SBR One Residence
2 & 3 BHK mixed-use project by SBR Structures · Pattandur Agrahara, Kadugodi–Hope Farm, Bengaluru
Pattandur Agrahara, Kadugodi–Hope Farm, BengaluruOpen on Google Maps (opens in a new tab)
- Under construction
- RERA registered
- mixed
Price: Price on request
Site photo filed with Karnataka RERA Karnataka RERA filing · Source ↗ (opens in a new tab)
SBR One Residence at a glance
- Possession (RERA)Dec 2030Karnataka RERA
- Construction15% built · on pace for Sep 2034 45 mo after RERA dateRERA filing to 31 Mar 2026; estimate from average pace
- Homes booked261 of 931 (28%)RERA update · as on 31 Mar 2026
- RERA complaints (project)None listedKarnataka RERA · as on 16 Oct 2026
- Approvals filed7 of 9 on RERAKarnataka RERA uploads · 16 Oct 2026
- Nearest metroHopefarm Channasandra · 0.57 kmstraight line · OpenStreetMap, 5 Oct 2026
- Airport driveapprox. 100 min at peak24.81 km straight line · estimate
- Nearest lakePattandur Agrahara Lake · 1,314 mFrom the RERA map point · OpenStreetMap, 5 Oct 2026
Project summary
SBR One Residence is a mixed-use project by SBR Structures in Pattandur Agrahara, Bengaluru with 931 homes, registered with Karnataka RERA. The completion date on RERA is 31 Dec 2030.
Facts collected on 16 Oct 2026 from public records — each linked to its source. Free for buyers. If you book through us, the builder pays us a commission.
SBR One Residence buyers’ group: join to ask for a group price
No one has joined yet. Be one of the first 10 buyers in this group — the founding members.
Join free. When enough buyers have joined, our agent partner asks SBR Structures for a group price — for example a lower price, an easier payment plan or waived charges. Nothing is promised: you see what the builder offers and book directly with the builder if you want to. Free for buyers. If you book through us, the builder pays us a commission.
- Gathering buyers
- Talking to the builder
- Group offer
- Group site visit
- Booking
0 buyers have joined · 0 committed
Committed buyers have confirmed their budget, home type and timeline with us on a call; builders negotiate with them. Joining is free and never obliges you to buy.
Join the SBR One Residence buyers’ groupHow group buying works
See it for yourself
Visit the site with our team, or get a call to clear your questions. Free, no obligation.
Key facts: home types, towers, land and possession
- Home types
- 2.5 BHK, 3 BHK
- Carpet area
- 764 – 79,653 sq ft
- Towers
- 13
- Floors
- 20
- Total homes
- 931
- Land
- 10.32 acres
- Possession (RERA)
- Dec 2030
- Built (RERA update)
- 15%
SBR One Residence RERA number and registration details
- RERA number
- PRM/KA/RERA/1251/446/PR/131224/007297
- Registered on
- 13 Dec 2024
- Promised completion
- 31 Dec 2030
- Extended to
- No extension recorded
- RERA status
- New launch
- Homes booked
- 261 of 931 as on
- Price
- Not found in public records yet: price
- Project type
- Mixed
Towers and blocks (RERA filing)
13 rows: towers. Scroll inside the table to see them all.
| Tower | Floors | Basements | Homes |
|---|---|---|---|
| A | 20 | 2 | 78 |
| B | 20 | 2 | 78 |
| C | 19 | 2 | 75 |
| D | 20 | 2 | 78 |
| E | 20 | 2 | 78 |
| F | 20 | 2 | 78 |
| G | 20 | 2 | 78 |
| H | 20 | 2 | 78 |
| I | 19 | 2 | 75 |
| J | 20 | 2 | 78 |
| K | 20 | 2 | 78 |
| L | 20 | 2 | 78 |
| Commercial | 2 | 1 | 1 |
A dash (—) means the filing did not state that value.
Summary in plain English
SBR One Residence is a mixed-use project by SBR Structures in Pattandur Agrahara, Bengaluru East, with 931 homes across 13 towers. The project includes 2.5 BHK and 3 BHK flats plus commercial spaces, with a completion date of 31 December 2030.
Written by AI from the RERA record above on 16 Oct 2026. Every number in it was checked against that record; if anything differs, the record wins.
Open space, home loans, escrow and other details
- Open space
- 72.3% of land
- Water and power
- Water source filed with RERA: BoreWell,BWSSB
- Home loans: approved banks
- Not found in public records yet: bank approvals
- Payment plans
- Not found in public records yet: payment plans
- Maintenance
- Not found in public records yet: maintenance
- Car parking
- Not found in public records yet: car parking charge
- Escrow bank (RERA)
- HDFC, Kadugodi, Bengaluru
- Building plan (RERA)
- BBMP - Bruhat Bengaluru Mahanagara Palike · No. BBMP/ADDL.DIR/JDNORTH/0041/24-25 · dated 1 Oct 2024
- Project cost declared to RERA
- ₹1475 Cr
Open area as a share of the land, from the areas filed with RERA (includes driveways and landscaped areas).
Amenities
- Electricity
- Smart Home Automation
- Club House
- Community Hall
- Outdoor Sports facility
- Swimming Pool
- Gym
- Parks
- Power Backup
Amenities and internal works as filed by the promoter with Karnataka RERA; we have not visited the site.
SBR One Residence location and address
- Address
- KHATHA NO.468/67, SY.NO:27, 30, 31, 35 & 36 OF PATTANDUR AGRAHARA VILLAGE , K.R PURAM HOBLI, WARD NO.83 , Bengaluru East , Bengaluru Urban, Karnataka - 560066
- Village (RERA)
- Pattandur Agrahara
- Locality
- Kadugodi–Hope FarmAlso known as Kadugodi, Hope Farm
- PIN code
- 560066
- City
- Bengaluru
- State
- Karnataka
- Coordinates
- 12.98367, 77.75758
Distances to landmarks
Not found in public records yet: landmarksAbout Kadugodi–Hope Farm
Not found in public records yet: locality factsCommute times to tech parks and the airport
| To | Straight line | Peak-hour drive (estimate) |
|---|---|---|
| ITPL, Whitefield (main gate)Map point on OpenStreetMap (opens in a new tab) | 2.19 km | approx. 9 min |
| Outer Ring Road tech corridor (RMZ Ecospace, Bellandur)Map point on OpenStreetMap (opens in a new tab) | 10.63 km | approx. 43 min |
| Manyata Tech ParkMap point on OpenStreetMap (opens in a new tab) | 16.55 km | approx. 67 min |
| Electronic City Phase 1Map point on OpenStreetMap (opens in a new tab) | 17.97 km | approx. 73 min |
| KSR Bengaluru City railway station (Majestic)Map point on OpenStreetMap (opens in a new tab) | 20.38 km | approx. 83 min |
| Kempegowda International AirportMap point on OpenStreetMap (opens in a new tab) | 24.81 km | approx. 100 min |
How we calculate
Straight line: from the project’s map point on RERA to the destination’s point on OpenStreetMap.
Peak-hour drive is a rough estimate, not a route: straight line × 1.35 for the road network, at 20 km/h. Real times vary a lot with the route and the hour.
Sources:Source (openstreetmap.org) (opens in a new tab)How we calculate this
Schools and hospitals nearby
Within 2 km
- 37Schools and colleges22 schools, 4 colleges, 11 kindergartens
- 14Hospitals and clinics6 hospitals, 8 clinics
Nearest schools and colleges
- Whitefield Global School · 0.21 km
- Government Polytechnic College · 0.37 km
- Divine Light Trust For The Blind · 0.44 km
Nearest hospitals and clinics
- Whitefield Clinic of Nephro-Urology · 0.61 km
- Bhagwan Mahavir Jain Health Center · 0.62 km
- Amrik Hospital · 1.06 km
Places as mapped on OpenStreetMap (amenity=school, college, kindergarten, university; hospital, clinic), counted within 2 km in a straight line of the RERA map point. Volunteers map these, so some places may be missing or closed. Places data © OpenStreetMap contributors, extract of 5 Oct 2026.
Nearest metro station and railway
- Hopefarm Channasandra (ಹೋಪ್ ಫಾರ್ಮ್ ಚನ್ನಸಂದ್ರ)Open now — nearest operating metro station0.57 km
- Whitefield (ವೈಟ್ಫೀಲ್ಡ್)Nearest railway station1.47 km
Straight-line distances from the RERA map point to the station points mapped on OpenStreetMap; status (open or under construction) as tagged there. Places data © OpenStreetMap contributors, extract of 5 Oct 2026.
Lake and lake-buffer check
The nearest mapped lake is Pattandur Agrahara Lake, 1,314 m from the project’s RERA map point.
The site boundary is not published as a shape, so its nearest edge can be closer than this point. Whether any building sits inside a lake buffer can only be checked on the approved plan.
- Pattandur Agrahara Lake on OpenStreetMap (opens in a new tab) (ಪಟ್ಟಂದೂರು ಅಗ್ರಹಾರ ಕೆರೆ)1,314 m
The buffer rule
Bengaluru’s lake buffer rule has changed over time: the National Green Tribunal ordered a 75 m buffer in May 2016; the Supreme Court set that order aside on 5 March 2019, leaving the 30 m buffer of the Revised Master Plan 2015. Check the current rule and the approved plan before relying on either number.
- LiveLaw: SC sets aside NGT order enlarging buffer zones (2019) (livelaw.in) (opens in a new tab)
- Citizen Matters: Shrinking lake buffers (citizenmatters.in) (opens in a new tab)
Shortest distance from the RERA map point to the mapped water edge (OpenStreetMap water polygons tagged lake or reservoir, or named lake/kere/tank). Mapped shorelines can differ from the revenue-record boundary of a lake. Places data © OpenStreetMap contributors, extract of 5 Oct 2026.
Sources:Source (openstreetmap.org) (opens in a new tab)Source (livelaw.in) (opens in a new tab)Source (citizenmatters.in) (opens in a new tab)How we calculate this
Satellite time-lapse of the site
Satellite photos load when you scroll to them.
Photos from Esri World Imagery Wayback, centred on the project’s map point; dates are the capture dates in Esri’s metadata. Loaded from Esri when you scroll here.
Sources:Source (livingatlas.arcgis.com) (opens in a new tab)
SBR One Residence home types and carpet areas
Documents the builder uploaded to Karnataka RERA, shown as filed. Tap a page to see it full size; the full PDF opens on the RERA website.
Approved building plan3 files

Approved Building/Plotting PlanFull PDF on RERA 
Area Development Plan Of Project AreaFull PDF on RERA 
BBMP Approved PlanFiled 4 Dec 2024 · Full PDF on RERA
Approved layout plan3 files

Approved Layout PlanFull PDF on RERA 
Existing Layout PlanFull PDF on RERA 
6 Demarcation of Sy No in CDP Master ExtractFiled 4 Dec 2024 · Full PDF on RERA
Floor plans and brochure not published? The builder shares them only on request. We’ll get the brochure, floor plans and current price list for you, free.
Get brochure, floor plans & price| Home type | Carpet area | Homes |
|---|---|---|
| 2.5 BHK | 764 – 840 sq ft | 144 |
| 3 BHK | 1,044 – 1,130 sq ft | 786 |
| Commercial | 79,653 sq ft | 1 |
| Commercial space | 79,653 sq ft | 1 |
Home types, counts and carpet areas as filed with Karnataka RERA (carpet area, not super built-up).
We have not collected floor-plan drawings; the builder’s sales team can share them.
SBR One Residence possession date and construction status
Promoter’s quarterly update to RERA for Q4 2025-26, submitted 2026-06-09.
By tower (Q4 2025-26)
Units sold and unsold, from RERA (Q4 2025-26)
| Type | Homes | Booked | Available |
|---|---|---|---|
| 2.5 BHK | 144 | 93 | 51 |
| 3 BHK | 786 | 168 | 618 |
| COMMERCIAL | 1 | 0 | 1 |
As reported by the promoter in the quarterly update to RERA, not verified by us.
Timeline
- 1 Oct 2024Project start date given to RERA
- 13 Dec 2024Registered with Karnataka RERA
- 31 Dec 2030Completion date given at registration
Construction pace from RERA quarterly filings
At the average pace so far, construction would reach 100% around Sep 2034 — about 45 months after the completion date on RERA (31 Dec 2030).
At the pace between the 2 quarterly filings we have (10% → 15% in 3 months), it would be around Jun 2030 — about 7 months before the RERA date.
- Filed on RERA
- Average pace since start
- Pace between filings (and 0% assumed at the start date)
- RERA completion date
Quarterly filings
| Quarter | Filed on | Built | Homes booked |
|---|---|---|---|
| Q4 2025-26to 31 Mar 2026 | 9 Jun 2026 | 15% | 261 of 931 |
| Q3 2025-26to 31 Dec 2025 | 27 Jan 2026 | 10% | 217 of 931 |
How we calculate
Average pace = % built ÷ months since the start date in the RERA record. Here: 15% ÷ 17.9 months (1 Oct 2024 to 31 Mar 2026) = 0.8% a month.
Estimated finish = latest filing date + (100 − % built) ÷ pace = 31 Mar 2026 + 85 ÷ 0.8 = 101.6 months → Sep 2034. This is an estimate, not a date from the builder or RERA.
Pace between filings = (15% − 10%) ÷ 3 months = 1.7% a month.
A straight line is a simplification: the builder reports one overall %, which mixes excavation, structure and finishing, and work rarely moves at a constant speed. The % values are the promoter’s own figures filed with RERA, not checked by us. Promoter’s quarterly update to RERA for Q4 2025-26, submitted 2026-06-09.
Sources:Source (rera.karnataka.gov.in) (opens in a new tab)How we calculate this
Approvals and documents checklist
19 rows: approvals. Scroll inside the table to see them all.
| Approval | Authority | Source |
|---|---|---|
| Building plan | BBMP - Bruhat Bengaluru Mahanagara Palike · No. BBMP/ADDL.DIR/JDNORTH/0041/24-25 · dated 2024-10-01 | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Land conversion (4 orders) | DC Benglauru · No. ALN(EKHW)SR/02/19-20 and 3 more · dated 2024-09-26 | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Commencement Certificate | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Electricity Permission Letter | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Water Permission Letter | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Approved Layout Plan | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Approved Building/Plotting Plan | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Approved Section Of Building/Infrastructure Plan of Plotting | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Change of Land Use | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| District Magistrate | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Conversion Certificate under section 95 of the KLR Act 1964 | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| ESCOM/Electricity | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| KWSSB/Water | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Approval/NOC under section 109 of KLR Act 1961 | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Approval/NOC under section 14 of the KTCP Act | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Fire Force Department | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Airport Authority of India | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| KSPCB | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| NOC in case of building proposals abutting to neighbouring properties | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
Documents uploaded to RERA
- Building or layout plan · Approved drawings from the planning authorityFiled on RERA ✓ — BBMP - Bruhat Bengaluru Mahanagara Palike · No. BBMP/ADDL.DIR/JDNORTH/0041/24-25 · dated 1 Oct 2024
- Commencement certificate · Permission to start buildingFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
- Environment clearance · SEIAA KarnatakaNot on RERA yet
- Fire NOC · Karnataka Fire and Emergency ServicesFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
- Pollution board consent · KSPCBFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
- Water and sewerage · BWSSBFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
- Electricity · BESCOMFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
- Height clearance · Airports Authority of IndiaFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
- Occupancy certificate (OC) · Issued only when the building is finishedNot on RERA yet — expected at completion
From the documents the promoter uploaded to Karnataka RERA, collected 16 Oct 2026. “Filed” means a document is on RERA — we have not checked its contents or validity. Not every approval applies to every project (for example, smaller projects may not need an environment clearance). The project page on RERA lists each upload.
SBR One Residence RERA complaints
No complaints listed on Karnataka RERA for this registration as on Source (rera.karnataka.gov.in) (opens in a new tab)
Court and consumer cases
We list case numbers, courts and outcomes only — never names of private individuals.
About SBR Structures
- Promoter type
- Partnership Firm
- Projects on this site
- 1
- RERA complaints against promoter
- 0
- Company number (CIN)
- Not found in public records yet: CIN
From Karnataka RERA, as collected so far (16 Oct 2026). Complaints are those RERA lists against this promoter across all its projects.
SBR Structures’s RERA recordSBR Structures delivery record
- 1Projects in Bengaluru on RERA1 approved registration under SBR Structures in Bengaluru Urban and Rural. Source (rera.karnataka.gov.in) (opens in a new tab)
- 931Homes registeredAs stated in each registrations.
- 0RERA complaintsas on Source (rera.karnataka.gov.in) (opens in a new tab)
- 0Complaints per 1,000 homes0 complaints ÷ 931 homes in its 1 registration on Karnataka RERA in Bengaluru.
Sources:Source (rera.karnataka.gov.in) (opens in a new tab)How we calculate this
What’s changed since Oct 2024
- 9 Jun 2026Quarterly update filed for Q4 2025-26: 15% built, 261 of 931 homes booked Source (rera.karnataka.gov.in) (opens in a new tab)
- 27 Jan 2026Quarterly update filed for Q3 2025-26: 10% built, 217 of 931 homes booked Source (rera.karnataka.gov.in) (opens in a new tab)
- 13 Dec 2024Registered with Karnataka RERA (PRM/KA/RERA/1251/446/PR/131224/007297); completion date 31 Dec 2030 Source (rera.karnataka.gov.in) (opens in a new tab)
- 1 Oct 2024Building plan approved by BBMP - Bruhat Bengaluru Mahanagara Palike (No. BBMP/ADDL.DIR/JDNORTH/0041/24-25) Source (rera.karnataka.gov.in) (opens in a new tab)
- 1 Oct 2024Project start date in the RERA record Source (rera.karnataka.gov.in) (opens in a new tab)
Newest first. No extension of the completion date is recorded on RERA. When the RERA crawl sees a new filing, complaint or extension, it is added here with its date.
Home loan EMI calculator
- Monthly EMI
- —
- Down payment
- —
- Loan amount
- —
- Total interest
- —
A calculation only, from the numbers you enter — not a loan offer.
All-in cost: GST, registration and other charges
The calculator loads when you scroll to it.
Assumptions
- Base price: the builder’s price is not published in a form we could collect — enter it from the cost sheet.
- GST 5% on the base price and charges — the usual rate for an under-construction home that is not “affordable housing” (1%).
- Stamp duty about 5.6% and registration 2% — the Karnataka rule (registration was raised from 1% to 2% on 31 Aug 2025). Calculated on the agreement value.
- Car parking, other charges and the maintenance deposit are not in the public record we collect; enter them from the builder’s cost sheet.
- Loan on the agreement value (banks usually lend up to 75–90%); EMI is the standard reducing-balance formula. Example rate only — use your bank’s quote.
SBR One Residence FAQs
When will SBR One Residence be completed?
The project completion date is 31 December 2030, according to the RERA record.
How many homes are in SBR One Residence?
The project has 931 homes across 13 towers, with a maximum of 20 floors.
What home types are available in SBR One Residence?
The project offers 2.5 BHK flats (144 homes) and 3 BHK flats (786 homes), plus commercial space.
What is the carpet area range for flats in SBR One Residence?
2.5 BHK flats range from 764 to 840 sq ft carpet area, and 3 BHK flats range from 1,044 to 1,130 sq ft carpet area.
What is the RERA registration number for SBR One Residence?
The RERA registration number is PRM/KA/RERA/1251/446/PR/131224/007297, registered on 13 December 2024.
How many homes have been booked in SBR One Residence?
As of the latest quarterly update for Q4 2025-26, 261 homes have been booked out of 931 total homes.
What is the construction progress of SBR One Residence?
As of 31 March 2026, the project is 15% complete according to the latest quarterly update.
Where is SBR One Residence located?
The project is in Pattandur Agrahara, Bengaluru East taluk, Bengaluru Urban district, with PIN code 560066.
Are there any RERA complaints against SBR One Residence or the builder?
There are no RERA complaints on this project or against SBR Structures across all projects on the RERA record.
How many projects does SBR Structures have on the RERA record?
SBR Structures has 1 project on the RERA record.
Written by AI from the RERA record above on 16 Oct 2026. Answers use only that record; check them against the source before you decide.
Questions about SBR One Residence
No questions published yet. Ask the first one: you get an instant answer from this page’s public record, and our team follows up on anything the record does not show.
Bought a home from SBR Structures? Review the builder.
Reviews of SBR Structures by verified buyers
No verified reviews of SBR Structures yet. If you bought a home from them, your review helps other buyers.
How reviews work: only buyers and owners can review; we confirm each purchase by phone before publishing, publish positive and negative reviews alike, never accept payment for reviews, and the builder may reply.
Similar projects within 5 km
| Project | Distance | Homes | Possession (RERA) | Built | Complaints | Price |
|---|---|---|---|---|---|---|
| S.V.PrimeS V Infra Holdings Limited | 0.2 km | 256 | Nov 2025 | 100% | 0 | Not collected |
| Mahindra BlossomMahindra Lifespace Developers Limited | 0.6 km | 735 | Oct 2030 | 3% | 17 | from ₹3.4 Cr |
| Lemon TreeLegend Properties | 1.1 km | 92 | Dec 2030 | 22% | 0 | Not collected |
| Sai Silicon HeightsUnited Developers | 1.4 km | 208 | Dec 2027 | 79% | 0 | Not collected |
| SBR MinaraSBR Infra Buildtech | 3.4 km | 447 | Aug 2027 | 52% | 1 | Not collected |
| SBR Earth & SkySBR Infraspace | 4.7 km | 135 | Sep 2026 | 90% | 0 | Not collected |
Projects of the same kind within 5 km in a straight line of this project’s RERA map point, nearest first. % built is the promoter’s latest quarterly figure on RERA (shown for single-registration projects); prices are from the builder’s own website where we found one.
Sources and last checked dates
Collected on 16 Oct 2026 by AI research agents reading public pages. Facts are written in our own words. Not found yet: price; court cases; landmarks; specifications; news.
How to check on RERA: On rera.karnataka.gov.in/viewAllProjects, type the registration number in 'Registration No', press Search, then click the 'View Project Details' icon. Complaints open from the 'Complaints / Litigation' icon in the same row. Registration number: PRM/KA/RERA/1251/446/PR/131224/007297.
- RERA record last checked: 16 Oct 2026
- Last change in the record (registration, quarterly filing or complaint): 9 Jun 2026
How this page is made: software builds it from public records (Karnataka RERA filings, OpenStreetMap, the builder’s own website). AI is used only to read filings into fields and to write the plain-English summary and FAQ answers, which are checked against the record. Facts are checked automatically against the RERA filing. Methodology · How we earn · Report an error
More new projects in Kadugodi–Hope Farm
Pattandur Agrahara, Kadugodi–Hope FarmArtist’s impressionUnder constructionRERA registeredBuyers’ group openMahindra Blossom
by Mahindra Lifespace
Price: Price on requestGet brochure & price →
- 1 BHK, 2 BHK, 3 BHK, 4 BHK
- 400 – 6,522 sq ft
- Oct 2030
735 homes · 17 RERA complaints
Be one of the first 10 buyers in this groupFounding members — it’s free
Join group for Mahindra Blossom
Channasandra, Kadugodi–Hope FarmUnder constructionRERA registeredBuyers’ group openLemon Tree
by Legend Properties
Price: Price on requestGet brochure & price →
- 2 BHK, 3 BHK
- 819 – 7,034 sq ft
- Dec 2030
92 homes
Be one of the first 10 buyers in this groupFounding members — it’s free
Join group for Lemon Tree
Pattanduru Agrahara, WhitefieldReady to moveRERA registeredBuyers’ group openS.V.Prime
by S V Infra Holdings
Price: Price on requestGet brochure & price →
- 1 BHK, 2 BHK, 3 BHK
- 520 – 6,051 sq ft
- Nov 2025
256 homes
Be one of the first 10 buyers in this groupFounding members — it’s free
Join group for S.V.Prime