1, 2 & 3 BHK apartments by Rohan Builders · Gunjur, Bengaluru

Gunjur, BengaluruOpen on Google Maps (opens in a new tab)

  • Under construction
  • RERA registered
  • residential

by Rohan Builders

Price: Price on request

Get brochure, floor plans & price

Brochure, floor plans and price list for Rohan Ekanta

Builders share their brochure, floor plans and price list only on request. Tell us how to reach you and we’ll get them and send them to you, free.

Free for buyers. If you book through us, the builder pays us a commission. How we earn

Project summary

Rohan Ekanta is a residential project by Rohan Builders in Gunjur, Bengaluru with 708 homes, registered with Karnataka RERA. The completion date on RERA is 31 Dec 2028. It is registered in 3 phases.

Facts collected on 22 Oct 2026 from public records — each linked to its source. Free for buyers. If you book through us, the builder pays us a commission.

Rohan Ekanta buyers’ group: join to ask for a group price

No one has joined yet. Be one of the first 10 buyers in this group — the founding members.

Join free. When enough buyers have joined, our agent partner asks Rohan Builders for a group price — for example a lower price, an easier payment plan or waived charges. Nothing is promised: you see what the builder offers and book directly with the builder if you want to. Free for buyers. If you book through us, the builder pays us a commission.

  1. Gathering buyers
  2. Talking to the builder
  3. Group offer
  4. Group site visit
  5. Booking

0 buyers have joined · 0 committed

Committed buyers have confirmed their budget, home type and timeline with us on a call; builders negotiate with them. Joining is free and never obliges you to buy.

Join the Rohan Ekanta buyers’ groupHow group buying works

See it for yourself

Visit the site with our team, or get a call to clear your questions. Free, no obligation.

Key facts: home types, towers, land and possession

Updated on 22 Oct 2026
Home types
1.5 BHK, 2 BHK, 2.5 BHK, 3 BHK
Carpet area
445 – 1,074 sq ft
Towers
9
Floors
22
Total homes
708
Land
6.17 acres
Possession (RERA)
Dec 2028
Built (RERA update)
Not found in public records yet: construction progress

Rohan Ekanta RERA number and registration details

RERA number
PRM/KA/RERA/1251/446/PR/200423/005887
Registered on
20 Apr 2023
Promised completion
31 Dec 2028
Extended to
No extension recorded
RERA status
New launch
Homes booked
Not found in public records yet: homes booked
Price
Not found in public records yet: price
Project type
Residential

3 RERA registrations (one per phase) are shown together on this page; dates above are the latest across phases.

Phases and RERA numbers

PhaseRERA numberPromised completionHomesStatusSource
Phase 2PRM/KA/RERA/1251/446/PR/200423/00588731 Mar 2028154CompletedSource (rera.karnataka.gov.in) (opens in a new tab)
Phase 1PRM/KA/RERA/1251/446/PR/200423/00589031 Mar 2027283CompletedSource (rera.karnataka.gov.in) (opens in a new tab)
Phase 3PRM/KA/RERA/1251/446/PR/130723/00606431 Dec 2028271New launchSource (rera.karnataka.gov.in) (opens in a new tab)

Towers and blocks (RERA filing)

TowerPhaseFloorsBasementsHomes
Wing DPhase 219272
Wing EPhase 221282
Wing APhase 121282
Wing BPhase 1212119
Wing CPhase 122282
Wing FPhase 317265
Wing GPhase 319272
Wing HPhase 317264
Wing IPhase 319270

A dash (—) means the filing did not state that value.

Sources:Source (rera.karnataka.gov.in) (opens in a new tab)

Summary in plain English

Rohan Ekanta is a residential project by Rohan Builders in Gunjur, Bengaluru East. The project has 708 homes across 3 phases. Phase 1 completes on 31 March 2027, Phase 2 on 31 March 2028, and Phase 3 on 31 December 2028.

Written by AI from the RERA record above on 11 Oct 2026. Every number in it was checked against that record; if anything differs, the record wins.

Open space, home loans, escrow and other details

Open space
Not found in public records yet: open space
Water and power
Water source filed with RERA: BoreWell,BWSSB,Others
Home loans: approved banks
Not found in public records yet: bank approvals
Payment plans
Not found in public records yet: payment plans
Maintenance
Not found in public records yet: maintenance
Car parking
Not found in public records yet: car parking charge
Escrow bank (RERA) · Phase 2
State Bank of Mauritius Ltd., ULSOOR ROAD
Escrow bank (RERA) · Phase 1
State Bank of Mauritius Ltd., ULSOOR ROAD
Escrow bank (RERA) · Phase 3
State Bank of Mauritius Ltd., ULSOOR RAOD, BENGALURU

Sources:Source (rera.karnataka.gov.in) (opens in a new tab)

Amenities

  • Electricity
  • Power Backup
  • Water and Sanitation
  • Club House
  • Outdoor Sports facility
  • Swimming Pool

Amenities and internal works as filed by the promoter with Karnataka RERA; we have not visited the site.

Sources:Source (rera.karnataka.gov.in) (opens in a new tab)

Rohan Ekanta location and address

Address
Survey No. 129/1, 129/4, 129/6 and 130/3, , Gunjur Village, , Bengaluru East , Bengaluru Urban, Karnataka - 560087
Village (RERA)
Gunjur
Locality
Gunjur
PIN code
560087
City
Bengaluru
State
Karnataka
Coordinates
12.92721, 77.72486

Distances to landmarks

Not found in public records yet: landmarks

About Gunjur

Not found in public records yet: locality facts

Commute times to tech parks and the airport

As on 5 Oct 2026
ToStraight linePeak-hour drive (estimate)
Outer Ring Road tech corridor (RMZ Ecospace, Bellandur)Map point on OpenStreetMap (opens in a new tab)4.74 kmapprox. 19 min
ITPL, Whitefield (main gate)Map point on OpenStreetMap (opens in a new tab)6.86 kmapprox. 28 min
Electronic City Phase 1Map point on OpenStreetMap (opens in a new tab)10.79 kmapprox. 44 min
Manyata Tech ParkMap point on OpenStreetMap (opens in a new tab)17.61 kmapprox. 71 min
KSR Bengaluru City railway station (Majestic)Map point on OpenStreetMap (opens in a new tab)17.76 kmapprox. 72 min
Kempegowda International AirportMap point on OpenStreetMap (opens in a new tab)30.49 kmapprox. 124 min
How we calculate

Straight line: from the project’s map point on RERA to the destination’s point on OpenStreetMap.

Peak-hour drive is a rough estimate, not a route: straight line × 1.35 for the road network, at 20 km/h. Real times vary a lot with the route and the hour.

Sources:Source (openstreetmap.org) (opens in a new tab)How we calculate this

Schools and hospitals nearby

As on 5 Oct 2026

Within 2 km

  • 14Schools and colleges10 schools, 1 colleges, 3 kindergartens
  • 7Hospitals and clinics2 hospitals, 5 clinics

Nearest schools and colleges

  • Gunjur Palya Government School · 0.99 km
  • Gunjuru Government School · 1.31 km
  • Sarah Montessori · 1.38 km

Nearest hospitals and clinics

  • Apollo Clinic · 1.05 km
  • Government Hospital, Gunjur · 1.33 km
  • Pranathi Clinic · 1.41 km

Places as mapped on OpenStreetMap (amenity=school, college, kindergarten, university; hospital, clinic), counted within 2 km in a straight line of the RERA map point. Volunteers map these, so some places may be missing or closed. Places data © OpenStreetMap contributors, extract of 5 Oct 2026.

Sources:Source (openstreetmap.org) (opens in a new tab)

Nearest metro station and railway

As on 5 Oct 2026
  • Kodibisanahalli (ಕೋಡಿಬೀಸನಹಳ್ಳಿ)Blue Line metro, under construction3.52 km
  • Embassy Tech Village Kadubeesanahalli (ಕಾಡುಬೀಸನಹಳ್ಳಿ)Blue Line metro, under construction4.08 km
  • Marathahalli (ಮಾರತಹಳ್ಳಿ)Blue Line metro, under construction4.27 km
  • Nallurahalli (ನಲ್ಲೂರಹಳ್ಳಿ)Open now — nearest operating metro station5.5 km
  • Belandur Road (ಬೆಳಂದೂರು ರಸ್ತೆ)Nearest railway station2.3 km

Straight-line distances from the RERA map point to the station points mapped on OpenStreetMap; status (open or under construction) as tagged there. Places data © OpenStreetMap contributors, extract of 5 Oct 2026.

Sources:Source (openstreetmap.org) (opens in a new tab)

Lake and lake-buffer check

As on 5 Oct 2026

The nearest mapped lake is Gunjuru Palya Lake, 758 m from the project’s RERA map point.

The site boundary is not published as a shape, so its nearest edge can be closer than this point. Whether any building sits inside a lake buffer can only be checked on the approved plan.

The buffer rule

Bengaluru’s lake buffer rule has changed over time: the National Green Tribunal ordered a 75 m buffer in May 2016; the Supreme Court set that order aside on 5 March 2019, leaving the 30 m buffer of the Revised Master Plan 2015. Check the current rule and the approved plan before relying on either number.

Shortest distance from the RERA map point to the mapped water edge (OpenStreetMap water polygons tagged lake or reservoir, or named lake/kere/tank). Mapped shorelines can differ from the revenue-record boundary of a lake. Places data © OpenStreetMap contributors, extract of 5 Oct 2026.

Sources:Source (openstreetmap.org) (opens in a new tab)Source (livelaw.in) (opens in a new tab)Source (citizenmatters.in) (opens in a new tab)How we calculate this

Satellite time-lapse of the site

Satellite photos load when you scroll to them.

Photos from Esri World Imagery Wayback, centred on the project’s map point; dates are the capture dates in Esri’s metadata. Loaded from Esri when you scroll here.

Sources:Source (livingatlas.arcgis.com) (opens in a new tab)

Rohan Ekanta floor plans, brochure and elevations

Documents the builder uploaded to Karnataka RERA, shown as filed. Tap a page to see it full size; the full PDF opens on the RERA website.

Brochure4 pages

Approved layout plan

Home typeCarpet areaHomes
1.5 BHK445 – 462 sq ft79
2 BHK699 – 833 sq ft314
2.5 BHK849 – 949 sq ft77
3 BHK956 – 1,074 sq ft238

Home types, counts and carpet areas as filed with Karnataka RERA (carpet area, not super built-up).

We have not collected floor-plan drawings; the builder’s sales team can share them.

Sources:Source (rera.karnataka.gov.in) (opens in a new tab)

Rohan Ekanta possession date and construction status

  • Phase 2100%

    as on · 151 of 154 homes booked

  • Phase 1100%

    as on · 278 of 283 homes booked

  • Phase 365%

    as on · 255 of 271 homes booked

Timeline

  1. 15 Mar 2023Phase 2: Project start date given to RERA
  2. 15 Mar 2023Phase 1: Project start date given to RERA
  3. 20 Apr 2023Phase 2: Registered with Karnataka RERA
  4. 20 Apr 2023Phase 1: Registered with Karnataka RERA
  5. 1 Jul 2023Phase 3: Project start date given to RERA
  6. 13 Jul 2023Phase 3: Registered with Karnataka RERA
  7. 7 Aug 2026Phase 2: Promoter applied to RERA for completion
  8. 7 Aug 2026Phase 1: Promoter applied to RERA for completion
  9. 31 Mar 2027Phase 1: Completion date given at registration
  10. 31 Mar 2028Phase 2: Completion date given at registration
  11. 31 Dec 2028Phase 3: Completion date given at registration

Sources:Source (rera.karnataka.gov.in) (opens in a new tab)

Approvals and documents checklist

37 rows: approvals. Scroll inside the table to see them all.

ApprovalAuthoritySource
Building plan (Phase 2)BBMP - Bruhat Bengaluru Mahanagara Palike · No. BBMP/Addl.Dir/JDNORTH/0066/22-23 · dated 2023-03-09Source (rera.karnataka.gov.in) (opens in a new tab)
Land conversion (4 orders) (Phase 2)Specal Deputy Commissioner (Revenue) Bangalore Dist. · No. ALN[EVH]SR51/2007-08 and 3 more · dated 2009-03-02Source (rera.karnataka.gov.in) (opens in a new tab)
Commencement Certificate (Phase 2)scan uploaded to RERASource (rera.karnataka.gov.in) (opens in a new tab)
Approved Layout Plan (Phase 2)scan uploaded to RERASource (rera.karnataka.gov.in) (opens in a new tab)
Approved Building/Plotting Plan (Phase 2)scan uploaded to RERASource (rera.karnataka.gov.in) (opens in a new tab)
Approved Section Of Building/Infrastructure Plan of Plotting (Phase 2)scan uploaded to RERASource (rera.karnataka.gov.in) (opens in a new tab)
ESCOM/Electricity (Phase 2)scan uploaded to RERASource (rera.karnataka.gov.in) (opens in a new tab)
KWSSB/Water (Phase 2)scan uploaded to RERASource (rera.karnataka.gov.in) (opens in a new tab)
Fire Force Department (Phase 2)scan uploaded to RERASource (rera.karnataka.gov.in) (opens in a new tab)
Airport Authority of India (Phase 2)scan uploaded to RERASource (rera.karnataka.gov.in) (opens in a new tab)
KSPCB (Phase 2)scan uploaded to RERASource (rera.karnataka.gov.in) (opens in a new tab)
SEIAA (Phase 2)scan uploaded to RERASource (rera.karnataka.gov.in) (opens in a new tab)
Building plan (Phase 1)BBMP - Bruhat Bengaluru Mahanagara Palike · No. BBMP/Addl.Dir/JDNORTH/0066/22-23 · dated 2023-03-09Source (rera.karnataka.gov.in) (opens in a new tab)
Land conversion (4 orders) (Phase 1)Special Deputy Commissioner (Revenue) Bangalore Dist. · No. ALN[EVH]SR51/2007-08 and 3 more · dated 2009-03-02Source (rera.karnataka.gov.in) (opens in a new tab)
Commencement Certificate (Phase 1)scan uploaded to RERASource (rera.karnataka.gov.in) (opens in a new tab)
Approved Layout Plan (Phase 1)scan uploaded to RERASource (rera.karnataka.gov.in) (opens in a new tab)
Approved Building/Plotting Plan (Phase 1)scan uploaded to RERASource (rera.karnataka.gov.in) (opens in a new tab)
Approved Section Of Building/Infrastructure Plan of Plotting (Phase 1)scan uploaded to RERASource (rera.karnataka.gov.in) (opens in a new tab)
Conversion Certificate under section 95 of the KLR Act 1964 (Phase 1)scan uploaded to RERASource (rera.karnataka.gov.in) (opens in a new tab)
ESCOM/Electricity (Phase 1)scan uploaded to RERASource (rera.karnataka.gov.in) (opens in a new tab)
KWSSB/Water (Phase 1)scan uploaded to RERASource (rera.karnataka.gov.in) (opens in a new tab)
Fire Force Department (Phase 1)scan uploaded to RERASource (rera.karnataka.gov.in) (opens in a new tab)
Airport Authority of India (Phase 1)scan uploaded to RERASource (rera.karnataka.gov.in) (opens in a new tab)
KSPCB (Phase 1)scan uploaded to RERASource (rera.karnataka.gov.in) (opens in a new tab)
SEIAA (Phase 1)scan uploaded to RERASource (rera.karnataka.gov.in) (opens in a new tab)
Building plan (Phase 3)BBMP - Bruhat Bengaluru Mahanagara Palike · No. BBMP/Addl.Dir/JDNORTH/0066/22-23 · dated 2023-03-09Source (rera.karnataka.gov.in) (opens in a new tab)
Land conversion (4 orders) (Phase 3)Special Deputy Commissioner Revenue Bangalore Dist · No. ALN EVH SR 51 2007 08 and 3 more · dated 2009-03-02Source (rera.karnataka.gov.in) (opens in a new tab)
Commencement Certificate (Phase 3)scan uploaded to RERASource (rera.karnataka.gov.in) (opens in a new tab)
Approved Layout Plan (Phase 3)scan uploaded to RERASource (rera.karnataka.gov.in) (opens in a new tab)
Approved Building/Plotting Plan (Phase 3)scan uploaded to RERASource (rera.karnataka.gov.in) (opens in a new tab)
Approved Section Of Building/Infrastructure Plan of Plotting (Phase 3)scan uploaded to RERASource (rera.karnataka.gov.in) (opens in a new tab)
ESCOM/Electricity (Phase 3)scan uploaded to RERASource (rera.karnataka.gov.in) (opens in a new tab)
KWSSB/Water (Phase 3)scan uploaded to RERASource (rera.karnataka.gov.in) (opens in a new tab)
Fire Force Department (Phase 3)scan uploaded to RERASource (rera.karnataka.gov.in) (opens in a new tab)
Airport Authority of India (Phase 3)scan uploaded to RERASource (rera.karnataka.gov.in) (opens in a new tab)
KSPCB (Phase 3)scan uploaded to RERASource (rera.karnataka.gov.in) (opens in a new tab)
SEIAA (Phase 3)scan uploaded to RERASource (rera.karnataka.gov.in) (opens in a new tab)

Documents uploaded to RERA (Phase 1)

As on 4 Oct 2026
  • Building or layout plan · Approved drawings from the planning authorityFiled on RERA ✓ — BBMP - Bruhat Bengaluru Mahanagara Palike · No. BBMP/Addl.Dir/JDNORTH/0066/22-23 · dated 9 Mar 2023
  • Commencement certificate · Permission to start buildingFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
  • Environment clearance · SEIAA KarnatakaFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
  • Fire NOC · Karnataka Fire and Emergency ServicesFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
  • Pollution board consent · KSPCBFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
  • Water and sewerage · BWSSBFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
  • Electricity · BESCOMFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
  • Height clearance · Airports Authority of IndiaFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
  • Occupancy certificate (OC) · Issued only when the building is finishedNot on RERA yet

From the documents the promoter uploaded to Karnataka RERA, collected 4 Oct 2026. “Filed” means a document is on RERA — we have not checked its contents or validity. Not every approval applies to every project (for example, smaller projects may not need an environment clearance). Each phase is registered separately; this list is for the phase named above. The project page on RERA lists each upload.

Sources:Source (rera.karnataka.gov.in) (opens in a new tab)

Rohan Ekanta RERA complaints

No complaints listed on Karnataka RERA for these registrations as on Source (rera.karnataka.gov.in) (opens in a new tab)

Court and consumer cases

Not found in public records yet: court cases

We list case numbers, courts and outcomes only — never names of private individuals.

About Rohan Builders

Promoter type
Partnership Firm
Projects on this site
1
RERA complaints against promoter
1
Company number (CIN)
Not found in public records yet: CIN

From Karnataka RERA, as collected so far (22 Oct 2026). Complaints are those RERA lists against this promoter across all its projects.

Rohan Builders’s RERA record

Rohan Builders delivery record

As on 22 Oct 2026
  • 1Projects in Bengaluru on RERA3 approved registrations under Rohan Builders in Bengaluru Urban and Rural. Source (rera.karnataka.gov.in) (opens in a new tab)
  • 708Homes registeredAs stated in each registrations.
  • 1RERA complaints0 open, 1 disposed. as on Source (rera.karnataka.gov.in) (opens in a new tab)
  • 1.4Complaints per 1,000 homes1 complaints ÷ 708 homes in its 3 registrations on Karnataka RERA in Bengaluru.
  • 2Completion filed on RERARegistrations where the promoter applied to RERA for completion; 2 with an occupancy certificate on RERA.
  • 2 of 2Filed by the date given at registrationMedian gap 0 months (on-time ones count as 0). The completion application can come after handover, so this is an upper bound on lateness.

What the complaints are about

  • Registration, sale deed or agreement1

1 complaint subject as written on RERA, as on . Each subject is sorted into one group by keywords (first match wins: delay, refund, registration, quality, litigation, association); one complaint often raises several issues. Source (rera.karnataka.gov.in) (opens in a new tab)

Completion filed on RERA

ProjectDate at registrationCompletion filedGap
Rohan Ekanta Phase 2OC on RERA31 Mar 20287 Aug 2026By the date
Rohan Ekanta Phase 1OC on RERA31 Mar 20277 Aug 2026By the date

Measured against the completion date given at registration; many projects had RERA extensions (including the COVID-period extension), shown under the date.

Sources:Source (rera.karnataka.gov.in) (opens in a new tab)How we calculate this

What’s changed since Mar 2023

As on 22 Oct 2026
  1. 7 Aug 2026Phase 2: Promoter applied to RERA for completion (occupancy certificate on RERA) Source (rera.karnataka.gov.in) (opens in a new tab)
  2. 7 Aug 2026Phase 1: Promoter applied to RERA for completion (occupancy certificate on RERA) Source (rera.karnataka.gov.in) (opens in a new tab)
  3. 31 Jul 2026Phase 2: Quarterly update filed for Q1 2026-27: 100% built, 151 of 154 homes booked Source (rera.karnataka.gov.in) (opens in a new tab)
  4. 31 Jul 2026Phase 1: Quarterly update filed for Q1 2026-27: 100% built, 278 of 283 homes booked Source (rera.karnataka.gov.in) (opens in a new tab)
  5. 15 Jul 2026Phase 3: Quarterly update filed for Q1 2026-27: 65% built, 255 of 271 homes booked Source (rera.karnataka.gov.in) (opens in a new tab)
  6. 15 Apr 2026Phase 2: Quarterly update filed for Q4 2025-26: 84% built, 151 of 154 homes booked Source (rera.karnataka.gov.in) (opens in a new tab)
  7. 15 Apr 2026Phase 1: Quarterly update filed for Q4 2025-26: 86% built, 276 of 283 homes booked Source (rera.karnataka.gov.in) (opens in a new tab)
  8. 15 Apr 2026Phase 3: Quarterly update filed for Q4 2025-26: 61% built, 246 of 271 homes booked Source (rera.karnataka.gov.in) (opens in a new tab)
  9. 31 Jan 2026Phase 2: Quarterly update filed for Q3 2025-26: 81% built, 147 of 154 homes booked Source (rera.karnataka.gov.in) (opens in a new tab)
  10. 31 Jan 2026Phase 1: Quarterly update filed for Q3 2025-26: 83% built, 273 of 283 homes booked Source (rera.karnataka.gov.in) (opens in a new tab)
  11. 31 Jan 2026Phase 3: Quarterly update filed for Q3 2025-26: 56% built, 243 of 271 homes booked Source (rera.karnataka.gov.in) (opens in a new tab)
  12. 13 Jul 2023Phase 3: Registered with Karnataka RERA (PRM/KA/RERA/1251/446/PR/130723/006064); completion date 31 Dec 2028 Source (rera.karnataka.gov.in) (opens in a new tab)
  13. 1 Jul 2023Phase 3: Project start date in the RERA record Source (rera.karnataka.gov.in) (opens in a new tab)
  14. 20 Apr 2023Phase 2: Registered with Karnataka RERA (PRM/KA/RERA/1251/446/PR/200423/005887); completion date 31 Mar 2028 Source (rera.karnataka.gov.in) (opens in a new tab)
  15. 20 Apr 2023Phase 1: Registered with Karnataka RERA (PRM/KA/RERA/1251/446/PR/200423/005890); completion date 31 Mar 2027 Source (rera.karnataka.gov.in) (opens in a new tab)
  16. 15 Mar 2023Phase 2: Project start date in the RERA record Source (rera.karnataka.gov.in) (opens in a new tab)
  17. 15 Mar 2023Phase 1: Project start date in the RERA record Source (rera.karnataka.gov.in) (opens in a new tab)
  18. 9 Mar 2023Phase 2: Building plan approved by BBMP - Bruhat Bengaluru Mahanagara Palike (No. BBMP/Addl.Dir/JDNORTH/0066/22-23) Source (rera.karnataka.gov.in) (opens in a new tab)
  19. 9 Mar 2023Phase 1: Building plan approved by BBMP - Bruhat Bengaluru Mahanagara Palike (No. BBMP/Addl.Dir/JDNORTH/0066/22-23) Source (rera.karnataka.gov.in) (opens in a new tab)
  20. 9 Mar 2023Phase 3: Building plan approved by BBMP - Bruhat Bengaluru Mahanagara Palike (No. BBMP/Addl.Dir/JDNORTH/0066/22-23) Source (rera.karnataka.gov.in) (opens in a new tab)

Newest first. No extension of the completion date is recorded on RERA. When the RERA crawl sees a new filing, complaint or extension, it is added here with its date.

Home loan EMI calculator

No listed price found — enter one to try.

Example only — use your bank’s quote.

Monthly EMI
—
Down payment
—
Loan amount
—
Total interest
—

A calculation only, from the numbers you enter — not a loan offer.

All-in cost: GST, registration and other charges

The calculator loads when you scroll to it.

Assumptions
  • Base price: the builder’s price is not published in a form we could collect — enter it from the cost sheet.
  • GST 5% on the base price and charges — the usual rate for an under-construction home that is not “affordable housing” (1%).
  • Stamp duty about 5.6% and registration 2% — the Karnataka rule (registration was raised from 1% to 2% on 31 Aug 2025). Calculated on the agreement value.
  • Car parking, other charges and the maintenance deposit are not in the public record we collect; enter them from the builder’s cost sheet.
  • Loan on the agreement value (banks usually lend up to 75–90%); EMI is the standard reducing-balance formula. Example rate only — use your bank’s quote.

How we calculate this

Rohan Ekanta FAQs

What is Rohan Ekanta?

Rohan Ekanta is a residential project by Rohan Builders in Gunjur, Bengaluru East, with 708 homes across 3 phases.

When will Rohan Ekanta be completed?

Phase 1 is due on 31 March 2027, Phase 2 on 31 March 2028, and Phase 3 on 31 December 2028.

What home types are available in Rohan Ekanta?

The project offers 1.5 BHK, 2 BHK, 2.5 BHK, and 3 BHK homes with carpet areas ranging from 445 sq ft to 1,074 sq ft.

How many homes are in each phase of Rohan Ekanta?

Phase 1 has 283 homes, Phase 2 has 154 homes, and Phase 3 has 271 homes.

What are the RERA registration numbers for Rohan Ekanta?

Phase 1 is PRM/KA/RERA/1251/446/PR/200423/005890, Phase 2 is PRM/KA/RERA/1251/446/PR/200423/005887, and Phase 3 is PRM/KA/RERA/1251/446/PR/130723/006064.

How many homes have been booked in Rohan Ekanta?

As of Q1 2026-27, Phase 1 has 278 homes booked, Phase 2 has 151 homes booked, and Phase 3 has 255 homes booked.

What is the construction progress of Rohan Ekanta?

Phase 1 and Phase 2 are 100% complete, and Phase 3 is 65% complete as of Q1 2026-27.

Are there any RERA complaints on Rohan Ekanta?

There are no RERA complaints on this project.

Where is Rohan Ekanta located?

Rohan Ekanta is in Gunjur, Bengaluru East taluk, PIN code 560087.

How many towers does each phase have?

Phase 1 has 3 towers, Phase 2 has 2 towers, and Phase 3 has 4 towers.

Written by AI from the RERA record above on 11 Oct 2026. Answers use only that record; check them against the source before you decide.

Questions about Rohan Ekanta

No questions published yet. Ask the first one: you get an instant answer from this page’s public record, and our team follows up on anything the record does not show.

Bought a home from Rohan Builders? Review the builder.

Reviews of Rohan Builders by verified buyers

No verified reviews of Rohan Builders yet. If you bought a home from them, your review helps other buyers.

How reviews work: only buyers and owners can review; we confirm each purchase by phone before publishing, publish positive and negative reviews alike, never accept payment for reviews, and the builder may reply.

Similar projects within 5 km

ProjectDistanceHomesPossession (RERA)BuiltComplaintsPrice
Orchid LifeGoyal Hariyana Associates0.3 km772Feb 203084%0Not collected
Vertex WellingtonVertex Infras0.4 km32Dec 2025—0Not collected
SOBHA Ayana at Dream Acres Wing 60 to 71Sobha Limited0.5 km683Dec 203125%0from ₹2.3 Crabout ₹19,200/sq ft carpet
The Adwaith By SanjeeviniSanjeevini Properties Private Limited0.6 km704Dec 202836%0Not collected
Spirit Of OneSkandaavani Shelters Pvt Ltd0.7 km104Dec 2029—1Not collected
KRK Urban VilleKRK Housing Private Limited0.7 km68Aug 202685%0Not collected

Projects of the same kind within 5 km in a straight line of this project’s RERA map point, nearest first. % built is the promoter’s latest quarterly figure on RERA (shown for single-registration projects); prices are from the builder’s own website where we found one.

Sources:Source (rera.karnataka.gov.in) (opens in a new tab)

Sources and last checked dates

  1. Karnataka RERA — project register (search by the registration number) (opens in a new tab)

Collected on 22 Oct 2026 by AI research agents reading public pages. Facts are written in our own words. Not found yet: price; court cases; landmarks; specifications; news.

How to check on RERA: On rera.karnataka.gov.in/viewAllProjects, type the registration number in 'Registration No', press Search, then click the 'View Project Details' icon. Complaints open from the 'Complaints / Litigation' icon in the same row. Registration numbers: PRM/KA/RERA/1251/446/PR/200423/005887, PRM/KA/RERA/1251/446/PR/200423/005890, PRM/KA/RERA/1251/446/PR/130723/006064.

  • RERA record last checked: 22 Oct 2026
  • Last change in the record (registration, quarterly filing or complaint): 31 Jul 2026

How this page is made: software builds it from public records (Karnataka RERA filings, OpenStreetMap, the builder’s own website). AI is used only to read filings into fields and to write the plain-English summary and FAQ answers, which are checked against the record. Facts are checked automatically against the RERA filing. Methodology · How we earn · Report an error

More new projects in Gunjur