Prestige Raintree Park

3 & 4 BHK apartments by Prestige Group · Ramgondanahalli, Whitefield, Bengaluru

Ramgondanahalli, Whitefield, BengaluruOpen on Google Maps (opens in a new tab)

  • Under construction
  • RERA registered
  • apartments

by Prestige Group

Listed price: ₹3.41 Cr – ₹6.29 Cr

as on · Source (squareyards.com) (opens in a new tab)

Get today’s price list

Latest price for Prestige Raintree Park

Builders change prices often and rarely publish them. Tell us how to reach you and we’ll send you the current price list.

Free for buyers. If you book through us, the builder pays us a commission. How we earn

Project summary

Prestige Raintree Park is a RERA-registered (PRM/KA/RERA/1251/446/PR/270824/006981) apartment project by Prestige Estates Projects on Varthur Road, Whitefield, with 1,520 units in 18 towers of 19 floors and a RERA completion date of 31 December 2028. The promoter's latest quarterly RERA update (Q1 2026-27) reports 50% completion and 1,400 units booked. One RERA complaint against the project (misrepresentation, filed October 2024) is shown as disposed, and Square Yards listed prices from Rs 3.41 crore to Rs 6.29 crore.

Facts collected on 18 Oct 2026 from public records — each linked to its source. Free for buyers. If you book through us, the builder pays us a commission.

Prestige Raintree Park buyers’ group: join to ask for a group price

No one has joined yet. Be one of the first 10 buyers in this group — the founding members.

Join free. When enough buyers have joined, our agent partner asks Prestige Group for a group price — for example a lower price, an easier payment plan or waived charges. Nothing is promised: you see what the builder offers and book directly with the builder if you want to. Free for buyers. If you book through us, the builder pays us a commission.

  1. Gathering buyers
  2. Talking to the builder
  3. Group offer
  4. Group site visit
  5. Booking

0 buyers have joined · 0 committed

Committed buyers have confirmed their budget, home type and timeline with us on a call; builders negotiate with them. Joining is free and never obliges you to buy.

Join the Prestige Raintree Park buyers’ groupHow group buying works

See it for yourself

Visit the site with our team, or get a call to clear your questions. Free, no obligation.

Key facts: home types, towers, land and possession

Updated on 18 Oct 2026
Home types
Studio, 3 BHK, 4 BHK
Carpet area
283 – 2,003 sq ft
Towers
18
Floors
19
Total homes
1,520
Land
27.84 acres
Possession (RERA)
Dec 2028
Built (RERA update)
43%

Prestige Raintree Park RERA number and registration details

RERA number
PRM/KA/RERA/1251/446/PR/270824/006981
Registered on
27 Aug 2024
Promised completion
31 Dec 2028
Extended to
No extension recorded
RERA status
New launch
Homes booked
1,455 of 1,520 as on
Price
₹3.41 Cr – ₹6.29 Cr as on
Project type
Apartments

Page seen 2026-10-04; it shows 'last updated January 2026' and Rs 17,000 per sq ft (saleable area), for 3 BHK 2,005 sq ft to 5 BHK 3,698 sq ft.

Towers and blocks (RERA filing)

18 rows: towers. Scroll inside the table to see them all.

TowerFloorsBasementsHomes
Building 1 - Tower 119274
Building 1 Tower 2192110
Building 1 Tower 319274
Building 1 Tower 419274
Building 2 Tower 519274
Building 2 Tower 619274
Building 2 Tower 719274
Building 2 Tower 819274
Building 2 Tower 919274
Building 3 Tower 10192112
Building 3 Tower 1119274
Building 3 Tower 1219274
Building 3 Tower 13192112
Building 4 Tower 14192112
Building 4 Tower 1519274
Building 4 Tower 1619274
Building 4 Tower 1719274
Building 4 Tower 18192112

A dash (—) means the filing did not state that value.

Sources:Source (rera.karnataka.gov.in) (opens in a new tab)

Prestige Raintree Park price list

From the builder’s website, as on 4 Oct 2026
Home typeSizePrice₹ per sq ftSource
3 BHK—unknownFrom ₹3.7 Cronwards—Source (prestigeconstructions.com) (opens in a new tab)

As published by the builder on the date shown — not an offer, and not checked with the builder. Check whether the size is carpet or super built-up area before comparing.

Sources:Source (prestigeconstructions.com) (opens in a new tab)

Price per sq ft vs projects within 5 km

As on 4 Oct 2026

The builder’s published prices work out to about ₹24,900 – ₹30,800 per sq ft of carpet area.

Home typeBuilder priceCarpet area (RERA)₹ per sq ft carpet
3 BHKfrom ₹3.7 Crseen 4 Oct 20261,202 – 1,486 sq ft₹24,900 – ₹30,800

Worked out as the builder’s “from” price ÷ the largest and smallest carpet area RERA lists for that home type — we don’t know which unit the starting price is for. Builders usually say taxes and other charges are extra. Builder price list (prestigeconstructions.com) (opens in a new tab) RERA carpet areas (rera.karnataka.gov.in) (opens in a new tab)

Sources:Source (prestigeconstructions.com) (opens in a new tab)Source (rera.karnataka.gov.in) (opens in a new tab)How we calculate this

Price history

As on 4 Oct 2026

One snapshot so far: the builder’s “onwards” prices seen on 4 Oct 2026. Each new check of the builder’s website adds a dated point here, so rises and offers show up with their dates.

0₹1 Cr₹2 Cr₹3 Cr₹4 Cr₹5 CrOct 26NovDecJan 27FebMarAprMayJunJulAugSepLater checks will appear here3 BHK ₹3.7 Cr
Seen onWherePrices
4 Oct 2026Builder’s website Source (prestigeconstructions.com) (opens in a new tab)3 BHK from ₹3.7 Cr
4 Oct 2026squareyards.com Source (squareyards.com) (opens in a new tab)₹3.41 Cr – ₹6.29 Cr

Sources:Source (prestigeconstructions.com) (opens in a new tab)Source (squareyards.com) (opens in a new tab)

Summary in plain English

Prestige Raintree Park is a residential project by Prestige Estates Projects Ltd in Ramgondanahalli, Bengaluru East. The project has 1,520 homes across 18 towers with up to 19 floors, and is registered with completion on 31 December 2028.

Written by AI from the RERA record above on 18 Oct 2026. Every number in it was checked against that record; if anything differs, the record wins.

Open space, home loans, escrow and other details

Open space
65.2% of land
Water and power
RERA lists BWSSB as the water source; the quarterly update shows BWSSB and BESCOM approvals granted and a transformer/substation in the external works.
Home loans: approved banks
Not found in public records yet: bank approvals
Payment plans
Maintenance
Not found in public records yet: maintenance
Car parking
Not found in public records yet: car parking charge
Escrow bank (RERA)
ICICI Bank, M G Road
Building plan (RERA)
BBMP - Bruhat Bengaluru Mahanagara Palike · No. BBMP/Addl.Dir/JDNORTH/0027/24-25 · dated 28 Jun 2024
Project cost declared to RERA
₹2811 Cr

Computed from RERA: open area 73,443 sq m of 112,652 sq m total land area.

Sources:Source (rera.karnataka.gov.in) (opens in a new tab)

Amenities

  • Clubhouse
  • Community hall
  • Swimming pool
  • Gym
  • Indoor sports facility
  • Outdoor sports facility
  • Parks
  • CCTV surveillance
  • Power backup
  • Sewage treatment plant
  • Rainwater harvesting

Amenities and internal works as filed by the promoter with Karnataka RERA; we have not visited the site.

Sources:Source (rera.karnataka.gov.in) (opens in a new tab)

Specifications and materials

StructureRCC frameSource (squareyards.com) (opens in a new tab)
Living areasIndian marble flooring, false ceilingSource (squareyards.com) (opens in a new tab)
Master bedroomIndian marble flooring, acrylic emulsion paint on wallsSource (squareyards.com) (opens in a new tab)
Other bedroomsEngineered wood flooringSource (squareyards.com) (opens in a new tab)
BathroomsShower panel and geyser providedSource (squareyards.com) (opens in a new tab)
Basements2 basement levels per tower; 2,755 covered parking spaces, no open parking (RERA)Source (rera.karnataka.gov.in) (opens in a new tab)
Tower height64.2 m; 19 floors per tower (RERA)Source (rera.karnataka.gov.in) (opens in a new tab)
Main contractorKalpataru Projects International Limited (RERA)Source (rera.karnataka.gov.in) (opens in a new tab)

Prestige Raintree Park location and address

Address
Katha No. 1233, survey numbers in Ramagondanahalli and Amani Bellandur Khane villages, Bengaluru East taluk, Bengaluru Urban (west side abuts the Hoskote–Anekal State Highway 35)
Village (RERA)
Ramgondanahalli
Locality
WhitefieldAlso known as ITPL
City
Bengaluru
State
Karnataka
Coordinates
12.95341, 77.74473

Distances to landmarks

  • Kadugodi Tree Park metro station (Purple Line)Metro3.6 km
  • International Tech Park Bengaluru (ITPL)Work3.7 km
  • Hopefarm Channasandra metro stationMetro4 km
  • Kundalahalli metro stationMetro4.1 km
  • Whitefield (Kadugodi) metro stationMetro4.8 km
  • VR Bengaluru mallMall7.2 km
  • Kempegowda International AirportAirport27.6 km

Straight-line distances (straight-line (haversine) distance from the RERA project coordinates (12.9534075, 77.7447296) to landmark coordinates published on each landmark's English Wikipedia page; road distances will be longer), not by road — travel distance will be longer.

About Whitefield

Commute times to tech parks and the airport

As on 5 Oct 2026
ToStraight linePeak-hour drive (estimate)
ITPL, Whitefield (main gate)Map point on OpenStreetMap (opens in a new tab)3.88 kmapprox. 16 min
Outer Ring Road tech corridor (RMZ Ecospace, Bellandur)Map point on OpenStreetMap (opens in a new tab)7.63 kmapprox. 31 min
Electronic City Phase 1Map point on OpenStreetMap (opens in a new tab)14.41 kmapprox. 58 min
Manyata Tech ParkMap point on OpenStreetMap (opens in a new tab)17.15 kmapprox. 69 min
KSR Bengaluru City railway station (Majestic)Map point on OpenStreetMap (opens in a new tab)19.18 kmapprox. 78 min
Kempegowda International AirportMap point on OpenStreetMap (opens in a new tab)27.85 kmapprox. 113 min
How we calculate

Straight line: from the project’s map point on RERA to the destination’s point on OpenStreetMap.

Peak-hour drive is a rough estimate, not a route: straight line × 1.35 for the road network, at 20 km/h. Real times vary a lot with the route and the hour.

Sources:Source (openstreetmap.org) (opens in a new tab)How we calculate this

Schools and hospitals nearby

As on 5 Oct 2026

Within 2 km

  • 37Schools and colleges22 schools, 0 colleges, 15 kindergartens
  • 32Hospitals and clinics12 hospitals, 20 clinics

Nearest schools and colleges

  • The Sommer School · 0.79 km
  • Government School · 0.83 km
  • Klay Preschool · 1.02 km

Nearest hospitals and clinics

  • Hair Loss Treatment in Bangalore - Hairline International · 0.47 km
  • Cloud Nine · 0.51 km
  • Revive Aesthetic Clinic Skin Hair And Laser Center · 0.52 km

Places as mapped on OpenStreetMap (amenity=school, college, kindergarten, university; hospital, clinic), counted within 2 km in a straight line of the RERA map point. Volunteers map these, so some places may be missing or closed. Places data © OpenStreetMap contributors, extract of 5 Oct 2026.

Sources:Source (openstreetmap.org) (opens in a new tab)

Nearest metro station and railway

As on 5 Oct 2026
  • Nallurahalli (ನಲ್ಲೂರಹಳ್ಳಿ)Open now — nearest operating metro station3.36 km
  • Belandur Road (ಬೆಳಂದೂರು ರಸ್ತೆ)Nearest railway station4.4 km

Straight-line distances from the RERA map point to the station points mapped on OpenStreetMap; status (open or under construction) as tagged there. Places data © OpenStreetMap contributors, extract of 5 Oct 2026.

Sources:Source (openstreetmap.org) (opens in a new tab)

Lake and lake-buffer check

As on 5 Oct 2026

The nearest mapped lake is Varthur Lake, 78 m from the project’s RERA map point.

The site may be next to the lake. The RERA point is one approximate spot and the site boundary is not published as a shape — check the approved plan for the lake buffer.

The buffer rule

Bengaluru’s lake buffer rule has changed over time: the National Green Tribunal ordered a 75 m buffer in May 2016; the Supreme Court set that order aside on 5 March 2019, leaving the 30 m buffer of the Revised Master Plan 2015. Check the current rule and the approved plan before relying on either number.

Shortest distance from the RERA map point to the mapped water edge (OpenStreetMap water polygons tagged lake or reservoir, or named lake/kere/tank). Mapped shorelines can differ from the revenue-record boundary of a lake. Places data © OpenStreetMap contributors, extract of 5 Oct 2026.

Sources:Source (openstreetmap.org) (opens in a new tab)Source (livelaw.in) (opens in a new tab)Source (citizenmatters.in) (opens in a new tab)How we calculate this

Satellite time-lapse of the site

Satellite photos load when you scroll to them.

Photos from Esri World Imagery Wayback, centred on the project’s map point; dates are the capture dates in Esri’s metadata. Loaded from Esri when you scroll here.

Sources:Source (livingatlas.arcgis.com) (opens in a new tab)

Prestige Raintree Park floor plans, brochure and elevations

Documents the builder uploaded to Karnataka RERA, shown as filed. Tap a page to see it full size; the full PDF opens on the RERA website.

Brochure43 pages

Approved layout plan

Home typeCarpet areaHomes
3 BHK1,202 – 1,486 sq ft315
4 BHK1,342 – 2,003 sq ft1,053
Studio283 – 313 sq ft152

Home types, counts and carpet areas as filed with Karnataka RERA (carpet area, not super built-up).

Sources:Source (rera.karnataka.gov.in) (opens in a new tab)

Prestige Raintree Park possession date and construction status

  • Whole project (promoter’s RERA update)43%

    as on · 1,455 of 1,520 homes booked

Promoter’s quarterly update to RERA for Q2 2026-27, submitted 2026-10-14.

By tower (Q2 2026-27)

  • Building 1 - Tower 156%
  • Building 1 Tower 228%
  • Building 1 Tower 353%
  • Building 1 Tower 444%
  • Building 2 Tower 537%
  • Building 2 Tower 636%
  • Building 2 Tower 735%
  • Building 2 Tower 824%
  • Building 2 Tower 933%
  • Building 3 Tower 1030%
  • Building 3 Tower 1125%
  • Building 3 Tower 1224%
  • Building 3 Tower 1333%
  • Building 4 Tower 1424%
  • Building 4 Tower 1530%
  • Building 4 Tower 1634%
  • Building 4 Tower 1741%
  • Building 4 Tower 1848%

Units sold and unsold, from RERA (Q2 2026-27)

TypeHomesBookedAvailable
4 BHK1054100153
3 BHK3143068
STUDIO1521484

As reported by the promoter in the quarterly update to RERA, not verified by us.

Timeline

  1. 28 Jun 2024BBMP building plan approved
  2. 27 Aug 2024Karnataka RERA registration
  3. 1 Sep 2024Project start date declared to RERA
  4. 14 Jan 2026Quarterly update: 42% complete (Q3 2025-26)
  5. 15 Apr 2026Quarterly update: 47% complete (Q4 2025-26)
  6. 15 Jul 2026Quarterly update: 50% complete (Q1 2026-27)
  7. 31 Dec 2028Proposed completion date on RERA

Sources:Source (rera.karnataka.gov.in) (opens in a new tab)

Construction pace from RERA quarterly filings

As on 14 Oct 2026

At the average pace so far, construction would reach 100% around Jul 2029 — about 6 months after the completion date on RERA (31 Dec 2028).

0%25%50%75%100%20252026202720282029RERA date42%47%50%43%
  • Filed on RERA
  • Average pace since start
  • RERA completion date

Quarterly filings

QuarterFiled onBuiltHomes booked
Q2 2026-27to 30 Sep 202614 Oct 202643%1,455 of 1,520
Q1 2026-27to 30 Jun 202615 Jul 202650%1,400 of 1,520
Q4 2025-26to 31 Mar 202615 Apr 202647%1,343 of 1,520
Q3 2025-26to 31 Dec 202514 Jan 202642%1,232 of 1,520
How we calculate

Average pace = % built ÷ months since the start date in the RERA record. Here: 43% ÷ 24.9 months (1 Sep 2024 to 30 Sep 2026) = 1.7% a month.

Estimated finish = latest filing date + (100 − % built) ÷ pace = 30 Sep 2026 + 57 ÷ 1.7 = 33.1 months → Jul 2029. This is an estimate, not a date from the builder or RERA.

Pace between filings = (43% − 42%) ÷ 9 months = 0.1% a month.

A straight line is a simplification: the builder reports one overall %, which mixes excavation, structure and finishing, and work rarely moves at a constant speed. The % values are the promoter’s own figures filed with RERA, not checked by us. Promoter’s quarterly update to RERA for Q2 2026-27, submitted 2026-10-14.

Sources:Source (rera.karnataka.gov.in) (opens in a new tab)How we calculate this

Approvals and documents checklist

ApprovalAuthoritySource
Building planBBMP - Bruhat Bengaluru Mahanagara Palike · No. BBMP/Addl.Dir/JDNORTH/0027/24-25 · dated 2024-06-28Source (rera.karnataka.gov.in) (opens in a new tab)
Land conversion (52 orders)Special Deputy Commissioner · No. B.Dis.ALN.SR (ASA)30/98-99 and 51 more · dated 2023-04-03Source (rera.karnataka.gov.in) (opens in a new tab)
Water Permission Letterscan uploaded to RERASource (rera.karnataka.gov.in) (opens in a new tab)
Approved Layout Planscan uploaded to RERASource (rera.karnataka.gov.in) (opens in a new tab)
Approved Building/Plotting Planscan uploaded to RERASource (rera.karnataka.gov.in) (opens in a new tab)
Approved Section Of Building/Infrastructure Plan of Plottingscan uploaded to RERASource (rera.karnataka.gov.in) (opens in a new tab)
Conversion Certificate under section 95 of the KLR Act 1964scan uploaded to RERASource (rera.karnataka.gov.in) (opens in a new tab)
KWSSB/Waterscan uploaded to RERASource (rera.karnataka.gov.in) (opens in a new tab)
Fire Force Departmentscan uploaded to RERASource (rera.karnataka.gov.in) (opens in a new tab)
Airport Authority of Indiascan uploaded to RERASource (rera.karnataka.gov.in) (opens in a new tab)

Documents uploaded to RERA

As on 18 Oct 2026
  • Building or layout plan · Approved drawings from the planning authorityFiled on RERA ✓ — BBMP - Bruhat Bengaluru Mahanagara Palike · No. BBMP/Addl.Dir/JDNORTH/0027/24-25 · dated 28 Jun 2024
  • Commencement certificate · Permission to start buildingNot on RERA yet
  • Environment clearance · SEIAA KarnatakaNot on RERA yet
  • Fire NOC · Karnataka Fire and Emergency ServicesFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
  • Pollution board consent · KSPCBNot on RERA yet
  • Water and sewerage · BWSSBFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
  • Electricity · BESCOMNot on RERA yet
  • Height clearance · Airports Authority of IndiaFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
  • Occupancy certificate (OC) · Issued only when the building is finishedNot on RERA yet — expected at completion

From the documents the promoter uploaded to Karnataka RERA, collected 18 Oct 2026. “Filed” means a document is on RERA — we have not checked its contents or validity. Not every approval applies to every project (for example, smaller projects may not need an environment clearance). The project page on RERA lists each upload.

Sources:Source (rera.karnataka.gov.in) (opens in a new tab)

Prestige Raintree Park RERA complaints and orders

1 complaint as on Source (rera.karnataka.gov.in) (opens in a new tab)

Complaint refFiledSubjectStatusSource
01029/202418 Oct 2024Misreprentation of the informationDisposedSource (rera.karnataka.gov.in) (opens in a new tab)

Court and consumer cases

Not found in public records yet: court cases

We list case numbers, courts and outcomes only — never names of private individuals.

About Prestige Group

Founded
1986
Headquarters
Bengaluru
Bengaluru projects
15
Delivered on time
16 of 27
RERA complaints
77
Court cases listed
4

Prestige Estates Projects Limited (CIN L07010KA1997PLC022322) is a listed Bengaluru developer; the group dates from 1986. In 27 Bengaluru projects where Karnataka RERA shows both dates, 16 received occupancy certificates on or before the completion date given at RERA registration and 11 after it; all but one of the late ones were within RERA extensions. Karnataka RERA lists 77 complaints against the promoter, mostly about delayed possession in projects registered in 2017. Two NCDRC rulings (2014, 2022) awarded Bengaluru buyers interest for late possession.

Prestige Group’s full record

Prestige Group delivery record

As on 22 Oct 2026
  • 12Projects in Bengaluru on RERA13 approved registrations under Prestige Estates Projects Ltd in Bengaluru Urban and Rural. Source (rera.karnataka.gov.in) (opens in a new tab)
  • 6,683Homes and plots registeredAs stated in each registrations.
  • 77RERA complaints4 open, 73 disposed. as on Source (rera.karnataka.gov.in) (opens in a new tab)
  • 11.5Complaints per 1,000 homes and plots77 complaints ÷ 6,683 homes and plots in its 13 registrations on Karnataka RERA in Bengaluru.
  • 4Court cases listedFound in public court records; see the list on the builder’s page.

What the complaints are about

  • Delay in possession or delay interest45
  • Construction quality, size or inspection9
  • Refund of booking or other money6
  • Registration, sale deed or agreement4
  • Owners' association, amenities or documents4
  • Other9

77 complaint subjects as written on RERA, as on . Each subject is sorted into one group by keywords (first match wins: delay, refund, registration, quality, litigation, association); one complaint often raises several issues. Source (rera.karnataka.gov.in) (opens in a new tab)

Handovers we checked by hand

27 rows: handovers. Scroll inside the table to see them all.

ProjectPromised (at registration)OCResultSource
Prestige Westwoods31 Aug 201825 Oct 20182 months lateSource (rera.karnataka.gov.in) (opens in a new tab)
Prestige Royale Gardens Phase I20 Jul 20204 Jul 2018On timeSource (rera.karnataka.gov.in) (opens in a new tab)
Prestige Bagamane Temple Bells30 Sep 201929 Jun 2019On timeSource (rera.karnataka.gov.in) (opens in a new tab)
Prestige Pinewood30 Jun 20208 Apr 2019On timeSource (rera.karnataka.gov.in) (opens in a new tab)
Prestige Dejavu30 Sep 20196 Sep 2019On timeSource (rera.karnataka.gov.in) (opens in a new tab)
Prestige Boulevard25 Dec 201920 Aug 2019On timeSource (rera.karnataka.gov.in) (opens in a new tab)
Prestige Kew Gardens31 Dec 201916 Dec 2019On timeSource (rera.karnataka.gov.in) (opens in a new tab)
Prestige Song of the South Phase I31 Dec 202014 Nov 2019On timeSource (rera.karnataka.gov.in) (opens in a new tab)
Prestige Leela Residences31 May 202023 Jan 2020On timeSource (rera.karnataka.gov.in) (opens in a new tab)
Prestige Royal Gardens Phase III31 Mar 20204 Mar 2020On timeSource (rera.karnataka.gov.in) (opens in a new tab)
Prestige Lake Ridge Phase 130 Apr 20215 Oct 2020On timeSource (rera.karnataka.gov.in) (opens in a new tab)
Prestige Jindal City Phase I31 Oct 202126 Apr 2021On timeSource (rera.karnataka.gov.in) (opens in a new tab)
Prestige Park Square23 May 20226 Jan 2022On timeSource (rera.karnataka.gov.in) (opens in a new tab)
Prestige Song of the South Phase 231 May 20224 Apr 2022On timeSource (rera.karnataka.gov.in) (opens in a new tab)
Prestige Botanique30 Nov 202119 Apr 20225 months lateSource (rera.karnataka.gov.in) (opens in a new tab)
Prestige Woodland Park31 Dec 202127 Apr 20224 months lateSource (rera.karnataka.gov.in) (opens in a new tab)
Prestige Willow Tree30 Jun 202221 Jul 20221 months lateSource (rera.karnataka.gov.in) (opens in a new tab)
Prestige Elysian31 Dec 202213 Apr 20233 months lateSource (rera.karnataka.gov.in) (opens in a new tab)
Prestige Fairfield31 Aug 20231 Feb 20245 months lateSource (rera.karnataka.gov.in) (opens in a new tab)
Prestige Waterford15 Dec 20236 Feb 20242 months lateSource (rera.karnataka.gov.in) (opens in a new tab)
Prestige Primrose Hills Phase I31 May 202417 Feb 2024On timeSource (rera.karnataka.gov.in) (opens in a new tab)
The Prestige City - Avalon Park20 Feb 202522 Oct 2024On timeSource (rera.karnataka.gov.in) (opens in a new tab)
Prestige Primrose Hills Phase 230 Sep 202415 Apr 20256 months lateSource (rera.karnataka.gov.in) (opens in a new tab)
Prestige Green Gables30 Jun 202529 Oct 20254 months lateSource (rera.karnataka.gov.in) (opens in a new tab)
Prestige Dew Drops14 Apr 202628 Nov 2025On timeSource (rera.karnataka.gov.in) (opens in a new tab)
Meridian Park Phase I @ The Prestige City14 Jul 202512 Jan 20266 months lateSource (rera.karnataka.gov.in) (opens in a new tab)
Meridian Park Phase II @ The Prestige City14 Jan 202610 Jul 20266 months lateSource (rera.karnataka.gov.in) (opens in a new tab)

Sources:Source (rera.karnataka.gov.in) (opens in a new tab)Source (indiankanoon.org) (opens in a new tab)Source (indiankanoon.org) (opens in a new tab)Source (realestatelawjournal.in) (opens in a new tab)Source (indiankanoon.org) (opens in a new tab)How we calculate this

In the news

What’s changed since Jun 2024

As on 18 Oct 2026
  1. 14 Oct 2026Quarterly update filed for Q2 2026-27: 43% built, 1,455 of 1,520 homes booked Source (rera.karnataka.gov.in) (opens in a new tab)
  2. 4 Oct 2026Builder’s price list seen: 3 BHK from ₹3.7 Cr Source (prestigeconstructions.com) (opens in a new tab)
  3. 4 Oct 2026Listing price seen on squareyards.com: ₹3.41 Cr – ₹6.29 Cr Source (squareyards.com) (opens in a new tab)
  4. 15 Jul 2026Quarterly update filed for Q1 2026-27: 50% built, 1,400 of 1,520 homes booked Source (rera.karnataka.gov.in) (opens in a new tab)
  5. 15 Apr 2026Quarterly update filed for Q4 2025-26: 47% built, 1,343 of 1,520 homes booked Source (rera.karnataka.gov.in) (opens in a new tab)
  6. 14 Jan 2026Quarterly update filed for Q3 2025-26: 42% built, 1,232 of 1,520 homes booked Source (rera.karnataka.gov.in) (opens in a new tab)
  7. 18 Oct 2024Complaint 01029/2024 filed with RERA: “Misreprentation of the information” — now disposed Source (rera.karnataka.gov.in) (opens in a new tab)
  8. 1 Sep 2024Project start date in the RERA record Source (rera.karnataka.gov.in) (opens in a new tab)
  9. 27 Aug 2024Registered with Karnataka RERA (PRM/KA/RERA/1251/446/PR/270824/006981); completion date 31 Dec 2028 Source (rera.karnataka.gov.in) (opens in a new tab)
  10. 28 Jun 2024Building plan approved by BBMP - Bruhat Bengaluru Mahanagara Palike (No. BBMP/Addl.Dir/JDNORTH/0027/24-25) Source (rera.karnataka.gov.in) (opens in a new tab)

Newest first. No extension of the completion date is recorded on RERA. When the RERA crawl sees a new filing, complaint or extension, it is added here with its date.

Home loan EMI calculator

Starts at the lowest listed price; change it to the home you want.

Example only — use your bank’s quote.

Monthly EMI
₹2,36,742
Down payment
₹68,20,000
Loan amount
₹2,72,80,000
Total interest
₹2,95,38,123

A calculation only, from the numbers you enter — not a loan offer.

All-in cost: GST, registration and other charges

As on 4 Oct 2026

The calculator loads when you scroll to it.

Assumptions
  • Base price: the builder’s published “onwards” price for the home type, where it publishes one (it usually says government charges, other charges and taxes are extra). You can change it.
  • GST 5% on the base price and charges — the usual rate for an under-construction home that is not “affordable housing” (1%).
  • Stamp duty about 5.6% and registration 2% — the Karnataka rule (registration was raised from 1% to 2% on 31 Aug 2025). Calculated on the agreement value.
  • Car parking, other charges and the maintenance deposit are not in the public record we collect; enter them from the builder’s cost sheet.
  • Loan on the agreement value (banks usually lend up to 75–90%); EMI is the standard reducing-balance formula. Example rate only — use your bank’s quote.

Sources:Source (prestigeconstructions.com) (opens in a new tab)How we calculate this

Prestige Raintree Park FAQs

When is possession of Prestige Raintree Park?

The proposed completion date on Karnataka RERA is 31 December 2028, with no extension recorded so far.

What is the RERA number of Prestige Raintree Park?

PRM/KA/RERA/1251/446/PR/270824/006981, registered on 27 August 2024.

What is the price of Prestige Raintree Park?

Square Yards listed Rs 3.41 crore to Rs 6.29 crore (about Rs 17,000 per sq ft of saleable area) when seen on 4 October 2026; its page said it was last updated in January 2026.

What unit sizes are available?

The RERA filing lists 152 studios (about 283–313 sq ft carpet), 315 3 BHK (about 1,202–1,486 sq ft carpet) and 1,053 4 BHK (about 1,342–2,003 sq ft carpet). Listing sites quote 2,005–3,698 sq ft saleable area for 3 to 5 BHK.

How far along is construction?

The promoter's RERA quarterly update for April–June 2026 reports 50% completion, up from 42% and 47% in the two previous quarters.

How many units and towers are there?

1,520 units in 18 towers of 19 floors each, with two basement levels and 2,755 covered parking spaces.

Are there complaints against this project?

Karnataka RERA lists one complaint on this project, filed 18 October 2024 about misrepresentation of information; it is shown as disposed. No litigation on the project land is declared.

What is the builder's track record?

This file covers the project only; the builder's delivery record and complaint history are in the Prestige builder profile (builders/prestige.json).

Which metro station is nearest?

Kadugodi Tree Park on the Purple Line is about 3.6 km straight-line; ITPL is about 3.7 km and the airport about 27.6 km straight-line.

Which banks give home loans for this project?

No public source listing approved lenders was found. The RERA escrow account is with ICICI Bank, which is not the same as a loan approval.

What are the maintenance and car parking charges?

Not found in public sources.

How much open space does the project have?

RERA figures give 73,443 sq m of open area out of 112,652 sq m of land, about 65%.

More questions, answered from the RERA record

What is the RERA registration number for Prestige Raintree Park?

The RERA registration number is PRM/KA/RERA/1251/446/PR/270824/006981, registered on 27 August 2024.

When will Prestige Raintree Park be completed?

The completion date on RERA is 31 December 2028.

How many homes are in Prestige Raintree Park?

The project has 1,520 homes across 18 towers.

What home types are available in Prestige Raintree Park?

The project offers studios (283 to 313 carpet sq ft, 152 homes), 3 BHK (1,202 to 1,486 carpet sq ft, 315 homes), and 4 BHK (1,342 to 2,003 carpet sq ft, 1,053 homes).

How much land does Prestige Raintree Park cover?

The project is on 112,652 square metres of land.

What is the construction progress at Prestige Raintree Park?

As of Q2 2026-27 (ending 30 September 2026), construction is 43 per cent complete.

How many homes have been booked at Prestige Raintree Park?

As of Q2 2026-27, 1,455 of the 1,520 homes have been booked.

Are there any RERA complaints against Prestige Raintree Park?

There is 1 complaint on RERA for this project.

Where is Prestige Raintree Park located?

The project is in Ramgondanahalli, Bengaluru East taluk, PIN code 560001.

How many RERA complaints are there against Prestige Estates Projects Ltd?

There are 77 complaints on RERA against the builder across all projects, and the builder has 38 projects in the Bengaluru records.

Written by AI from the RERA record above on 18 Oct 2026. Answers use only that record; check them against the source before you decide.

Questions about Prestige Raintree Park

No questions published yet. Ask the first one: you get an instant answer from this page’s public record, and our team follows up on anything the record does not show.

Bought a home from Prestige Group? Review the builder.

Reviews of Prestige Group by verified buyers

No verified reviews of Prestige Group yet. If you bought a home from them, your review helps other buyers.

How reviews work: only buyers and owners can review; we confirm each purchase by phone before publishing, publish positive and negative reviews alike, never accept payment for reviews, and the builder may reply.

Similar projects within 5 km

ProjectDistanceHomesPossession (RERA)BuiltComplaintsPrice
Prestige SomervillePrestige Estates Projects Ltd0.3 km306Dec 202745%0Not collected
Evergreen @ Prestige Raintree ParkPrestige Estates Projects Ltd0.3 km2,000Jun 203011%0Not collected
Tru AquapolisTru Infra Projects And Realty LLP0.9 km310Apr 202935%0Not collected
Miraya Woods by UKNWaterline Hotels Private Limited1.2 km72Oct 202949%0Not collected
Green Edge SignatureGreen Edge Ventures1.3 km216Dec 202647%0Not collected
Sri Sai Krupa MeadowsSri Sai Krupa Developers1.3 km68Dec 2025100%0Not collected

Projects of the same kind within 5 km in a straight line of this project’s RERA map point, nearest first. % built is the promoter’s latest quarterly figure on RERA (shown for single-registration projects); prices are from the builder’s own website where we found one.

Sources:Source (rera.karnataka.gov.in) (opens in a new tab)

Sources and last checked dates

  1. Karnataka RERA — project register (search by the registration number) (opens in a new tab)
  2. Square Yards project listing (price, specifications) (opens in a new tab)
  3. NoBroker project listing (payment plan) (opens in a new tab)
  4. Business Standard, 26 Sep 2024 (opens in a new tab)
  5. Construction World, 22 Jan 2026 (opens in a new tab)
  6. Wikipedia: Kadugodi Tree Park metro station (coordinates, line, opening) (opens in a new tab)
  7. Wikipedia: Hopefarm Channasandra metro station (coordinates, read via the Wikipedia API) (opens in a new tab)
  8. Wikipedia: Kundalahalli metro station (coordinates, read via the Wikipedia API) (opens in a new tab)
  9. Wikipedia: Whitefield (Kadugodi) metro station (coordinates, read via the Wikipedia API) (opens in a new tab)
  10. Wikipedia: International Tech Park, Bengaluru (coordinates, read via the Wikipedia API) (opens in a new tab)
  11. Wikipedia: VR Bengaluru (coordinates, read via the Wikipedia API) (opens in a new tab)
  12. Wikipedia: Kempegowda International Airport (coordinates, read via the Wikipedia API) (opens in a new tab)

Collected on 18 Oct 2026 by AI research agents reading public pages. Facts are written in our own words. Not found yet: bank approvals; maintenance per sqft; car parking; other charges; court cases (none found).

How to check on RERA: On rera.karnataka.gov.in/viewAllProjects, type the registration number in 'Registration No', press Search, then click the 'View Project Details' icon. Complaints open from the 'Complaints / Litigation' icon in the same row. Registration number: PRM/KA/RERA/1251/446/PR/270824/006981.

  • RERA record last checked: 18 Oct 2026
  • Last change in the record (registration, quarterly filing or complaint): 18 Oct 2026
  • Builder price list seen: Square Yards

How this page is made: software builds it from public records (Karnataka RERA filings, OpenStreetMap, the builder’s own website). AI is used only to read filings into fields and to write the plain-English summary and FAQ answers, which are checked against the record. Facts are checked automatically against the RERA filing. Methodology · How we earn · Report an error