Prestige Raintree Park
3 & 4 BHK apartments by Prestige Group · Ramgondanahalli, Whitefield, Bengaluru
Ramgondanahalli, Whitefield, BengaluruOpen on Google Maps (opens in a new tab)
- Under construction
- RERA registered
- apartments
Listed price: ₹3.41 Cr – ₹6.29 Cr
Exterior render of the towers across Varthur Lake (artist's impression) Artist’s impression · © Prestige Estates Projects Limited · Source ↗ (opens in a new tab)
Prestige Raintree Park at a glance
- Price from₹3.7 Cr · 3 BHKBuilder’s website · as on 4 Oct 2026
- All-in from₹4.17 Cr · 3 BHKBuilder price + GST, stamp duty, registration · 4 Oct 2026
- Possession (RERA)Dec 2028Karnataka RERA
- Construction43% built · on pace for Jul 2029 6 mo after RERA dateRERA filing to 30 Sep 2026; estimate from average pace
- Homes booked1,455 of 1,520 (96%)RERA update · as on 30 Sep 2026
- RERA complaints (project)1 complaintKarnataka RERA · as on 18 Oct 2026
- Builder on-time record16 of 27 on time Some lateCompleted projects: OC date vs promised date
- Approvals filed4 of 9 on RERAKarnataka RERA uploads · 18 Oct 2026
- Nearest metroNallurahalli · 3.36 kmstraight line · OpenStreetMap, 5 Oct 2026
- Airport driveapprox. 113 min at peak27.85 km straight line · estimate
- Nearest lakeVarthur Lake · 78 mFrom the RERA map point · OpenStreetMap, 5 Oct 2026
Project summary
Prestige Raintree Park is a RERA-registered (PRM/KA/RERA/1251/446/PR/270824/006981) apartment project by Prestige Estates Projects on Varthur Road, Whitefield, with 1,520 units in 18 towers of 19 floors and a RERA completion date of 31 December 2028. The promoter's latest quarterly RERA update (Q1 2026-27) reports 50% completion and 1,400 units booked. One RERA complaint against the project (misrepresentation, filed October 2024) is shown as disposed, and Square Yards listed prices from Rs 3.41 crore to Rs 6.29 crore.
Facts collected on 18 Oct 2026 from public records — each linked to its source. Free for buyers. If you book through us, the builder pays us a commission.
Prestige Raintree Park buyers’ group: join to ask for a group price
No one has joined yet. Be one of the first 10 buyers in this group — the founding members.
Join free. When enough buyers have joined, our agent partner asks Prestige Group for a group price — for example a lower price, an easier payment plan or waived charges. Nothing is promised: you see what the builder offers and book directly with the builder if you want to. Free for buyers. If you book through us, the builder pays us a commission.
- Gathering buyers
- Talking to the builder
- Group offer
- Group site visit
- Booking
0 buyers have joined · 0 committed
Committed buyers have confirmed their budget, home type and timeline with us on a call; builders negotiate with them. Joining is free and never obliges you to buy.
Join the Prestige Raintree Park buyers’ groupHow group buying works
See it for yourself
Visit the site with our team, or get a call to clear your questions. Free, no obligation.
Key facts: home types, towers, land and possession
- Home types
- Studio, 3 BHK, 4 BHK
- Carpet area
- 283 – 2,003 sq ft
- Towers
- 18
- Floors
- 19
- Total homes
- 1,520
- Land
- 27.84 acres
- Possession (RERA)
- Dec 2028
- Built (RERA update)
- 43%
Prestige Raintree Park RERA number and registration details
- RERA number
- PRM/KA/RERA/1251/446/PR/270824/006981
- Registered on
- 27 Aug 2024
- Promised completion
- 31 Dec 2028
- Extended to
- No extension recorded
- RERA status
- New launch
- Homes booked
- 1,455 of 1,520 as on
- Price
- ₹3.41 Cr – ₹6.29 Cr as on
- Project type
- Apartments
Page seen 2026-10-04; it shows 'last updated January 2026' and Rs 17,000 per sq ft (saleable area), for 3 BHK 2,005 sq ft to 5 BHK 3,698 sq ft.
Towers and blocks (RERA filing)
18 rows: towers. Scroll inside the table to see them all.
| Tower | Floors | Basements | Homes |
|---|---|---|---|
| Building 1 - Tower 1 | 19 | 2 | 74 |
| Building 1 Tower 2 | 19 | 2 | 110 |
| Building 1 Tower 3 | 19 | 2 | 74 |
| Building 1 Tower 4 | 19 | 2 | 74 |
| Building 2 Tower 5 | 19 | 2 | 74 |
| Building 2 Tower 6 | 19 | 2 | 74 |
| Building 2 Tower 7 | 19 | 2 | 74 |
| Building 2 Tower 8 | 19 | 2 | 74 |
| Building 2 Tower 9 | 19 | 2 | 74 |
| Building 3 Tower 10 | 19 | 2 | 112 |
| Building 3 Tower 11 | 19 | 2 | 74 |
| Building 3 Tower 12 | 19 | 2 | 74 |
| Building 3 Tower 13 | 19 | 2 | 112 |
| Building 4 Tower 14 | 19 | 2 | 112 |
| Building 4 Tower 15 | 19 | 2 | 74 |
| Building 4 Tower 16 | 19 | 2 | 74 |
| Building 4 Tower 17 | 19 | 2 | 74 |
| Building 4 Tower 18 | 19 | 2 | 112 |
A dash (—) means the filing did not state that value.
Prestige Raintree Park price list
| Home type | Size | Price | ₹ per sq ft | Source |
|---|---|---|---|---|
| 3 BHK | —unknown | From ₹3.7 Cronwards | — | Source (prestigeconstructions.com) (opens in a new tab) |
As published by the builder on the date shown — not an offer, and not checked with the builder. Check whether the size is carpet or super built-up area before comparing.
Sources:Source (prestigeconstructions.com) (opens in a new tab)
Price per sq ft vs projects within 5 km
The builder’s published prices work out to about ₹24,900 – ₹30,800 per sq ft of carpet area.
| Home type | Builder price | Carpet area (RERA) | ₹ per sq ft carpet |
|---|---|---|---|
| 3 BHK | from ₹3.7 Crseen 4 Oct 2026 | 1,202 – 1,486 sq ft | ₹24,900 – ₹30,800 |
Worked out as the builder’s “from” price ÷ the largest and smallest carpet area RERA lists for that home type — we don’t know which unit the starting price is for. Builders usually say taxes and other charges are extra. Builder price list (prestigeconstructions.com) (opens in a new tab) RERA carpet areas (rera.karnataka.gov.in) (opens in a new tab)
Sources:Source (prestigeconstructions.com) (opens in a new tab)Source (rera.karnataka.gov.in) (opens in a new tab)How we calculate this
Price history
One snapshot so far: the builder’s “onwards” prices seen on 4 Oct 2026. Each new check of the builder’s website adds a dated point here, so rises and offers show up with their dates.
| Seen on | Where | Prices |
|---|---|---|
| 4 Oct 2026 | Builder’s website Source (prestigeconstructions.com) (opens in a new tab) | 3 BHK from ₹3.7 Cr |
| 4 Oct 2026 | squareyards.com Source (squareyards.com) (opens in a new tab) | ₹3.41 Cr – ₹6.29 Cr |
Sources:Source (prestigeconstructions.com) (opens in a new tab)Source (squareyards.com) (opens in a new tab)
Summary in plain English
Prestige Raintree Park is a residential project by Prestige Estates Projects Ltd in Ramgondanahalli, Bengaluru East. The project has 1,520 homes across 18 towers with up to 19 floors, and is registered with completion on 31 December 2028.
Written by AI from the RERA record above on 18 Oct 2026. Every number in it was checked against that record; if anything differs, the record wins.
Open space, home loans, escrow and other details
- Open space
- 65.2% of land
- Water and power
- RERA lists BWSSB as the water source; the quarterly update shows BWSSB and BESCOM approvals granted and a transformer/substation in the external works.
- Home loans: approved banks
- Not found in public records yet: bank approvals
- Payment plans
- Construction-linked — Listing site describes 10% on booking, instalments linked to construction stages, about 5% on possession Source (nobroker.in) (opens in a new tab)
- Maintenance
- Not found in public records yet: maintenance
- Car parking
- Not found in public records yet: car parking charge
- Escrow bank (RERA)
- ICICI Bank, M G Road
- Building plan (RERA)
- BBMP - Bruhat Bengaluru Mahanagara Palike · No. BBMP/Addl.Dir/JDNORTH/0027/24-25 · dated 28 Jun 2024
- Project cost declared to RERA
- ₹2811 Cr
Computed from RERA: open area 73,443 sq m of 112,652 sq m total land area.
Amenities
- Clubhouse
- Community hall
- Swimming pool
- Gym
- Indoor sports facility
- Outdoor sports facility
- Parks
- CCTV surveillance
- Power backup
- Sewage treatment plant
- Rainwater harvesting
Amenities and internal works as filed by the promoter with Karnataka RERA; we have not visited the site.
Specifications and materials
| Structure | RCC frame | Source (squareyards.com) (opens in a new tab) |
|---|---|---|
| Living areas | Indian marble flooring, false ceiling | Source (squareyards.com) (opens in a new tab) |
| Master bedroom | Indian marble flooring, acrylic emulsion paint on walls | Source (squareyards.com) (opens in a new tab) |
| Other bedrooms | Engineered wood flooring | Source (squareyards.com) (opens in a new tab) |
| Bathrooms | Shower panel and geyser provided | Source (squareyards.com) (opens in a new tab) |
| Basements | 2 basement levels per tower; 2,755 covered parking spaces, no open parking (RERA) | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Tower height | 64.2 m; 19 floors per tower (RERA) | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Main contractor | Kalpataru Projects International Limited (RERA) | Source (rera.karnataka.gov.in) (opens in a new tab) |
Prestige Raintree Park location and address
- Address
- Katha No. 1233, survey numbers in Ramagondanahalli and Amani Bellandur Khane villages, Bengaluru East taluk, Bengaluru Urban (west side abuts the Hoskote–Anekal State Highway 35)
- Village (RERA)
- Ramgondanahalli
- Locality
- WhitefieldAlso known as ITPL
- City
- Bengaluru
- State
- Karnataka
- Coordinates
- 12.95341, 77.74473
Distances to landmarks
- Kadugodi Tree Park metro station (Purple Line)Metro3.6 km
- International Tech Park Bengaluru (ITPL)Work3.7 km
- Hopefarm Channasandra metro stationMetro4 km
- Kundalahalli metro stationMetro4.1 km
- Whitefield (Kadugodi) metro stationMetro4.8 km
- VR Bengaluru mallMall7.2 km
- Kempegowda International AirportAirport27.6 km
Straight-line distances (straight-line (haversine) distance from the RERA project coordinates (12.9534075, 77.7447296) to landmark coordinates published on each landmark's English Wikipedia page; road distances will be longer), not by road — travel distance will be longer.
About Whitefield
- Kadugodi Tree Park metro station on the Purple Line opened to the public on 26 March 2023, about 3.6 km straight-line from the project Source (en.wikipedia.org) (opens in a new tab)
- RERA site boundaries: a proposed 31 m wide road on the north, a nala on the south, and the existing 40 m Hoskote–Anekal State Highway 35 on the west Source (rera.karnataka.gov.in) (opens in a new tab)
- A second RERA-registered phase, Evergreen @ Prestige Raintree Park (PRM/KA/RERA/1251/446/PR/010126/008374), has 2,000 units with proposed completion 30-06-2030 Source (rera.karnataka.gov.in) (opens in a new tab)
Commute times to tech parks and the airport
| To | Straight line | Peak-hour drive (estimate) |
|---|---|---|
| ITPL, Whitefield (main gate)Map point on OpenStreetMap (opens in a new tab) | 3.88 km | approx. 16 min |
| Outer Ring Road tech corridor (RMZ Ecospace, Bellandur)Map point on OpenStreetMap (opens in a new tab) | 7.63 km | approx. 31 min |
| Electronic City Phase 1Map point on OpenStreetMap (opens in a new tab) | 14.41 km | approx. 58 min |
| Manyata Tech ParkMap point on OpenStreetMap (opens in a new tab) | 17.15 km | approx. 69 min |
| KSR Bengaluru City railway station (Majestic)Map point on OpenStreetMap (opens in a new tab) | 19.18 km | approx. 78 min |
| Kempegowda International AirportMap point on OpenStreetMap (opens in a new tab) | 27.85 km | approx. 113 min |
How we calculate
Straight line: from the project’s map point on RERA to the destination’s point on OpenStreetMap.
Peak-hour drive is a rough estimate, not a route: straight line × 1.35 for the road network, at 20 km/h. Real times vary a lot with the route and the hour.
Sources:Source (openstreetmap.org) (opens in a new tab)How we calculate this
Schools and hospitals nearby
Within 2 km
- 37Schools and colleges22 schools, 0 colleges, 15 kindergartens
- 32Hospitals and clinics12 hospitals, 20 clinics
Nearest schools and colleges
- The Sommer School · 0.79 km
- Government School · 0.83 km
- Klay Preschool · 1.02 km
Nearest hospitals and clinics
- Hair Loss Treatment in Bangalore - Hairline International · 0.47 km
- Cloud Nine · 0.51 km
- Revive Aesthetic Clinic Skin Hair And Laser Center · 0.52 km
Places as mapped on OpenStreetMap (amenity=school, college, kindergarten, university; hospital, clinic), counted within 2 km in a straight line of the RERA map point. Volunteers map these, so some places may be missing or closed. Places data © OpenStreetMap contributors, extract of 5 Oct 2026.
Nearest metro station and railway
- Nallurahalli (ನಲ್ಲೂರಹಳ್ಳಿ)Open now — nearest operating metro station3.36 km
- Belandur Road (ಬೆಳಂದೂರು ರಸ್ತೆ)Nearest railway station4.4 km
Straight-line distances from the RERA map point to the station points mapped on OpenStreetMap; status (open or under construction) as tagged there. Places data © OpenStreetMap contributors, extract of 5 Oct 2026.
Lake and lake-buffer check
The nearest mapped lake is Varthur Lake, 78 m from the project’s RERA map point.
The site may be next to the lake. The RERA point is one approximate spot and the site boundary is not published as a shape — check the approved plan for the lake buffer.
- Varthur Lake on OpenStreetMap (opens in a new tab) (ವರ್ತೂರು ಕೆರೆ)78 m
- Sheelavathana Kere on OpenStreetMap (opens in a new tab) (ಶೀಲವಂತ ಕೆರೆ)1,122 m
- Thubarahalli Lake on OpenStreetMap (opens in a new tab) (ತೂಬರಹಳ್ಳಿ ಕೆರೆ)1,935 m
The buffer rule
Bengaluru’s lake buffer rule has changed over time: the National Green Tribunal ordered a 75 m buffer in May 2016; the Supreme Court set that order aside on 5 March 2019, leaving the 30 m buffer of the Revised Master Plan 2015. Check the current rule and the approved plan before relying on either number.
- LiveLaw: SC sets aside NGT order enlarging buffer zones (2019) (livelaw.in) (opens in a new tab)
- Citizen Matters: Shrinking lake buffers (citizenmatters.in) (opens in a new tab)
Shortest distance from the RERA map point to the mapped water edge (OpenStreetMap water polygons tagged lake or reservoir, or named lake/kere/tank). Mapped shorelines can differ from the revenue-record boundary of a lake. Places data © OpenStreetMap contributors, extract of 5 Oct 2026.
Sources:Source (openstreetmap.org) (opens in a new tab)Source (livelaw.in) (opens in a new tab)Source (citizenmatters.in) (opens in a new tab)How we calculate this
Satellite time-lapse of the site
Satellite photos load when you scroll to them.
Photos from Esri World Imagery Wayback, centred on the project’s map point; dates are the capture dates in Esri’s metadata. Loaded from Esri when you scroll here.
Sources:Source (livingatlas.arcgis.com) (opens in a new tab)
Prestige Raintree Park floor plans, brochure and elevations
Documents the builder uploaded to Karnataka RERA, shown as filed. Tap a page to see it full size; the full PDF opens on the RERA website.
Brochure43 pages

BrochureFull PDF on RERA 






Approved layout plan

Approved Layout PlanFull PDF on RERA
| Home type | Carpet area | Homes |
|---|---|---|
| 3 BHK | 1,202 – 1,486 sq ft | 315 |
| 4 BHK | 1,342 – 2,003 sq ft | 1,053 |
| Studio | 283 – 313 sq ft | 152 |
Home types, counts and carpet areas as filed with Karnataka RERA (carpet area, not super built-up).
(opens full size in a new tab)Unit plan: 3 BHK, Regalia type E (furnished layout, for illustration) © Prestige Estates Projects Limited · Source ↗ (opens in a new tab)
(opens full size in a new tab)Unit plan: 4 BHK, Imperia type L (furnished layout, for illustration) © Prestige Estates Projects Limited · Source ↗ (opens in a new tab)
(opens full size in a new tab)Unit plan: 5 BHK, Aurum Suites type S & Sa (furnished layout, for illustration) © Prestige Estates Projects Limited · Source ↗ (opens in a new tab)
Prestige Raintree Park possession date and construction status
Promoter’s quarterly update to RERA for Q2 2026-27, submitted 2026-10-14.
By tower (Q2 2026-27)
Units sold and unsold, from RERA (Q2 2026-27)
| Type | Homes | Booked | Available |
|---|---|---|---|
| 4 BHK | 1054 | 1001 | 53 |
| 3 BHK | 314 | 306 | 8 |
| STUDIO | 152 | 148 | 4 |
As reported by the promoter in the quarterly update to RERA, not verified by us.
Timeline
- 28 Jun 2024BBMP building plan approved
- 27 Aug 2024Karnataka RERA registration
- 1 Sep 2024Project start date declared to RERA
- 14 Jan 2026Quarterly update: 42% complete (Q3 2025-26)
- 15 Apr 2026Quarterly update: 47% complete (Q4 2025-26)
- 15 Jul 2026Quarterly update: 50% complete (Q1 2026-27)
- 31 Dec 2028Proposed completion date on RERA
Construction pace from RERA quarterly filings
At the average pace so far, construction would reach 100% around Jul 2029 — about 6 months after the completion date on RERA (31 Dec 2028).
- Filed on RERA
- Average pace since start
- RERA completion date
Quarterly filings
| Quarter | Filed on | Built | Homes booked |
|---|---|---|---|
| Q2 2026-27to 30 Sep 2026 | 14 Oct 2026 | 43% | 1,455 of 1,520 |
| Q1 2026-27to 30 Jun 2026 | 15 Jul 2026 | 50% | 1,400 of 1,520 |
| Q4 2025-26to 31 Mar 2026 | 15 Apr 2026 | 47% | 1,343 of 1,520 |
| Q3 2025-26to 31 Dec 2025 | 14 Jan 2026 | 42% | 1,232 of 1,520 |
How we calculate
Average pace = % built ÷ months since the start date in the RERA record. Here: 43% ÷ 24.9 months (1 Sep 2024 to 30 Sep 2026) = 1.7% a month.
Estimated finish = latest filing date + (100 − % built) ÷ pace = 30 Sep 2026 + 57 ÷ 1.7 = 33.1 months → Jul 2029. This is an estimate, not a date from the builder or RERA.
Pace between filings = (43% − 42%) ÷ 9 months = 0.1% a month.
A straight line is a simplification: the builder reports one overall %, which mixes excavation, structure and finishing, and work rarely moves at a constant speed. The % values are the promoter’s own figures filed with RERA, not checked by us. Promoter’s quarterly update to RERA for Q2 2026-27, submitted 2026-10-14.
Sources:Source (rera.karnataka.gov.in) (opens in a new tab)How we calculate this
Approvals and documents checklist
| Approval | Authority | Source |
|---|---|---|
| Building plan | BBMP - Bruhat Bengaluru Mahanagara Palike · No. BBMP/Addl.Dir/JDNORTH/0027/24-25 · dated 2024-06-28 | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Land conversion (52 orders) | Special Deputy Commissioner · No. B.Dis.ALN.SR (ASA)30/98-99 and 51 more · dated 2023-04-03 | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Water Permission Letter | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Approved Layout Plan | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Approved Building/Plotting Plan | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Approved Section Of Building/Infrastructure Plan of Plotting | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Conversion Certificate under section 95 of the KLR Act 1964 | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| KWSSB/Water | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Fire Force Department | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Airport Authority of India | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
Documents uploaded to RERA
- Building or layout plan · Approved drawings from the planning authorityFiled on RERA ✓ — BBMP - Bruhat Bengaluru Mahanagara Palike · No. BBMP/Addl.Dir/JDNORTH/0027/24-25 · dated 28 Jun 2024
- Commencement certificate · Permission to start buildingNot on RERA yet
- Environment clearance · SEIAA KarnatakaNot on RERA yet
- Fire NOC · Karnataka Fire and Emergency ServicesFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
- Pollution board consent · KSPCBNot on RERA yet
- Water and sewerage · BWSSBFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
- Electricity · BESCOMNot on RERA yet
- Height clearance · Airports Authority of IndiaFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
- Occupancy certificate (OC) · Issued only when the building is finishedNot on RERA yet — expected at completion
From the documents the promoter uploaded to Karnataka RERA, collected 18 Oct 2026. “Filed” means a document is on RERA — we have not checked its contents or validity. Not every approval applies to every project (for example, smaller projects may not need an environment clearance). The project page on RERA lists each upload.
Prestige Raintree Park RERA complaints and orders
1 complaint as on Source (rera.karnataka.gov.in) (opens in a new tab)
| Complaint ref | Filed | Subject | Status | Source |
|---|---|---|---|---|
| 01029/2024 | 18 Oct 2024 | Misreprentation of the information | Disposed | Source (rera.karnataka.gov.in) (opens in a new tab) |
Court and consumer cases
We list case numbers, courts and outcomes only — never names of private individuals.
About Prestige Group
- Founded
- 1986
- Headquarters
- Bengaluru
- Bengaluru projects
- 15
- Delivered on time
- 16 of 27
- RERA complaints
- 77
- Court cases listed
- 4
Prestige Estates Projects Limited (CIN L07010KA1997PLC022322) is a listed Bengaluru developer; the group dates from 1986. In 27 Bengaluru projects where Karnataka RERA shows both dates, 16 received occupancy certificates on or before the completion date given at RERA registration and 11 after it; all but one of the late ones were within RERA extensions. Karnataka RERA lists 77 complaints against the promoter, mostly about delayed possession in projects registered in 2017. Two NCDRC rulings (2014, 2022) awarded Bengaluru buyers interest for late possession.
Prestige Group’s full recordPrestige Group delivery record
- 12Projects in Bengaluru on RERA13 approved registrations under Prestige Estates Projects Ltd in Bengaluru Urban and Rural. Source (rera.karnataka.gov.in) (opens in a new tab)
- 6,683Homes and plots registeredAs stated in each registrations.
- 77RERA complaints4 open, 73 disposed. as on Source (rera.karnataka.gov.in) (opens in a new tab)
- 11.5Complaints per 1,000 homes and plots77 complaints ÷ 6,683 homes and plots in its 13 registrations on Karnataka RERA in Bengaluru.
- 4Court cases listedFound in public court records; see the list on the builder’s page.
What the complaints are about
77 complaint subjects as written on RERA, as on . Each subject is sorted into one group by keywords (first match wins: delay, refund, registration, quality, litigation, association); one complaint often raises several issues. Source (rera.karnataka.gov.in) (opens in a new tab)
Handovers we checked by hand
27 rows: handovers. Scroll inside the table to see them all.
| Project | Promised (at registration) | OC | Result | Source |
|---|---|---|---|---|
| Prestige Westwoods | 31 Aug 2018 | 25 Oct 2018 | 2 months late | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Prestige Royale Gardens Phase I | 20 Jul 2020 | 4 Jul 2018 | On time | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Prestige Bagamane Temple Bells | 30 Sep 2019 | 29 Jun 2019 | On time | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Prestige Pinewood | 30 Jun 2020 | 8 Apr 2019 | On time | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Prestige Dejavu | 30 Sep 2019 | 6 Sep 2019 | On time | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Prestige Boulevard | 25 Dec 2019 | 20 Aug 2019 | On time | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Prestige Kew Gardens | 31 Dec 2019 | 16 Dec 2019 | On time | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Prestige Song of the South Phase I | 31 Dec 2020 | 14 Nov 2019 | On time | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Prestige Leela Residences | 31 May 2020 | 23 Jan 2020 | On time | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Prestige Royal Gardens Phase III | 31 Mar 2020 | 4 Mar 2020 | On time | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Prestige Lake Ridge Phase 1 | 30 Apr 2021 | 5 Oct 2020 | On time | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Prestige Jindal City Phase I | 31 Oct 2021 | 26 Apr 2021 | On time | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Prestige Park Square | 23 May 2022 | 6 Jan 2022 | On time | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Prestige Song of the South Phase 2 | 31 May 2022 | 4 Apr 2022 | On time | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Prestige Botanique | 30 Nov 2021 | 19 Apr 2022 | 5 months late | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Prestige Woodland Park | 31 Dec 2021 | 27 Apr 2022 | 4 months late | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Prestige Willow Tree | 30 Jun 2022 | 21 Jul 2022 | 1 months late | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Prestige Elysian | 31 Dec 2022 | 13 Apr 2023 | 3 months late | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Prestige Fairfield | 31 Aug 2023 | 1 Feb 2024 | 5 months late | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Prestige Waterford | 15 Dec 2023 | 6 Feb 2024 | 2 months late | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Prestige Primrose Hills Phase I | 31 May 2024 | 17 Feb 2024 | On time | Source (rera.karnataka.gov.in) (opens in a new tab) |
| The Prestige City - Avalon Park | 20 Feb 2025 | 22 Oct 2024 | On time | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Prestige Primrose Hills Phase 2 | 30 Sep 2024 | 15 Apr 2025 | 6 months late | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Prestige Green Gables | 30 Jun 2025 | 29 Oct 2025 | 4 months late | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Prestige Dew Drops | 14 Apr 2026 | 28 Nov 2025 | On time | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Meridian Park Phase I @ The Prestige City | 14 Jul 2025 | 12 Jan 2026 | 6 months late | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Meridian Park Phase II @ The Prestige City | 14 Jan 2026 | 10 Jul 2026 | 6 months late | Source (rera.karnataka.gov.in) (opens in a new tab) |
Sources:Source (rera.karnataka.gov.in) (opens in a new tab)Source (indiankanoon.org) (opens in a new tab)Source (indiankanoon.org) (opens in a new tab)Source (realestatelawjournal.in) (opens in a new tab)Source (indiankanoon.org) (opens in a new tab)How we calculate this
In the news
- 22 Jan 2026Prestige launches Evergreen, a roughly 24-acre, about 2,000-apartment extension of Raintree Park with smaller units from about Rs 92 lakh — Construction World Read (constructionworld.in) (opens in a new tab)
- 26 Sep 2024Prestige reports Raintree Park in Whitefield as a 21-acre, 18-tower, 1,520-home launch with about Rs 5,000 crore revenue potential — Business Standard (Capital Market feed) Read (business-standard.com) (opens in a new tab)
What’s changed since Jun 2024
- 14 Oct 2026Quarterly update filed for Q2 2026-27: 43% built, 1,455 of 1,520 homes booked Source (rera.karnataka.gov.in) (opens in a new tab)
- 4 Oct 2026Builder’s price list seen: 3 BHK from ₹3.7 Cr Source (prestigeconstructions.com) (opens in a new tab)
- 4 Oct 2026Listing price seen on squareyards.com: ₹3.41 Cr – ₹6.29 Cr Source (squareyards.com) (opens in a new tab)
- 15 Jul 2026Quarterly update filed for Q1 2026-27: 50% built, 1,400 of 1,520 homes booked Source (rera.karnataka.gov.in) (opens in a new tab)
- 15 Apr 2026Quarterly update filed for Q4 2025-26: 47% built, 1,343 of 1,520 homes booked Source (rera.karnataka.gov.in) (opens in a new tab)
- 14 Jan 2026Quarterly update filed for Q3 2025-26: 42% built, 1,232 of 1,520 homes booked Source (rera.karnataka.gov.in) (opens in a new tab)
- 18 Oct 2024Complaint 01029/2024 filed with RERA: “Misreprentation of the information” — now disposed Source (rera.karnataka.gov.in) (opens in a new tab)
- 1 Sep 2024Project start date in the RERA record Source (rera.karnataka.gov.in) (opens in a new tab)
- 27 Aug 2024Registered with Karnataka RERA (PRM/KA/RERA/1251/446/PR/270824/006981); completion date 31 Dec 2028 Source (rera.karnataka.gov.in) (opens in a new tab)
- 28 Jun 2024Building plan approved by BBMP - Bruhat Bengaluru Mahanagara Palike (No. BBMP/Addl.Dir/JDNORTH/0027/24-25) Source (rera.karnataka.gov.in) (opens in a new tab)
Newest first. No extension of the completion date is recorded on RERA. When the RERA crawl sees a new filing, complaint or extension, it is added here with its date.
Home loan EMI calculator
- Monthly EMI
- ₹2,36,742
- Down payment
- ₹68,20,000
- Loan amount
- ₹2,72,80,000
- Total interest
- ₹2,95,38,123
A calculation only, from the numbers you enter — not a loan offer.
All-in cost: GST, registration and other charges
The calculator loads when you scroll to it.
Assumptions
- Base price: the builder’s published “onwards” price for the home type, where it publishes one (it usually says government charges, other charges and taxes are extra). You can change it.
- GST 5% on the base price and charges — the usual rate for an under-construction home that is not “affordable housing” (1%).
- Stamp duty about 5.6% and registration 2% — the Karnataka rule (registration was raised from 1% to 2% on 31 Aug 2025). Calculated on the agreement value.
- Car parking, other charges and the maintenance deposit are not in the public record we collect; enter them from the builder’s cost sheet.
- Loan on the agreement value (banks usually lend up to 75–90%); EMI is the standard reducing-balance formula. Example rate only — use your bank’s quote.
Sources:Source (prestigeconstructions.com) (opens in a new tab)How we calculate this
Prestige Raintree Park FAQs
When is possession of Prestige Raintree Park?
The proposed completion date on Karnataka RERA is 31 December 2028, with no extension recorded so far.
What is the RERA number of Prestige Raintree Park?
PRM/KA/RERA/1251/446/PR/270824/006981, registered on 27 August 2024.
What is the price of Prestige Raintree Park?
Square Yards listed Rs 3.41 crore to Rs 6.29 crore (about Rs 17,000 per sq ft of saleable area) when seen on 4 October 2026; its page said it was last updated in January 2026.
What unit sizes are available?
The RERA filing lists 152 studios (about 283–313 sq ft carpet), 315 3 BHK (about 1,202–1,486 sq ft carpet) and 1,053 4 BHK (about 1,342–2,003 sq ft carpet). Listing sites quote 2,005–3,698 sq ft saleable area for 3 to 5 BHK.
How far along is construction?
The promoter's RERA quarterly update for April–June 2026 reports 50% completion, up from 42% and 47% in the two previous quarters.
How many units and towers are there?
1,520 units in 18 towers of 19 floors each, with two basement levels and 2,755 covered parking spaces.
Are there complaints against this project?
Karnataka RERA lists one complaint on this project, filed 18 October 2024 about misrepresentation of information; it is shown as disposed. No litigation on the project land is declared.
What is the builder's track record?
This file covers the project only; the builder's delivery record and complaint history are in the Prestige builder profile (builders/prestige.json).
Which metro station is nearest?
Kadugodi Tree Park on the Purple Line is about 3.6 km straight-line; ITPL is about 3.7 km and the airport about 27.6 km straight-line.
Which banks give home loans for this project?
No public source listing approved lenders was found. The RERA escrow account is with ICICI Bank, which is not the same as a loan approval.
What are the maintenance and car parking charges?
Not found in public sources.
How much open space does the project have?
RERA figures give 73,443 sq m of open area out of 112,652 sq m of land, about 65%.
More questions, answered from the RERA record
What is the RERA registration number for Prestige Raintree Park?
The RERA registration number is PRM/KA/RERA/1251/446/PR/270824/006981, registered on 27 August 2024.
When will Prestige Raintree Park be completed?
The completion date on RERA is 31 December 2028.
How many homes are in Prestige Raintree Park?
The project has 1,520 homes across 18 towers.
What home types are available in Prestige Raintree Park?
The project offers studios (283 to 313 carpet sq ft, 152 homes), 3 BHK (1,202 to 1,486 carpet sq ft, 315 homes), and 4 BHK (1,342 to 2,003 carpet sq ft, 1,053 homes).
How much land does Prestige Raintree Park cover?
The project is on 112,652 square metres of land.
What is the construction progress at Prestige Raintree Park?
As of Q2 2026-27 (ending 30 September 2026), construction is 43 per cent complete.
How many homes have been booked at Prestige Raintree Park?
As of Q2 2026-27, 1,455 of the 1,520 homes have been booked.
Are there any RERA complaints against Prestige Raintree Park?
There is 1 complaint on RERA for this project.
Where is Prestige Raintree Park located?
The project is in Ramgondanahalli, Bengaluru East taluk, PIN code 560001.
How many RERA complaints are there against Prestige Estates Projects Ltd?
There are 77 complaints on RERA against the builder across all projects, and the builder has 38 projects in the Bengaluru records.
Written by AI from the RERA record above on 18 Oct 2026. Answers use only that record; check them against the source before you decide.
Questions about Prestige Raintree Park
No questions published yet. Ask the first one: you get an instant answer from this page’s public record, and our team follows up on anything the record does not show.
Bought a home from Prestige Group? Review the builder.
Reviews of Prestige Group by verified buyers
No verified reviews of Prestige Group yet. If you bought a home from them, your review helps other buyers.
How reviews work: only buyers and owners can review; we confirm each purchase by phone before publishing, publish positive and negative reviews alike, never accept payment for reviews, and the builder may reply.
Similar projects within 5 km
| Project | Distance | Homes | Possession (RERA) | Built | Complaints | Price |
|---|---|---|---|---|---|---|
| Prestige SomervillePrestige Estates Projects Ltd | 0.3 km | 306 | Dec 2027 | 45% | 0 | Not collected |
| Evergreen @ Prestige Raintree ParkPrestige Estates Projects Ltd | 0.3 km | 2,000 | Jun 2030 | 11% | 0 | Not collected |
| Tru AquapolisTru Infra Projects And Realty LLP | 0.9 km | 310 | Apr 2029 | 35% | 0 | Not collected |
| Miraya Woods by UKNWaterline Hotels Private Limited | 1.2 km | 72 | Oct 2029 | 49% | 0 | Not collected |
| Green Edge SignatureGreen Edge Ventures | 1.3 km | 216 | Dec 2026 | 47% | 0 | Not collected |
| Sri Sai Krupa MeadowsSri Sai Krupa Developers | 1.3 km | 68 | Dec 2025 | 100% | 0 | Not collected |
Projects of the same kind within 5 km in a straight line of this project’s RERA map point, nearest first. % built is the promoter’s latest quarterly figure on RERA (shown for single-registration projects); prices are from the builder’s own website where we found one.
Sources and last checked dates
- Karnataka RERA — project register (search by the registration number) (opens in a new tab)
- Square Yards project listing (price, specifications) (opens in a new tab)
- NoBroker project listing (payment plan) (opens in a new tab)
- Business Standard, 26 Sep 2024 (opens in a new tab)
- Construction World, 22 Jan 2026 (opens in a new tab)
- Wikipedia: Kadugodi Tree Park metro station (coordinates, line, opening) (opens in a new tab)
- Wikipedia: Hopefarm Channasandra metro station (coordinates, read via the Wikipedia API) (opens in a new tab)
- Wikipedia: Kundalahalli metro station (coordinates, read via the Wikipedia API) (opens in a new tab)
- Wikipedia: Whitefield (Kadugodi) metro station (coordinates, read via the Wikipedia API) (opens in a new tab)
- Wikipedia: International Tech Park, Bengaluru (coordinates, read via the Wikipedia API) (opens in a new tab)
- Wikipedia: VR Bengaluru (coordinates, read via the Wikipedia API) (opens in a new tab)
- Wikipedia: Kempegowda International Airport (coordinates, read via the Wikipedia API) (opens in a new tab)
Collected on 18 Oct 2026 by AI research agents reading public pages. Facts are written in our own words. Not found yet: bank approvals; maintenance per sqft; car parking; other charges; court cases (none found).
How to check on RERA: On rera.karnataka.gov.in/viewAllProjects, type the registration number in 'Registration No', press Search, then click the 'View Project Details' icon. Complaints open from the 'Complaints / Litigation' icon in the same row. Registration number: PRM/KA/RERA/1251/446/PR/270824/006981.
- RERA record last checked: 18 Oct 2026
- Last change in the record (registration, quarterly filing or complaint): 18 Oct 2026
- Builder price list seen: Square Yards
How this page is made: software builds it from public records (Karnataka RERA filings, OpenStreetMap, the builder’s own website). AI is used only to read filings into fields and to write the plain-English summary and FAQ answers, which are checked against the record. Facts are checked automatically against the RERA filing. Methodology · How we earn · Report an error
More new projects in Whitefield
Ramagondanahalli, WhitefieldUnder constructionRERA registeredBuyers’ group openPrestige Somerville
by Prestige Estates
Price: Price on requestGet brochure & price →
- 2 BHK, 3 BHK, 3.5 BHK, 4 BHK
- 759 – 2,278 sq ft
- Dec 2027
306 homes
Be one of the first 10 buyers in this groupFounding members — it’s free
Join group for Prestige Somerville
Bellandur Amanikere, WhitefieldUnder constructionRERA registeredBuyers’ group openEvergreen @ Prestige Raintree Park
by Prestige Estates
Price: Price on requestGet brochure & price →
- 1 BHK, 2 BHK, 3 BHK, 4 BHK
- 419 – 1,593 sq ft
- Jun 2030
2,000 homes
Be one of the first 10 buyers in this groupFounding members — it’s free
Join group for Evergreen @ Prestige Raintree Park
Siddapura, WhitefieldUnder constructionRERA registeredBuyers’ group openMiraya Woods by UKN
by Waterline Hotels
Price: Price on requestGet brochure & price →
- 3 BHK, 4 BHK
- 237 – 1,776 sq ft
- Oct 2029
72 homes
Be one of the first 10 buyers in this groupFounding members — it’s free
Join group for Miraya Woods by UKN