Nambiar District 25 at a glance
- Possession (RERA)Feb 2032Karnataka RERA
- Construction30% built · on pace for Aug 2030 7 mo after RERA dateRERA filing to 30 Sep 2026 (Phase 1); estimate from average pace
- RERA complaints (project)2 complaintsKarnataka RERA · as on 20 Oct 2026
- Approvals filed8 of 9 on RERAKarnataka RERA uploads · 19 Oct 2026
- Nearest metroHuskur Road · 9.39 kmstraight line · OpenStreetMap, 5 Oct 2026
- Airport driveapprox. 147 min at peak36.28 km straight line · estimate
- Nearest lakeYamare Lake · 340 mFrom the RERA map point · OpenStreetMap, 5 Oct 2026
Project summary
Nambiar District 25 is a residential project by Nambiar EnsembleResidential Projects LLP in Dommasandra, Bengaluru with 2,814 homes, registered with Karnataka RERA. The completion date on RERA is 29 Feb 2032. It is registered in 3 phases.
Facts collected on 20 Oct 2026 from public records — each linked to its source. Free for buyers. If you book through us, the builder pays us a commission.
Nambiar District 25 buyers’ group: join to ask for a group price
No one has joined yet. Be one of the first 10 buyers in this group — the founding members.
Join free. When enough buyers have joined, our agent partner asks Nambiar EnsembleResidential Projects LLP for a group price — for example a lower price, an easier payment plan or waived charges. Nothing is promised: you see what the builder offers and book directly with the builder if you want to. Free for buyers. If you book through us, the builder pays us a commission.
- Gathering buyers
- Talking to the builder
- Group offer
- Group site visit
- Booking
0 buyers have joined · 0 committed
Committed buyers have confirmed their budget, home type and timeline with us on a call; builders negotiate with them. Joining is free and never obliges you to buy.
Join the Nambiar District 25 buyers’ groupHow group buying works
See it for yourself
Visit the site with our team, or get a call to clear your questions. Free, no obligation.
Key facts: home types, towers, land and possession
- Home types
- 2 BHK, 2.5 BHK, 3 BHK, 3.5 BHK, +1 more
- Carpet area
- 796 – 2,180 sq ft
- Towers
- 20
- Floors
- 38
- Total homes
- 2,814
- Land
- 28.89 acres
- Possession (RERA)
- Feb 2032
- Built (RERA update)
- Not found in public records yet: construction progress
Nambiar District 25 RERA number and registration details
- RERA number
- PRM/KA/RERA/1251/308/PR/100125/007377
- Registered on
- 10 Jan 2025
- Promised completion
- 29 Feb 2032
- Extended to
- No extension recorded
- RERA status
- New launch
- Homes booked
- Not found in public records yet: homes booked
- Price
- Not found in public records yet: price
- Project type
- Residential
3 RERA registrations (one per phase) are shown together on this page; dates above are the latest across phases.
Phases and RERA numbers
| Phase | RERA number | Promised completion | Homes | Status | Source |
|---|---|---|---|---|---|
| Phase 1 | PRM/KA/RERA/1251/308/PR/100125/007377 | 26 Jan 2030 | 796 | New launch | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Phase 2 | PRM/KA/RERA/1251/308/PR/200825/008011 | 31 Aug 2030 | 816 | New launch | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Phase 3 | PRM/KA/RERA/1251/308/PR/260526/008686 | 29 Feb 2032 | 1,202 | New launch | Source (rera.karnataka.gov.in) (opens in a new tab) |
Towers and blocks (RERA filing)
20 rows: towers. Scroll inside the table to see them all.
| Tower | Phase | Floors | Basements | Homes |
|---|---|---|---|---|
| 1 | Phase 1 | 32 | 2 | 130 |
| 2 | Phase 1 | 32 | 2 | 130 |
| 3 | Phase 1 | 33 | 2 | 134 |
| 4 | Phase 1 | 33 | 2 | 134 |
| 5 | Phase 1 | 33 | 2 | 134 |
| 6 | Phase 1 | 33 | 2 | 134 |
| Tower 7 | Phase 2 | 34 | 2 | 136 |
| Tower 8 | Phase 2 | 34 | 2 | 136 |
| Tower 9 | Phase 2 | 34 | 2 | 136 |
| Tower 10 | Phase 2 | 34 | 2 | 136 |
| Tower 11 | Phase 2 | 34 | 2 | 136 |
| Tower 12 | Phase 2 | 34 | 2 | 136 |
| Tower -13 | Phase 3 | 36 | 3 | 142 |
| Tower -14 | Phase 3 | 36 | 3 | 142 |
| Tower-15 | Phase 3 | 38 | 3 | 152 |
| Tower-16 | Phase 3 | 38 | 3 | 152 |
| Tower-17 | Phase 3 | 38 | 3 | 152 |
| Tower-18 | Phase 3 | 38 | 3 | 152 |
| Tower-19 | Phase 3 | 38 | 3 | 155 |
| Tower-20 | Phase 3 | 38 | 3 | 155 |
A dash (—) means the filing did not state that value.
Summary in plain English
Nambiar District 25 is a residential project by Nambiar Ensemble Residential Projects LLP in Dommasandra, Anekal. The project has 2,814 homes across three phases in 20 towers, with completion dates from 26 January 2030 to 29 February 2032.
Written by AI from the RERA record above on 20 Oct 2026. Every number in it was checked against that record; if anything differs, the record wins.
Open space, home loans, escrow and other details
- Open space
- Not found in public records yet: open space
- Water and power
- Water source filed with RERA: BWSSB, Local Authority
- Home loans: approved banks
- Not found in public records yet: bank approvals
- Payment plans
- Not found in public records yet: payment plans
- Maintenance
- Not found in public records yet: maintenance
- Car parking
- Not found in public records yet: car parking charge
- Escrow bank (RERA) · Phase 1
- KOTAK MAHINDRA BANK, Bellandur
- Escrow bank (RERA) · Phase 2
- KOTAK MAHINDRA BANK, Bellandur
- Escrow bank (RERA) · Phase 3
- RATNAKAR BANK, Residency Road
Amenities
- Electricity
- CCTV Surveillance
- Club House
- Outdoor Sports facility
- Swimming Pool
- Gym
- Parks
- Power Backup
- Water and Sanitation
Amenities and internal works as filed by the promoter with Karnataka RERA; we have not visited the site.
Nambiar District 25 location and address
- Address
- Survey No. 171/1, 171/3, 171/4, 172/1, 172/2, 172/3, 251/1, 251/2 and 252/2 situated at Dommasandra Village, , Sarjapur Hobli, Anekal taluk, , Anekal , Bengaluru Urban, Karnataka - 560099
- Village (RERA)
- Dommasandra
- Locality
- Dommasandra
- PIN code
- 560099
- City
- Bengaluru
- State
- Karnataka
- Coordinates
- 12.87807, 77.75428
Distances to landmarks
Not found in public records yet: landmarksAbout Dommasandra
Not found in public records yet: locality factsCommute times to tech parks and the airport
| To | Straight line | Peak-hour drive (estimate) |
|---|---|---|
| Outer Ring Road tech corridor (RMZ Ecospace, Bellandur)Map point on OpenStreetMap (opens in a new tab) | 9.4 km | approx. 38 min |
| Electronic City Phase 1Map point on OpenStreetMap (opens in a new tab) | 10.18 km | approx. 41 min |
| ITPL, Whitefield (main gate)Map point on OpenStreetMap (opens in a new tab) | 12.31 km | approx. 50 min |
| KSR Bengaluru City railway station (Majestic)Map point on OpenStreetMap (opens in a new tab) | 22.91 km | approx. 93 min |
| Manyata Tech ParkMap point on OpenStreetMap (opens in a new tab) | 23.87 km | approx. 97 min |
| Kempegowda International AirportMap point on OpenStreetMap (opens in a new tab) | 36.28 km | approx. 147 min |
How we calculate
Straight line: from the project’s map point on RERA to the destination’s point on OpenStreetMap.
Peak-hour drive is a rough estimate, not a route: straight line × 1.35 for the road network, at 20 km/h. Real times vary a lot with the route and the hour.
Sources:Source (openstreetmap.org) (opens in a new tab)How we calculate this
Schools and hospitals nearby
Within 2 km
- 7Schools and colleges4 schools, 3 colleges, 0 kindergartens
- 6Hospitals and clinics3 hospitals, 3 clinics
Nearest schools and colleges
- International School Of Management Excellence · 0.63 km
- Oakridge International School · 1.08 km
- Silver Oaks Internation School · 1.55 km
Nearest hospitals and clinics
- Balaji Nursing Home · 0.13 km
- Sri Lakshmi Multi Speciality Hospital · 0.45 km
- Thyrocare · 0.91 km
Places as mapped on OpenStreetMap (amenity=school, college, kindergarten, university; hospital, clinic), counted within 2 km in a straight line of the RERA map point. Volunteers map these, so some places may be missing or closed. Places data © OpenStreetMap contributors, extract of 5 Oct 2026.
Nearest metro station and railway
- Huskur Road (ಹುಸ್ಕೂರು ರಸ್ತೆ)Open now — nearest operating metro station9.39 km
- Huskuru (ಹುಸ್ಕೂರ್)Nearest railway station5.16 km
Straight-line distances from the RERA map point to the station points mapped on OpenStreetMap; status (open or under construction) as tagged there. Places data © OpenStreetMap contributors, extract of 5 Oct 2026.
Lake and lake-buffer check
The nearest mapped lake is Yamare Lake, 340 m from the project’s RERA map point.
The site boundary is not published as a shape, so its nearest edge can be closer than this point. Whether any building sits inside a lake buffer can only be checked on the approved plan.
- Yamare Lake on OpenStreetMap (opens in a new tab) 340 m
- Dommasandra Lake on OpenStreetMap (opens in a new tab) 396 m
- Thiagalara Chowdenahalli Lake on OpenStreetMap (opens in a new tab) 1,016 m
The buffer rule
Bengaluru’s lake buffer rule has changed over time: the National Green Tribunal ordered a 75 m buffer in May 2016; the Supreme Court set that order aside on 5 March 2019, leaving the 30 m buffer of the Revised Master Plan 2015. Check the current rule and the approved plan before relying on either number.
- LiveLaw: SC sets aside NGT order enlarging buffer zones (2019) (livelaw.in) (opens in a new tab)
- Citizen Matters: Shrinking lake buffers (citizenmatters.in) (opens in a new tab)
Shortest distance from the RERA map point to the mapped water edge (OpenStreetMap water polygons tagged lake or reservoir, or named lake/kere/tank). Mapped shorelines can differ from the revenue-record boundary of a lake. Places data © OpenStreetMap contributors, extract of 5 Oct 2026.
Sources:Source (openstreetmap.org) (opens in a new tab)Source (livelaw.in) (opens in a new tab)Source (citizenmatters.in) (opens in a new tab)How we calculate this
Satellite time-lapse of the site
Satellite photos load when you scroll to them.
Photos from Esri World Imagery Wayback, centred on the project’s map point; dates are the capture dates in Esri’s metadata. Loaded from Esri when you scroll here.
Sources:Source (livingatlas.arcgis.com) (opens in a new tab)
Nambiar District 25 home types and carpet areas
Documents the builder uploaded to Karnataka RERA, shown as filed. Tap a page to see it full size; the full PDF opens on the RERA website.
Approved building plan6 files

Phase 3: Approved Building PlanFull PDF on RERA 
Phase 1: Approved Building PlanFull PDF on RERA 
Phase 2: Approved Building PlanFull PDF on RERA 
Phase 2: Building Plan 1.pdfFull PDF on RERA 
Phase 2: Building Plan 2.pdfFull PDF on RERA 
Phase 2: Building Plan 3.pdfFull PDF on RERA
Approved layout plan5 files

Phase 3: 1DEMARCATION Ph3.pdfFull PDF on RERA 
Phase 2: D25_P-02_DemarcationFiled 20 Aug 2025 · Full PDF on RERA 
Phase 1: Demarcation in DPFiled 7 Jan 2025 · Full PDF on RERA 
Phase 1: Demarcation.pdfFull PDF on RERA 
Phase 2: Demarcation - Phase 2.pdfFull PDF on RERA
Floor plans and brochure not published? The builder shares them only on request. We’ll get the brochure, floor plans and current price list for you, free.
Get brochure, floor plans & price| Home type | Carpet area | Homes |
|---|---|---|
| 2 BHK | 796 – 1,311 sq ft | 146 |
| 2 BHK 2t-01 | 904 sq ft | 68 |
| 2 BHK 2t-02 | 1,302 sq ft | 2 |
| 2 BHK 2t-03 | 996 sq ft | 2 |
| 2 BHK 2t-04 | 883 sq ft | 140 |
| 2 BHK 2t-05 | 1,257 sq ft | 8 |
| 2 BHK 2t-06 | 1,001 sq ft | 4 |
| 2 BHK 2t-07 | 992 sq ft | 12 |
| 2.5 BHK | 938 – 950 sq ft | 66 |
| 2b2t -01 | 904 sq ft | 34 |
| 2b2t -02 | 1,303 sq ft | 1 |
| 2b2t -03 | 996 sq ft | 1 |
| 2b2t 01 | 904 sq ft | 34 |
| 2b2t 02 | 1,303 sq ft | 1 |
| 2b2t 03 | 996 sq ft | 1 |
| 2b2t 04 | 883 sq ft | 140 |
| 2b2t 05 | 1,256 sq ft | 8 |
| 2b2t 06 | 1,001 sq ft | 4 |
| 2b2t 07 | 992 sq ft | 12 |
| 3 BHK | 1,215 sq ft | 402 |
| 3 BHK - 2t | 962 sq ft | 68 |
| 3 BHK - 3t | 1,209 sq ft | 402 |
| 3 BHK 2t | 914 – 1,081 sq ft | 358 |
| 3 BHK 3t | 1,124 – 1,310 sq ft | 670 |
| 3 BHK 3t l-01 | 1,499 sq ft | 142 |
| 3 BHK 3t l-02 | 1,493 sq ft | 148 |
| 3 BHK 3t l-03 | 1,711 sq ft | 8 |
| 3 BHK 3t r-01 | 1,204 sq ft | 70 |
| 3 BHK 3t r-02 | 1,265 sq ft | 74 |
| 3 BHK 3t r-03 | 1,201 sq ft | 142 |
| 3 BHK 4t-sr | 1,894 sq ft | 4 |
| 3.5 BHK | 1,386 – 1,406 sq ft | 128 |
| 3b2t | 1,079 sq ft | 156 |
| 3b3t l 01 | 1,499 sq ft | 71 |
| 3b3t l 02 | 1,493 sq ft | 148 |
| 3b3t l 03 | 1,711 sq ft | 8 |
| 3b3t l-01 | 1,499 sq ft | 71 |
| 3b3t r -01 | 1,204 sq ft | 35 |
| 3b3t r 01 | 1,204 sq ft | 35 |
| 3b3t r 02 | 1,265 sq ft | 74 |
| 3b3t r 03 | 1,201 sq ft | 142 |
| 3b4t sr | 1,895 sq ft | 4 |
| 4 BHK | 1,605 – 1,958 sq ft | 400 |
| 4 BHK 4t | 1,933 sq ft | 148 |
| 4 BHK 5t | 2,180 sq ft | 74 |
| 4b4t | 1,933 sq ft | 148 |
| 4b5t | 2,180 sq ft | 74 |
Home types, counts and carpet areas as filed with Karnataka RERA (carpet area, not super built-up).
We have not collected floor-plan drawings; the builder’s sales team can share them.
Nambiar District 25 possession date and construction status
Timeline
- 10 Jan 2025Phase 1: Registered with Karnataka RERA
- 25 Jan 2025Phase 1: Project start date given to RERA
- 20 Aug 2025Phase 2: Registered with Karnataka RERA
- 1 Sep 2025Phase 2: Project start date given to RERA
- 26 May 2026Phase 3: Registered with Karnataka RERA
- 15 Jul 2026Phase 3: Project start date given to RERA
- 26 Jan 2030Phase 1: Completion date given at registration
- 31 Aug 2030Phase 2: Completion date given at registration
- 29 Feb 2032Phase 3: Completion date given at registration
Construction pace from RERA quarterly filings (Phase 1)
At the average pace so far, construction would reach 100% around Aug 2030 — about 7 months after the completion date on RERA (26 Jan 2030).
At the pace between the 4 quarterly filings we have (20% → 30% in 9 months), it would be around Dec 2031 — about 23 months after the RERA date.
This project has 3 RERA registrations; the chart uses Phase 1, the one with the most quarterly filings.
- Filed on RERA
- Average pace since start
- Pace between filings (and 0% assumed at the start date)
- RERA completion date
Quarterly filings
| Quarter | Filed on | Built | Homes booked |
|---|---|---|---|
| Q2 2026-27to 30 Sep 2026 | 12 Oct 2026 | 30% | 764 of 796 |
| Q1 2026-27to 30 Jun 2026 | 15 Jul 2026 | 24% | 763 of 796 |
| Q4 2025-26to 31 Mar 2026 | 15 Apr 2026 | 20% | 763 of 796 |
| Q3 2025-26to 31 Dec 2025 | 15 Jan 2026 | 20% | 763 of 796 |
How we calculate
Average pace = % built ÷ months since the start date in the RERA record. Here: 30% ÷ 20.1 months (25 Jan 2025 to 30 Sep 2026) = 1.5% a month.
Estimated finish = latest filing date + (100 − % built) ÷ pace = 30 Sep 2026 + 70 ÷ 1.5 = 47 months → Aug 2030. This is an estimate, not a date from the builder or RERA.
Pace between filings = (30% − 20%) ÷ 9 months = 1.1% a month.
A straight line is a simplification: the builder reports one overall %, which mixes excavation, structure and finishing, and work rarely moves at a constant speed. The % values are the promoter’s own figures filed with RERA, not checked by us.
Sources:Source (rera.karnataka.gov.in) (opens in a new tab)How we calculate this
Approvals and documents checklist
28 rows: approvals. Scroll inside the table to see them all.
| Approval | Authority | Source |
|---|---|---|
| Building plan (Phase 1) | BDA - Bangalore Development Authority · No. BDA/TPM/DLP-31/2023-24/670/2024-25 · dated 2024-06-27 | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Land conversion (9 orders) (Phase 1) | DC, Bangalore · No. ALN/ASH/SR/302/2021-2022 and 8 more · dated 2024-01-11 | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Commencement Certificate (Phase 1) | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Approved Building Plan (Phase 1) | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| ESCOM/Electricity (Phase 1) | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| KWSSB/Water (Phase 1) | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| KSPCB (Phase 1) | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| SEIAA (Phase 1) | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Airport Authority of India (Phase 1) | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Building plan (Phase 2) | BDA - Bangalore Development Authority · No. BDA/NM/AS/AA-1/TS-2/E/31/2025-26 · dated 2025-08-16 | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Land conversion (5 orders) (Phase 2) | DC, Bangalore · No. ALN/ASH/SR/196/21-22 and 4 more · dated 2022-03-08 | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Commencement Certificate (Phase 2) | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Approved Building Plan (Phase 2) | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| ESCOM/Electricity (Phase 2) | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| KWSSB/Water (Phase 2) | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| KSPCB (Phase 2) | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Fire Force Department (Phase 2) | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Airport Authority of India (Phase 2) | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Building plan (Phase 3) | BDA - Bangalore Development Authority · No. BDA/NM/AS/AA-5/TS-2/E/09/2026-27 · dated 2026-05-15 | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Land conversion (17 orders) (Phase 3) | DC,Bangalore · No. ALN/ASH/SR/92/2023-2024 and 16 more · dated 2023-08-04 | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Commencement Certificate (Phase 3) | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Approved Building Plan (Phase 3) | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| ESCOM/Electricity (Phase 3) | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| KWSSB/Water (Phase 3) | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| KSPCB (Phase 3) | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| SEIAA (Phase 3) | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Fire Force Department (Phase 3) | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Airport Authority of India (Phase 3) | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
Documents uploaded to RERA (Phase 3)
- Building or layout plan · Approved drawings from the planning authorityFiled on RERA ✓ — BDA - Bangalore Development Authority · No. BDA/NM/AS/AA-5/TS-2/E/09/2026-27 · dated 15 May 2026
- Commencement certificate · Permission to start buildingFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
- Environment clearance · SEIAA KarnatakaFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
- Fire NOC · Karnataka Fire and Emergency ServicesFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
- Pollution board consent · KSPCBFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
- Water and sewerage · BWSSBFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
- Electricity · BESCOMFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
- Height clearance · Airports Authority of IndiaFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
- Occupancy certificate (OC) · Issued only when the building is finishedNot on RERA yet — expected at completion
From the documents the promoter uploaded to Karnataka RERA, collected 19 Oct 2026. “Filed” means a document is on RERA — we have not checked its contents or validity. Not every approval applies to every project (for example, smaller projects may not need an environment clearance). Each phase is registered separately; this list is for the phase named above. The project page on RERA lists each upload.
Nambiar District 25 RERA complaints
2 complaints as on Source (rera.karnataka.gov.in) (opens in a new tab)
| Complaint ref | Filed | Subject | Status | Source |
|---|---|---|---|---|
| 00312/2026 | 26 Mar 2026 | Complaint against Nambiar Builders for material deviations and non-refund of stamp duty and balance amount for Unit 12112 in Nambiar Ensemble. | Under enquiry | Source (rera.karnataka.gov.in) (opens in a new tab) |
| 00109/2026 | 11 Feb 2026 | Cancelled within 15 days but amount deducted | Under enquiry | Source (rera.karnataka.gov.in) (opens in a new tab) |
Court and consumer cases
We list case numbers, courts and outcomes only — never names of private individuals.
About Nambiar EnsembleResidential Projects LLP
- Promoter type
- Partnership Firm
- Projects on this site
- 1
- RERA complaints against promoter
- 2
- Company number (CIN)
- ACD-9470
From Karnataka RERA, as collected so far (20 Oct 2026). Complaints are those RERA lists against this promoter across all its projects.
Nambiar EnsembleResidential Projects LLP’s RERA recordNambiar EnsembleResidential Projects LLP delivery record
- 1Projects in Bengaluru on RERA3 approved registrations under Nambiar EnsembleResidential Projects LLP in Bengaluru Urban and Rural. Source (rera.karnataka.gov.in) (opens in a new tab)
- 2,814Homes registeredAs stated in each registrations.
- 2RERA complaints2 open, 0 disposed. as on Source (rera.karnataka.gov.in) (opens in a new tab)
- 0.7Complaints per 1,000 homes2 complaints ÷ 2,814 homes in its 3 registrations on Karnataka RERA in Bengaluru.
What the complaints are about
2 complaint subjects as written on RERA, as on . Each subject is sorted into one group by keywords (first match wins: delay, refund, registration, quality, litigation, association); one complaint often raises several issues. Source (rera.karnataka.gov.in) (opens in a new tab)
Sources:Source (rera.karnataka.gov.in) (opens in a new tab)How we calculate this
What’s changed since Jun 2024
- 12 Oct 2026Phase 1: Quarterly update filed for Q2 2026-27: 30% built, 764 of 796 homes booked Source (rera.karnataka.gov.in) (opens in a new tab)
- 12 Oct 2026Phase 2: Quarterly update filed for Q2 2026-27: 8% built, 705 of 816 homes booked Source (rera.karnataka.gov.in) (opens in a new tab)
- 12 Oct 2026Phase 3: Quarterly update filed for Q2 2026-27: 0% built, 327 of 1,202 homes booked Source (rera.karnataka.gov.in) (opens in a new tab)
- 15 Jul 2026Phase 1: Quarterly update filed for Q1 2026-27: 24% built, 763 of 796 homes booked Source (rera.karnataka.gov.in) (opens in a new tab)
- 15 Jul 2026Phase 2: Quarterly update filed for Q1 2026-27: 7% built, 701 of 816 homes booked Source (rera.karnataka.gov.in) (opens in a new tab)
- 15 Jul 2026Phase 3: Project start date in the RERA record Source (rera.karnataka.gov.in) (opens in a new tab)
- 15 Jul 2026Phase 3: Quarterly update filed for Q1 2026-27: 0% built, 97 of 1,202 homes booked Source (rera.karnataka.gov.in) (opens in a new tab)
- 26 May 2026Phase 3: Registered with Karnataka RERA (PRM/KA/RERA/1251/308/PR/260526/008686); completion date 29 Feb 2032 Source (rera.karnataka.gov.in) (opens in a new tab)
- 15 May 2026Phase 3: Building plan approved by BDA - Bangalore Development Authority (No. BDA/NM/AS/AA-5/TS-2/E/09/2026-27) Source (rera.karnataka.gov.in) (opens in a new tab)
- 15 Apr 2026Phase 1: Quarterly update filed for Q4 2025-26: 20% built, 763 of 796 homes booked Source (rera.karnataka.gov.in) (opens in a new tab)
- 15 Apr 2026Phase 2: Quarterly update filed for Q4 2025-26: 6% built, 668 of 816 homes booked Source (rera.karnataka.gov.in) (opens in a new tab)
- 26 Mar 2026Complaint 00312/2026 filed with RERA: “Complaint against Nambiar Builders for material deviations and non-refund of stamp duty and balance amount for Unit 12112 in Nambiar Ensemble.” — now under enquiry Source (rera.karnataka.gov.in) (opens in a new tab)
- 11 Feb 2026Complaint 00109/2026 filed with RERA: “Cancelled within 15 days but amount deducted” — now under enquiry Source (rera.karnataka.gov.in) (opens in a new tab)
- 15 Jan 2026Phase 1: Quarterly update filed for Q3 2025-26: 20% built, 763 of 796 homes booked Source (rera.karnataka.gov.in) (opens in a new tab)
- 15 Jan 2026Phase 2: Quarterly update filed for Q3 2025-26: 5% built, 547 of 816 homes booked Source (rera.karnataka.gov.in) (opens in a new tab)
- 1 Sep 2025Phase 2: Project start date in the RERA record Source (rera.karnataka.gov.in) (opens in a new tab)
- 20 Aug 2025Phase 2: Registered with Karnataka RERA (PRM/KA/RERA/1251/308/PR/200825/008011); completion date 31 Aug 2030 Source (rera.karnataka.gov.in) (opens in a new tab)
- 16 Aug 2025Phase 2: Building plan approved by BDA - Bangalore Development Authority (No. BDA/NM/AS/AA-1/TS-2/E/31/2025-26) Source (rera.karnataka.gov.in) (opens in a new tab)
- 25 Jan 2025Phase 1: Project start date in the RERA record Source (rera.karnataka.gov.in) (opens in a new tab)
- 10 Jan 2025Phase 1: Registered with Karnataka RERA (PRM/KA/RERA/1251/308/PR/100125/007377); completion date 26 Jan 2030 Source (rera.karnataka.gov.in) (opens in a new tab)
- 27 Jun 2024Phase 1: Building plan approved by BDA - Bangalore Development Authority (No. BDA/TPM/DLP-31/2023-24/670/2024-25) Source (rera.karnataka.gov.in) (opens in a new tab)
Newest first. No extension of the completion date is recorded on RERA. When the RERA crawl sees a new filing, complaint or extension, it is added here with its date.
Home loan EMI calculator
- Monthly EMI
- —
- Down payment
- —
- Loan amount
- —
- Total interest
- —
A calculation only, from the numbers you enter — not a loan offer.
All-in cost: GST, registration and other charges
The calculator loads when you scroll to it.
Assumptions
- Base price: the builder’s price is not published in a form we could collect — enter it from the cost sheet.
- GST 5% on the base price and charges — the usual rate for an under-construction home that is not “affordable housing” (1%).
- Stamp duty about 5.6% and registration 2% — the Karnataka rule (registration was raised from 1% to 2% on 31 Aug 2025). Calculated on the agreement value.
- Car parking, other charges and the maintenance deposit are not in the public record we collect; enter them from the builder’s cost sheet.
- Loan on the agreement value (banks usually lend up to 75–90%); EMI is the standard reducing-balance formula. Example rate only — use your bank’s quote.
Nambiar District 25 FAQs
What is Nambiar District 25?
Nambiar District 25 is a residential project by Nambiar Ensemble Residential Projects LLP located in Dommasandra, Anekal, Bengaluru Urban (PIN 560099).
How many homes does Nambiar District 25 have?
The project has 2,814 homes across three phases: Phase 1 has 796 homes, Phase 2 has 816 homes, and Phase 3 has 1,202 homes.
When will Nambiar District 25 be completed?
Phase 1 completion date is 26 January 2030, Phase 2 is 31 August 2030, and Phase 3 is 29 February 2032.
What home types are available in Nambiar District 25?
The project offers 2 BHK, 2.5 BHK, 3 BHK, 3.5 BHK, and 4 BHK units with carpet areas ranging from 796 sq ft to 2,180 sq ft.
What is the construction progress of Nambiar District 25?
As of 30 September 2026, Phase 1 is 30% complete with 764 of 796 homes booked, Phase 2 is 8% complete with 705 of 816 homes booked, and Phase 3 is 0% complete with 327 of 1,202 homes booked.
What are the RERA registration numbers for Nambiar District 25?
Phase 1 is registered as PRM/KA/RERA/1251/308/PR/100125/007377, Phase 2 as PRM/KA/RERA/1251/308/PR/200825/008011, and Phase 3 as PRM/KA/RERA/1251/308/PR/260526/008686.
How many RERA complaints are there on Nambiar District 25?
There are 2 complaints on the project: 0 complaints on Phase 1 and 2 complaints on Phase 2.
Which bank handles escrow for Nambiar District 25?
Phase 1 and Phase 2 use Kotak Mahindra Bank for escrow, while Phase 3 uses Ratnakar Bank.
How many towers does Nambiar District 25 have?
The project has 20 towers: 6 towers in Phase 1, 6 towers in Phase 2, and 8 towers in Phase 3, with heights up to 38 floors.
Has the builder completed other projects in Bengaluru?
Nambiar Ensemble Residential Projects LLP has 1 other project on record with RERA in Bengaluru and 2 complaints against the builder across all projects.
Written by AI from the RERA record above on 20 Oct 2026. Answers use only that record; check them against the source before you decide.
Questions about Nambiar District 25
No questions published yet. Ask the first one: you get an instant answer from this page’s public record, and our team follows up on anything the record does not show.
Bought a home from Nambiar EnsembleResidential Projects LLP? Review the builder.
Reviews of Nambiar EnsembleResidential Projects LLP by verified buyers
No verified reviews of Nambiar EnsembleResidential Projects LLP yet. If you bought a home from them, your review helps other buyers.
How reviews work: only buyers and owners can review; we confirm each purchase by phone before publishing, publish positive and negative reviews alike, never accept payment for reviews, and the builder may reply.
Similar projects within 5 km
| Project | Distance | Homes | Possession (RERA) | Built | Complaints | Price |
|---|---|---|---|---|---|---|
| ElanzaLodha Developers Limited | 0.6 km | 698 | Sep 2031 | 2% | 0 | from ₹2.45 Crabout ₹23,400/sq ft carpet |
| Sri Sai Nandana CrystalSri Sai Nandana Builders | 0.8 km | 44 | Dec 2030 | 78% | 0 | Not collected |
| Meridian ParkPrestige Projects Private Limited | 1.2 km | 2,900 | Aug 2026extended | — | 7 | Not collected |
| Sri Nandana GalaxySri Nandana Builders | 1.3 km | 80 | Dec 2026 | 100% | 0 | Not collected |
| Srinis PristineSrinivasa Constructions | 1.4 km | 76 | Dec 2028 | 74% | 0 | Not collected |
| Cynosure Sunny GrovesCynosure Living Spaces LLP | 1.5 km | 317 | Dec 2028 | 37% | 0 | Not collected |
Projects of the same kind within 5 km in a straight line of this project’s RERA map point, nearest first. % built is the promoter’s latest quarterly figure on RERA (shown for single-registration projects); prices are from the builder’s own website where we found one.
Sources and last checked dates
Collected on 20 Oct 2026 by AI research agents reading public pages. Facts are written in our own words. Not found yet: price; court cases; landmarks; specifications; news.
How to check on RERA: On rera.karnataka.gov.in/viewAllProjects, type the registration number in 'Registration No', press Search, then click the 'View Project Details' icon. Complaints open from the 'Complaints / Litigation' icon in the same row. Registration numbers: PRM/KA/RERA/1251/308/PR/100125/007377, PRM/KA/RERA/1251/308/PR/200825/008011, PRM/KA/RERA/1251/308/PR/260526/008686.
- RERA record last checked: 20 Oct 2026
- Last change in the record (registration, quarterly filing or complaint): 20 Oct 2026
How this page is made: software builds it from public records (Karnataka RERA filings, OpenStreetMap, the builder’s own website). AI is used only to read filings into fields and to write the plain-English summary and FAQ answers, which are checked against the record. Facts are checked automatically against the RERA filing. Methodology · How we earn · Report an error
More new projects in Dommasandra
Yamare, DommasandraUnder constructionRERA registeredBuyers’ group openElanza
by Lodha
Price: Price on requestGet brochure & price →
- 1 BHK, 2 BHK, 3 BHK, 4 BHK
- 321 – 1,982 sq ft
- Sep 2031
698 homes
Be one of the first 10 buyers in this groupFounding members — it’s free
Join group for Elanza
Chambenahalli, DommasandraUnder constructionRERA registeredBuyers’ group openSri Sai Nandana Crystal
by Sri Sai Nandana Builders
Price: Price on requestGet brochure & price →
- 2 BHK, 3 BHK
- 700 – 1,057 sq ft
- Dec 2030
44 homes
Be one of the first 10 buyers in this groupFounding members — it’s free
Join group for Sri Sai Nandana Crystal
Valagere Kallahalli, DommasandraReady to moveRERA registeredBuyers’ group openMeridian Park
by Prestige
Price: Price on requestGet brochure & price →
- 2 BHK, 3 BHK
- 838 – 1,359 sq ft
- Aug 2026 (extended)
3 phases on RERA · 2,900 homes · 7 RERA complaints