Shriram 107 Southeast
2 & 3 BHK apartments by Shriprop Living Space Private Limited · Manchenahalli, Bengaluru
Manchenahalli, Bengaluru
- Under construction
- RERA registered
- RERA not updated: completion promised Jul 2025; no extension or completion filed
- residential
by Shriprop Living Space Private Limited
Price: Price on request
Site photo filed with Karnataka RERA Karnataka RERA filing · Source ↗ (opens in a new tab)
Project summary
Shriram 107 Southeast is a residential project by Shriprop Living Space Private Limited in Manchenahalli, Bengaluru with 2,684 homes, registered with Karnataka RERA. The completion date on RERA is 19 Jul 2025. It is registered in 2 phases.
Not in the RERA record we collected yet: map location. This page fills in as the record is collected.
Facts collected on 13 Oct 2026 from public records — each linked to its source. Free for buyers. If you book through us, the builder pays us a commission.
Shriram 107 Southeast buyers’ group: join to ask for a group price
No one has joined yet. Be one of the first 10 buyers in this group — the founding members.
Join free. When enough buyers have joined, our agent partner asks Shriprop Living Space Private Limited for a group price — for example a lower price, an easier payment plan or waived charges. Nothing is promised: you see what the builder offers and book directly with the builder if you want to. Free for buyers. If you book through us, the builder pays us a commission.
- Gathering buyers
- Talking to the builder
- Group offer
- Group site visit
- Booking
0 buyers have joined · 0 committed
Committed buyers have confirmed their budget, home type and timeline with us on a call; builders negotiate with them. Joining is free and never obliges you to buy.
Join the Shriram 107 Southeast buyers’ groupHow group buying works
See it for yourself
Visit the site with our team, or get a call to clear your questions. Free, no obligation.
Key facts: home types, towers, land and possession
- Home types
- 2 BHK, 3 BHK
- Carpet area
- 460 – 613 sq ft
- Towers
- 13
- Floors
- 14
- Total homes
- 2,684
- Land
- 36.25 acres
- Possession (extended)
- Jul 2025
- Built (RERA update)
- Not found in public records yet: construction progress
Shriram 107 Southeast RERA number and registration details
- RERA number
- PRM/KA/RERA/1251/308/PR/181122/002156
- Registered on
- 22 Nov 2018
- Promised completion
- 14 Jun 2024
- Extended to
- 19 Jul 2025
- RERA status
- New launch
- Homes booked
- Not found in public records yet: homes booked
- Price
- Not found in public records yet: price
- Project type
- Residential
2 RERA registrations (one per phase) are shown together on this page; dates above are the latest across phases.
Phases and RERA numbers
| Phase | RERA number | Promised completion | Homes | Status | Source |
|---|---|---|---|---|---|
| Main registration | PRM/KA/RERA/1251/308/PR/181122/002156 | 19 Oct 2023Extended to 19 Jul 2025 | 1,268 | Completed | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Phase 2 | PRM/KA/RERA/1251/308/PR/190715/002689 | 14 Jun 2024Extended to 14 Mar 2025 | 1,416 | New launch | Source (rera.karnataka.gov.in) (opens in a new tab) |
Towers and blocks (RERA filing)
13 rows: towers. Scroll inside the table to see them all.
| Tower | Phase | Floors | Basements | Homes |
|---|---|---|---|---|
| 15 | Main registration | 14 | 1 | 89 |
| 16 | Main registration | 14 | 1 | 89 |
| 17 | Main registration | 14 | 1 | 118 |
| 18 | Main registration | 13 | 1 | 83 |
| 19 | Main registration | 13 | 1 | 83 |
| 20 | Main registration | 13 | 1 | 83 |
| 21 | Main registration | 14 | 1 | 89 |
| 7 | Phase 2 | 14 | 2 | 118 |
| 8 | Phase 2 | 14 | 2 | 118 |
| 9 | Phase 2 | 14 | 2 | 118 |
| 10 | Phase 2 | 14 | 2 | 118 |
| 11 | Phase 2 | 14 | 2 | 118 |
| 12 | Phase 2 | 14 | 2 | 118 |
A dash (—) means the filing did not state that value.
Summary in plain English
Shriram 107 Southeast is a residential project by Shriprop Living Space Private Limited in Manchenahalli, Anekal. The project has 2,684 homes across two phases with completion dates of 19 July 2025 for the main registration and 14 March 2025 for Phase 2.
Written by AI from the RERA record above on 5 Oct 2026. Every number in it was checked against that record; if anything differs, the record wins.
Open space, home loans, escrow and other details
- Open space
- Not found in public records yet: open space
- Water and power
- Not found in public records yet: water and power
- Home loans: approved banks
- Not found in public records yet: bank approvals
- Payment plans
- Not found in public records yet: payment plans
- Maintenance
- Not found in public records yet: maintenance
- Car parking
- Not found in public records yet: car parking charge
- Escrow bank (RERA) · Main registration
- STATE BANK OF INDIA, COMMERCIAL BRANCH
- Escrow bank (RERA) · Phase 2
- STATE BANK OF INDIA, COMMERCIAL BRANCH
Amenities
Shriram 107 Southeast location and address
- Address
- Sy.No. 5/1, 5/2, 7/2, 10/2, 44/2, 44/5, 45/2C, 46 and 47 of Manchenahalli Village,, Attibele hobli, Anekal Taluk, Bangalore
- Village (RERA)
- Manchenahalli
- PIN code
- 560043
- City
- Bengaluru
- State
- Karnataka
- Coordinates
- Not found in public records yet: coordinates
Distances to landmarks
Not found in public records yet: landmarksAbout Manchenahalli
Not found in public records yet: locality factsShriram 107 Southeast home types and carpet areas
Floor plans and brochure not published? The builder shares them only on request. We’ll get the brochure, floor plans and current price list for you, free.
Get brochure, floor plans & price| Home type | Carpet area | Homes |
|---|---|---|
| 2 BHK | 460 – 498 sq ft | 986 |
| 3 BHK | 613 sq ft | 356 |
| Apartments | 472 sq ft | 634 |
| Appartments | 547 sq ft | 708 |
Home types, counts and carpet areas as filed with Karnataka RERA (carpet area, not super built-up).
We have not collected floor-plan drawings; the builder’s sales team can share them.
Shriram 107 Southeast possession date and construction status
Timeline
- 4 Oct 2018Main registration: Project start date given to RERA
- 22 Nov 2018Main registration: Registered with Karnataka RERA
- 15 Jun 2019Phase 2: Project start date given to RERA
- 15 Jul 2019Phase 2: Registered with Karnataka RERA
- 19 Oct 2023Main registration: Completion date given at registration
- 14 Jun 2024Phase 2: Completion date given at registration
- 19 Jul 2024Main registration: Covid Extension: completion date moved to this date
- 14 Mar 2025Phase 2: Covid Extension: completion date moved to this date
- 17 Mar 2025Main registration: Promoter applied to RERA for completion
- 19 Jul 2025Main registration: Section 6 Extension: completion date moved to this date
Approvals and documents checklist
| Approval | Authority | Source |
|---|---|---|
| Building plan (Main registration) | BMRDA - Bangalore Metropolitan Region Development Authority | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Building plan (Phase 2) | BMRDA - Bangalore Metropolitan Region Development Authority | Source (rera.karnataka.gov.in) (opens in a new tab) |
Documents uploaded to RERA (Main registration)
- Building or layout plan · Approved drawings from the planning authorityFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
- Commencement certificate · Permission to start buildingNot on RERA yet
- Environment clearance · SEIAA KarnatakaNot on RERA yet
- Fire NOC · Karnataka Fire and Emergency ServicesNot on RERA yet
- Pollution board consent · KSPCBNot on RERA yet
- Water and sewerage · BWSSBNot on RERA yet
- Electricity · BESCOMNot on RERA yet
- Height clearance · Airports Authority of IndiaNot on RERA yet
- Occupancy certificate (OC) · Issued only when the building is finishedNot on RERA yet
From the documents the promoter uploaded to Karnataka RERA, collected 4 Oct 2026. “Filed” means a document is on RERA — we have not checked its contents or validity. Not every approval applies to every project (for example, smaller projects may not need an environment clearance). Each phase is registered separately; this list is for the phase named above. The project page on RERA lists each upload.
Shriram 107 Southeast RERA complaints and orders
15 complaints as on Source (rera.karnataka.gov.in) (opens in a new tab)
15 rows: rera complaints. Scroll inside the table to see them all.
| Complaint ref | Filed | Subject | Status | Source |
|---|---|---|---|---|
| 00364/2026 | 8 Apr 2026 | Delay in possession and payment of interest under Section 18 of RERA | Under enquiry | Source (rera.karnataka.gov.in) (opens in a new tab) |
| 00344/2026 | 6 Apr 2026 | Delay in possession and payment of interest under Section 18 of RERA | Under enquiry | Source (rera.karnataka.gov.in) (opens in a new tab) |
| 00286/2026 | 24 Mar 2026 | Delay in Interest Payment & Referral Invoice Amount | Under enquiry | Source (rera.karnataka.gov.in) (opens in a new tab) |
| 01149/2025 | 9 Sep 2025 | Delayed Project and Carpet Area Discrepancy | Under enquiry | Source (rera.karnataka.gov.in) (opens in a new tab) |
| 01179/2024 | 16 Nov 2024 | Misguided during the flat booking and no clarity on possession on above demanding for the penalty charges for unreleased amount | Disposed | Source (rera.karnataka.gov.in) (opens in a new tab) |
| 01055/2024 | 24 Oct 2024 | Booking refund issue | Disposed | Source (rera.karnataka.gov.in) (opens in a new tab) |
| 00952/2024 | 30 Sep 2024 | Delay in Possession amounting to breach of agreement | Disposed | Source (rera.karnataka.gov.in) (opens in a new tab) |
| 00875/2024 | 12 Sep 2024 | Misguided during the flat booking and no clarity on possession on above demanding for the penalty charges for unreleased amount | Disposed | Source (rera.karnataka.gov.in) (opens in a new tab) |
| 00425/2024 | 4 May 2024 | Please help me to get the refund of 2,30,317 amount | Disposed | Source (rera.karnataka.gov.in) (opens in a new tab) |
| CMP/221220/0010491 | 20 Dec 2022 | Booking amount of rs.50000 not refunding | Disposed | Source (rera.karnataka.gov.in) (opens in a new tab) |
| CMP/220206/0008968 | 6 Feb 2022 | False Advertisement and Misleading by Shriram Properties Pvt ltd | Disposed | Source (rera.karnataka.gov.in) (opens in a new tab) |
| CMP/220118/0008824 | 18 Jan 2022 | Request for Refund of Booking Amount | Disposed | Source (rera.karnataka.gov.in) (opens in a new tab) |
| CMP/200927/0006685 | 27 Sep 2020 | Based on wrong advertisement of Project at the time of sales Asked for Cancellation and refund amount But Cancellation request has never been accepted | Disposed | Source (rera.karnataka.gov.in) (opens in a new tab) |
| CMP/200813/0006019 | 13 Aug 2020 | Refund of Rs.266333/- (two lacs sixty six thousand three hundred thirty three) paid to builder. | Disposed | Source (rera.karnataka.gov.in) (opens in a new tab) |
| CMP/191106/0004338 | 6 Nov 2019 | Refund of amount after booking cancellation | Disposed ao | Source (rera.karnataka.gov.in) (opens in a new tab) |
Court and consumer cases
We list case numbers, courts and outcomes only — never names of private individuals.
About Shriprop Living Space Private Limited
- Promoter type
- Company
- Projects on this site
- 2
- RERA complaints against promoter
- 18
- Company number (CIN)
- U70109KA2014PTC076190
From Karnataka RERA, as collected so far (13 Oct 2026). Complaints are those RERA lists against this promoter across all its projects.
Shriprop Living Space Private Limited’s RERA recordShriprop Living Space Private Limited delivery record
- 2Projects in Bengaluru on RERA3 approved registrations under Shriprop Living Space Private Limited in Bengaluru Urban and Rural. Source (rera.karnataka.gov.in) (opens in a new tab)
- 3,739Homes registeredAs stated in each registrations.
- 18RERA complaints4 open, 14 disposed. as on Source (rera.karnataka.gov.in) (opens in a new tab)
- 4.8Complaints per 1,000 homes18 complaints ÷ 3,739 homes in its 3 registrations on Karnataka RERA in Bengaluru.
- 1Completion filed on RERARegistrations where the promoter applied to RERA for completion; 1 with an occupancy certificate on RERA.
- 0 of 1Filed by the date given at registrationMedian gap 16.9 months (on-time ones count as 0). The completion application can come after handover, so this is an upper bound on lateness.
What the complaints are about
18 complaint subjects as written on RERA, as on . Each subject is sorted into one group by keywords (first match wins: delay, refund, registration, quality, litigation, association); one complaint often raises several issues. Source (rera.karnataka.gov.in) (opens in a new tab)
Completion filed on RERA
| Project | Date at registration | Completion filed | Gap |
|---|---|---|---|
| Shriram 107 SoutheastOC on RERA | 19 Oct 2023extended to 19 Jul 2025 | 17 Mar 2025 | 17 months after |
Measured against the completion date given at registration; many projects had RERA extensions (including the COVID-period extension), shown under the date.
Sources:Source (rera.karnataka.gov.in) (opens in a new tab)How we calculate this
What’s changed since Oct 2018
- 8 Apr 2026Complaint 00364/2026 filed with RERA: “Delay in possession and payment of interest under Section 18 of RERA” — now under enquiry Source (rera.karnataka.gov.in) (opens in a new tab)
- 6 Apr 2026Complaint 00344/2026 filed with RERA: “Delay in possession and payment of interest under Section 18 of RERA” — now under enquiry Source (rera.karnataka.gov.in) (opens in a new tab)
- 24 Mar 2026Complaint 00286/2026 filed with RERA: “Delay in Interest Payment & Referral Invoice Amount” — now under enquiry Source (rera.karnataka.gov.in) (opens in a new tab)
- 23 Mar 2026Phase 2: Quarterly update filed for Q4 2025-26: 100% built, 708 of 708 homes booked Source (rera.karnataka.gov.in) (opens in a new tab)
- 24 Jan 2026Phase 2: Quarterly update filed for Q3 2025-26: 100% built, 708 of 708 homes booked Source (rera.karnataka.gov.in) (opens in a new tab)
- 9 Sep 2025Complaint 01149/2025 filed with RERA: “Delayed Project and Carpet Area Discrepancy” — now under enquiry Source (rera.karnataka.gov.in) (opens in a new tab)
- 19 Jul 2025Main registration: Completion date extended to 19 Jul 2025 Source (rera.karnataka.gov.in) (opens in a new tab)
- 17 Mar 2025Main registration: Promoter applied to RERA for completion (occupancy certificate on RERA) Source (rera.karnataka.gov.in) (opens in a new tab)
- 14 Mar 2025Phase 2: Completion date extended to 14 Mar 2025 Source (rera.karnataka.gov.in) (opens in a new tab)
- 16 Nov 2024Complaint 01179/2024 filed with RERA: “Misguided during the flat booking and no clarity on possession on above demanding for the penalty charges for unreleased amount” — now disposed Source (rera.karnataka.gov.in) (opens in a new tab)
- 24 Oct 2024Complaint 01055/2024 filed with RERA: “Booking refund issue” — now disposed Source (rera.karnataka.gov.in) (opens in a new tab)
- 30 Sep 2024Complaint 00952/2024 filed with RERA: “Delay in Possession amounting to breach of agreement” — now disposed Source (rera.karnataka.gov.in) (opens in a new tab)
- 12 Sep 2024Complaint 00875/2024 filed with RERA: “Misguided during the flat booking and no clarity on possession on above demanding for the penalty charges for unreleased amount” — now disposed Source (rera.karnataka.gov.in) (opens in a new tab)
- 4 May 2024Complaint 00425/2024 filed with RERA: “Please help me to get the refund of 2,30,317 amount” — now disposed Source (rera.karnataka.gov.in) (opens in a new tab)
- 20 Dec 2022Complaint CMP/221220/0010491 filed with RERA: “Booking amount of rs.50000 not refunding” — now disposed Source (rera.karnataka.gov.in) (opens in a new tab)
- 6 Feb 2022Complaint CMP/220206/0008968 filed with RERA: “False Advertisement and Misleading by Shriram Properties Pvt ltd” — now disposed Source (rera.karnataka.gov.in) (opens in a new tab)
- 18 Jan 2022Complaint CMP/220118/0008824 filed with RERA: “Request for Refund of Booking Amount” — now disposed Source (rera.karnataka.gov.in) (opens in a new tab)
- 27 Sep 2020Complaint CMP/200927/0006685 filed with RERA: “Based on wrong advertisement of Project at the time of sales Asked for Cancellation and refund amount But Cancellation request has never been accepted” — now disposed Source (rera.karnataka.gov.in) (opens in a new tab)
- 13 Aug 2020Complaint CMP/200813/0006019 filed with RERA: “Refund of Rs.266333/- (two lacs sixty six thousand three hundred thirty three) paid to builder.” — now disposed Source (rera.karnataka.gov.in) (opens in a new tab)
- 6 Nov 2019Complaint CMP/191106/0004338 filed with RERA: “Refund of amount after booking cancellation” — now disposed Source (rera.karnataka.gov.in) (opens in a new tab)
- 15 Jul 2019Phase 2: Registered with Karnataka RERA (PRM/KA/RERA/1251/308/PR/190715/002689); completion date 14 Jun 2024 Source (rera.karnataka.gov.in) (opens in a new tab)
- 15 Jun 2019Phase 2: Project start date in the RERA record Source (rera.karnataka.gov.in) (opens in a new tab)
- 22 Nov 2018Main registration: Registered with Karnataka RERA (PRM/KA/RERA/1251/308/PR/181122/002156); completion date 19 Oct 2023 Source (rera.karnataka.gov.in) (opens in a new tab)
- 4 Oct 2018Main registration: Project start date in the RERA record Source (rera.karnataka.gov.in) (opens in a new tab)
Newest first. When the RERA crawl sees a new filing, complaint or extension, it is added here with its date.
Home loan EMI calculator
- Monthly EMI
- —
- Down payment
- —
- Loan amount
- —
- Total interest
- —
A calculation only, from the numbers you enter — not a loan offer.
All-in cost: GST, registration and other charges
The calculator loads when you scroll to it.
Assumptions
- Base price: the builder’s price is not published in a form we could collect — enter it from the cost sheet.
- GST 5% on the base price and charges — the usual rate for an under-construction home that is not “affordable housing” (1%).
- Stamp duty about 5.6% and registration 2% — the Karnataka rule (registration was raised from 1% to 2% on 31 Aug 2025). Calculated on the agreement value.
- Car parking, other charges and the maintenance deposit are not in the public record we collect; enter them from the builder’s cost sheet.
- Loan on the agreement value (banks usually lend up to 75–90%); EMI is the standard reducing-balance formula. Example rate only — use your bank’s quote.
Shriram 107 Southeast FAQs
What is the completion date for Shriram 107 Southeast?
The main registration has a completion date of 19 July 2025, and Phase 2 has a completion date of 14 March 2025 on RERA.
How many homes are in Shriram 107 Southeast?
The project has 2,684 homes across two phases: 1,268 homes in the main registration and 1,416 homes in Phase 2.
What home types are available in Shriram 107 Southeast?
The main registration offers 1 BHK apartments (472 carpet sq ft) and 2 BHK homes (460-498 carpet sq ft). Phase 2 offers 2 BHK homes (460-498 carpet sq ft), 3 BHK homes (613 carpet sq ft), and apartments (547 carpet sq ft).
What are the RERA registration numbers for Shriram 107 Southeast?
The main registration number is PRM/KA/RERA/1251/308/PR/181122/002156 (registered 22 November 2018) and Phase 2 is PRM/KA/RERA/1251/308/PR/190715/002689 (registered 15 July 2019).
How many complaints have been filed against Shriram 107 Southeast on RERA?
There are 15 complaints on RERA for this project: 7 on the main registration and 8 on Phase 2.
What is the construction status of Shriram 107 Southeast?
The occupancy certificate has been uploaded for the main registration. Phase 2 is 100% complete as of Q4 2025-26 with 708 homes booked.
Where is Shriram 107 Southeast located?
The project is in Manchenahalli, Anekal taluk, Bengaluru Urban district.
Who is the builder of Shriram 107 Southeast?
Shriprop Living Space Private Limited is the builder.
How many RERA complaints are against Shriprop Living Space Private Limited across all projects?
There are 18 complaints against the builder across all projects in the RERA record.
How many other projects does Shriprop Living Space Private Limited have in Bengaluru?
The builder has 2 projects in the Bengaluru RERA record.
Written by AI from the RERA record above on 5 Oct 2026. Answers use only that record; check them against the source before you decide.
Questions about Shriram 107 Southeast
No questions published yet. Ask the first one: you get an instant answer from this page’s public record, and our team follows up on anything the record does not show.
Bought a home from Shriprop Living Space Private Limited? Review the builder.
Reviews of Shriprop Living Space Private Limited by verified buyers
No verified reviews of Shriprop Living Space Private Limited yet. If you bought a home from them, your review helps other buyers.
How reviews work: only buyers and owners can review; we confirm each purchase by phone before publishing, publish positive and negative reviews alike, never accept payment for reviews, and the builder may reply.
Sources and last checked dates
Collected on 13 Oct 2026 by AI research agents reading public pages. Facts are written in our own words. Not found yet: price; court cases; landmarks; specifications; news.
How to check on RERA: On rera.karnataka.gov.in/viewAllProjects, type the registration number in 'Registration No', press Search, then click the 'View Project Details' icon. Complaints open from the 'Complaints / Litigation' icon in the same row. Registration numbers: PRM/KA/RERA/1251/308/PR/181122/002156, PRM/KA/RERA/1251/308/PR/190715/002689.
- RERA record last checked: 13 Oct 2026
- Last change in the record (registration, quarterly filing or complaint): 8 Apr 2026
How this page is made: software builds it from public records (Karnataka RERA filings, OpenStreetMap, the builder’s own website). AI is used only to read filings into fields and to write the plain-English summary and FAQ answers, which are checked against the record. Facts are checked automatically against the RERA filing. Methodology · How we earn · Report an error
More new projects nearby
Manchenahalli, Chandapura–AttibeleUnder constructionRERA registeredBuyers’ group openShriram 107southeast - Phase 3
by Shriprop Living Space
Price: Price on requestGet brochure & price →
- 2 BHK, 3 BHK
- 463 – 635 sq ft
- Jan 2027
1,055 homes · 3 RERA complaints
Be one of the first 10 buyers in this groupFounding members — it’s free
Join group for Shriram 107southeast - Phase 3
Hosakerehalli, Rajarajeshwari NagarArtist’s impressionUnder constructionRERA registeredBuyers’ group openSobha Valley View - Heritage
by Sobha
Price: Price on requestGet brochure & price →
- 2 BHK, 3 BHK
- 917 – 1,267 sq ft
- Feb 2019
RERA not updated since promised Feb 2019 · 624 homes · 19 RERA complaints
Be one of the first 10 buyers in this groupFounding members — it’s free
Join group for Sobha Valley View - Heritage
Agara, HSR LayoutArtist’s impressionUnder constructionRERA registeredBuyers’ group openSterling Infinia
by Sterling
Price: Price on requestGet brochure & price →
- 1 BHK, 2 BHK, 3 BHK, 4 BHK
- 904 – 2,336 sq ft
- Sep 2026 (extended)
RERA not updated since promised Sep 2026 · 344 homes · 4 RERA complaints