TG Legacy
2 & 3 BHK apartments by TG Prime Realty Private Limited · Gattahalli, near Kodathi–Carmelaram, Bengaluru
Gattahalli, near Kodathi–Carmelaram, BengaluruOpen on Google Maps (opens in a new tab)
- Under construction
- RERA registered
- residential
by TG Prime Realty Private Limited
Price: Price on request
Site photo filed with Karnataka RERA Karnataka RERA filing · Source ↗ (opens in a new tab)
TG Legacy at a glance
- Possession (RERA)Dec 2030Karnataka RERA
- Construction40% built · on pace for Dec 2028RERA filing to 30 Sep 2026; estimate from average pace
- Homes booked49 of 210 (23%)RERA update · as on 30 Sep 2026
- RERA complaints (project)None listedKarnataka RERA · as on 20 Oct 2026
- Approvals filed8 of 9 on RERAKarnataka RERA uploads · 20 Oct 2026
- Nearest metroInfosys Foundation Konappana Agrahara · 3.38 kmstraight line · OpenStreetMap, 5 Oct 2026
- Airport driveapprox. 151 min at peak37.28 km straight line · estimate
- Nearest lakeGattahalli Lake · 892 mFrom the RERA map point · OpenStreetMap, 5 Oct 2026
Project summary
TG Legacy is a residential project by TG Prime Realty Private Limited in Gattahalli, Bengaluru with 210 homes, registered with Karnataka RERA. The completion date on RERA is 31 Dec 2030.
Facts collected on 20 Oct 2026 from public records — each linked to its source. Free for buyers. If you book through us, the builder pays us a commission.
TG Legacy buyers’ group: join to ask for a group price
No one has joined yet. Be one of the first 10 buyers in this group — the founding members.
Join free. When enough buyers have joined, our agent partner asks TG Prime Realty Private Limited for a group price — for example a lower price, an easier payment plan or waived charges. Nothing is promised: you see what the builder offers and book directly with the builder if you want to. Free for buyers. If you book through us, the builder pays us a commission.
- Gathering buyers
- Talking to the builder
- Group offer
- Group site visit
- Booking
0 buyers have joined · 0 committed
Committed buyers have confirmed their budget, home type and timeline with us on a call; builders negotiate with them. Joining is free and never obliges you to buy.
Join the TG Legacy buyers’ groupHow group buying works
See it for yourself
Visit the site with our team, or get a call to clear your questions. Free, no obligation.
Key facts: home types, towers, land and possession
- Home types
- 2 BHK, 3 BHK
- Carpet area
- 778 – 1,082 sq ft
- Towers
- 2
- Floors
- 14
- Total homes
- 210
- Land
- 2.95 acres
- Possession (RERA)
- Dec 2030
- Built (RERA update)
- 40%
TG Legacy RERA number and registration details
- RERA number
- PRM/KA/RERA/1251/310/PR/090425/007663
- Registered on
- 9 Apr 2025
- Promised completion
- 31 Dec 2030
- Extended to
- No extension recorded
- RERA status
- New launch
- Homes booked
- 49 of 210 as on
- Price
- Not found in public records yet: price
- Project type
- Residential
Towers and blocks (RERA filing)
| Tower | Floors | Basements | Homes |
|---|---|---|---|
| TOWER -1 (WING B) | 14 | 1 | 70 |
| TOWER -2 (WING C & D) | 14 | 1 | 140 |
A dash (—) means the filing did not state that value.
Open space, home loans, escrow and other details
- Open space
- 71.8% of land
- Water and power
- Water source filed with RERA: Local Authority
- Home loans: approved banks
- Not found in public records yet: bank approvals
- Payment plans
- Not found in public records yet: payment plans
- Maintenance
- Not found in public records yet: maintenance
- Car parking
- Not found in public records yet: car parking charge
- Escrow bank (RERA)
- ICICI Bank, Bannerghatta Road
- Building plan (RERA)
- BDA - Bangalore Development Authority · No. 63/2024-25 · dated 10 Mar 2025
- Project cost declared to RERA
- ₹147 Cr
Open area as a share of the land, from the areas filed with RERA (includes driveways and landscaped areas).
Amenities
- Electricity
- CCTV Surveillance
- Club House
- Community Hall
- Swimming Pool
- Gym
- Power Backup
- Water and Sanitation
Amenities and internal works as filed by the promoter with Karnataka RERA; we have not visited the site.
TG Legacy location and address
- Address
- Sy No. 30/1, Gattahalli Village, , Sarjapura Hobli, Anekal Taluk , Bengaluru South , Bengaluru Urban, Karnataka - 560099
- Village (RERA)
- Gattahalli
- Locality
- Near Kodathi–CarmelaramAlso known as Kodathi, Carmelaram
- PIN code
- 560099
- City
- Bengaluru
- State
- Karnataka
- Coordinates
- 12.86558, 77.69537
Distances to landmarks
Not found in public records yet: landmarksAbout Gattahalli
Not found in public records yet: locality factsCommute times to tech parks and the airport
| To | Straight line | Peak-hour drive (estimate) |
|---|---|---|
| Electronic City Phase 1Map point on OpenStreetMap (opens in a new tab) | 3.74 km | approx. 15 min |
| Outer Ring Road tech corridor (RMZ Ecospace, Bellandur)Map point on OpenStreetMap (opens in a new tab) | 6.64 km | approx. 27 min |
| ITPL, Whitefield (main gate)Map point on OpenStreetMap (opens in a new tab) | 14.33 km | approx. 58 min |
| KSR Bengaluru City railway station (Majestic)Map point on OpenStreetMap (opens in a new tab) | 18.51 km | approx. 75 min |
| Manyata Tech ParkMap point on OpenStreetMap (opens in a new tab) | 21.89 km | approx. 89 min |
| Kempegowda International AirportMap point on OpenStreetMap (opens in a new tab) | 37.28 km | approx. 151 min |
How we calculate
Straight line: from the project’s map point on RERA to the destination’s point on OpenStreetMap.
Peak-hour drive is a rough estimate, not a route: straight line × 1.35 for the road network, at 20 km/h. Real times vary a lot with the route and the hour.
Sources:Source (openstreetmap.org) (opens in a new tab)How we calculate this
Schools and hospitals nearby
Within 2 km
- 5Schools and colleges5 schools, 0 colleges, 0 kindergartens
- 0Hospitals and clinics0 hospitals, 0 clinics
Nearest schools and colleges
- Edenbridge International School · 1.6 km
- St Gasper School · 1.88 km
Places as mapped on OpenStreetMap (amenity=school, college, kindergarten, university; hospital, clinic), counted within 2 km in a straight line of the RERA map point. Volunteers map these, so some places may be missing or closed. Places data © OpenStreetMap contributors, extract of 5 Oct 2026.
Nearest metro station and railway
- Infosys Foundation Konappana Agrahara (ಇನ್ಫೋಸಿಸ್ ಫೌಂಡೇಶನ್ ಕೊನಪ್ಪನ ಅಗ್ರಹಾರ)Open now — nearest operating metro station3.38 km
- Huskuru (ಹುಸ್ಕೂರ್)Nearest railway station1.75 km
Straight-line distances from the RERA map point to the station points mapped on OpenStreetMap; status (open or under construction) as tagged there. Places data © OpenStreetMap contributors, extract of 5 Oct 2026.
Lake and lake-buffer check
The nearest mapped lake is Gattahalli Lake, 892 m from the project’s RERA map point.
The site boundary is not published as a shape, so its nearest edge can be closer than this point. Whether any building sits inside a lake buffer can only be checked on the approved plan.
- Gattahalli Lake on OpenStreetMap (opens in a new tab) (ಗಟ್ಟಹಳ್ಳಿ ಕೆರೆ)892 m
- Gulimangala Lake on OpenStreetMap (opens in a new tab) 980 m
- Unnamed lake (mapped on OpenStreetMap) on OpenStreetMap (opens in a new tab) 1,192 m
The buffer rule
Bengaluru’s lake buffer rule has changed over time: the National Green Tribunal ordered a 75 m buffer in May 2016; the Supreme Court set that order aside on 5 March 2019, leaving the 30 m buffer of the Revised Master Plan 2015. Check the current rule and the approved plan before relying on either number.
- LiveLaw: SC sets aside NGT order enlarging buffer zones (2019) (livelaw.in) (opens in a new tab)
- Citizen Matters: Shrinking lake buffers (citizenmatters.in) (opens in a new tab)
Shortest distance from the RERA map point to the mapped water edge (OpenStreetMap water polygons tagged lake or reservoir, or named lake/kere/tank). Mapped shorelines can differ from the revenue-record boundary of a lake. Places data © OpenStreetMap contributors, extract of 5 Oct 2026.
Sources:Source (openstreetmap.org) (opens in a new tab)Source (livelaw.in) (opens in a new tab)Source (citizenmatters.in) (opens in a new tab)How we calculate this
Satellite time-lapse of the site
Satellite photos load when you scroll to them.
Photos from Esri World Imagery Wayback, centred on the project’s map point; dates are the capture dates in Esri’s metadata. Loaded from Esri when you scroll here.
Sources:Source (livingatlas.arcgis.com) (opens in a new tab)
TG Legacy floor plans, brochure and elevations
Documents the builder uploaded to Karnataka RERA, shown as filed. Tap a page to see it full size; the full PDF opens on the RERA website.
Floor plans4 files

Approved Building PlanFull PDF on RERA 
4th, 5th, 6th Floor Plan.pdfFull PDF on RERA 
7th to 14th, Terrace Floor Plan.pdfFull PDF on RERA 
Club House, Basement and Ground Floor Plan.pdfFull PDF on RERA
Approved layout plan

Location and Demarcation.jpegFull PDF on RERA
| Home type | Carpet area | Homes |
|---|---|---|
| 2 BHK | 778 – 790 sq ft | 42 |
| 3 BHK | 928 – 1,082 sq ft | 168 |
Home types, counts and carpet areas as filed with Karnataka RERA (carpet area, not super built-up).
We have not collected floor-plan drawings; the builder’s sales team can share them.
TG Legacy possession date and construction status
Promoter’s quarterly update to RERA for Q2 2026-27, submitted 2026-10-15.
By tower (Q2 2026-27)
Units sold and unsold, from RERA (Q2 2026-27)
| Type | Homes | Booked | Available |
|---|---|---|---|
| 2 BHK | 42 | 6 | 36 |
| 3 BHK | 168 | 43 | 125 |
As reported by the promoter in the quarterly update to RERA, not verified by us.
Timeline
- 1 Apr 2025Project start date given to RERA
- 9 Apr 2025Registered with Karnataka RERA
- 31 Dec 2030Completion date given at registration
Construction pace from RERA quarterly filings
At the average pace so far, construction would reach 100% around Dec 2028 — about 24 months before the completion date on RERA (31 Dec 2030).
At the pace between the 4 quarterly filings we have (15% → 40% in 9 months), it would be around Jul 2028 — about 29 months before the RERA date.
- Filed on RERA
- Average pace since start
- Pace between filings (and 0% assumed at the start date)
- RERA completion date
Quarterly filings
| Quarter | Filed on | Built | Homes booked |
|---|---|---|---|
| Q2 2026-27to 30 Sep 2026 | 15 Oct 2026 | 40% | 49 of 210 |
| Q1 2026-27to 30 Jun 2026 | 14 Jul 2026 | 34% | 47 of 210 |
| Q4 2025-26to 31 Mar 2026 | 15 Apr 2026 | 17% | 27 of 210 |
| Q3 2025-26to 31 Dec 2025 | 5 Feb 2026 | 15% | 27 of 210 |
How we calculate
Average pace = % built ÷ months since the start date in the RERA record. Here: 40% ÷ 18 months (1 Apr 2025 to 30 Sep 2026) = 2.2% a month.
Estimated finish = latest filing date + (100 − % built) ÷ pace = 30 Sep 2026 + 60 ÷ 2.2 = 27 months → Dec 2028. This is an estimate, not a date from the builder or RERA.
Pace between filings = (40% − 15%) ÷ 9 months = 2.8% a month.
A straight line is a simplification: the builder reports one overall %, which mixes excavation, structure and finishing, and work rarely moves at a constant speed. The % values are the promoter’s own figures filed with RERA, not checked by us. Promoter’s quarterly update to RERA for Q2 2026-27, submitted 2026-10-15.
Sources:Source (rera.karnataka.gov.in) (opens in a new tab)How we calculate this
Approvals and documents checklist
| Approval | Authority | Source |
|---|---|---|
| Building plan | BDA - Bangalore Development Authority · No. 63/2024-25 · dated 2025-03-10 | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Land conversion | DC · No. ALN(ASH)SR/137/13-14 · dated 2013-10-28 | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Commencement Certificate | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Approved Building Plan | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| ESCOM/Electricity | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| KWSSB/Water | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| KSPCB | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| SEIAA | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Fire Force Department | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Airport Authority of India | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
Documents uploaded to RERA
- Building or layout plan · Approved drawings from the planning authorityFiled on RERA ✓ — BDA - Bangalore Development Authority · No. 63/2024-25 · dated 10 Mar 2025
- Commencement certificate · Permission to start buildingFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
- Environment clearance · SEIAA KarnatakaFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
- Fire NOC · Karnataka Fire and Emergency ServicesFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
- Pollution board consent · KSPCBFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
- Water and sewerage · BWSSBFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
- Electricity · BESCOMFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
- Height clearance · Airports Authority of IndiaFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
- Occupancy certificate (OC) · Issued only when the building is finishedNot on RERA yet — expected at completion
From the documents the promoter uploaded to Karnataka RERA, collected 20 Oct 2026. “Filed” means a document is on RERA — we have not checked its contents or validity. Not every approval applies to every project (for example, smaller projects may not need an environment clearance). The project page on RERA lists each upload.
TG Legacy RERA complaints
No complaints listed on Karnataka RERA for this registration as on Source (rera.karnataka.gov.in) (opens in a new tab)
Court and consumer cases
We list case numbers, courts and outcomes only — never names of private individuals.
About TG Prime Realty Private Limited
- Promoter type
- Company
- Projects on this site
- 2
- RERA complaints against promoter
- 0
- Company number (CIN)
- U45500KA2023PTC170044
From Karnataka RERA, as collected so far (20 Oct 2026). Complaints are those RERA lists against this promoter across all its projects.
TG Prime Realty Private Limited’s RERA recordTG Prime Realty Private Limited delivery record
- 2Projects in Bengaluru on RERA2 approved registrations under TG Prime Realty Private Limited in Bengaluru Urban and Rural. Source (rera.karnataka.gov.in) (opens in a new tab)
- 271Homes registeredAs stated in each registrations.
- 0RERA complaintsas on Source (rera.karnataka.gov.in) (opens in a new tab)
- 0Complaints per 1,000 homes0 complaints ÷ 271 homes in its 2 registrations on Karnataka RERA in Bengaluru.
Sources:Source (rera.karnataka.gov.in) (opens in a new tab)How we calculate this
What’s changed since Mar 2025
- 15 Oct 2026Quarterly update filed for Q2 2026-27: 40% built, 49 of 210 homes booked Source (rera.karnataka.gov.in) (opens in a new tab)
- 14 Jul 2026Quarterly update filed for Q1 2026-27: 34% built, 47 of 210 homes booked Source (rera.karnataka.gov.in) (opens in a new tab)
- 15 Apr 2026Quarterly update filed for Q4 2025-26: 17% built, 27 of 210 homes booked Source (rera.karnataka.gov.in) (opens in a new tab)
- 5 Feb 2026Quarterly update filed for Q3 2025-26: 15% built, 27 of 210 homes booked Source (rera.karnataka.gov.in) (opens in a new tab)
- 9 Apr 2025Registered with Karnataka RERA (PRM/KA/RERA/1251/310/PR/090425/007663); completion date 31 Dec 2030 Source (rera.karnataka.gov.in) (opens in a new tab)
- 1 Apr 2025Project start date in the RERA record Source (rera.karnataka.gov.in) (opens in a new tab)
- 10 Mar 2025Building plan approved by BDA - Bangalore Development Authority (No. 63/2024-25) Source (rera.karnataka.gov.in) (opens in a new tab)
Newest first. No extension of the completion date is recorded on RERA. When the RERA crawl sees a new filing, complaint or extension, it is added here with its date.
Home loan EMI calculator
- Monthly EMI
- —
- Down payment
- —
- Loan amount
- —
- Total interest
- —
A calculation only, from the numbers you enter — not a loan offer.
All-in cost: GST, registration and other charges
The calculator loads when you scroll to it.
Assumptions
- Base price: the builder’s price is not published in a form we could collect — enter it from the cost sheet.
- GST 5% on the base price and charges — the usual rate for an under-construction home that is not “affordable housing” (1%).
- Stamp duty about 5.6% and registration 2% — the Karnataka rule (registration was raised from 1% to 2% on 31 Aug 2025). Calculated on the agreement value.
- Car parking, other charges and the maintenance deposit are not in the public record we collect; enter them from the builder’s cost sheet.
- Loan on the agreement value (banks usually lend up to 75–90%); EMI is the standard reducing-balance formula. Example rate only — use your bank’s quote.
TG Legacy FAQs
Questions about TG Legacy
No questions published yet. Ask the first one: you get an instant answer from this page’s public record, and our team follows up on anything the record does not show.
Bought a home from TG Prime Realty Private Limited? Review the builder.
Reviews of TG Prime Realty Private Limited by verified buyers
No verified reviews of TG Prime Realty Private Limited yet. If you bought a home from them, your review helps other buyers.
How reviews work: only buyers and owners can review; we confirm each purchase by phone before publishing, publish positive and negative reviews alike, never accept payment for reviews, and the builder may reply.
Similar projects within 5 km
| Project | Distance | Homes | Possession (RERA) | Built | Complaints | Price |
|---|---|---|---|---|---|---|
| Assetz Ren & ReiApg Premium Residential Private Limited | 0.1 km | 218 | Jan 2029 | 57% | 1 | Not collected |
| VistaM S Shelters Private Limited | 0.1 km | 22 | Dec 2026 | 79% | 1 | Not collected |
| Assetz Muse & MaisonAssetz Private Limited | 0.3 km | 128 | Mar 2030 | 44% | 0 | Not collected |
| DS Max Sahara GrandDS MAX | 0.3 km | 365 | Jan 2029 | 66% | 0 | Not collected |
| Evershine NORTHEAST ApartmentsEvershine Dwellings Pvt ltd | 0.4 km | 168 | Sep 2026 | 100% | 0 | Not collected |
| Adarsh Welkin Park VillasAdarsh Developers | 0.9 km | 115 | Oct 2027 | 71% | 0 | Not collected |
Projects of the same kind within 5 km in a straight line of this project’s RERA map point, nearest first. % built is the promoter’s latest quarterly figure on RERA (shown for single-registration projects); prices are from the builder’s own website where we found one.
Sources and last checked dates
Collected on 20 Oct 2026 by AI research agents reading public pages. Facts are written in our own words. Not found yet: price; court cases; landmarks; specifications; news.
How to check on RERA: On rera.karnataka.gov.in/viewAllProjects, type the registration number in 'Registration No', press Search, then click the 'View Project Details' icon. Complaints open from the 'Complaints / Litigation' icon in the same row. Registration number: PRM/KA/RERA/1251/310/PR/090425/007663.
- RERA record last checked: 20 Oct 2026
- Last change in the record (registration, quarterly filing or complaint): 20 Oct 2026
How this page is made: software builds it from public records (Karnataka RERA filings, OpenStreetMap, the builder’s own website). AI is used only to read filings into fields and to write the plain-English summary and FAQ answers, which are checked against the record. Facts are checked automatically against the RERA filing. Methodology · How we earn · Report an error
More new projects nearby
- Gattahalli, near Kodathi–Carmelaram© Esri, Maxar, Earthstar GeographicsUnder constructionRERA registeredBuyers’ group open
Assetz Ren & Rei
by Apg Premium Residential
Price: Price on requestGet brochure & price →
- 3 BHK
- 1,207 – 1,226 sq ft
- Jan 2029
218 homes · 1 RERA complaint
Be one of the first 10 buyers in this groupFounding members — it’s free
Join group for Assetz Ren & Rei
Gattahalli, near Kodathi–CarmelaramUnder constructionRERA registeredBuyers’ group openAssetz Muse & Maison
by Assetz
Price: Price on requestGet brochure & price →
- 3 BHK
- 1,124 – 1,262 sq ft
- Mar 2030
128 homes
Be one of the first 10 buyers in this groupFounding members — it’s free
Join group for Assetz Muse & Maison
Gattahalli, near Kodathi–CarmelaramReady to moveRERA registeredBuyers’ group openEvershine NORTHEAST Apartments
by Evershine Dwellings
Price: Price on requestGet brochure & price →
- 2 BHK, 3 BHK
- 534 – 792 sq ft
- Sep 2026
168 homes
Be one of the first 10 buyers in this groupFounding members — it’s free
Join group for Evershine NORTHEAST Apartments