new tab)21.4 kmapprox. 87 min
How we calculate

Straight line: from the project’s map point on RERA to the destination’s point on OpenStreetMap.

Peak-hour drive is a rough estimate, not a route: straight line × 1.35 for the road network, at 20 km/h. Real times vary a lot with the route and the hour.

Sources:Source (openstreetmap.org) (opens in a new tab)How we calculate this

Schools and hospitals nearby

As on 5 Oct 2026

Within 2 km

  • 10Schools and colleges9 schools, 1 colleges, 0 kindergartens
  • 4Hospitals and clinics3 hospitals, 1 clinics

Nearest schools and colleges

  • Chrysalis High School · 0.88 km
  • Valistus International School · 1.18 km
  • Chryalis High · 1.25 km

Nearest hospitals and clinics

  • Miracle Hospital · 0.96 km
  • Nationwide Kadugodi Clinic · 1.14 km
  • Kannamangala Primary Health Center · 1.55 km

Places as mapped on OpenStreetMap (amenity=school, college, kindergarten, university; hospital, clinic), counted within 2 km in a straight line of the RERA map point. Volunteers map these, so some places may be missing or closed. Places data © OpenStreetMap contributors, extract of 5 Oct 2026.

Sources:Source (openstreetmap.org) (opens in a new tab)

Nearest metro station and railway

As on 5 Oct 2026
  • Whitefield (Kadugodi) (ವೈಟ್‌ಫೀಲ್ಡ್ (ಕಾಡುಗೋಡಿ))Open now — nearest operating metro station2.43 km
  • Whitefield (ವೈಟ್‌ಫೀಲ್ಡ್)Nearest railway station2.31 km

Straight-line distances from the RERA map point to the station points mapped on OpenStreetMap; status (open or under construction) as tagged there. Places data © OpenStreetMap contributors, extract of 5 Oct 2026.

Sources:Source (openstreetmap.org) (opens in a new tab)

Lake and lake-buffer check

As on 5 Oct 2026

The nearest mapped lake is Unnamed lake (mapped on OpenStreetMap), 612 m from the project’s RERA map point.

The site boundary is not published as a shape, so its nearest edge can be closer than this point. Whether any building sits inside a lake buffer can only be checked on the approved plan.

The buffer rule

Bengaluru’s lake buffer rule has changed over time: the National Green Tribunal ordered a 75 m buffer in May 2016; the Supreme Court set that order aside on 5 March 2019, leaving the 30 m buffer of the Revised Master Plan 2015. Check the current rule and the approved plan before relying on either number.

Shortest distance from the RERA map point to the mapped water edge (OpenStreetMap water polygons tagged lake or reservoir, or named lake/kere/tank). Mapped shorelines can differ from the revenue-record boundary of a lake. Places data © OpenStreetMap contributors, extract of 5 Oct 2026.

Sources:Source (openstreetmap.org) (opens in a new tab)Source (livelaw.in) (opens in a new tab)Source (citizenmatters.in) (opens in a new tab)How we calculate this

Satellite time-lapse of the site

Satellite photos load when you scroll to them.

Photos from Esri World Imagery Wayback, centred on the project’s map point; dates are the capture dates in Esri’s metadata. Loaded from Esri when you scroll here.

Sources:Source (livingatlas.arcgis.com) (opens in a new tab)

Pavani Mirabilia floor plans, brochure and elevations

Documents the builder uploaded to Karnataka RERA, shown as filed. Tap a page to see it full size; the full PDF opens on the RERA website.

Brochure2 files

Floor plans17 files

  • Pavani Mirabilia: Approved Building Plan (filed with Karnataka RERA)
    Phase III: Approved Building PlanFull PDF on RERA
  • Pavani Mirabilia: BLOCK E TYPICAL 2ND TO 16TH FLOOR PLAN AND TERRANCE FLOOR PLAN (filed with Karnataka RERA)
    Phase-II: BLOCK E TYPICAL 2ND TO 16TH FLOOR PLAN AND TERRANCE FLOOR PLANFiled 16 Feb 2024 · Full PDF on RERA
  • Pavani Mirabilia: BLOCK-E TYPICAL 2ND TO 19TH & TERRANCE FLOOR PLAN_compressed (filed with Karnataka RERA)
    Phase-II: BLOCK-E TYPICAL 2ND TO 19TH & TERRANCE FLOOR PLAN_compressedFiled 17 Apr 2026 · Full PDF on RERA
  • Pavani Mirabilia: BLOCK-E TYPICAL 2ND TO 19TH & TERRANCE FLOOR PLAN_compressed (filed with Karnataka RERA)
    Phase-II: BLOCK-E TYPICAL 2ND TO 19TH & TERRANCE FLOOR PLAN_compressedFiled 17 Apr 2026 · Full PDF on RERA
  • Pavani Mirabilia: BLOCK-G TYPICAL 2ND TO 19TH & TERRANCE FLOOR PLAN_compressed (filed with Karnataka RERA)
    Phase-II: BLOCK-G TYPICAL 2ND TO 19TH & TERRANCE FLOOR PLAN_compressedFiled 17 Apr 2026 · Full PDF on RERA
  • Pavani Mirabilia: BLOCK-I TYPICAL 2ND TO 19TH & TERRANCE FLOOR PLAN_compressed (filed with Karnataka RERA)
    Phase-II: BLOCK-I TYPICAL 2ND TO 19TH & TERRANCE FLOOR PLAN_compressedFiled 17 Apr 2026 · Full PDF on RERA
  • Pavani Mirabilia: BLOCK I TYPICAL TO 14 TH FLOOR PLAN AND TERRACE FLOOR PLAN (filed with Karnataka RERA)
    Phase-II: BLOCK I TYPICAL TO 14 TH FLOOR PLAN AND TERRACE FLOOR PLANFiled 16 Feb 2024 · Full PDF on RERA
  • Pavani Mirabilia: TYPICAL 2ND TO 19TH & TERRANCE FLOOR PLAN (filed with Karnataka RERA)
    Phase III: TYPICAL 2ND TO 19TH & TERRANCE FLOOR PLANFiled 18 May 2026 · Full PDF on RERA
  • Pavani Mirabilia: Approved Building/Plotting Plan (filed with Karnataka RERA)
    Phase I: Approved Building/Plotting PlanFull PDF on RERA
  • Pavani Mirabilia: GROUND FLOOR PLAN.pdf (filed with Karnataka RERA)
    Phase I: GROUND FLOOR PLAN.pdfFull PDF on RERA
  • Pavani Mirabilia: BLOCK-E GROUND AND FIRST FLOOR PLAN_compressed (filed with Karnataka RERA)
    Phase-II: BLOCK-E GROUND AND FIRST FLOOR PLAN_compressedFiled 17 Apr 2026 · Full PDF on RERA
  • Pavani Mirabilia: BLOCK E GROUND AND FIRST FLOOR PLAN (filed with Karnataka RERA)
    Phase-II: BLOCK E GROUND AND FIRST FLOOR PLANFiled 16 Feb 2024 · Full PDF on RERA
  • Pavani Mirabilia: BLOCK-G GROUND AND FIRST FLOOR PLAN_compressed (filed with Karnataka RERA)
    Phase-II: BLOCK-G GROUND AND FIRST FLOOR PLAN_compressedFiled 17 Apr 2026 · Full PDF on RERA
  • Pavani Mirabilia: BLOCK G GROUND AND FIRST FLOOR PLAN (filed with Karnataka RERA)
    Phase-II: BLOCK G GROUND AND FIRST FLOOR PLANFiled 16 Feb 2024 · Full PDF on RERA
  • Pavani Mirabilia: BLOCK I GROUND AND FIRST FLOOR PLAN (filed with Karnataka RERA)
    Phase-II: BLOCK I GROUND AND FIRST FLOOR PLANFiled 16 Feb 2024 · Full PDF on RERA
  • Pavani Mirabilia: GROUND AND FIRST FLOOR PLAN (filed with Karnataka RERA)
    Phase III: GROUND AND FIRST FLOOR PLANFiled 18 May 2026 · Full PDF on RERA
  • Pavani Mirabilia: GROUND FLOOR PLAN (filed with Karnataka RERA)
    Phase-II: GROUND FLOOR PLANFiled 16 Feb 2024 · Full PDF on RERA

Elevations2 files

Approved layout plan2 files

Home typeCarpet areaHomes
1 BHK393 – 437 sq ft200
2 BHK665 – 780 sq ft402
3 BHK844 – 1,560 sq ft964
4 BHK1,438 – 1,560 sq ft136

Home types, counts and carpet areas as filed with Karnataka RERA (carpet area, not super built-up).

We have not collected floor-plan drawings; the builder’s sales team can share them.

Sources:Source (rera.karnataka.gov.in) (opens in a new tab)

Pavani Mirabilia possession date and construction status

  • Phase I87%

    as on · 465 of 1,006 homes booked

  • Phase-II48%

    as on · 285 of 379 homes booked

  • Phase III2%

    as on · 0 of 239 homes booked

Timeline

  1. 19 May 2022Phase I: Project start date given to RERA
  2. 12 Sep 2022Phase I: Registered with Karnataka RERA
  3. 5 Jan 2024Phase-II: Project start date given to RERA
  4. 20 Feb 2024Phase-II: Registered with Karnataka RERA
  5. 6 Mar 2026Phase III: Project start date given to RERA
  6. 24 Jun 2026Phase III: Registered with Karnataka RERA
  7. 22 Dec 2026Phase-II: Completion date given at registration
  8. 22 Dec 2027Phase-II: Section 6 Extension: completion date moved to this date
  9. 25 May 2028Phase I: Completion date given at registration
  10. 3 Mar 2031Phase III: Completion date given at registration

Sources:Source (rera.karnataka.gov.in) (opens in a new tab)

Construction pace from RERA quarterly filings (Phase I)

As on 14 Oct 2026

At the average pace so far, construction would reach 100% around May 2027 — about 12 months before the completion date on RERA (25 May 2028).

At the pace between the 2 quarterly filings we have (84% → 87% in 3 months), it would be around Nov 2027 — about 7 months before the RERA date.

This project has 3 RERA registrations; the chart uses Phase I, the one with the most quarterly filings.

0%25%50%75%100%202320242025202620272028RERA date84%87%
  • Filed on RERA
  • Average pace since start
  • Pace between filings (and 0% assumed at the start date)
  • RERA completion date

Quarterly filings

QuarterFiled onBuiltHomes booked
Q2 2026-27to 30 Sep 202614 Oct 202687%465 of 1,108
Q1 2026-27to 30 Jun 202615 Jul 202684%465 of 1,108
How we calculate

Average pace = % built ÷ months since the start date in the RERA record. Here: 87% ÷ 52.4 months (19 May 2022 to 30 Sep 2026) = 1.7% a month.

Estimated finish = latest filing date + (100 − % built) ÷ pace = 30 Sep 2026 + 13 ÷ 1.7 = 7.8 months → May 2027. This is an estimate, not a date from the builder or RERA.

Pace between filings = (87% − 84%) ÷ 3 months = 1% a month.

A straight line is a simplification: the builder reports one overall %, which mixes excavation, structure and finishing, and work rarely moves at a constant speed. The % values are the promoter’s own figures filed with RERA, not checked by us.

Sources:Source (rera.karnataka.gov.in) (opens in a new tab)How we calculate this

Approvals and documents checklist

34 rows: approvals. Scroll inside the table to see them all.

ApprovalAuthoritySource
Building plan (Phase I)BDA - Bangalore Development Authority · No. BDA/EM/EA-01/TA-4/E/07/2022-23 · dated 2022-05-19Source (rera.karnataka.gov.in) (opens in a new tab)
Land conversion (3 orders) (Phase I)DISTRICT OFFICER BANGALORE · No. ALN(EBK)SR/81/12-13 and 2 more · dated 2012-12-24Source (rera.karnataka.gov.in) (opens in a new tab)
Commencement Certificate (Phase I)scan uploaded to RERASource (rera.karnataka.gov.in) (opens in a new tab)
Electricity Permission Letter (Phase I)scan uploaded to RERASource (rera.karnataka.gov.in) (opens in a new tab)
Water Permission Letter (Phase I)scan uploaded to RERASource (rera.karnataka.gov.in) (opens in a new tab)
Approved Building/Plotting Plan (Phase I)scan uploaded to RERASource (rera.karnataka.gov.in) (opens in a new tab)
Approved Section Of Building/Infrastructure Plan of Plotting (Phase I)scan uploaded to RERASource (rera.karnataka.gov.in) (opens in a new tab)
Change of Land Use (Phase I)scan uploaded to RERASource (rera.karnataka.gov.in) (opens in a new tab)
Conversion Certificate under section 95 of the KLR Act 1964 (Phase I)scan uploaded to RERASource (rera.karnataka.gov.in) (opens in a new tab)
ESCOM/Electricity (Phase I)scan uploaded to RERASource (rera.karnataka.gov.in) (opens in a new tab)
KWSSB/Water (Phase I)scan uploaded to RERASource (rera.karnataka.gov.in) (opens in a new tab)
Airport Authority of India (Phase I)scan uploaded to RERASource (rera.karnataka.gov.in) (opens in a new tab)
KSPCB (Phase I)scan uploaded to RERASource (rera.karnataka.gov.in) (opens in a new tab)
SEIAA (Phase I)scan uploaded to RERASource (rera.karnataka.gov.in) (opens in a new tab)
Building plan (Phase-II)BDA - Bangalore Development Authority · No. BDA/EM/EA-01/TA-4/E/41/2023-24 · dated 2023-12-08Source (rera.karnataka.gov.in) (opens in a new tab)
Land conversion (3 orders) (Phase-II)DYP COMMISSIONER · No. BDS ALN (E) VB/SR 1/05-06 and 2 more · dated 2009-04-17Source (rera.karnataka.gov.in) (opens in a new tab)
Commencement Certificate (Phase-II)scan uploaded to RERASource (rera.karnataka.gov.in) (opens in a new tab)
Electricity Permission Letter (Phase-II)scan uploaded to RERASource (rera.karnataka.gov.in) (opens in a new tab)
Water Permission Letter (Phase-II)scan uploaded to RERASource (rera.karnataka.gov.in) (opens in a new tab)
Approved Building/Plotting Plan (Phase-II)scan uploaded to RERASource (rera.karnataka.gov.in) (opens in a new tab)
Approved Section Of Building/Infrastructure Plan of Plotting (Phase-II)scan uploaded to RERASource (rera.karnataka.gov.in) (opens in a new tab)
ESCOM/Electricity (Phase-II)scan uploaded to RERASource (rera.karnataka.gov.in) (opens in a new tab)
KWSSB/Water (Phase-II)scan uploaded to RERASource (rera.karnataka.gov.in) (opens in a new tab)
Fire Force Department (Phase-II)scan uploaded to RERASource (rera.karnataka.gov.in) (opens in a new tab)
Airport Authority of India (Phase-II)scan uploaded to RERASource (rera.karnataka.gov.in) (opens in a new tab)
KSPCB (Phase-II)scan uploaded to RERASource (rera.karnataka.gov.in) (opens in a new tab)
Building plan (Phase III)BDA - Bangalore Development Authority · No. BDA/EM/EO-05/TA-4/E/74/2025-26 · dated 2026-03-06Source (rera.karnataka.gov.in) (opens in a new tab)
Land conversion (Phase III)DISTRICT OFFICERBANGALORE · No. ALN(EB)S.R/177/08-09 · dated 2009-04-17Source (rera.karnataka.gov.in) (opens in a new tab)
Approved Building Plan (Phase III)scan uploaded to RERASource (rera.karnataka.gov.in) (opens in a new tab)
ESCOM/Electricity (Phase III)scan uploaded to RERASource (rera.karnataka.gov.in) (opens in a new tab)
KSPCB (Phase III)scan uploaded to RERASource (rera.karnataka.gov.in) (opens in a new tab)
SEIAA (Phase III)scan uploaded to RERASource (rera.karnataka.gov.in) (opens in a new tab)
Fire Force Department (Phase III)scan uploaded to RERASource (rera.karnataka.gov.in) (opens in a new tab)
Airport Authority of India (Phase III)scan uploaded to RERASource (rera.karnataka.gov.in) (opens in a new tab)

Documents uploaded to RERA (Phase I)

As on 22 Oct 2026
  • Building or layout plan · Approved drawings from the planning authorityFiled on RERA ✓ — BDA - Bangalore Development Authority · No. BDA/EM/EA-01/TA-4/E/07/2022-23 · dated 19 May 2022
  • Commencement certificate · Permission to start buildingFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
  • Environment clearance · SEIAA KarnatakaFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
  • Fire NOC · Karnataka Fire and Emergency ServicesNot on RERA yet
  • Pollution board consent · KSPCBFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
  • Water and sewerage · BWSSBFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
  • Electricity · BESCOMFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
  • Height clearance · Airports Authority of IndiaFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
  • Occupancy certificate (OC) · Issued only when the building is finishedNot on RERA yet — expected at completion

From the documents the promoter uploaded to Karnataka RERA, collected 22 Oct 2026. “Filed” means a document is on RERA — we have not checked its contents or validity. Not every approval applies to every project (for example, smaller projects may not need an environment clearance). Each phase is registered separately; this list is for the phase named above. The project page on RERA lists each upload.

Sources:Source (rera.karnataka.gov.in) (opens in a new tab)

Pavani Mirabilia RERA complaints and orders

3 complaints as on Source (rera.karnataka.gov.in) (opens in a new tab)

Complaint refFiledSubjectStatusSource
01131/202616 Sep 2026Complaint regarding delay in possession and non-responsive communication – Pavani Mirabilia Phase 1, Flat D-208Under enquirySource (rera.karnataka.gov.in) (opens in a new tab)
00986/202610 Aug 2026Delay in possession of Apt J-801 & J-802, 8th Floor, Tower J, Pavani Mirabilia Phase I — Possession promised by 31-12-2025, grace period expired 30-06-2026, possession not offered till dateDisposedSource (rera.karnataka.gov.in) (opens in a new tab)
00404/202616 Apr 2026Complaint under Sec 31 of the Real Estate Act 2016, misrepresentation of litigation status (Section 12), failure to update project disclosures (Section 11), & contract delivery timeline breach(Sec 18)DisposedSource (rera.karnataka.gov.in) (opens in a new tab)

Court and consumer cases

Not found in public records yet: court cases

We list case numbers, courts and outcomes only — never names of private individuals.

About Sai Sravanthi Infra Projects Pvt Ltd

Promoter type
Company
Projects on this site
1
RERA complaints against promoter
3
Company number (CIN)
U45203TG2008PTC060151

From Karnataka RERA, as collected so far (22 Oct 2026). Complaints are those RERA lists against this promoter across all its projects.

Sai Sravanthi Infra Projects Pvt Ltd’s RERA record

Sai Sravanthi Infra Projects Pvt Ltd delivery record

As on 22 Oct 2026

What the complaints are about

  • Delay in possession or delay interest3

3 complaint subjects as written on RERA, as on . Each subject is sorted into one group by keywords (first match wins: delay, refund, registration, quality, litigation, association); one complaint often raises several issues. Source (rera.karnataka.gov.in) (opens in a new tab)

Sources:Source (rera.karnataka.gov.in) (opens in a new tab)How we calculate this

What’s changed since May 2022

As on 22 Oct 2026
  1. 22 Dec 2027Phase-II: Completion date extended to 22 Dec 2027 Source (rera.karnataka.gov.in) (opens in a new tab)
  2. 15 Oct 2026Phase III: Quarterly update filed for Q2 2026-27: 2% built, 0 of 239 homes booked Source (rera.karnataka.gov.in) (opens in a new tab)
  3. 14 Oct 2026Phase I: Quarterly update filed for Q2 2026-27: 87% built, 465 of 1,108 homes booked Source (rera.karnataka.gov.in) (opens in a new tab)
  4. 14 Oct 2026Phase-II: Quarterly update filed for Q2 2026-27: 48% built, 285 of 456 homes booked Source (rera.karnataka.gov.in) (opens in a new tab)
  5. 16 Sep 2026Complaint 01131/2026 filed with RERA: “Complaint regarding delay in possession and non-responsive communication – Pavani Mirabilia Phase 1, Flat D-208” — now under enquiry Source (rera.karnataka.gov.in) (opens in a new tab)
  6. 10 Aug 2026Complaint 00986/2026 filed with RERA: “Delay in possession of Apt J-801 & J-802, 8th Floor, Tower J, Pavani Mirabilia Phase I — Possession promised by 31-12-2025, grace period expired 30-06-2026, possession not offered till date” — now disposed Source (rera.karnataka.gov.in) (opens in a new tab)
  7. 15 Jul 2026Phase I: Quarterly update filed for Q1 2026-27: 84% built, 465 of 1,108 homes booked Source (rera.karnataka.gov.in) (opens in a new tab)
  8. 15 Jul 2026Phase-II: Quarterly update filed for Q1 2026-27: 45% built, 284 of 456 homes booked Source (rera.karnataka.gov.in) (opens in a new tab)
  9. 15 Jul 2026Phase III: Quarterly update filed for Q1 2026-27: 3% built, 0 of 239 homes booked Source (rera.karnataka.gov.in) (opens in a new tab)
  10. 24 Jun 2026Phase III: Registered with Karnataka RERA (PRM/KA/RERA/1251/446/PR/240626/008750); completion date 3 Mar 2031 Source (rera.karnataka.gov.in) (opens in a new tab)
  11. 16 Apr 2026Complaint 00404/2026 filed with RERA: “Complaint under Sec 31 of the Real Estate Act 2016, misrepresentation of litigation status (Section 12), failure to update project disclosures (Section 11), & contract delivery timeline breach(Sec 18)” — now disposed Source (rera.karnataka.gov.in) (opens in a new tab)
  12. 6 Mar 2026Phase III: Building plan approved by BDA - Bangalore Development Authority (No. BDA/EM/EO-05/TA-4/E/74/2025-26) Source (rera.karnataka.gov.in) (opens in a new tab)
  13. 6 Mar 2026Phase III: Project start date in the RERA record Source (rera.karnataka.gov.in) (opens in a new tab)
  14. 20 Feb 2024Phase-II: Registered with Karnataka RERA (PRM/KA/RERA/1251/446/PR/200224/006641); completion date 22 Dec 2026 Source (rera.karnataka.gov.in) (opens in a new tab)
  15. 5 Jan 2024Phase-II: Project start date in the RERA record Source (rera.karnataka.gov.in) (opens in a new tab)
  16. 8 Dec 2023Phase-II: Building plan approved by BDA - Bangalore Development Authority (No. BDA/EM/EA-01/TA-4/E/41/2023-24) Source (rera.karnataka.gov.in) (opens in a new tab)
  17. 12 Sep 2022Phase I: Registered with Karnataka RERA (PRM/KA/RERA/1251/446/PR/120922/005235); completion date 25 May 2028 Source (rera.karnataka.gov.in) (opens in a new tab)
  18. 19 May 2022Phase I: Building plan approved by BDA - Bangalore Development Authority (No. BDA/EM/EA-01/TA-4/E/07/2022-23) Source (rera.karnataka.gov.in) (opens in a new tab)
  19. 19 May 2022Phase I: Project start date in the RERA record Source (rera.karnataka.gov.in) (opens in a new tab)

Newest first. When the RERA crawl sees a new filing, complaint or extension, it is added here with its date.

Home loan EMI calculator

No listed price found — enter one to try.

Example only — use your bank’s quote.

Monthly EMI
—
Down payment
—
Loan amount
—
Total interest
—

A calculation only, from the numbers you enter — not a loan offer.

All-in cost: GST, registration and other charges

The calculator loads when you scroll to it.

Assumptions
  • Base price: the builder’s price is not published in a form we could collect — enter it from the cost sheet.
  • GST 5% on the base price and charges — the usual rate for an under-construction home that is not “affordable housing” (1%).
  • Stamp duty about 5.6% and registration 2% — the Karnataka rule (registration was raised from 1% to 2% on 31 Aug 2025). Calculated on the agreement value.
  • Car parking, other charges and the maintenance deposit are not in the public record we collect; enter them from the builder’s cost sheet.
  • Loan on the agreement value (banks usually lend up to 75–90%); EMI is the standard reducing-balance formula. Example rate only — use your bank’s quote.

How we calculate this

Pavani Mirabilia FAQs

What is Pavani Mirabilia?

Pavani Mirabilia is a residential project by Sai Sravanthi Infra Projects Pvt Ltd located in Bengaluru East, PIN code 560049, with 1,624 homes across three phases.

When will Pavani Mirabilia be completed?

Phase I completion date is 25 May 2028, Phase II completion date is 22 December 2027 (extended from 22 December 2026), and Phase III completion date is 3 March 2031.

What home types are available in Pavani Mirabilia?

Phase I offers 1 BHK (393-437 sq ft carpet area), 2 BHK (665-780 sq ft), 3 BHK (844-1,209 sq ft), and 4 BHK (1,438-1,560 sq ft). Phase II offers 3 BHK (844-1,560 sq ft) and 4 BHK (1,438-1,560 sq ft). Phase III offers 3 BHK (844-1,016 sq ft).

How many homes are in each phase of Pavani Mirabilia?

Phase I has 1,006 homes, Phase II has 379 homes, and Phase III has 239 homes.

What is the RERA registration number for Pavani Mirabilia?

Phase I registration number is PRM/KA/RERA/1251/446/PR/120922/005235 (registered 12 September 2022), Phase II is PRM/KA/RERA/1251/446/PR/200224/006641 (registered 20 February 2024), and Phase III is PRM/KA/RERA/1251/446/PR/240626/008750 (registered 24 June 2026).

What is the construction progress of Pavani Mirabilia?

As of Q1 2026-27, Phase I is 84% complete with 465 homes booked out of 1,108 in the booking table. Phase II as of Q2 2026-27 is 48% complete with 285 homes booked out of 456 in the booking table. Phase III as of Q2 2026-27 is 2% complete with 0 homes booked out of 239 in the booking table.

How many RERA complaints have been filed for Pavani Mirabilia?

Three RERA complaints have been filed on this project, all against Phase I registration.

How many RERA complaints are there against the builder of Pavani Mirabilia?

The builder Sai Sravanthi Infra Projects Pvt Ltd has 3 RERA complaints across all projects on record.

How many other projects does the builder have?

The builder has 2 projects in the Karnataka RERA Bengaluru records.

Which banks are holding escrow for Pavani Mirabilia?

Phase I escrow is held by IDFC FIRST BANK, Phase II by STATE BANK OF INDIA, and Phase III by HDFC.

Written by AI from the RERA record above on 21 Oct 2026. Answers use only that record; check them against the source before you decide.

Questions about Pavani Mirabilia

No questions published yet. Ask the first one: you get an instant answer from this page’s public record, and our team follows up on anything the record does not show.

Bought a home from Sai Sravanthi Infra Projects Pvt Ltd? Review the builder.

Reviews of Sai Sravanthi Infra Projects Pvt Ltd by verified buyers

No verified reviews of Sai Sravanthi Infra Projects Pvt Ltd yet. If you bought a home from them, your review helps other buyers.

How reviews work: only buyers and owners can review; we confirm each purchase by phone before publishing, publish positive and negative reviews alike, never accept payment for reviews, and the builder may reply.

Similar projects within 5 km

ProjectDistanceHomesPossession (RERA)BuiltComplaintsPrice
ELV High GardenELV Projects Private Limited0.1 km219Oct 2027extended30%7Not collected
SV Green ViewSri Venkateshwara Constructions0.5 km174Dec 202828%1Not collected
Green Edge CaseroGreen Edge Projects0.6 km117Dec 2026—0Not collected
Ashraya MeadowsAshraya Constructions0.6 km36Dec 202985%0Not collected
Sterling Villa GrandeSterling Urban Developments Private Limited0.6 km173Jun 2026—1Not collected
SBR FlorensoSBR Infra0.8 km104Dec 202760%0Not collected

Projects of the same kind within 5 km in a straight line of this project’s RERA map point, nearest first. % built is the promoter’s latest quarterly figure on RERA (shown for single-registration projects); prices are from the builder’s own website where we found one.

Sources:Source (rera.karnataka.gov.in) (opens in a new tab)

Sources and last checked dates

  1. Karnataka RERA — project register (search by the registration number) (opens in a new tab)

Collected on 22 Oct 2026 by AI research agents reading public pages. Facts are written in our own words. Not found yet: price; court cases; landmarks; specifications; news.

How to check on RERA: On rera.karnataka.gov.in/viewAllProjects, type the registration number in 'Registration No', press Search, then click the 'View Project Details' icon. Complaints open from the 'Complaints / Litigation' icon in the same row. Registration numbers: PRM/KA/RERA/1251/446/PR/120922/005235, PRM/KA/RERA/1251/446/PR/200224/006641, PRM/KA/RERA/1251/446/PR/240626/008750.

  • RERA record last checked: 22 Oct 2026
  • Last change in the record (registration, quarterly filing or complaint): 22 Oct 2026

How this page is made: software builds it from public records (Karnataka RERA filings, OpenStreetMap, the builder’s own website). AI is used only to read filings into fields and to write the plain-English summary and FAQ answers, which are checked against the record. Facts are checked automatically against the RERA filing. Methodology · How we earn · Report an error