SBR Earth & Sky
3 & 4 BHK mixed-use project by SBR Infraspace · Kannamangala, Old Madras Road, Bengaluru
Kannamangala, Old Madras Road, BengaluruOpen on Google Maps (opens in a new tab)
- Under construction
- RERA registered
- RERA not updated: completion promised Sep 2026; no extension or completion filed
- mixed
Price: Price on request
Site photo filed with Karnataka RERA Karnataka RERA filing · Source ↗ (opens in a new tab)
SBR Earth & Sky at a glance
- Possession (RERA)Sep 2026 Date passedKarnataka RERA
- Construction90% built · on pace for Aug 2026RERA filing to 31 Mar 2026; estimate from average pace
- Homes booked134 of 135 (99%)RERA update · as on 31 Mar 2026
- RERA complaints (project)None listedKarnataka RERA · as on 17 Oct 2026
- Approvals filed5 of 9 on RERAKarnataka RERA uploads · 17 Oct 2026
- Nearest metroWhitefield (Kadugodi) · 3.36 kmstraight line · OpenStreetMap, 5 Oct 2026
- Airport driveapprox. 83 min at peak20.46 km straight line · estimate
- Nearest lakeUnnamed lake · 621 mFrom the RERA map point · OpenStreetMap, 5 Oct 2026
Project summary
SBR Earth & Sky is a mixed-use project by SBR Infraspace in Kannamangala, Bengaluru with 135 homes, registered with Karnataka RERA. The completion date on RERA is 30 Sep 2026.
Facts collected on 17 Oct 2026 from public records — each linked to its source. Free for buyers. If you book through us, the builder pays us a commission.
SBR Earth & Sky buyers’ group: join to ask for a group price
No one has joined yet. Be one of the first 10 buyers in this group — the founding members.
Join free. When enough buyers have joined, our agent partner asks SBR Infraspace for a group price — for example a lower price, an easier payment plan or waived charges. Nothing is promised: you see what the builder offers and book directly with the builder if you want to. Free for buyers. If you book through us, the builder pays us a commission.
- Gathering buyers
- Talking to the builder
- Group offer
- Group site visit
- Booking
0 buyers have joined · 0 committed
Committed buyers have confirmed their budget, home type and timeline with us on a call; builders negotiate with them. Joining is free and never obliges you to buy.
Join the SBR Earth & Sky buyers’ groupHow group buying works
See it for yourself
Visit the site with our team, or get a call to clear your questions. Free, no obligation.
Key facts: home types, towers, land and possession
- Home types
- 3 BHK, 4 BHK, Villa
- Carpet area
- 1,336 – 4,529 sq ft
- Towers
- 2
- Floors
- 7
- Total homes
- 135
- Land
- 2.21 acres
- Possession (RERA)
- Sep 2026
- Built (RERA update)
- 90%
SBR Earth & Sky RERA number and registration details
- RERA number
- PRM/KA/RERA/1251/446/PR/191022/005344
- Registered on
- 19 Oct 2022
- Promised completion
- 30 Sep 2026
- Extended to
- No extension recorded
- RERA status
- New launch
- Homes booked
- 134 of 135 as on
- Price
- Not found in public records yet: price
- Project type
- Mixed
Towers and blocks (RERA filing)
| Tower | Floors | Basements | Homes |
|---|---|---|---|
| TOWER A | 7 | 1 | 67 |
| TOWER B | 7 | 1 | 70 |
A dash (—) means the filing did not state that value.
Summary in plain English
SBR Earth & Sky is a mixed-use project by SBR Infraspace with 135 homes across 2 towers in Kannamangala, Bengaluru East. The project includes 3 BHK, 4 BHK and villament units with carpet areas from 1,336 to 1,900 sq ft, plus commercial spaces. The completion date on RERA is 30 September 2026.
Written by AI from the RERA record above on 17 Oct 2026. Every number in it was checked against that record; if anything differs, the record wins.
Open space, home loans, escrow and other details
- Open space
- 52.3% of land
- Water and power
- Water source filed with RERA: BoreWell
- Home loans: approved banks
- Not found in public records yet: bank approvals
- Payment plans
- Not found in public records yet: payment plans
- Maintenance
- Not found in public records yet: maintenance
- Car parking
- Not found in public records yet: car parking charge
- Escrow bank (RERA)
- Axis Bank, KADUGODI
- Building plan (RERA)
- BDA - Bangalore Development Authority · No. BDA/NAMA/AASA/A.A-1/TASA-4/PU/18/2022-2023 · dated 22 Jul 2022
- Project cost declared to RERA
- ₹153 Cr
Open area as a share of the land, from the areas filed with RERA (includes driveways and landscaped areas).
Amenities
- Electricity
- CCTV Surveillance
- Club House
- Community Hall
- Indoor Sports facility
- Swimming Pool
- Gym
- Parks
- Power Backup
- Water and Sanitation
Amenities and internal works as filed by the promoter with Karnataka RERA; we have not visited the site.
SBR Earth & Sky location and address
- Address
- SURVEY NUMBER 170/2, KANNAMANGALA VILLAGE , BIDARAHALLI HOBLI, BANGALORE EAST TALUK , Bengaluru East , Bengaluru Urban, Karnataka - 560067
- Village (RERA)
- Kannamangala
- Locality
- Old Madras RoadAlso known as OMR, Old Madras Road
- PIN code
- 560067
- City
- Bengaluru
- State
- Karnataka
- Coordinates
- 13.02562, 77.76251
Distances to landmarks
Not found in public records yet: landmarksAbout Old Madras Road
Not found in public records yet: locality factsCommute times to tech parks and the airport
| To | Straight line | Peak-hour drive (estimate) |
|---|---|---|
| ITPL, Whitefield (main gate)Map point on OpenStreetMap (opens in a new tab) | 5 km | approx. 20 min |
| Outer Ring Road tech corridor (RMZ Ecospace, Bellandur)Map point on OpenStreetMap (opens in a new tab) | 14.35 km | approx. 58 min |
| Manyata Tech ParkMap point on OpenStreetMap (opens in a new tab) | 15.65 km | approx. 63 min |
| Kempegowda International AirportMap point on OpenStreetMap (opens in a new tab) | 20.46 km | approx. 83 min |
| KSR Bengaluru City railway station (Majestic)Map point on OpenStreetMap (opens in a new tab) | 21.56 km | approx. 87 min |
| Electronic City Phase 1Map point on OpenStreetMap (opens in a new tab) | 22.24 km | approx. 90 min |
How we calculate
Straight line: from the project’s map point on RERA to the destination’s point on OpenStreetMap.
Peak-hour drive is a rough estimate, not a route: straight line × 1.35 for the road network, at 20 km/h. Real times vary a lot with the route and the hour.
Sources:Source (openstreetmap.org) (opens in a new tab)How we calculate this
Schools and hospitals nearby
Within 2 km
- 7Schools and colleges7 schools, 0 colleges, 0 kindergartens
- 2Hospitals and clinics2 hospitals, 0 clinics
Nearest schools and colleges
- Chrysalis High School · 0.34 km
- Narayana e-Techno School · 1.84 km
- National Public School ITPL · 1.84 km
Nearest hospitals and clinics
- Kannamangala Primary Health Center · 0.65 km
- Miracle Hospital · 1.87 km
Places as mapped on OpenStreetMap (amenity=school, college, kindergarten, university; hospital, clinic), counted within 2 km in a straight line of the RERA map point. Volunteers map these, so some places may be missing or closed. Places data © OpenStreetMap contributors, extract of 5 Oct 2026.
Nearest metro station and railway
- Whitefield (Kadugodi) (ವೈಟ್ಫೀಲ್ಡ್ (ಕಾಡುಗೋಡಿ))Open now — nearest operating metro station3.36 km
- Whitefield (ವೈಟ್ಫೀಲ್ಡ್)Nearest railway station3.25 km
Straight-line distances from the RERA map point to the station points mapped on OpenStreetMap; status (open or under construction) as tagged there. Places data © OpenStreetMap contributors, extract of 5 Oct 2026.
Lake and lake-buffer check
The nearest mapped lake is Unnamed lake (mapped on OpenStreetMap), 621 m from the project’s RERA map point.
The site boundary is not published as a shape, so its nearest edge can be closer than this point. Whether any building sits inside a lake buffer can only be checked on the approved plan.
- Unnamed lake (mapped on OpenStreetMap) on OpenStreetMap (opens in a new tab) 621 m
- Kannamangala Lake on OpenStreetMap (opens in a new tab) (ಕನ್ನಮಂಗಲ ಕೆರೆ)1,215 m
- Unnamed lake (mapped on OpenStreetMap) on OpenStreetMap (opens in a new tab) 1,508 m
The buffer rule
Bengaluru’s lake buffer rule has changed over time: the National Green Tribunal ordered a 75 m buffer in May 2016; the Supreme Court set that order aside on 5 March 2019, leaving the 30 m buffer of the Revised Master Plan 2015. Check the current rule and the approved plan before relying on either number.
- LiveLaw: SC sets aside NGT order enlarging buffer zones (2019) (livelaw.in) (opens in a new tab)
- Citizen Matters: Shrinking lake buffers (citizenmatters.in) (opens in a new tab)
Shortest distance from the RERA map point to the mapped water edge (OpenStreetMap water polygons tagged lake or reservoir, or named lake/kere/tank). Mapped shorelines can differ from the revenue-record boundary of a lake. Places data © OpenStreetMap contributors, extract of 5 Oct 2026.
Sources:Source (openstreetmap.org) (opens in a new tab)Source (livelaw.in) (opens in a new tab)Source (citizenmatters.in) (opens in a new tab)How we calculate this
Satellite time-lapse of the site
Satellite photos load when you scroll to them.
Photos from Esri World Imagery Wayback, centred on the project’s map point; dates are the capture dates in Esri’s metadata. Loaded from Esri when you scroll here.
Sources:Source (livingatlas.arcgis.com) (opens in a new tab)
SBR Earth & Sky floor plans, brochure and elevations
Documents the builder uploaded to Karnataka RERA, shown as filed. Tap a page to see it full size; the full PDF opens on the RERA website.
Brochure

BrochureFull PDF on RERA
Approved building plan

Approved Building/Plotting PlanFull PDF on RERA
Approved layout plan2 files

Approved Layout PlanFull PDF on RERA 
Existing Layout PlanFull PDF on RERA
| Home type | Carpet area | Homes |
|---|---|---|
| 3 BHK | 1,336 – 1,830 sq ft | 115 |
| 4 BHK | 1,593 – 1,900 sq ft | 20 |
| Commercial | 4,520 – 4,529 sq ft | 2 |
| Commercial space | 4,526 sq ft | 2 |
| Villaments | 1,562 sq ft | 135 |
Home types, counts and carpet areas as filed with Karnataka RERA (carpet area, not super built-up).
We have not collected floor-plan drawings; the builder’s sales team can share them.
SBR Earth & Sky possession date and construction status
Promoter’s quarterly update to RERA for Q4 2025-26, submitted 2026-09-30.
By tower (Q4 2025-26)
Units sold and unsold, from RERA (Q4 2025-26)
| Type | Homes | Booked | Available |
|---|---|---|---|
| 3 BHK | 115 | 114 | 1 |
| 4 BHK | 20 | 20 | 0 |
| COMMERCIAL | 2 | 0 | 2 |
As reported by the promoter in the quarterly update to RERA, not verified by us.
Timeline
- 25 Aug 2022Project start date given to RERA
- 19 Oct 2022Registered with Karnataka RERA
- 30 Sep 2026Completion date given at registration
Construction pace from RERA quarterly filings
At the average pace so far, construction would reach 100% around Aug 2026 — about 1 month before the completion date on RERA (30 Sep 2026).
At the pace between the 2 quarterly filings we have (88% → 90% in 3 months), it would be around Jun 2027 — about 9 months after the RERA date.
- Filed on RERA
- Average pace since start
- Pace between filings (and 0% assumed at the start date)
- RERA completion date
Quarterly filings
| Quarter | Filed on | Built | Homes booked |
|---|---|---|---|
| Q4 2025-26to 31 Mar 2026 | 30 Sep 2026 | 90% | 134 of 137 |
| Q3 2025-26to 31 Dec 2025 | 31 Jan 2026 | 88% | 134 of 137 |
How we calculate
Average pace = % built ÷ months since the start date in the RERA record. Here: 90% ÷ 43.2 months (25 Aug 2022 to 31 Mar 2026) = 2.1% a month.
Estimated finish = latest filing date + (100 − % built) ÷ pace = 31 Mar 2026 + 10 ÷ 2.1 = 4.8 months → Aug 2026. This is an estimate, not a date from the builder or RERA.
Pace between filings = (90% − 88%) ÷ 3 months = 0.7% a month.
A straight line is a simplification: the builder reports one overall %, which mixes excavation, structure and finishing, and work rarely moves at a constant speed. The % values are the promoter’s own figures filed with RERA, not checked by us. Promoter’s quarterly update to RERA for Q4 2025-26, submitted 2026-09-30.
Sources:Source (rera.karnataka.gov.in) (opens in a new tab)How we calculate this
Approvals and documents checklist
17 rows: approvals. Scroll inside the table to see them all.
| Approval | Authority | Source |
|---|---|---|
| Building plan | BDA - Bangalore Development Authority · No. BDA/NAMA/AASA/A.A-1/TASA-4/PU/18/2022-2023 · dated 2022-07-22 | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Land conversion | DEPUTY COMMISSIONER · No. ALN(EBK)CR/30/91-92 AND B.DIS.ALN.CR(S)30/91-92 · dated 2015-07-17 | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Commencement Certificate | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Electricity Permission Letter | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Water Permission Letter | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Approved Layout Plan | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Approved Building/Plotting Plan | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Approved Section Of Building/Infrastructure Plan of Plotting | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Change of Land Use | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| District Magistrate | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Conversion Certificate under section 95 of the KLR Act 1964 | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| ESCOM/Electricity | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| KWSSB/Water | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Approval/NOC under section 109 of KLR Act 1961 | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Approval/NOC under section 14 of the KTCP Act | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Airport Authority of India | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| NOC in case of building proposals abutting to neighbouring properties | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
Documents uploaded to RERA
- Building or layout plan · Approved drawings from the planning authorityFiled on RERA ✓ — BDA - Bangalore Development Authority · No. BDA/NAMA/AASA/A.A-1/TASA-4/PU/18/2022-2023 · dated 22 Jul 2022
- Commencement certificate · Permission to start buildingFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
- Environment clearance · SEIAA KarnatakaNot on RERA yet
- Fire NOC · Karnataka Fire and Emergency ServicesNot on RERA yet
- Pollution board consent · KSPCBNot on RERA yet
- Water and sewerage · BWSSBFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
- Electricity · BESCOMFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
- Height clearance · Airports Authority of IndiaFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
- Occupancy certificate (OC) · Issued only when the building is finishedNot on RERA yet — expected at completion
From the documents the promoter uploaded to Karnataka RERA, collected 17 Oct 2026. “Filed” means a document is on RERA — we have not checked its contents or validity. Not every approval applies to every project (for example, smaller projects may not need an environment clearance). The project page on RERA lists each upload.
SBR Earth & Sky RERA complaints
No complaints listed on Karnataka RERA for this registration as on Source (rera.karnataka.gov.in) (opens in a new tab)
Court and consumer cases
We list case numbers, courts and outcomes only — never names of private individuals.
About SBR Infraspace
- Promoter type
- Partnership Firm
- Projects on this site
- 1
- RERA complaints against promoter
- 0
- Company number (CIN)
- Not found in public records yet: CIN
From Karnataka RERA, as collected so far (17 Oct 2026). Complaints are those RERA lists against this promoter across all its projects.
SBR Infraspace’s RERA recordSBR Infraspace delivery record
- 1Projects in Bengaluru on RERA1 approved registration under SBR Infraspace in Bengaluru Urban and Rural. Source (rera.karnataka.gov.in) (opens in a new tab)
- 135Homes registeredAs stated in each registrations.
- 0RERA complaintsas on Source (rera.karnataka.gov.in) (opens in a new tab)
- 0Complaints per 1,000 homes0 complaints ÷ 135 homes in its 1 registration on Karnataka RERA in Bengaluru.
Sources:Source (rera.karnataka.gov.in) (opens in a new tab)How we calculate this
What’s changed since Jul 2022
- 30 Sep 2026Quarterly update filed for Q4 2025-26: 90% built, 134 of 137 homes booked Source (rera.karnataka.gov.in) (opens in a new tab)
- 31 Jan 2026Quarterly update filed for Q3 2025-26: 88% built, 134 of 137 homes booked Source (rera.karnataka.gov.in) (opens in a new tab)
- 19 Oct 2022Registered with Karnataka RERA (PRM/KA/RERA/1251/446/PR/191022/005344); completion date 30 Sep 2026 Source (rera.karnataka.gov.in) (opens in a new tab)
- 25 Aug 2022Project start date in the RERA record Source (rera.karnataka.gov.in) (opens in a new tab)
- 22 Jul 2022Building plan approved by BDA - Bangalore Development Authority (No. BDA/NAMA/AASA/A.A-1/TASA-4/PU/18/2022-2023) Source (rera.karnataka.gov.in) (opens in a new tab)
Newest first. No extension of the completion date is recorded on RERA. When the RERA crawl sees a new filing, complaint or extension, it is added here with its date.
Home loan EMI calculator
- Monthly EMI
- —
- Down payment
- —
- Loan amount
- —
- Total interest
- —
A calculation only, from the numbers you enter — not a loan offer.
All-in cost: GST, registration and other charges
The calculator loads when you scroll to it.
Assumptions
- Base price: the builder’s price is not published in a form we could collect — enter it from the cost sheet.
- GST 5% on the base price and charges — the usual rate for an under-construction home that is not “affordable housing” (1%).
- Stamp duty about 5.6% and registration 2% — the Karnataka rule (registration was raised from 1% to 2% on 31 Aug 2025). Calculated on the agreement value.
- Car parking, other charges and the maintenance deposit are not in the public record we collect; enter them from the builder’s cost sheet.
- Loan on the agreement value (banks usually lend up to 75–90%); EMI is the standard reducing-balance formula. Example rate only — use your bank’s quote.
SBR Earth & Sky FAQs
What is the completion date for SBR Earth & Sky?
The project completion date on RERA is 30 September 2026.
How many homes are in SBR Earth & Sky?
The project has 135 homes across 2 towers, with a maximum of 7 floors.
What home types are available in SBR Earth & Sky?
The project offers 3 BHK units (115 homes), 4 BHK units (20 homes), and 135 villament units, with carpet areas ranging from 1,336 to 1,900 sq ft.
What is the RERA registration number for SBR Earth & Sky?
The registration number is PRM/KA/RERA/1251/446/PR/191022/005344, registered on 19 October 2022.
Where is SBR Earth & Sky located?
The project is in Kannamangala, Bengaluru East taluk, Bengaluru Urban district, PIN code 560067.
What is the construction progress of SBR Earth & Sky?
As of Q4 2025-26 (quarter ended 31 March 2026), the project is 90% complete with 134 homes booked.
Are there any RERA complaints against SBR Earth & Sky?
There are no complaints filed against this project on RERA.
Are there any RERA complaints against the builder SBR Infraspace?
There are no complaints against SBR Infraspace on RERA across all its projects.
How much land does SBR Earth & Sky cover?
The project is built on 8,946 sq m of land.
What bank holds the escrow for SBR Earth & Sky?
Axis Bank holds the escrow account for this project.
Written by AI from the RERA record above on 17 Oct 2026. Answers use only that record; check them against the source before you decide.
Questions about SBR Earth & Sky
No questions published yet. Ask the first one: you get an instant answer from this page’s public record, and our team follows up on anything the record does not show.
Bought a home from SBR Infraspace? Review the builder.
Reviews of SBR Infraspace by verified buyers
No verified reviews of SBR Infraspace yet. If you bought a home from them, your review helps other buyers.
How reviews work: only buyers and owners can review; we confirm each purchase by phone before publishing, publish positive and negative reviews alike, never accept payment for reviews, and the builder may reply.
Similar projects within 5 km
| Project | Distance | Homes | Possession (RERA) | Built | Complaints | Price |
|---|---|---|---|---|---|---|
| SBR MinaraSBR Infra Buildtech | 1.3 km | 447 | Aug 2027 | 52% | 1 | Not collected |
| Mahindra BlossomMahindra Lifespace Developers Limited | 4.5 km | 735 | Oct 2030 | 3% | 17 | from ₹3.4 Cr |
| SBR One ResidenceSBR Structures | 4.7 km | 931 | Dec 2030 | 15% | 0 | Not collected |
| Lemon TreeLegend Properties | 4.8 km | 92 | Dec 2030 | 22% | 0 | Not collected |
| S.V.PrimeS V Infra Holdings Limited | 4.8 km | 256 | Nov 2025 | 100% | 0 | Not collected |
Projects of the same kind within 5 km in a straight line of this project’s RERA map point, nearest first. % built is the promoter’s latest quarterly figure on RERA (shown for single-registration projects); prices are from the builder’s own website where we found one.
Sources and last checked dates
Collected on 17 Oct 2026 by AI research agents reading public pages. Facts are written in our own words. Not found yet: price; court cases; landmarks; specifications; news.
How to check on RERA: On rera.karnataka.gov.in/viewAllProjects, type the registration number in 'Registration No', press Search, then click the 'View Project Details' icon. Complaints open from the 'Complaints / Litigation' icon in the same row. Registration number: PRM/KA/RERA/1251/446/PR/191022/005344.
- RERA record last checked: 17 Oct 2026
- Last change in the record (registration, quarterly filing or complaint): 30 Sep 2026
How this page is made: software builds it from public records (Karnataka RERA filings, OpenStreetMap, the builder’s own website). AI is used only to read filings into fields and to write the plain-English summary and FAQ answers, which are checked against the record. Facts are checked automatically against the RERA filing. Methodology · How we earn · Report an error
More new projects in Old Madras Road
Seegehalli, near Kadugodi–Hope FarmUnder constructionRERA registeredBuyers’ group openSBR Minara
by SBR Infra Buildtech
Price: Price on requestGet brochure & price →
- 2 BHK, 3 BHK, 3.5 BHK, 4 BHK, +1 more
- 570 – 10,278 sq ft
- Aug 2027
447 homes · 1 RERA complaint
Be one of the first 10 buyers in this groupFounding members — it’s free
Join group for SBR Minara
Pattandur Agrahara, Kadugodi–Hope FarmArtist’s impressionUnder constructionRERA registeredBuyers’ group openMahindra Blossom
by Mahindra Lifespace
Price: Price on requestGet brochure & price →
- 1 BHK, 2 BHK, 3 BHK, 4 BHK
- 400 – 6,522 sq ft
- Oct 2030
735 homes · 17 RERA complaints
Be one of the first 10 buyers in this groupFounding members — it’s free
Join group for Mahindra Blossom
Pattandur Agrahara, Kadugodi–Hope FarmUnder constructionRERA registeredBuyers’ group openSBR One Residence
by SBR Structures
Price: Price on requestGet brochure & price →
- 2.5 BHK, 3 BHK
- 764 – 79,653 sq ft
- Dec 2030
931 homes
Be one of the first 10 buyers in this groupFounding members — it’s free
Join group for SBR One Residence