Ready homes still available: 4 of 8 homes were unsold when the builder filed completion with RERA (30 Dec 2025). Some may have sold since — join the group and we’ll ask the builder what is left and for a group price.

by Sankalp Constructions Private Limited

Price: Price on request

Get brochure, floor plans & price

Brochure, floor plans and price list for Sankalp Windsor House

Builders share their brochure, floor plans and price list only on request. Tell us how to reach you and we’ll get them and send them to you, free.

Free for buyers. If you book through us, the builder pays us a commission. How we earn

Project summary

Sankalp Windsor House is a residential project by Sankalp Constructions Private Limited in Judicial Layout Jakkur Plantation, Bengaluru with 8 homes, registered with Karnataka RERA. The completion date on RERA is 31 Dec 2025.

Facts collected on 4 Oct 2026 from public records — each linked to its source. Free for buyers. If you book through us, the builder pays us a commission.

Sankalp Windsor House buyers’ group: join to ask for a group price

No one has joined yet. Be one of the first 10 buyers in this group — the founding members.

Join free. When enough buyers have joined, our agent partner asks Sankalp Constructions Private Limited for a group price — for example a lower price, an easier payment plan or waived charges. Nothing is promised: you see what the builder offers and book directly with the builder if you want to. Free for buyers. If you book through us, the builder pays us a commission.

  1. Gathering buyers
  2. Talking to the builder
  3. Group offer
  4. Group site visit
  5. Booking

0 buyers have joined · 0 committed

Committed buyers have confirmed their budget, home type and timeline with us on a call; builders negotiate with them. Joining is free and never obliges you to buy.

Join the Sankalp Windsor House buyers’ groupHow group buying works

See it for yourself

Visit the site with our team, or get a call to clear your questions. Free, no obligation.

Key facts: home types, towers, land and possession

Updated on 4 Oct 2026
Home types
3 BHK
Carpet area
1,643 – 1,669 sq ft
Towers
1
Floors
4
Total homes
8
Land
0.22 acres
Possession (RERA)
Dec 2025
Built (RERA update)
Not found in public records yet: construction progress

Sankalp Windsor House RERA number and registration details

RERA number
PRM/KA/RERA/1251/472/PR/151222/005527
Registered on
15 Dec 2022
Promised completion
31 Dec 2025
Extended to
No extension recorded
RERA status
Completed
Homes booked
Not found in public records yet: homes booked
Price
Not found in public records yet: price
Project type
Residential

Towers and blocks (RERA filing)

TowerFloorsBasementsHomes
SANKALP WINDSOR HOUSE408

A dash (—) means the filing did not state that value.

Sources:Source (rera.karnataka.gov.in) (opens in a new tab)

Summary in plain English

Sankalp Windsor House is a residential project by Sankalp Constructions Private Limited in Judicial Layout Jakkur Plantation, Yelahanka. The project has 8 homes in 1 tower with 4 floors. The completion date on RERA is 31 December 2025.

Written by AI from the RERA record above on 5 Oct 2026. Every number in it was checked against that record; if anything differs, the record wins.

Open space, home loans, escrow and other details

Open space
58.5% of land
Water and power
Water source filed with RERA: Local Authority
Home loans: approved banks
Not found in public records yet: bank approvals
Payment plans
Not found in public records yet: payment plans
Maintenance
Not found in public records yet: maintenance
Car parking
Not found in public records yet: car parking charge
Escrow bank (RERA)
STATE BANK OF INDIA, KUVEMPUNAGAR
Building plan (RERA)
BBMP - Bruhat Bengaluru Mahanagara Palike · No. BBMP.AD.COMYLK/1457/2021 · dated 5 Aug 2021
Project cost declared to RERA
₹12.22 Cr

Open area as a share of the land, from the areas filed with RERA (includes driveways and landscaped areas).

Sources:Source (rera.karnataka.gov.in) (opens in a new tab)

Amenities

  • Electricity
  • Power Backup
  • Water and Sanitation

Amenities and internal works as filed by the promoter with Karnataka RERA; we have not visited the site.

Sources:Source (rera.karnataka.gov.in) (opens in a new tab)

Sankalp Windsor House location and address

Address
BBMP KHATA NO.1528/1493/1412 (SITE NO.1412) JUDICIAL LAYOUT JAKKUR PLANTATION VILLAGE YELAHANKA WARD , BENGALURU NORTH , Yelahanka , Bengaluru Urban, Karnataka - 560064
Village (RERA)
Judicial Layout Jakkur Plantation
Locality
Jakkur
PIN code
560064
City
Bengaluru
State
Karnataka
Coordinates
13.07696, 77.59249

Distances to landmarks

Not found in public records yet: landmarks

About Jakkur

Not found in public records yet: locality facts

Commute times to tech parks and the airport

As on 5 Oct 2026
ToStraight linePeak-hour drive (estimate)
Manyata Tech ParkMap point on OpenStreetMap (opens in a new tab)4.37 kmapprox. 18 min
KSR Bengaluru City railway station (Majestic)Map point on OpenStreetMap (opens in a new tab)11.26 kmapprox. 46 min
Kempegowda International AirportMap point on OpenStreetMap (opens in a new tab)18.34 kmapprox. 74 min
ITPL, Whitefield (main gate)Map point on OpenStreetMap (opens in a new tab)18.61 kmapprox. 75 min
Outer Ring Road tech corridor (RMZ Ecospace, Bellandur)Map point on OpenStreetMap (opens in a new tab)19.57 kmapprox. 79 min
Electronic City Phase 1Map point on OpenStreetMap (opens in a new tab)26.47 kmapprox. 107 min
How we calculate

Straight line: from the project’s map point on RERA to the destination’s point on OpenStreetMap.

Peak-hour drive is a rough estimate, not a route: straight line × 1.35 for the road network, at 20 km/h. Real times vary a lot with the route and the hour.

Sources:Source (openstreetmap.org) (opens in a new tab)How we calculate this

Schools and hospitals nearby

As on 5 Oct 2026

Within 2 km

  • 30Schools and colleges16 schools, 8 colleges, 6 kindergartens
  • 29Hospitals and clinics14 hospitals, 15 clinics

Nearest schools and colleges

  • Gyan Jyothi, State Bank of India · 0.61 km
  • Vidya Prakash High School · 0.74 km
  • Central Institute of Medicinal and Aromatic Plants · 0.77 km

Nearest hospitals and clinics

  • Dr Bhanus Skin Clinic · 1.16 km
  • Venus Bone & Joint Centre · 1.23 km
  • HCG Hebbal · 1.24 km

Places as mapped on OpenStreetMap (amenity=school, college, kindergarten, university; hospital, clinic), counted within 2 km in a straight line of the RERA map point. Volunteers map these, so some places may be missing or closed. Places data © OpenStreetMap contributors, extract of 5 Oct 2026.

Sources:Source (openstreetmap.org) (opens in a new tab)

Nearest metro station and railway

As on 5 Oct 2026
  • Jakkur Cross (ಜಕ್ಕೂರು ಅಡ್ಡ)Blue Line metro, under construction0.77 km
  • Kodigehalli (ಕೊಡಿಗೇಹಳ್ಳಿ)Blue Line metro, under construction2.25 km
  • Yelahanka (ಯಲಹಂಕ)Blue Line metro, under construction2.89 km
  • Yeshwantpur (ಯಶವಂತಪುರ)Open now — nearest operating metro station7.55 km
  • Kodigehalli (ಕೊಡಿಗೇಹಳ್ಳಿ)Nearest railway station2.38 km

Straight-line distances from the RERA map point to the station points mapped on OpenStreetMap; status (open or under construction) as tagged there. Places data © OpenStreetMap contributors, extract of 5 Oct 2026.

Lines under construction near here

  • 6 Aug 2026Namma Metro Blue Line, Phase 2B (KR Pura – Hebbal – Yelahanka – Kempegowda Airport, 38.44 km). Under construction; reported 72% complete overall, with the remaining work targeted for June 2027 and phased opening through 2027. Nearest: Jakkur Cross, about 0.77 km straight-line. — Business Today. News report quoting BMRCL; the airport line has slipped before. Read (businesstoday.in) (opens in a new tab)

Sources:Source (businesstoday.in) (opens in a new tab)Source (openstreetmap.org) (opens in a new tab)

Lake and lake-buffer check

As on 5 Oct 2026

The nearest mapped lake is Allalasandra Lake, 1,406 m from the project’s RERA map point.

The site boundary is not published as a shape, so its nearest edge can be closer than this point. Whether any building sits inside a lake buffer can only be checked on the approved plan.

The buffer rule

Bengaluru’s lake buffer rule has changed over time: the National Green Tribunal ordered a 75 m buffer in May 2016; the Supreme Court set that order aside on 5 March 2019, leaving the 30 m buffer of the Revised Master Plan 2015. Check the current rule and the approved plan before relying on either number.

Shortest distance from the RERA map point to the mapped water edge (OpenStreetMap water polygons tagged lake or reservoir, or named lake/kere/tank). Mapped shorelines can differ from the revenue-record boundary of a lake. Places data © OpenStreetMap contributors, extract of 5 Oct 2026.

Sources:Source (openstreetmap.org) (opens in a new tab)Source (livelaw.in) (opens in a new tab)Source (citizenmatters.in) (opens in a new tab)How we calculate this

Satellite time-lapse of the site

Satellite photos load when you scroll to them.

Photos from Esri World Imagery Wayback, centred on the project’s map point; dates are the capture dates in Esri’s metadata. Loaded from Esri when you scroll here.

Sources:Source (livingatlas.arcgis.com) (opens in a new tab)

Sankalp Windsor House home types and carpet areas

Floor plans and brochure not published? The builder shares them only on request. We’ll get the brochure, floor plans and current price list for you, free.

Get brochure, floor plans & price

Brochure, floor plans and price list for Sankalp Windsor House

Builders share their brochure, floor plans and price list only on request. Tell us how to reach you and we’ll get them and send them to you, free.

Free for buyers. If you book through us, the builder pays us a commission. How we earn

Home typeCarpet areaHomes
3 BHK1,643 – 1,669 sq ft8

Home types, counts and carpet areas as filed with Karnataka RERA (carpet area, not super built-up).

We have not collected floor-plan drawings; the builder’s sales team can share them.

Sources:Source (rera.karnataka.gov.in) (opens in a new tab)

Sankalp Windsor House possession date and construction status

Not found in public records yet: construction progress

Timeline

  1. 29 Jan 2022Project start date given to RERA
  2. 15 Dec 2022Registered with Karnataka RERA
  3. 30 Dec 2025Promoter applied to RERA for completion
  4. 31 Dec 2025Completion date given at registration

Approvals and documents checklist

ApprovalAuthoritySource
Building planBBMP - Bruhat Bengaluru Mahanagara Palike · No. BBMP.AD.COMYLK/1457/2021 · dated 2021-08-05Source (rera.karnataka.gov.in) (opens in a new tab)
Commencement Certificatescan uploaded to RERASource (rera.karnataka.gov.in) (opens in a new tab)
Electricity Permission Letterscan uploaded to RERASource (rera.karnataka.gov.in) (opens in a new tab)
Approved Building/Plotting Planscan uploaded to RERASource (rera.karnataka.gov.in) (opens in a new tab)
Approved Section Of Building/Infrastructure Plan of Plottingscan uploaded to RERASource (rera.karnataka.gov.in) (opens in a new tab)
ESCOM/Electricityscan uploaded to RERASource (rera.karnataka.gov.in) (opens in a new tab)

Documents uploaded to RERA

As on 4 Oct 2026
  • Building or layout plan · Approved drawings from the planning authorityFiled on RERA ✓ — BBMP - Bruhat Bengaluru Mahanagara Palike · No. BBMP.AD.COMYLK/1457/2021 · dated 5 Aug 2021
  • Commencement certificate · Permission to start buildingFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
  • Environment clearance · SEIAA KarnatakaNot on RERA yet
  • Fire NOC · Karnataka Fire and Emergency ServicesNot on RERA yet
  • Pollution board consent · KSPCBNot on RERA yet
  • Water and sewerage · BWSSBNot on RERA yet
  • Electricity · BESCOMFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
  • Height clearance · Airports Authority of IndiaNot on RERA yet
  • Occupancy certificate (OC) · Issued only when the building is finishedNot on RERA yet

From the documents the promoter uploaded to Karnataka RERA, collected 4 Oct 2026. “Filed” means a document is on RERA — we have not checked its contents or validity. Not every approval applies to every project (for example, smaller projects may not need an environment clearance). The project page on RERA lists each upload.

Sources:Source (rera.karnataka.gov.in) (opens in a new tab)

Sankalp Windsor House RERA complaints

No complaints listed on Karnataka RERA for this registration as on Source (rera.karnataka.gov.in) (opens in a new tab)

Court and consumer cases

Not found in public records yet: court cases

We list case numbers, courts and outcomes only — never names of private individuals.

About Sankalp Constructions Private Limited

Promoter type
Company
Projects on this site
1
RERA complaints against promoter
0
Company number (CIN)
Not found in public records yet: CIN

From Karnataka RERA, as collected so far (4 Oct 2026). Complaints are those RERA lists against this promoter across all its projects.

Sankalp Constructions Private Limited’s RERA record

Sankalp Constructions Private Limited delivery record

As on 5 Oct 2026
  • 1Projects in Bengaluru on RERA1 approved registration under Sankalp Constructions Private Limited in Bengaluru Urban and Rural. Source (rera.karnataka.gov.in) (opens in a new tab)
  • 8Homes registeredAs stated in each registrations.
  • 0RERA complaintsas on Source (rera.karnataka.gov.in) (opens in a new tab)
  • 0Complaints per 1,000 homes0 complaints ÷ 8 homes in its 1 registration on Karnataka RERA in Bengaluru.
  • 1Completion filed on RERARegistrations where the promoter applied to RERA for completion; 1 with an occupancy certificate on RERA.
  • 1 of 1Filed by the date given at registrationMedian gap 0 months (on-time ones count as 0). The completion application can come after handover, so this is an upper bound on lateness.

Completion filed on RERA

ProjectDate at registrationCompletion filedGap
Sankalp Windsor HouseOC on RERA31 Dec 202530 Dec 2025By the date

Measured against the completion date given at registration; many projects had RERA extensions (including the COVID-period extension), shown under the date.

Sources:Source (rera.karnataka.gov.in) (opens in a new tab)How we calculate this

What’s changed since Aug 2021

As on 4 Oct 2026
  1. 30 Dec 2025Promoter applied to RERA for completion (occupancy certificate on RERA) Source (rera.karnataka.gov.in) (opens in a new tab)
  2. 15 Dec 2022Registered with Karnataka RERA (PRM/KA/RERA/1251/472/PR/151222/005527); completion date 31 Dec 2025 Source (rera.karnataka.gov.in) (opens in a new tab)
  3. 29 Jan 2022Project start date in the RERA record Source (rera.karnataka.gov.in) (opens in a new tab)
  4. 5 Aug 2021Building plan approved by BBMP - Bruhat Bengaluru Mahanagara Palike (No. BBMP.AD.COMYLK/1457/2021) Source (rera.karnataka.gov.in) (opens in a new tab)

Newest first. No extension of the completion date is recorded on RERA. When the RERA crawl sees a new filing, complaint or extension, it is added here with its date.

Home loan EMI calculator

No listed price found — enter one to try.

Example only — use your bank’s quote.

Monthly EMI
—
Down payment
—
Loan amount
—
Total interest
—

A calculation only, from the numbers you enter — not a loan offer.

All-in cost: GST, registration and other charges

The calculator loads when you scroll to it.

Assumptions
  • Base price: the builder’s price is not published in a form we could collect — enter it from the cost sheet.
  • GST 5% on the base price and charges — the usual rate for an under-construction home that is not “affordable housing” (1%).
  • Stamp duty about 5.6% and registration 2% — the Karnataka rule (registration was raised from 1% to 2% on 31 Aug 2025). Calculated on the agreement value.
  • Car parking, other charges and the maintenance deposit are not in the public record we collect; enter them from the builder’s cost sheet.
  • Loan on the agreement value (banks usually lend up to 75–90%); EMI is the standard reducing-balance formula. Example rate only — use your bank’s quote.

How we calculate this

Sankalp Windsor House FAQs

What is Sankalp Windsor House?

Sankalp Windsor House is a residential project by Sankalp Constructions Private Limited located in Judicial Layout Jakkur Plantation, Yelahanka, Bengaluru Urban, PIN 560064.

How many homes are in Sankalp Windsor House?

The project has 8 homes.

What home types are available in Sankalp Windsor House?

The project offers 3 BHK homes with carpet areas ranging from 1,643 to 1,669 sq ft.

When will Sankalp Windsor House be completed?

The completion date on RERA is 31 December 2025.

What is the RERA registration number for Sankalp Windsor House?

The RERA registration number is PRM/KA/RERA/1251/472/PR/151222/005527, registered on 15 December 2022.

Has the occupancy certificate been uploaded for Sankalp Windsor House?

Yes, the occupancy certificate has been uploaded on RERA.

Are there any RERA complaints on Sankalp Windsor House?

No RERA complaints have been filed on this project.

What is the land area of Sankalp Windsor House?

The land area is 894 sq m.

How many floors does Sankalp Windsor House have?

The project has 4 floors.

What is the builder's track record?

Sankalp Constructions Private Limited has 2 projects on record with Karnataka RERA and no complaints against the builder.

Written by AI from the RERA record above on 5 Oct 2026. Answers use only that record; check them against the source before you decide.

Questions about Sankalp Windsor House

No questions published yet. Ask the first one: you get an instant answer from this page’s public record, and our team follows up on anything the record does not show.

Bought a home from Sankalp Constructions Private Limited? Review the builder.

Reviews of Sankalp Constructions Private Limited by verified buyers

No verified reviews of Sankalp Constructions Private Limited yet. If you bought a home from them, your review helps other buyers.

How reviews work: only buyers and owners can review; we confirm each purchase by phone before publishing, publish positive and negative reviews alike, never accept payment for reviews, and the builder may reply.

Similar projects within 5 km

ProjectDistanceHomesPossession (RERA)BuiltComplaintsPrice
Elara CelestiaL&T Realty Developers Limited0.6 km634Mar 203023%1Not collected
BCM PanacheBCM Infrastructure Private Limited0.7 km69Mar 202940%0Not collected
Olivia At Raintree Boulevard Cluster 7L and T Realty Developers Limited0.8 km480Mar 2026100%1Not collected
Kay Arr MaverickKay Arr & Co0.9 km4Jan 2022extended—0Not collected
Visista By Vista Spaces | OkasVista Spaces Jakkur Residency Private Limited1.2 km236Dec 2026100%0Not collected
RR Wish TalesMSR Infraa1.3 km101Mar 2027100%0Not collected

Projects of the same kind within 5 km in a straight line of this project’s RERA map point, nearest first. % built is the promoter’s latest quarterly figure on RERA (shown for single-registration projects); prices are from the builder’s own website where we found one.

Sources:Source (rera.karnataka.gov.in) (opens in a new tab)

Sources and last checked dates

  1. Karnataka RERA — project register (search by the registration number) (opens in a new tab)

Collected on 4 Oct 2026 by AI research agents reading public pages. Facts are written in our own words. Not found yet: price; court cases; landmarks; specifications; news.

How to check on RERA: On rera.karnataka.gov.in/viewAllProjects, type the registration number in 'Registration No', press Search, then click the 'View Project Details' icon. Complaints open from the 'Complaints / Litigation' icon in the same row. Registration number: PRM/KA/RERA/1251/472/PR/151222/005527.

  • RERA record last checked: 4 Oct 2026
  • Last change in the record (registration, quarterly filing or complaint): 15 Dec 2022

How this page is made: software builds it from public records (Karnataka RERA filings, OpenStreetMap, the builder’s own website). AI is used only to read filings into fields and to write the plain-English summary and FAQ answers, which are checked against the record. Facts are checked automatically against the RERA filing. Methodology · How we earn · Report an error