Pavani Mirabilia
1, 2, 3 & 4 BHK apartments by Sai Sravanthi Infra Projects Pvt Ltd · Seegehalli, near Old Madras Road, Bengaluru
Seegehalli, near Old Madras Road, BengaluruOpen on Google Maps (opens in a new tab)
- Under construction
- RERA registered
- residential
by Sai Sravanthi Infra Projects Pvt Ltd
Price: Price on request
Site photo filed with Karnataka RERA Karnataka RERA filing · Source ↗ (opens in a new tab)
Pavani Mirabilia at a glance
- Possession (RERA)Dec 2027 ExtendedWas Mar 2031 · Karnataka RERA
- Construction87% built · on pace for May 2027RERA filing to 30 Sep 2026 (Phase I); estimate from average pace
- RERA complaints (project)3 complaintsKarnataka RERA · as on 22 Oct 2026
- Approvals filed7 of 9 on RERAKarnataka RERA uploads · 22 Oct 2026
- Nearest metroWhitefield (Kadugodi) · 2.43 kmstraight line · OpenStreetMap, 5 Oct 2026
- Airport driveapprox. 86 min at peak21.36 km straight line · estimate
- Nearest lakeUnnamed lake · 612 mFrom the RERA map point · OpenStreetMap, 5 Oct 2026
Project summary
Pavani Mirabilia is a residential project by Sai Sravanthi Infra Projects Pvt Ltd in Seegehalli, Bengaluru with 1,624 homes, registered with Karnataka RERA. The completion date on RERA is 22 Dec 2027. It is registered in 3 phases.
Facts collected on 22 Oct 2026 from public records — each linked to its source. Free for buyers. If you book through us, the builder pays us a commission.
Pavani Mirabilia buyers’ group: join to ask for a group price
No one has joined yet. Be one of the first 10 buyers in this group — the founding members.
Join free. When enough buyers have joined, our agent partner asks Sai Sravanthi Infra Projects Pvt Ltd for a group price — for example a lower price, an easier payment plan or waived charges. Nothing is promised: you see what the builder offers and book directly with the builder if you want to. Free for buyers. If you book through us, the builder pays us a commission.
- Gathering buyers
- Talking to the builder
- Group offer
- Group site visit
- Booking
0 buyers have joined · 0 committed
Committed buyers have confirmed their budget, home type and timeline with us on a call; builders negotiate with them. Joining is free and never obliges you to buy.
Join the Pavani Mirabilia buyers’ groupHow group buying works
See it for yourself
Visit the site with our team, or get a call to clear your questions. Free, no obligation.
Key facts: home types, towers, land and possession
- Home types
- 1 BHK, 2 BHK, 3 BHK, 4 BHK
- Carpet area
- 393 – 1,560 sq ft
- Towers
- 10
- Floors
- 19
- Total homes
- 1,624
- Land
- 19.04 acres
- Possession (extended)
- Dec 2027
- Built (RERA update)
- Not found in public records yet: construction progress
Pavani Mirabilia RERA number and registration details
- RERA number
- PRM/KA/RERA/1251/446/PR/120922/005235
- Registered on
- 12 Sep 2022
- Promised completion
- 3 Mar 2031
- Extended to
- 22 Dec 2027
- RERA status
- New launch
- Homes booked
- Not found in public records yet: homes booked
- Price
- Not found in public records yet: price
- Project type
- Residential
3 RERA registrations (one per phase) are shown together on this page; dates above are the latest across phases.
Phases and RERA numbers
| Phase | RERA number | Promised completion | Homes | Status | Source |
|---|---|---|---|---|---|
| Phase I | PRM/KA/RERA/1251/446/PR/120922/005235 | 25 May 2028 | 1,006 | New launch | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Phase-II | PRM/KA/RERA/1251/446/PR/200224/006641 | 22 Dec 2026Extended to 22 Dec 2027 | 379 | Under construction | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Phase III | PRM/KA/RERA/1251/446/PR/240626/008750 | 3 Mar 2031 | 239 | New launch | Source (rera.karnataka.gov.in) (opens in a new tab) |
Towers and blocks (RERA filing)
| Tower | Phase | Floors | Basements | Homes |
|---|---|---|---|---|
| TOWER A | Phase I | 19 | 2 | 158 |
| TOWER B | Phase I | 19 | 2 | 158 |
| TOWER C | Phase I | 19 | 2 | 238 |
| TOWER D | Phase I | 19 | 2 | 238 |
| TOWER H | Phase I | 19 | 2 | 80 |
| TOWER J | Phase I | 19 | 2 | 236 |
| TOWER E | Phase-II | 19 | 2 | 238 |
| TOWER G | Phase-II | 19 | 2 | 138 |
| TOWER I | Phase-II | 19 | 2 | 80 |
| TOWER F | Phase III | 19 | 2 | 239 |
A dash (—) means the filing did not state that value.
Summary in plain English
Pavani Mirabilia is a residential project by Sai Sravanthi Infra Projects Pvt Ltd in Bengaluru East with 1,624 homes across three phases. Phase I has 1,006 homes in 6 towers, Phase II has 379 homes in 3 towers, and Phase III has 239 homes in 1 tower. Completion dates range from 25 May 2028 for Phase I to 3 March 2031 for Phase III.
Written by AI from the RERA record above on 21 Oct 2026. Every number in it was checked against that record; if anything differs, the record wins.
Open space, home loans, escrow and other details
- Open space
- Not found in public records yet: open space
- Water and power
- Water source filed with RERA: Local Authority, BoreWell, BoreWell,Local Authority
- Home loans: approved banks
- Not found in public records yet: bank approvals
- Payment plans
- Not found in public records yet: payment plans
- Maintenance
- Not found in public records yet: maintenance
- Car parking
- Not found in public records yet: car parking charge
- Escrow bank (RERA) · Phase I
- HDFC, Richmond Road
- Escrow bank (RERA) · Phase-II
- STATE BANK OF INDIA, AECS LAYOUT BRANCH
- Escrow bank (RERA) · Phase III
- HDFC, WHITEFIELD,AECS LAYOUT
Amenities
- Electricity
- CCTV Surveillance
- Club House
- Community Hall
- Outdoor Sports facility
- Indoor Sports facility
- Swimming Pool
- Gym
- Parks
- Power Backup
- Water and Sanitation
Amenities and internal works as filed by the promoter with Karnataka RERA; we have not visited the site.
Pavani Mirabilia location and address
- Address
- Sy No. 22,23 & 124 SEGEHALLI , BANGALORE , Bengaluru East , Bengaluru Urban, Karnataka - 560049
- Village (RERA)
- Seegehalli
- Locality
- Near Old Madras RoadAlso known as OMR, Old Madras Road
- PIN code
- 560049
- City
- Bengaluru
- State
- Karnataka
- Coordinates
- 13.01715, 77.76233
Distances to landmarks
Not found in public records yet: landmarksAbout Seegehalli
Not found in public records yet: locality factsCommute times to tech parks and the airport
| To | Straight line | Peak-hour drive (estimate) |
|---|---|---|
| ITPL, Whitefield (main gate)Map point on OpenStreetMap (opens in a new tab) | 4.22 km | approx. 17 min |
| Outer Ring Road tech corridor (RMZ Ecospace, Bellandur)Map point on OpenStreetMap (opens in a new tab) | 13.61 km | approx. 55 min |
| Manyata Tech ParkMap point on OpenStreetMap (opens in a new tab) | 15.81 km | approx. 64 min |
| KSR Bengaluru City railway station (Majestic)Map point on OpenStreetMap (opens in a new tab) | 21.33 km | approx. 86 min |
| Kempegowda International AirportMap point on OpenStreetMap (opens in a new tab) | 21.36 km | approx. 86 min |
| Electronic City Phase 1Map point on OpenStreetMap (opens in a new tab) | 21.4 km | approx. 87 min |
How we calculate
Straight line: from the project’s map point on RERA to the destination’s point on OpenStreetMap.
Peak-hour drive is a rough estimate, not a route: straight line × 1.35 for the road network, at 20 km/h. Real times vary a lot with the route and the hour.
Sources:Source (openstreetmap.org) (opens in a new tab)How we calculate this
Schools and hospitals nearby
Within 2 km
- 10Schools and colleges9 schools, 1 colleges, 0 kindergartens
- 4Hospitals and clinics3 hospitals, 1 clinics
Nearest schools and colleges
- Chrysalis High School · 0.88 km
- Valistus International School · 1.18 km
- Chryalis High · 1.25 km
Nearest hospitals and clinics
- Miracle Hospital · 0.96 km
- Nationwide Kadugodi Clinic · 1.14 km
- Kannamangala Primary Health Center · 1.55 km
Places as mapped on OpenStreetMap (amenity=school, college, kindergarten, university; hospital, clinic), counted within 2 km in a straight line of the RERA map point. Volunteers map these, so some places may be missing or closed. Places data © OpenStreetMap contributors, extract of 5 Oct 2026.
Nearest metro station and railway
- Whitefield (Kadugodi) (ವೈಟ್ಫೀಲ್ಡ್ (ಕಾಡುಗೋಡಿ))Open now — nearest operating metro station2.43 km
- Whitefield (ವೈಟ್ಫೀಲ್ಡ್)Nearest railway station2.31 km
Straight-line distances from the RERA map point to the station points mapped on OpenStreetMap; status (open or under construction) as tagged there. Places data © OpenStreetMap contributors, extract of 5 Oct 2026.
Lake and lake-buffer check
The nearest mapped lake is Unnamed lake (mapped on OpenStreetMap), 612 m from the project’s RERA map point.
The site boundary is not published as a shape, so its nearest edge can be closer than this point. Whether any building sits inside a lake buffer can only be checked on the approved plan.
- Unnamed lake (mapped on OpenStreetMap) on OpenStreetMap (opens in a new tab) 612 m
- Unnamed lake (mapped on OpenStreetMap) on OpenStreetMap (opens in a new tab) 697 m
- Kannamangala Lake on OpenStreetMap (opens in a new tab) (ಕನ್ನಮಂಗಲ ಕೆರೆ)1,648 m
The buffer rule
Bengaluru’s lake buffer rule has changed over time: the National Green Tribunal ordered a 75 m buffer in May 2016; the Supreme Court set that order aside on 5 March 2019, leaving the 30 m buffer of the Revised Master Plan 2015. Check the current rule and the approved plan before relying on either number.
- LiveLaw: SC sets aside NGT order enlarging buffer zones (2019) (livelaw.in) (opens in a new tab)
- Citizen Matters: Shrinking lake buffers (citizenmatters.in) (opens in a new tab)
Shortest distance from the RERA map point to the mapped water edge (OpenStreetMap water polygons tagged lake or reservoir, or named lake/kere/tank). Mapped shorelines can differ from the revenue-record boundary of a lake. Places data © OpenStreetMap contributors, extract of 5 Oct 2026.
Sources:Source (openstreetmap.org) (opens in a new tab)Source (livelaw.in) (opens in a new tab)Source (citizenmatters.in) (opens in a new tab)How we calculate this
Satellite time-lapse of the site
Satellite photos load when you scroll to them.
Photos from Esri World Imagery Wayback, centred on the project’s map point; dates are the capture dates in Esri’s metadata. Loaded from Esri when you scroll here.
Sources:Source (livingatlas.arcgis.com) (opens in a new tab)
Pavani Mirabilia floor plans, brochure and elevations
Documents the builder uploaded to Karnataka RERA, shown as filed. Tap a page to see it full size; the full PDF opens on the RERA website.
Brochure2 files

Phase I: BrochureFull PDF on RERA 


Phase-II: BrochureFull PDF on RERA 




Floor plans17 files

Phase III: Approved Building PlanFull PDF on RERA 
Phase-II: BLOCK E TYPICAL 2ND TO 16TH FLOOR PLAN AND TERRANCE FLOOR PLANFiled 16 Feb 2024 · Full PDF on RERA 
Phase-II: BLOCK-E TYPICAL 2ND TO 19TH & TERRANCE FLOOR PLAN_compressedFiled 17 Apr 2026 · Full PDF on RERA 
Phase-II: BLOCK-E TYPICAL 2ND TO 19TH & TERRANCE FLOOR PLAN_compressedFiled 17 Apr 2026 · Full PDF on RERA 
Phase-II: BLOCK-G TYPICAL 2ND TO 19TH & TERRANCE FLOOR PLAN_compressedFiled 17 Apr 2026 · Full PDF on RERA 
Phase-II: BLOCK-I TYPICAL 2ND TO 19TH & TERRANCE FLOOR PLAN_compressedFiled 17 Apr 2026 · Full PDF on RERA 
Phase-II: BLOCK I TYPICAL TO 14 TH FLOOR PLAN AND TERRACE FLOOR PLANFiled 16 Feb 2024 · Full PDF on RERA 
Phase III: TYPICAL 2ND TO 19TH & TERRANCE FLOOR PLANFiled 18 May 2026 · Full PDF on RERA 
Phase I: Approved Building/Plotting PlanFull PDF on RERA 
Phase I: GROUND FLOOR PLAN.pdfFull PDF on RERA 
Phase-II: BLOCK-E GROUND AND FIRST FLOOR PLAN_compressedFiled 17 Apr 2026 · Full PDF on RERA 
Phase-II: BLOCK E GROUND AND FIRST FLOOR PLANFiled 16 Feb 2024 · Full PDF on RERA 
Phase-II: BLOCK-G GROUND AND FIRST FLOOR PLAN_compressedFiled 17 Apr 2026 · Full PDF on RERA 
Phase-II: BLOCK G GROUND AND FIRST FLOOR PLANFiled 16 Feb 2024 · Full PDF on RERA 
Phase-II: BLOCK I GROUND AND FIRST FLOOR PLANFiled 16 Feb 2024 · Full PDF on RERA 
Phase III: GROUND AND FIRST FLOOR PLANFiled 18 May 2026 · Full PDF on RERA 
Phase-II: GROUND FLOOR PLANFiled 16 Feb 2024 · Full PDF on RERA
Elevations2 files

Phase-II: BLOCK E ELEVATIONFiled 16 Feb 2024 · Full PDF on RERA 
Phase III: ELEVATION PLANFiled 18 May 2026 · Full PDF on RERA
Approved layout plan2 files

Phase-II: DEMARCATION DRAWINGFiled 24 Jan 2024 · Full PDF on RERA 
Phase-II: DEMARCATION DRAWINGFiled 24 Jan 2024 · Full PDF on RERA
| Home type | Carpet area | Homes |
|---|---|---|
| 1 BHK | 393 – 437 sq ft | 200 |
| 2 BHK | 665 – 780 sq ft | 402 |
| 3 BHK | 844 – 1,560 sq ft | 964 |
| 4 BHK | 1,438 – 1,560 sq ft | 136 |
Home types, counts and carpet areas as filed with Karnataka RERA (carpet area, not super built-up).
We have not collected floor-plan drawings; the builder’s sales team can share them.
Pavani Mirabilia possession date and construction status
Timeline
- 19 May 2022Phase I: Project start date given to RERA
- 12 Sep 2022Phase I: Registered with Karnataka RERA
- 5 Jan 2024Phase-II: Project start date given to RERA
- 20 Feb 2024Phase-II: Registered with Karnataka RERA
- 6 Mar 2026Phase III: Project start date given to RERA
- 24 Jun 2026Phase III: Registered with Karnataka RERA
- 22 Dec 2026Phase-II: Completion date given at registration
- 22 Dec 2027Phase-II: Section 6 Extension: completion date moved to this date
- 25 May 2028Phase I: Completion date given at registration
- 3 Mar 2031Phase III: Completion date given at registration
Construction pace from RERA quarterly filings (Phase I)
At the average pace so far, construction would reach 100% around May 2027 — about 12 months before the completion date on RERA (25 May 2028).
At the pace between the 2 quarterly filings we have (84% → 87% in 3 months), it would be around Nov 2027 — about 7 months before the RERA date.
This project has 3 RERA registrations; the chart uses Phase I, the one with the most quarterly filings.
- Filed on RERA
- Average pace since start
- Pace between filings (and 0% assumed at the start date)
- RERA completion date
Quarterly filings
| Quarter | Filed on | Built | Homes booked |
|---|---|---|---|
| Q2 2026-27to 30 Sep 2026 | 14 Oct 2026 | 87% | 465 of 1,108 |
| Q1 2026-27to 30 Jun 2026 | 15 Jul 2026 | 84% | 465 of 1,108 |
How we calculate
Average pace = % built ÷ months since the start date in the RERA record. Here: 87% ÷ 52.4 months (19 May 2022 to 30 Sep 2026) = 1.7% a month.
Estimated finish = latest filing date + (100 − % built) ÷ pace = 30 Sep 2026 + 13 ÷ 1.7 = 7.8 months → May 2027. This is an estimate, not a date from the builder or RERA.
Pace between filings = (87% − 84%) ÷ 3 months = 1% a month.
A straight line is a simplification: the builder reports one overall %, which mixes excavation, structure and finishing, and work rarely moves at a constant speed. The % values are the promoter’s own figures filed with RERA, not checked by us.
Sources:Source (rera.karnataka.gov.in) (opens in a new tab)How we calculate this
Approvals and documents checklist
34 rows: approvals. Scroll inside the table to see them all.
| Approval | Authority | Source |
|---|---|---|
| Building plan (Phase I) | BDA - Bangalore Development Authority · No. BDA/EM/EA-01/TA-4/E/07/2022-23 · dated 2022-05-19 | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Land conversion (3 orders) (Phase I) | DISTRICT OFFICER BANGALORE · No. ALN(EBK)SR/81/12-13 and 2 more · dated 2012-12-24 | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Commencement Certificate (Phase I) | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Electricity Permission Letter (Phase I) | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Water Permission Letter (Phase I) | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Approved Building/Plotting Plan (Phase I) | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Approved Section Of Building/Infrastructure Plan of Plotting (Phase I) | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Change of Land Use (Phase I) | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Conversion Certificate under section 95 of the KLR Act 1964 (Phase I) | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| ESCOM/Electricity (Phase I) | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| KWSSB/Water (Phase I) | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Airport Authority of India (Phase I) | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| KSPCB (Phase I) | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| SEIAA (Phase I) | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Building plan (Phase-II) | BDA - Bangalore Development Authority · No. BDA/EM/EA-01/TA-4/E/41/2023-24 · dated 2023-12-08 | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Land conversion (3 orders) (Phase-II) | DYP COMMISSIONER · No. BDS ALN (E) VB/SR 1/05-06 and 2 more · dated 2009-04-17 | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Commencement Certificate (Phase-II) | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Electricity Permission Letter (Phase-II) | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Water Permission Letter (Phase-II) | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Approved Building/Plotting Plan (Phase-II) | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Approved Section Of Building/Infrastructure Plan of Plotting (Phase-II) | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| ESCOM/Electricity (Phase-II) | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| KWSSB/Water (Phase-II) | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Fire Force Department (Phase-II) | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Airport Authority of India (Phase-II) | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| KSPCB (Phase-II) | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Building plan (Phase III) | BDA - Bangalore Development Authority · No. BDA/EM/EO-05/TA-4/E/74/2025-26 · dated 2026-03-06 | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Land conversion (Phase III) | DISTRICT OFFICERBANGALORE · No. ALN(EB)S.R/177/08-09 · dated 2009-04-17 | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Approved Building Plan (Phase III) | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| ESCOM/Electricity (Phase III) | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| KSPCB (Phase III) | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| SEIAA (Phase III) | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Fire Force Department (Phase III) | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Airport Authority of India (Phase III) | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
Documents uploaded to RERA (Phase I)
- Building or layout plan · Approved drawings from the planning authorityFiled on RERA ✓ — BDA - Bangalore Development Authority · No. BDA/EM/EA-01/TA-4/E/07/2022-23 · dated 19 May 2022
- Commencement certificate · Permission to start buildingFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
- Environment clearance · SEIAA KarnatakaFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
- Fire NOC · Karnataka Fire and Emergency ServicesNot on RERA yet
- Pollution board consent · KSPCBFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
- Water and sewerage · BWSSBFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
- Electricity · BESCOMFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
- Height clearance · Airports Authority of IndiaFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
- Occupancy certificate (OC) · Issued only when the building is finishedNot on RERA yet — expected at completion
From the documents the promoter uploaded to Karnataka RERA, collected 22 Oct 2026. “Filed” means a document is on RERA — we have not checked its contents or validity. Not every approval applies to every project (for example, smaller projects may not need an environment clearance). Each phase is registered separately; this list is for the phase named above. The project page on RERA lists each upload.
Pavani Mirabilia RERA complaints and orders
3 complaints as on Source (rera.karnataka.gov.in) (opens in a new tab)
| Complaint ref | Filed | Subject | Status | Source |
|---|---|---|---|---|
| 01131/2026 | 16 Sep 2026 | Complaint regarding delay in possession and non-responsive communication – Pavani Mirabilia Phase 1, Flat D-208 | Under enquiry | Source (rera.karnataka.gov.in) (opens in a new tab) |
| 00986/2026 | 10 Aug 2026 | Delay in possession of Apt J-801 & J-802, 8th Floor, Tower J, Pavani Mirabilia Phase I — Possession promised by 31-12-2025, grace period expired 30-06-2026, possession not offered till date | Disposed | Source (rera.karnataka.gov.in) (opens in a new tab) |
| 00404/2026 | 16 Apr 2026 | Complaint under Sec 31 of the Real Estate Act 2016, misrepresentation of litigation status (Section 12), failure to update project disclosures (Section 11), & contract delivery timeline breach(Sec 18) | Disposed | Source (rera.karnataka.gov.in) (opens in a new tab) |
Court and consumer cases
We list case numbers, courts and outcomes only — never names of private individuals.
About Sai Sravanthi Infra Projects Pvt Ltd
- Promoter type
- Company
- Projects on this site
- 1
- RERA complaints against promoter
- 3
- Company number (CIN)
- U45203TG2008PTC060151
From Karnataka RERA, as collected so far (22 Oct 2026). Complaints are those RERA lists against this promoter across all its projects.
Sai Sravanthi Infra Projects Pvt Ltd’s RERA recordSai Sravanthi Infra Projects Pvt Ltd delivery record
- 1Projects in Bengaluru on RERA3 approved registrations under Sai Sravanthi Infra Projects Pvt Ltd in Bengaluru Urban and Rural. Source (rera.karnataka.gov.in) (opens in a new tab)
- 1,624Homes registeredAs stated in each registrations.
- 3RERA complaints1 open, 2 disposed. as on Source (rera.karnataka.gov.in) (opens in a new tab)
- 1.8Complaints per 1,000 homes3 complaints ÷ 1,624 homes in its 3 registrations on Karnataka RERA in Bengaluru.
What the complaints are about
3 complaint subjects as written on RERA, as on . Each subject is sorted into one group by keywords (first match wins: delay, refund, registration, quality, litigation, association); one complaint often raises several issues. Source (rera.karnataka.gov.in) (opens in a new tab)
Sources:Source (rera.karnataka.gov.in) (opens in a new tab)How we calculate this
What’s changed since May 2022
- 22 Dec 2027Phase-II: Completion date extended to 22 Dec 2027 Source (rera.karnataka.gov.in) (opens in a new tab)
- 15 Oct 2026Phase III: Quarterly update filed for Q2 2026-27: 2% built, 0 of 239 homes booked Source (rera.karnataka.gov.in) (opens in a new tab)
- 14 Oct 2026Phase I: Quarterly update filed for Q2 2026-27: 87% built, 465 of 1,108 homes booked Source (rera.karnataka.gov.in) (opens in a new tab)
- 14 Oct 2026Phase-II: Quarterly update filed for Q2 2026-27: 48% built, 285 of 456 homes booked Source (rera.karnataka.gov.in) (opens in a new tab)
- 16 Sep 2026Complaint 01131/2026 filed with RERA: “Complaint regarding delay in possession and non-responsive communication – Pavani Mirabilia Phase 1, Flat D-208” — now under enquiry Source (rera.karnataka.gov.in) (opens in a new tab)
- 10 Aug 2026Complaint 00986/2026 filed with RERA: “Delay in possession of Apt J-801 & J-802, 8th Floor, Tower J, Pavani Mirabilia Phase I — Possession promised by 31-12-2025, grace period expired 30-06-2026, possession not offered till date” — now disposed Source (rera.karnataka.gov.in) (opens in a new tab)
- 15 Jul 2026Phase I: Quarterly update filed for Q1 2026-27: 84% built, 465 of 1,108 homes booked Source (rera.karnataka.gov.in) (opens in a new tab)
- 15 Jul 2026Phase-II: Quarterly update filed for Q1 2026-27: 45% built, 284 of 456 homes booked Source (rera.karnataka.gov.in) (opens in a new tab)
- 15 Jul 2026Phase III: Quarterly update filed for Q1 2026-27: 3% built, 0 of 239 homes booked Source (rera.karnataka.gov.in) (opens in a new tab)
- 24 Jun 2026Phase III: Registered with Karnataka RERA (PRM/KA/RERA/1251/446/PR/240626/008750); completion date 3 Mar 2031 Source (rera.karnataka.gov.in) (opens in a new tab)
- 16 Apr 2026Complaint 00404/2026 filed with RERA: “Complaint under Sec 31 of the Real Estate Act 2016, misrepresentation of litigation status (Section 12), failure to update project disclosures (Section 11), & contract delivery timeline breach(Sec 18)” — now disposed Source (rera.karnataka.gov.in) (opens in a new tab)
- 6 Mar 2026Phase III: Building plan approved by BDA - Bangalore Development Authority (No. BDA/EM/EO-05/TA-4/E/74/2025-26) Source (rera.karnataka.gov.in) (opens in a new tab)
- 6 Mar 2026Phase III: Project start date in the RERA record Source (rera.karnataka.gov.in) (opens in a new tab)
- 20 Feb 2024Phase-II: Registered with Karnataka RERA (PRM/KA/RERA/1251/446/PR/200224/006641); completion date 22 Dec 2026 Source (rera.karnataka.gov.in) (opens in a new tab)
- 5 Jan 2024Phase-II: Project start date in the RERA record Source (rera.karnataka.gov.in) (opens in a new tab)
- 8 Dec 2023Phase-II: Building plan approved by BDA - Bangalore Development Authority (No. BDA/EM/EA-01/TA-4/E/41/2023-24) Source (rera.karnataka.gov.in) (opens in a new tab)
- 12 Sep 2022Phase I: Registered with Karnataka RERA (PRM/KA/RERA/1251/446/PR/120922/005235); completion date 25 May 2028 Source (rera.karnataka.gov.in) (opens in a new tab)
- 19 May 2022Phase I: Building plan approved by BDA - Bangalore Development Authority (No. BDA/EM/EA-01/TA-4/E/07/2022-23) Source (rera.karnataka.gov.in) (opens in a new tab)
- 19 May 2022Phase I: Project start date in the RERA record Source (rera.karnataka.gov.in) (opens in a new tab)
Newest first. When the RERA crawl sees a new filing, complaint or extension, it is added here with its date.
Home loan EMI calculator
- Monthly EMI
- —
- Down payment
- —
- Loan amount
- —
- Total interest
- —
A calculation only, from the numbers you enter — not a loan offer.
All-in cost: GST, registration and other charges
The calculator loads when you scroll to it.
Assumptions
- Base price: the builder’s price is not published in a form we could collect — enter it from the cost sheet.
- GST 5% on the base price and charges — the usual rate for an under-construction home that is not “affordable housing” (1%).
- Stamp duty about 5.6% and registration 2% — the Karnataka rule (registration was raised from 1% to 2% on 31 Aug 2025). Calculated on the agreement value.
- Car parking, other charges and the maintenance deposit are not in the public record we collect; enter them from the builder’s cost sheet.
- Loan on the agreement value (banks usually lend up to 75–90%); EMI is the standard reducing-balance formula. Example rate only — use your bank’s quote.
Pavani Mirabilia FAQs
What is Pavani Mirabilia?
Pavani Mirabilia is a residential project by Sai Sravanthi Infra Projects Pvt Ltd located in Bengaluru East, PIN code 560049, with 1,624 homes across three phases.
When will Pavani Mirabilia be completed?
Phase I completion date is 25 May 2028, Phase II completion date is 22 December 2027 (extended from 22 December 2026), and Phase III completion date is 3 March 2031.
What home types are available in Pavani Mirabilia?
Phase I offers 1 BHK (393-437 sq ft carpet area), 2 BHK (665-780 sq ft), 3 BHK (844-1,209 sq ft), and 4 BHK (1,438-1,560 sq ft). Phase II offers 3 BHK (844-1,560 sq ft) and 4 BHK (1,438-1,560 sq ft). Phase III offers 3 BHK (844-1,016 sq ft).
How many homes are in each phase of Pavani Mirabilia?
Phase I has 1,006 homes, Phase II has 379 homes, and Phase III has 239 homes.
What is the RERA registration number for Pavani Mirabilia?
Phase I registration number is PRM/KA/RERA/1251/446/PR/120922/005235 (registered 12 September 2022), Phase II is PRM/KA/RERA/1251/446/PR/200224/006641 (registered 20 February 2024), and Phase III is PRM/KA/RERA/1251/446/PR/240626/008750 (registered 24 June 2026).
What is the construction progress of Pavani Mirabilia?
As of Q1 2026-27, Phase I is 84% complete with 465 homes booked out of 1,108 in the booking table. Phase II as of Q2 2026-27 is 48% complete with 285 homes booked out of 456 in the booking table. Phase III as of Q2 2026-27 is 2% complete with 0 homes booked out of 239 in the booking table.
How many RERA complaints have been filed for Pavani Mirabilia?
Three RERA complaints have been filed on this project, all against Phase I registration.
How many RERA complaints are there against the builder of Pavani Mirabilia?
The builder Sai Sravanthi Infra Projects Pvt Ltd has 3 RERA complaints across all projects on record.
How many other projects does the builder have?
The builder has 2 projects in the Karnataka RERA Bengaluru records.
Which banks are holding escrow for Pavani Mirabilia?
Phase I escrow is held by IDFC FIRST BANK, Phase II by STATE BANK OF INDIA, and Phase III by HDFC.
Written by AI from the RERA record above on 21 Oct 2026. Answers use only that record; check them against the source before you decide.
Questions about Pavani Mirabilia
No questions published yet. Ask the first one: you get an instant answer from this page’s public record, and our team follows up on anything the record does not show.
Bought a home from Sai Sravanthi Infra Projects Pvt Ltd? Review the builder.
Reviews of Sai Sravanthi Infra Projects Pvt Ltd by verified buyers
No verified reviews of Sai Sravanthi Infra Projects Pvt Ltd yet. If you bought a home from them, your review helps other buyers.
How reviews work: only buyers and owners can review; we confirm each purchase by phone before publishing, publish positive and negative reviews alike, never accept payment for reviews, and the builder may reply.
Similar projects within 5 km
| Project | Distance | Homes | Possession (RERA) | Built | Complaints | Price |
|---|---|---|---|---|---|---|
| ELV High GardenELV Projects Private Limited | 0.1 km | 219 | Oct 2027extended | 30% | 7 | Not collected |
| SV Green ViewSri Venkateshwara Constructions | 0.5 km | 174 | Dec 2028 | 28% | 1 | Not collected |
| Green Edge CaseroGreen Edge Projects | 0.6 km | 117 | Dec 2026 | — | 0 | Not collected |
| Ashraya MeadowsAshraya Constructions | 0.6 km | 36 | Dec 2029 | 85% | 0 | Not collected |
| Sterling Villa GrandeSterling Urban Developments Private Limited | 0.6 km | 173 | Jun 2026 | — | 1 | Not collected |
| SBR FlorensoSBR Infra | 0.8 km | 104 | Dec 2027 | 60% | 0 | Not collected |
Projects of the same kind within 5 km in a straight line of this project’s RERA map point, nearest first. % built is the promoter’s latest quarterly figure on RERA (shown for single-registration projects); prices are from the builder’s own website where we found one.
Sources and last checked dates
Collected on 22 Oct 2026 by AI research agents reading public pages. Facts are written in our own words. Not found yet: price; court cases; landmarks; specifications; news.
How to check on RERA: On rera.karnataka.gov.in/viewAllProjects, type the registration number in 'Registration No', press Search, then click the 'View Project Details' icon. Complaints open from the 'Complaints / Litigation' icon in the same row. Registration numbers: PRM/KA/RERA/1251/446/PR/120922/005235, PRM/KA/RERA/1251/446/PR/200224/006641, PRM/KA/RERA/1251/446/PR/240626/008750.
- RERA record last checked: 22 Oct 2026
- Last change in the record (registration, quarterly filing or complaint): 22 Oct 2026
How this page is made: software builds it from public records (Karnataka RERA filings, OpenStreetMap, the builder’s own website). AI is used only to read filings into fields and to write the plain-English summary and FAQ answers, which are checked against the record. Facts are checked automatically against the RERA filing. Methodology · How we earn · Report an error
More new projects nearby
Seegehalli, near Kadugodi–Hope FarmUnder constructionRERA registeredBuyers’ group openGreen Edge Casero
by Green Edge
Price: Price on requestGet brochure & price →
- 2 BHK, 3 BHK
- 774 – 1,097 sq ft
- Dec 2026
117 homes
Be one of the first 10 buyers in this groupFounding members — it’s free
Join group for Green Edge Casero
Seegehalli, near Kadugodi–Hope FarmUnder constructionRERA registeredBuyers’ group openSBR Florenso
by SBR Infra
Price: Price on requestGet brochure & price →
- 3 BHK
- 764 – 1,690 sq ft
- Dec 2027
104 homes
Be one of the first 10 buyers in this groupFounding members — it’s free
Join group for SBR Florenso
Seegehalli, Kadugodi–Hope FarmReady to moveRERA registeredBuyers’ group openJeevans Octave
by Jeevan
Price: Price on requestGet brochure & price →
- 2 BHK, 2.5 BHK, 3 BHK
- 744 – 1,067 sq ft
- Jun 2026 (extended)
274 homes · 3 RERA complaints
Be one of the first 10 buyers in this groupFounding members — it’s free
Join group for Jeevans Octave