Subha Ecostone
30×40, 30×50 +1 more plots by Subha Luxury Projects LLP · Iggalur, Chandapura–Attibele, Bengaluru
Iggalur, Chandapura–Attibele, BengaluruOpen on Google Maps (opens in a new tab)
- Completion filed with RERA
- RERA registered
- plotted
Plots still available: 109 of 159 plots were unsold when the developer filed completion with RERA (31 Dec 2025). Some may have sold since — join the group and we’ll ask the developer what is left and for a group price.
Price: Price on request
Subha Ecostone at a glance
- Completion (RERA)May 2025 ExtendedWas May 2024 · Karnataka RERA
- RERA complaints (project)1 complaintKarnataka RERA · as on 4 Oct 2026
- Approvals filed4 of 9 on RERAKarnataka RERA uploads · 4 Oct 2026
- Nearest metroDelta Electronics Bommasandra · 3.56 kmstraight line · OpenStreetMap, 5 Oct 2026
- Airport driveapprox. 186 min at peak45.88 km straight line · estimate
- Nearest lakeRamakrishnapura Lake · 1,025 mFrom the RERA map point · OpenStreetMap, 5 Oct 2026
Project summary
Subha Ecostone is a plotted development by Subha Luxury Projects LLP in Iggalur, Bengaluru with 159 plots, registered with Karnataka RERA. The completion date on RERA is 31 May 2025. It is registered in 2 phases.
Facts collected on 4 Oct 2026 from public records — each linked to its source. Free for buyers. If you book through us, the developer pays us a commission.
Subha Ecostone buyers’ group: join to ask for a group price
No one has joined yet. Be one of the first 10 buyers in this group — the founding members.
Join free. When enough buyers have joined, our agent partner asks Subha Luxury Projects LLP for a group price — for example a lower price, an easier payment plan or waived charges. Nothing is promised: you see what the developer offers and book directly with the developer if you want to. Free for buyers. If you book through us, the developer pays us a commission.
- Gathering buyers
- Talking to the developer
- Group offer
- Group site visit
- Booking
0 buyers have joined · 0 committed
Committed buyers have confirmed their budget, plot size and timeline with us on a call; developers negotiate with them. Joining is free and never obliges you to buy.
Join the Subha Ecostone buyers’ groupHow group buying works
See it for yourself
Visit the site with our team, or get a call to clear your questions. Free, no obligation.
Key facts: plot sizes, approval, land and completion
- Plot sizes (feet)
- 30×40, 30×50, 40×40
- Plot area
- 619 – 3,803 sq ft
- Total plots
- 159
- Layout approved by
- BMRDA
- Land
- Not found in public records yet: land area
- Land conversion orders
- 15
- Completion (extended)
- May 2025
- Development (RERA update)
- Not found in public records yet: development progress
Plot sizes (RERA filing)
| Size (feet) | Area | Plots |
|---|---|---|
| 30×40 | 1,200 sq ft | 28 |
| 30×50 | 1,500 sq ft | 7 |
| 40×40 | 1,600 sq ft | 2 |
| Odd-sized (irregular) | varies | 94 |
Sizes as filed with RERA, converted from metres to feet (9.14 m = 30 ft, 12.19 m = 40 ft). Ask the developer which plots are still unsold.
Approving authority as filed: BMRDA - Bangalore Metropolitan Region Development Authority.
Land conversion orders (RERA filing)
15 rows: land conversion orders. Scroll inside the table to see them all.
| Phase | Survey no. | Converted for | Order | By |
|---|---|---|---|---|
| Main registration | 148 | Residential | No. ALN (A) SR: 458:2004-05, 15 Feb 2005 | Bangalore DC |
| Main registration | 152/1 | Residential | No. ALNSR(A)223/2004-05, 15 Feb 2005 | Bangalore DC |
| Main registration | 152/3 | Residential | No. ALNSR(A) 223/2004-05, 10 Nov 2004 | Bangalore DC |
| Main registration | 152/5 | Residential | No. SLNSR(A)223/2004-05, 10 Nov 2004 | Bangalore DC |
| Phase-2 | 161/2 | Residential | No. ALN(A)(A)SR/153/22-23, 21 Feb 2023 | Deputy Commissioner, Bangalore District |
| Phase-2 | 161/3 | Residential | No. ALN(A)(A)SR/156/22-23, 21 Feb 2023 | Deputy Commissioner, Bangalore Urban District |
| Phase-2 | 161/4 | Residential | No. ALN(A)(A)SR/157/22-23, 21 Feb 2023 | Deputy Commissioner, Bangalore Urban District |
| Phase-2 | 161/5 | Residential | No. ALN(A)(A)SR/158/22-23, 21 Feb 2023 | Deputy Commissioner, Bangalore Urban District |
| Phase-2 | 161/6 | Residential | No. ALN(A)(A)SR/159/22-23, 21 Feb 2023 | Deputy Commissioner, Bangalore Urban District |
| Phase-2 | 167/2 | Residential | No. 415862, 31 Dec 2022 | Deputy Commissioner, Bangalore Urban District |
| Phase-2 | 231/3 | Residential | No. 175141, 6 Oct 2020 | Deputy Commissioner, Bangalore Urban District |
| Phase-2 | 161/1 | Residential | No. ALN(A)SR/448/2004-05, 15 Feb 2023 | District Commissioner Bangalore Urban |
| Phase-2 | 232 | Residential | No. ALN(A)SR/210/2004-05, 11 Feb 2005 | District Commissioner Bangalore Urban |
| Phase-2 | 229/1 | Residential | No. ALN(A)SR/422/2004-05, 11 Feb 2005 | District Commissioner Bangalore Urban |
| Phase-2 | 166/2 | Residential | No. ALN(A)(A)SR/88/22-23, 11 Aug 2022 | District Commissioner Bangalore Urban |
RERA does not cover each plot’s khata. Ask the developer for the khata and title documents and have a lawyer check them before paying an advance.
Subha Ecostone RERA number and registration details
- RERA number
- PRM/KA/RERA/1251/308/PR/020622/004953
- Registered on
- 2 Jun 2022
- Promised completion
- 31 May 2024
- Extended to
- 31 May 2025
- RERA status
- Completed
- Plots booked
- Not found in public records yet: plots booked
- Price
- Not found in public records yet: price
- Project type
- Plotted
2 RERA registrations (one per phase) are shown together on this page; dates above are the latest across phases.
Phases and RERA numbers
| Phase | RERA number | Promised completion | Plots | Status | Source |
|---|---|---|---|---|---|
| Main registration | PRM/KA/RERA/1251/308/PR/020622/004953 | 31 Aug 2023 | 87 | Completed | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Phase-2 | PRM/KA/RERA/1251/308/PR/110823/006150 | 31 May 2024Extended to 31 May 2025 | 72 | Completed | Source (rera.karnataka.gov.in) (opens in a new tab) |
Summary in plain English
Subha Ecostone is a plotted layout by Subha Projects LLP in Iggalur, Anekal taluk. The project has 159 plots across two RERA registrations. The main registration of 87 plots was due for completion on 31 August 2023, while Phase-2 of 72 plots is due on 31 May 2025.
Written by AI from the RERA record above on 7 Oct 2026. Every number in it was checked against that record; if anything differs, the record wins.
Open space, loans, escrow and other details
- Open space
- Not found in public records yet: open space
- Water and power
- Water source filed with RERA: BoreWell,Local Authority
- Plot loans: approved banks
- Not found in public records yet: bank approvals
- Payment plans
- Not found in public records yet: payment plans
- Maintenance
- Not found in public records yet: maintenance
- Car parking
- Not found in public records yet: car parking charge
- Escrow bank (RERA) · Main registration
- ICICI Bank, HSR LAYOUT
- Escrow bank (RERA) · Phase-2
- ICICI Bank, Akshay Nagar
Amenities
Subha Ecostone location and address
- Address
- SURVEY NO:148, 151, 152 (P), 164, of IGGALUR VILLAGE, CHANDAPURA HOBLI , ANEKAL TALUK,BENGALURU RURAL DISTRICT. , Anekal , Bengaluru Urban, Karnataka - 560081
- Village (RERA)
- Iggalur
- Locality
- Chandapura–AttibeleAlso known as Chandapura, Attibele
- PIN code
- 560081
- City
- Bengaluru
- State
- Karnataka
- Coordinates
- 12.78819, 77.69569
Distances to landmarks
Not found in public records yet: landmarksAbout Chandapura–Attibele
Not found in public records yet: locality factsCommute times to tech parks and the airport
| To | Straight line | Peak-hour drive (estimate) |
|---|---|---|
| Electronic City Phase 1Map point on OpenStreetMap (opens in a new tab) | 7.61 km | approx. 31 min |
| Outer Ring Road tech corridor (RMZ Ecospace, Bellandur)Map point on OpenStreetMap (opens in a new tab) | 15.15 km | approx. 61 min |
| ITPL, Whitefield (main gate)Map point on OpenStreetMap (opens in a new tab) | 22.64 km | approx. 92 min |
| KSR Bengaluru City railway station (Majestic)Map point on OpenStreetMap (opens in a new tab) | 25.16 km | approx. 102 min |
| Manyata Tech ParkMap point on OpenStreetMap (opens in a new tab) | 30.05 km | approx. 122 min |
| Kempegowda International AirportMap point on OpenStreetMap (opens in a new tab) | 45.88 km | approx. 186 min |
How we calculate
Straight line: from the project’s map point on RERA to the destination’s point on OpenStreetMap.
Peak-hour drive is a rough estimate, not a route: straight line × 1.35 for the road network, at 20 km/h. Real times vary a lot with the route and the hour.
Sources:Source (openstreetmap.org) (opens in a new tab)How we calculate this
Schools and hospitals nearby
Within 2 km
- 8Schools and colleges6 schools, 1 colleges, 1 kindergartens
- 10Hospitals and clinics5 hospitals, 5 clinics
Nearest schools and colleges
- Rising Kids Pre School · 1.76 km
Nearest hospitals and clinics
- Balaji Clinic · 1.22 km
- Athreya Hospital · 1.4 km
- Athreya Hospital, Chandpura · 1.4 km
Places as mapped on OpenStreetMap (amenity=school, college, kindergarten, university; hospital, clinic), counted within 2 km in a straight line of the RERA map point. Volunteers map these, so some places may be missing or closed. Places data © OpenStreetMap contributors, extract of 5 Oct 2026.
Nearest metro station and railway
- Delta Electronics Bommasandra (ಡೆಲ್ಟಾ ಎಲೆಕ್ಟ್ರಾನಿಕ್ಸ್ ಬೊಮ್ಮಸಂದ್ರ)Open now — nearest operating metro station3.56 km
- Heelalige (ಹೀಲಲಿಗೆ ರೈಲು ನಿಲ್ದಾಣ)Nearest railway station3.25 km
Straight-line distances from the RERA map point to the station points mapped on OpenStreetMap; status (open or under construction) as tagged there. Places data © OpenStreetMap contributors, extract of 5 Oct 2026.
Lake and lake-buffer check
The nearest mapped lake is Ramakrishnapura Lake, 1,025 m from the project’s RERA map point.
The site boundary is not published as a shape, so its nearest edge can be closer than this point. Whether any building sits inside a lake buffer can only be checked on the approved plan.
- Ramakrishnapura Lake on OpenStreetMap (opens in a new tab) (ರಾಮಕೃಷ್ಣಪುರ ಕೆರೆ)1,025 m
- Iggaluru Lake on OpenStreetMap (opens in a new tab) 1,107 m
The buffer rule
Bengaluru’s lake buffer rule has changed over time: the National Green Tribunal ordered a 75 m buffer in May 2016; the Supreme Court set that order aside on 5 March 2019, leaving the 30 m buffer of the Revised Master Plan 2015. Check the current rule and the approved plan before relying on either number.
- LiveLaw: SC sets aside NGT order enlarging buffer zones (2019) (livelaw.in) (opens in a new tab)
- Citizen Matters: Shrinking lake buffers (citizenmatters.in) (opens in a new tab)
Shortest distance from the RERA map point to the mapped water edge (OpenStreetMap water polygons tagged lake or reservoir, or named lake/kere/tank). Mapped shorelines can differ from the revenue-record boundary of a lake. Places data © OpenStreetMap contributors, extract of 5 Oct 2026.
Sources:Source (openstreetmap.org) (opens in a new tab)Source (livelaw.in) (opens in a new tab)Source (citizenmatters.in) (opens in a new tab)How we calculate this
Satellite time-lapse of the site
Satellite photos load when you scroll to them.
Photos from Esri World Imagery Wayback, centred on the project’s map point; dates are the capture dates in Esri’s metadata. Loaded from Esri when you scroll here.
Sources:Source (livingatlas.arcgis.com) (opens in a new tab)
Subha Ecostone layout plan and plot types as filed
Layout plan and brochure not published? The developer shares them only on request. We’ll get the brochure, layout plan and current price list for you, free.
Get brochure, layout plan & price| Plot type (as filed) | Area | Plots |
|---|---|---|
| 30*40 | — | 28 |
| 30*50 | — | 7 |
| 40*40 | — | 2 |
| Odd-shaped plots | — | 44 |
| Odd-shaped plots | — | 50 |
Plot types and counts as filed with Karnataka RERA.
We have not collected the layout plan drawing; the developer’s sales team can share it.
Subha Ecostone completion date and development status
Timeline
- 14 Jan 2022Main registration: Project start date given to RERA
- 2 Jun 2022Main registration: Registered with Karnataka RERA
- 17 May 2023Phase-2: Project start date given to RERA
- 11 Aug 2023Phase-2: Registered with Karnataka RERA
- 31 Aug 2023Main registration: Completion date given at registration
- 31 Oct 2023Main registration: Promoter applied to RERA for completion
- 31 May 2024Phase-2: Completion date given at registration
- 31 May 2025Phase-2: Section 6 Extension: completion date moved to this date
- 31 Dec 2025Phase-2: Promoter applied to RERA for completion
Approvals and documents checklist
23 rows: approvals. Scroll inside the table to see them all.
| Approval | Authority | Source |
|---|---|---|
| Layout plan (Main registration) | BMRDA - Bangalore Metropolitan Region Development Authority · No. LAO/30/2021-22 · dated 2022-01-14 | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Land conversion (4 orders) (Main registration) | Bangalore DC · No. ALN (A) SR: 458:2004-05 and 3 more · dated 2005-02-15 | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Commencement Certificate (Main registration) | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Electricity Permission Letter (Main registration) | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Water Permission Letter (Main registration) | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Approved Layout Plan (Main registration) | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Approved Building/Plotting Plan (Main registration) | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Approved Section Of Building/Infrastructure Plan of Plotting (Main registration) | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| District Magistrate (Main registration) | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Conversion Certificate under section 95 of the KLR Act 1964 (Main registration) | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| ESCOM/Electricity (Main registration) | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| KWSSB/Water (Main registration) | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Layout plan (Phase-2) | BIAPPA - Bangalore Airport Area Planning Authority · No. LAO/157/2022-23 · dated 2023-06-13 | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Land conversion (11 orders) (Phase-2) | Deputy Commissioner, Bangalore District · No. ALN(A)(A)SR/153/22-23 and 10 more · dated 2023-02-21 | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Commencement Certificate (Phase-2) | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Electricity Permission Letter (Phase-2) | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Water Permission Letter (Phase-2) | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Approved Layout Plan (Phase-2) | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Approved Building/Plotting Plan (Phase-2) | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Approved Section Of Building/Infrastructure Plan of Plotting (Phase-2) | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Conversion Certificate under section 95 of the KLR Act 1964 (Phase-2) | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| ESCOM/Electricity (Phase-2) | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| KWSSB/Water (Phase-2) | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
Documents uploaded to RERA (Main registration)
- Building or layout plan · Approved drawings from the planning authorityFiled on RERA ✓ — BMRDA - Bangalore Metropolitan Region Development Authority · No. LAO/30/2021-22 · dated 14 Jan 2022
- Commencement certificate · Permission to start buildingFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
- Environment clearance · SEIAA KarnatakaNot on RERA yet
- Fire NOC · Karnataka Fire and Emergency ServicesNot on RERA yet
- Pollution board consent · KSPCBNot on RERA yet
- Water and sewerage · BWSSBFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
- Electricity · BESCOMFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
- Height clearance · Airports Authority of IndiaNot on RERA yet
- Occupancy certificate (OC) · Issued only when the building is finishedNot on RERA yet — expected at completion
From the documents the promoter uploaded to Karnataka RERA, collected 4 Oct 2026. “Filed” means a document is on RERA — we have not checked its contents or validity. Not every approval applies to every project (for example, smaller projects may not need an environment clearance). Each phase is registered separately; this list is for the phase named above. The project page on RERA lists each upload.
Subha Ecostone RERA complaints
1 complaint as on Source (rera.karnataka.gov.in) (opens in a new tab)
| Complaint ref | Filed | Subject | Status | Source |
|---|---|---|---|---|
| 00202/2026 | 5 Mar 2026 | Completion of construction and interest on delay period | Under enquiry | Source (rera.karnataka.gov.in) (opens in a new tab) |
Court and consumer cases
We list case numbers, courts and outcomes only — never names of private individuals.
About Subha Luxury Projects LLP
- Promoter type
- Partnership Firm
- Projects on this site
- 4
- RERA complaints against promoter
- 2
- Company number (CIN)
- Not found in public records yet: CIN
From Karnataka RERA, as collected so far (4 Oct 2026). Complaints are those RERA lists against this promoter across all its projects.
Subha Luxury Projects LLP’s RERA recordSubha Luxury Projects LLP delivery record
- 4Projects in Bengaluru on RERA5 approved registrations under Subha Luxury Projects LLP in Bengaluru Urban and Rural. Source (rera.karnataka.gov.in) (opens in a new tab)
- 291Homes and plots registeredAs stated in each registrations.
- 2RERA complaints2 open, 0 disposed. as on Source (rera.karnataka.gov.in) (opens in a new tab)
- 6.9Complaints per 1,000 homes and plots2 complaints ÷ 291 homes and plots in its 5 registrations on Karnataka RERA in Bengaluru.
- 3Completion filed on RERARegistrations where the promoter applied to RERA for completion; 0 with an occupancy certificate on RERA.
- 1 of 3Filed by the date given at registrationMedian gap 2 months (on-time ones count as 0). The completion application can come after handover, so this is an upper bound on lateness.
What the complaints are about
2 complaint subjects as written on RERA, as on . Each subject is sorted into one group by keywords (first match wins: delay, refund, registration, quality, litigation, association); one complaint often raises several issues. Source (rera.karnataka.gov.in) (opens in a new tab)
Completion filed on RERA
| Project | Date at registration | Completion filed | Gap |
|---|---|---|---|
| Subha Ecocity Phase-1 | 31 Dec 2026 | 30 May 2026 | By the date |
| Subha Ecostone Phase-2 | 31 May 2024extended to 31 May 2025 | 31 Dec 2025 | 19 months after |
| Subha Ecostone | 31 Aug 2023 | 31 Oct 2023 | 2 months after |
Measured against the completion date given at registration; many projects had RERA extensions (including the COVID-period extension), shown under the date.
Sources:Source (rera.karnataka.gov.in) (opens in a new tab)How we calculate this
What’s changed since Jan 2022
- 5 Mar 2026Complaint 00202/2026 filed with RERA: “Completion of construction and interest on delay period” — now under enquiry Source (rera.karnataka.gov.in) (opens in a new tab)
- 31 Dec 2025Phase-2: Promoter applied to RERA for completion Source (rera.karnataka.gov.in) (opens in a new tab)
- 31 May 2025Phase-2: Completion date extended to 31 May 2025 Source (rera.karnataka.gov.in) (opens in a new tab)
- 31 Oct 2023Main registration: Promoter applied to RERA for completion Source (rera.karnataka.gov.in) (opens in a new tab)
- 11 Aug 2023Phase-2: Registered with Karnataka RERA (PRM/KA/RERA/1251/308/PR/110823/006150); completion date 31 May 2024 Source (rera.karnataka.gov.in) (opens in a new tab)
- 13 Jun 2023Phase-2: Building plan approved by BIAPPA - Bangalore Airport Area Planning Authority (No. LAO/157/2022-23) Source (rera.karnataka.gov.in) (opens in a new tab)
- 17 May 2023Phase-2: Project start date in the RERA record Source (rera.karnataka.gov.in) (opens in a new tab)
- 2 Jun 2022Main registration: Registered with Karnataka RERA (PRM/KA/RERA/1251/308/PR/020622/004953); completion date 31 Aug 2023 Source (rera.karnataka.gov.in) (opens in a new tab)
- 14 Jan 2022Main registration: Building plan approved by BMRDA - Bangalore Metropolitan Region Development Authority (No. LAO/30/2021-22) Source (rera.karnataka.gov.in) (opens in a new tab)
- 14 Jan 2022Main registration: Project start date in the RERA record Source (rera.karnataka.gov.in) (opens in a new tab)
Newest first. When the RERA crawl sees a new filing, complaint or extension, it is added here with its date.
Plot loan EMI calculator
- Monthly EMI
- —
- Down payment
- —
- Loan amount
- —
- Total interest
- —
A calculation only, from the numbers you enter — not a loan offer.
Subha Ecostone FAQs
What plot sizes are available in Subha Ecostone?
The main registration offers plots in 30×40 ft (1,200 sq ft), 30×50 ft (1,500 sq ft), and 40×40 ft (1,600 sq ft), plus 50 odd-sized plots. Phase-2 has 44 odd-sized plots; their dimensions are not in the RERA record.
How many plots are in Subha Ecostone?
The project has 159 plots total: 87 in the main registration and 72 in Phase-2.
When is Subha Ecostone due for completion?
The main registration was due on 31 August 2023. Phase-2 has been extended and is now due on 31 May 2025.
What are the RERA registration numbers for Subha Ecostone?
The main registration number is PRM/KA/RERA/1251/308/PR/020622/004953 (registered 2 June 2022), and Phase-2 is PRM/KA/RERA/1251/308/PR/110823/006150 (registered 11 August 2023).
Which authority approved the layout for Subha Ecostone?
The main registration layout was approved by BMRDA, and Phase-2 was approved by BIAAPA.
How many land conversion orders were issued for Subha Ecostone?
The main registration has 4 land conversion orders, and Phase-2 has 11.
Are there any RERA complaints against Subha Ecostone?
1 complaint has been filed on the main registration. No complaints are recorded for Phase-2.
Where is Subha Ecostone located?
The project is in Iggalur, Anekal taluk, Bengaluru Urban district, PIN code 560081.
How many other projects does the developer have on RERA record?
Subha Projects LLP has 4 projects in the Bengaluru RERA records, and 2 RERA complaints have been filed against the developer across all projects.
Which bank holds the escrow account for Subha Ecostone?
ICICI Bank holds the escrow account for both registrations of the project.
Written by AI from the RERA record above on 7 Oct 2026. Answers use only that record; check them against the source before you decide.
Questions about Subha Ecostone
No questions published yet. Ask the first one: you get an instant answer from this page’s public record, and our team follows up on anything the record does not show.
Bought a plot from Subha Luxury Projects LLP? Review the developer.
Reviews of Subha Luxury Projects LLP by verified buyers
No verified reviews of Subha Luxury Projects LLP yet. If you bought a plot from them, your review helps other buyers.
How reviews work: only buyers and owners can review; we confirm each purchase by phone before publishing, publish positive and negative reviews alike, never accept payment for reviews, and the developer may reply.
Similar projects within 5 km
| Project | Distance | Plots | Completion (RERA) | Developed | Complaints | Price |
|---|---|---|---|---|---|---|
| Subha Ecocity Phase-1Subha Luxury Projects LLP | 0.4 km | 106 | Dec 2026 | — | 1 | Not collected |
| Icon CalistaIcon Homz LLP | 1.7 km | 50 | Jun 2026 | 100% | 0 | Not collected |
| High Classic DelightM/s HIGH CLASSIC BUILDERS AND DEVELOPERS | 1.8 km | 21 | Dec 2027 | — | 0 | Not collected |
| Grand Icon 3Icon Infra Shelters India Pvt Ltd | 2.4 km | 80 | Apr 2026 | 100% | 0 | Not collected |
| Green VilleM/s. BEST PROPERTIES | 2.9 km | 23 | Oct 2026 | 100% | 0 | Not collected |
| SBM Sunrise HomesK Sreenivasulu Reddy & C Obul Reddy | 3.1 km | 43 | Mar 2029 | 100% | 0 | Not collected |
Projects of the same kind within 5 km in a straight line of this project’s RERA map point, nearest first. % built is the promoter’s latest quarterly figure on RERA (shown for single-registration projects); prices are from the developer’s own website where we found one.
Sources and last checked dates
Collected on 4 Oct 2026 by AI research agents reading public pages. Facts are written in our own words. Not found yet: price; court cases; landmarks; specifications; news.
How to check on RERA: On rera.karnataka.gov.in/viewAllProjects, type the registration number in 'Registration No', press Search, then click the 'View Project Details' icon. Complaints open from the 'Complaints / Litigation' icon in the same row. Registration numbers: PRM/KA/RERA/1251/308/PR/020622/004953, PRM/KA/RERA/1251/308/PR/110823/006150.
- RERA record last checked: 4 Oct 2026
- Last change in the record (registration, quarterly filing or complaint): 5 Mar 2026
How this page is made: software builds it from public records (Karnataka RERA filings, OpenStreetMap, the developer’s own website). AI is used only to read filings into fields and to write the plain-English summary and FAQ answers, which are checked against the record. Facts are checked automatically against the RERA filing. Methodology · How we earn · Report an error
More new projects in Chandapura–Attibele
- Iggalur, Chandapura–Attibele© Esri, Maxar, Earthstar GeographicsReady to moveRERA registeredBuyers’ group open
High Classic Delight
by M/s HIGH CLASSIC BUILDERS AND
Price: Price on requestGet brochure & price →
- 30×40
- 466 – 1,370 sq ft plots
- Approved by Anekal Planning Authority
- Dec 2027
21 plots
Be one of the first 10 buyers in this groupFounding members — it’s free
Join group for High Classic Delight
Marsur, Chandapura–AttibeleUnder constructionRERA registeredBuyers’ group openGreen Ville
by M/s. BEST PROPERTIES
Price: Price on requestGet brochure & price →
- 30×40, 35×40
- 1,138 – 1,651 sq ft plots
- Approved by BMRDA
- Oct 2026
23 plots
Be one of the first 10 buyers in this groupFounding members — it’s free
Join group for Green Ville- Marsur, Chandapura–Attibele© Esri, Maxar, Earthstar GeographicsReady to moveRERA registeredBuyers’ group open
SBM Sunrise Homes
by K Sreenivasulu Reddy & C Obul Reddy
Price: Price on requestGet brochure & price →
- 30×40, 30×50, 40×40 +1 more
- 885 – 2,261 sq ft plots
- Approved by Anekal Planning Authority
- Mar 2029
43 plots
Be one of the first 10 buyers in this groupFounding members — it’s free
Join group for SBM Sunrise Homes