The Magic Faraway Tree

3 BHK mixed-use project by Total Environment Building Systems Pvt Ltd · Kanakapura Road, Bengaluru

Kanakapura Road, BengaluruOpen on Google Maps (opens in a new tab)

  • Under construction
  • RERA registered
  • mixed

by Total Environment Building Systems Pvt Ltd

Price: Price on request

Get brochure, floor plans & price

Brochure, floor plans and price list for The Magic Faraway Tree

Builders share their brochure, floor plans and price list only on request. Tell us how to reach you and we’ll get them and send them to you, free.

Free for buyers. If you book through us, the builder pays us a commission. How we earn

Project summary

The Magic Faraway Tree is a mixed-use project by Total Environment Building Systems Pvt Ltd in Bengaluru with 720 homes, registered with Karnataka RERA. The completion date on RERA is 30 Sep 2027. It is registered in 2 phases.

Not in the RERA record we collected yet: locality. This page fills in as the record is collected.

Facts collected on 18 Oct 2026 from public records — each linked to its source. Free for buyers. If you book through us, the builder pays us a commission.

The Magic Faraway Tree buyers’ group: join to ask for a group price

No one has joined yet. Be one of the first 10 buyers in this group — the founding members.

Join free. When enough buyers have joined, our agent partner asks Total Environment Building Systems Pvt Ltd for a group price — for example a lower price, an easier payment plan or waived charges. Nothing is promised: you see what the builder offers and book directly with the builder if you want to. Free for buyers. If you book through us, the builder pays us a commission.

  1. Gathering buyers
  2. Talking to the builder
  3. Group offer
  4. Group site visit
  5. Booking

0 buyers have joined · 0 committed

Committed buyers have confirmed their budget, home type and timeline with us on a call; builders negotiate with them. Joining is free and never obliges you to buy.

Join the The Magic Faraway Tree buyers’ groupHow group buying works

See it for yourself

Visit the site with our team, or get a call to clear your questions. Free, no obligation.

Key facts: home types, towers, land and possession

Updated on 18 Oct 2026
Home types
3 BHK
Carpet area
1,647 – 2,648 sq ft
Towers
3
Floors
30
Total homes
720
Land
2.79 acres
Possession (extended)
Sep 2027
Built (RERA update)
Not found in public records yet: construction progress

The Magic Faraway Tree RERA number and registration details

RERA number
PRM/KA/RERA/1251/310/PR/171015/000424
Registered on
15 Oct 2017
Promised completion
31 Dec 2024
Extended to
30 Sep 2027
RERA status
New launch
Homes booked
Not found in public records yet: homes booked
Price
Not found in public records yet: price
Project type
Mixed

2 RERA registrations (one per phase) are shown together on this page; dates above are the latest across phases.

Phases and RERA numbers

PhaseRERA numberPromised completionHomesStatusSource
Phase 2PRM/KA/RERA/1251/310/PR/171015/00042431 Dec 2023Extended to 30 Sep 2027480Under constructionSource (rera.karnataka.gov.in) (opens in a new tab)
Phase 2aPRM/KA/RERA/1251/310/PR/181204/00219431 Dec 2024Extended to 30 Sep 2026240New launchSource (rera.karnataka.gov.in) (opens in a new tab)

Towers and blocks (RERA filing)

TowerPhaseFloorsBasementsHomes
Tower 03 (B2-as per sanction)Phase 2292120
Tower 04 (B3-as per sanction)Phase 2302120
Tower 02 (B1-as per sanction)Phase 2a292120

A dash (—) means the filing did not state that value.

Sources:Source (rera.karnataka.gov.in) (opens in a new tab)

Summary in plain English

The Magic Faraway Tree is a mixed-use project by Total Environment Building Systems Pvt Ltd in Bengaluru South with 7,20 homes across 2 phases and 3 towers. Phase 2 has 4,80 homes expected on 30 September 2027, and Phase 2a has 2,40 homes expected on 30 September 2026. The project is registered with Karnataka RERA.

Written by AI from the RERA record above on 18 Oct 2026. Every number in it was checked against that record; if anything differs, the record wins.

Open space, home loans, escrow and other details

Open space
Not found in public records yet: open space
Water and power
Not found in public records yet: water and power
Home loans: approved banks
Not found in public records yet: bank approvals
Payment plans
Not found in public records yet: payment plans
Maintenance
Not found in public records yet: maintenance
Car parking
Not found in public records yet: car parking charge
Escrow bank (RERA) · Phase 2
RATNAKAR BANK, Residency Road
Escrow bank (RERA) · Phase 2a
RATNAKAR BANK, Residency Road

Amenities

Not found in public records yet: amenities

The Magic Faraway Tree location and address

Address
Survey no 32 part1 and 33 part 1 and 33 part 2 Kanakapura Road, Tallaghattapura
Village (RERA)
Not found in public records yet: village
Locality
Kanakapura RoadAlso known as Kanakapura Main Road
City
Bengaluru
State
Karnataka
Coordinates
12.86031, 77.53036

Distances to landmarks

Not found in public records yet: landmarks

About Kanakapura Road

Not found in public records yet: locality facts

Commute times to tech parks and the airport

As on 5 Oct 2026
ToStraight linePeak-hour drive (estimate)
KSR Bengaluru City railway station (Majestic)Map point on OpenStreetMap (opens in a new tab)13.78 kmapprox. 56 min
Electronic City Phase 1Map point on OpenStreetMap (opens in a new tab)14.64 kmapprox. 59 min
Outer Ring Road tech corridor (RMZ Ecospace, Bellandur)Map point on OpenStreetMap (opens in a new tab)17.81 kmapprox. 72 min
Manyata Tech ParkMap point on OpenStreetMap (opens in a new tab)23.03 kmapprox. 93 min
ITPL, Whitefield (main gate)Map point on OpenStreetMap (opens in a new tab)26.57 kmapprox. 108 min
Kempegowda International AirportMap point on OpenStreetMap (opens in a new tab)42.29 kmapprox. 171 min
How we calculate

Straight line: from the project’s map point on RERA to the destination’s point on OpenStreetMap.

Peak-hour drive is a rough estimate, not a route: straight line × 1.35 for the road network, at 20 km/h. Real times vary a lot with the route and the hour.

Sources:Source (openstreetmap.org) (opens in a new tab)How we calculate this

Schools and hospitals nearby

As on 5 Oct 2026

Within 2 km

  • 9Schools and colleges9 schools, 0 colleges, 0 kindergartens
  • 6Hospitals and clinics0 hospitals, 6 clinics

Nearest schools and colleges

  • Deeksha PU College · 0.22 km
  • NGS Madrasa Ashraful Banat · 0.27 km
  • Jnana Sweekar Public School · 0.75 km

Nearest hospitals and clinics

  • Central Ayurveda Research Institute · 1.11 km
  • Apollo Clinic · 1.29 km
  • Shishu Care Clinic · 1.3 km

Places as mapped on OpenStreetMap (amenity=school, college, kindergarten, university; hospital, clinic), counted within 2 km in a straight line of the RERA map point. Volunteers map these, so some places may be missing or closed. Places data © OpenStreetMap contributors, extract of 5 Oct 2026.

Sources:Source (openstreetmap.org) (opens in a new tab)

Nearest metro station and railway

As on 5 Oct 2026
  • Silk Institute (ರೇಷ್ಮೆ ಸಂಸ್ಥೆ)Open now — nearest operating metro station0.16 km
  • Kengeri (ಕೆಂಗೇರಿ)Nearest railway station8.14 km

Straight-line distances from the RERA map point to the station points mapped on OpenStreetMap; status (open or under construction) as tagged there. Places data © OpenStreetMap contributors, extract of 5 Oct 2026.

Sources:Source (openstreetmap.org) (opens in a new tab)

Lake and lake-buffer check

As on 5 Oct 2026

The nearest mapped lake is Thalaghattapura Lake, 604 m from the project’s RERA map point.

The site boundary is not published as a shape, so its nearest edge can be closer than this point. Whether any building sits inside a lake buffer can only be checked on the approved plan.

The buffer rule

Bengaluru’s lake buffer rule has changed over time: the National Green Tribunal ordered a 75 m buffer in May 2016; the Supreme Court set that order aside on 5 March 2019, leaving the 30 m buffer of the Revised Master Plan 2015. Check the current rule and the approved plan before relying on either number.

Shortest distance from the RERA map point to the mapped water edge (OpenStreetMap water polygons tagged lake or reservoir, or named lake/kere/tank). Mapped shorelines can differ from the revenue-record boundary of a lake. Places data © OpenStreetMap contributors, extract of 5 Oct 2026.

Sources:Source (openstreetmap.org) (opens in a new tab)Source (livelaw.in) (opens in a new tab)Source (citizenmatters.in) (opens in a new tab)How we calculate this

Satellite time-lapse of the site

Satellite photos load when you scroll to them.

Photos from Esri World Imagery Wayback, centred on the project’s map point; dates are the capture dates in Esri’s metadata. Loaded from Esri when you scroll here.

Sources:Source (livingatlas.arcgis.com) (opens in a new tab)

The Magic Faraway Tree home types and carpet areas

Floor plans and brochure not published? The builder shares them only on request. We’ll get the brochure, floor plans and current price list for you, free.

Get brochure, floor plans & price

Brochure, floor plans and price list for The Magic Faraway Tree

Builders share their brochure, floor plans and price list only on request. Tell us how to reach you and we’ll get them and send them to you, free.

Free for buyers. If you book through us, the builder pays us a commission. How we earn

Home typeCarpet areaHomes
3 BHK1,647 – 2,648 sq ft360
C20a1,647 sq ft112
C20b1,658 sq ft120
C20g21,679 sq ft8
D35b2,562 sq ft112
D35bg2,648 sq ft8

Home types, counts and carpet areas as filed with Karnataka RERA (carpet area, not super built-up).

We have not collected floor-plan drawings; the builder’s sales team can share them.

Sources:Source (rera.karnataka.gov.in) (opens in a new tab)

The Magic Faraway Tree possession date and construction status

  • Phase 282%

    as on · 223 of 480 homes booked

  • Phase 2a90%

    as on · 113 of 240 homes booked

Timeline

  1. 2 Mar 2016Phase 2: Project start date given to RERA
  2. 15 Oct 2017Phase 2: Registered with Karnataka RERA
  3. 1 Jul 2018Phase 2a: Project start date given to RERA
  4. 4 Dec 2018Phase 2a: Registered with Karnataka RERA
  5. 31 Dec 2023Phase 2: Completion date given at registration
  6. 30 Sep 2024Phase 2: Covid Extension: completion date moved to this date
  7. 31 Dec 2024Phase 2a: Completion date given at registration
  8. 30 Sep 2025Phase 2: Section 6 Extension: completion date moved to this date
  9. 30 Sep 2025Phase 2a: Covid Extension: completion date moved to this date
  10. 30 Sep 2026Phase 2a: Section 6 Extension: completion date moved to this date
  11. 30 Sep 2027Phase 2: Further Extension: completion date moved to this date

Sources:Source (rera.karnataka.gov.in) (opens in a new tab)

Construction pace from RERA quarterly filings (Phase 2)

As on 15 Oct 2026

At the average pace so far, construction would reach 100% around Jan 2029 — about 16 months after the completion date on RERA (30 Sep 2027).

This project has 2 RERA registrations; the chart uses Phase 2, the one with the most quarterly filings.

0%25%50%75%100%2017201920212023202520272029RERA date97%67%72%82%
  • Filed on RERA
  • Average pace since start
  • RERA completion date

Quarterly filings

QuarterFiled onBuiltHomes booked
Q2 2026-27to 30 Sep 202615 Oct 202682%223 of 240
Q1 2026-27to 30 Jun 202615 Jul 202672%223 of 240
Q4 2025-26to 31 Mar 202615 Apr 202667%223 of 240
Q3 2025-26to 31 Dec 202527 Jan 202697%223 of 240
How we calculate

Average pace = % built ÷ months since the start date in the RERA record. Here: 82% ÷ 126.9 months (2 Mar 2016 to 30 Sep 2026) = 0.6% a month.

Estimated finish = latest filing date + (100 − % built) ÷ pace = 30 Sep 2026 + 18 ÷ 0.6 = 27.9 months → Jan 2029. This is an estimate, not a date from the builder or RERA.

Pace between filings = (82% − 97%) ÷ 9 months = -1.7% a month.

A straight line is a simplification: the builder reports one overall %, which mixes excavation, structure and finishing, and work rarely moves at a constant speed. The % values are the promoter’s own figures filed with RERA, not checked by us.

Sources:Source (rera.karnataka.gov.in) (opens in a new tab)How we calculate this

Approvals and documents checklist

ApprovalAuthoritySource
Building plan (Phase 2)BBMP - Bruhat Bengaluru Mahanagara PalikeSource (rera.karnataka.gov.in) (opens in a new tab)
Building plan (Phase 2a)BBMP - Bruhat Bengaluru Mahanagara PalikeSource (rera.karnataka.gov.in) (opens in a new tab)

Documents uploaded to RERA (Phase 2)

As on 18 Oct 2026
  • Building or layout plan · Approved drawings from the planning authorityFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
  • Commencement certificate · Permission to start buildingNot on RERA yet
  • Environment clearance · SEIAA KarnatakaNot on RERA yet
  • Fire NOC · Karnataka Fire and Emergency ServicesNot on RERA yet
  • Pollution board consent · KSPCBNot on RERA yet
  • Water and sewerage · BWSSBNot on RERA yet
  • Electricity · BESCOMNot on RERA yet
  • Height clearance · Airports Authority of IndiaNot on RERA yet
  • Occupancy certificate (OC) · Issued only when the building is finishedNot on RERA yet — expected at completion

From the documents the promoter uploaded to Karnataka RERA, collected 18 Oct 2026. “Filed” means a document is on RERA — we have not checked its contents or validity. Not every approval applies to every project (for example, smaller projects may not need an environment clearance). Each phase is registered separately; this list is for the phase named above. The project page on RERA lists each upload.

Sources:Source (rera.karnataka.gov.in) (opens in a new tab)

The Magic Faraway Tree RERA complaints and orders

3 complaints as on Source (rera.karnataka.gov.in) (opens in a new tab)

Complaint refFiledSubjectStatusSource
00618/20259 Apr 2025Directing the Respondent to execute sale deed in favour of the ComplainantsPosted for ordersSource (rera.karnataka.gov.in) (opens in a new tab)
CMP/211111/000853911 Nov 2021Refund of the booking amountDisposedSource (rera.karnataka.gov.in) (opens in a new tab)
CMP/210423/000791923 Apr 2021Promoter blocking execution and registration of agreement for saleDisposedSource (rera.karnataka.gov.in) (opens in a new tab)

Court and consumer cases

Not found in public records yet: court cases

We list case numbers, courts and outcomes only — never names of private individuals.

About Total Environment Building Systems Pvt Ltd

Promoter type
Company
Projects on this site
7
RERA complaints against promoter
17
Company number (CIN)
U45202KA1996PTC020790

From Karnataka RERA, as collected so far (18 Oct 2026). Complaints are those RERA lists against this promoter across all its projects.

Total Environment Building Systems Pvt Ltd’s RERA record

Total Environment Building Systems Pvt Ltd delivery record

As on 21 Oct 2026
  • 7Projects in Bengaluru on RERA9 approved registrations under Total Environment Building Systems Pvt Ltd in Bengaluru Urban and Rural. Source (rera.karnataka.gov.in) (opens in a new tab)
  • 1,842Homes registeredAs stated in each registrations.
  • 17RERA complaints2 open, 15 disposed. as on Source (rera.karnataka.gov.in) (opens in a new tab)
  • 9.2Complaints per 1,000 homes17 complaints ÷ 1,842 homes in its 9 registrations on Karnataka RERA in Bengaluru.
  • 2Completion filed on RERARegistrations where the promoter applied to RERA for completion; 2 with an occupancy certificate on RERA.
  • 0 of 2Filed by the date given at registrationMedian gap 48.1 months (on-time ones count as 0). The completion application can come after handover, so this is an upper bound on lateness.

What the complaints are about

  • Delay in possession or delay interest8
  • Refund of booking or other money3
  • Registration, sale deed or agreement2
  • Owners' association, amenities or documents1
  • Other3

17 complaint subjects as written on RERA, as on . Each subject is sorted into one group by keywords (first match wins: delay, refund, registration, quality, litigation, association); one complaint often raises several issues. Source (rera.karnataka.gov.in) (opens in a new tab)

Completion filed on RERA

ProjectDate at registrationCompletion filedGap
After the Rain - Phase II AOC on RERA31 Dec 2022extended to 30 Sep 202431 Dec 202536 months after
After the Rain- Phase 1OC on RERA30 Jun 2019extended to 30 Apr 20223 Jul 202460 months after

Measured against the completion date given at registration; many projects had RERA extensions (including the COVID-period extension), shown under the date.

Sources:Source (rera.karnataka.gov.in) (opens in a new tab)How we calculate this

What’s changed since Mar 2016

As on 18 Oct 2026
  1. 30 Sep 2027Phase 2: Completion date extended to 30 Sep 2027 Source (rera.karnataka.gov.in) (opens in a new tab)
  2. 15 Oct 2026Phase 2: Quarterly update filed for Q2 2026-27: 82% built, 223 of 240 homes booked Source (rera.karnataka.gov.in) (opens in a new tab)
  3. 15 Oct 2026Phase 2a: Quarterly update filed for Q2 2026-27: 90% built, 113 of 120 homes booked Source (rera.karnataka.gov.in) (opens in a new tab)
  4. 30 Sep 2026Phase 2a: Completion date extended to 30 Sep 2026 Source (rera.karnataka.gov.in) (opens in a new tab)
  5. 15 Jul 2026Phase 2: Quarterly update filed for Q1 2026-27: 72% built, 223 of 240 homes booked Source (rera.karnataka.gov.in) (opens in a new tab)
  6. 15 Jul 2026Phase 2a: Quarterly update filed for Q1 2026-27: 84% built, 113 of 120 homes booked Source (rera.karnataka.gov.in) (opens in a new tab)
  7. 15 Apr 2026Phase 2: Quarterly update filed for Q4 2025-26: 67% built, 223 of 240 homes booked Source (rera.karnataka.gov.in) (opens in a new tab)
  8. 15 Apr 2026Phase 2a: Quarterly update filed for Q4 2025-26: 77% built, 113 of 120 homes booked Source (rera.karnataka.gov.in) (opens in a new tab)
  9. 27 Jan 2026Phase 2: Quarterly update filed for Q3 2025-26: 97% built, 223 of 240 homes booked Source (rera.karnataka.gov.in) (opens in a new tab)
  10. 27 Jan 2026Phase 2a: Quarterly update filed for Q3 2025-26: 98% built, 113 of 120 homes booked Source (rera.karnataka.gov.in) (opens in a new tab)
  11. 9 Apr 2025Complaint 00618/2025 filed with RERA: “Directing the Respondent to execute sale deed in favour of the Complainants” — now posted for orders Source (rera.karnataka.gov.in) (opens in a new tab)
  12. 11 Nov 2021Complaint CMP/211111/0008539 filed with RERA: “Refund of the booking amount” — now disposed Source (rera.karnataka.gov.in) (opens in a new tab)
  13. 23 Apr 2021Complaint CMP/210423/0007919 filed with RERA: “Promoter blocking execution and registration of agreement for sale” — now disposed Source (rera.karnataka.gov.in) (opens in a new tab)
  14. 4 Dec 2018Phase 2a: Registered with Karnataka RERA (PRM/KA/RERA/1251/310/PR/181204/002194); completion date 31 Dec 2024 Source (rera.karnataka.gov.in) (opens in a new tab)
  15. 1 Jul 2018Phase 2a: Project start date in the RERA record Source (rera.karnataka.gov.in) (opens in a new tab)
  16. 15 Oct 2017Phase 2: Registered with Karnataka RERA (PRM/KA/RERA/1251/310/PR/171015/000424); completion date 31 Dec 2023 Source (rera.karnataka.gov.in) (opens in a new tab)
  17. 2 Mar 2016Phase 2: Project start date in the RERA record Source (rera.karnataka.gov.in) (opens in a new tab)

Newest first. When the RERA crawl sees a new filing, complaint or extension, it is added here with its date.

Home loan EMI calculator

No listed price found — enter one to try.

Example only — use your bank’s quote.

Monthly EMI
—
Down payment
—
Loan amount
—
Total interest
—

A calculation only, from the numbers you enter — not a loan offer.

All-in cost: GST, registration and other charges

The calculator loads when you scroll to it.

Assumptions
  • Base price: the builder’s price is not published in a form we could collect — enter it from the cost sheet.
  • GST 5% on the base price and charges — the usual rate for an under-construction home that is not “affordable housing” (1%).
  • Stamp duty about 5.6% and registration 2% — the Karnataka rule (registration was raised from 1% to 2% on 31 Aug 2025). Calculated on the agreement value.
  • Car parking, other charges and the maintenance deposit are not in the public record we collect; enter them from the builder’s cost sheet.
  • Loan on the agreement value (banks usually lend up to 75–90%); EMI is the standard reducing-balance formula. Example rate only — use your bank’s quote.

How we calculate this

The Magic Faraway Tree FAQs

When will The Magic Faraway Tree be completed?

Phase 2 completion is scheduled for 30 September 2027, and Phase 2a completion is scheduled for 30 September 2026, according to the current RERA record.

What is the RERA registration number for The Magic Faraway Tree?

Phase 2 is registered as PRM/KA/RERA/1251/310/PR/171015/000424, and Phase 2a is registered as PRM/KA/RERA/1251/310/PR/181204/002194.

How many homes are in The Magic Faraway Tree?

The project has 7,20 homes total: 4,80 homes in Phase 2 and 2,40 homes in Phase 2a.

What home types are available in The Magic Faraway Tree?

The project offers 3 BHK homes and types C20A, C20B, C20G2, D35B, and D35BG with carpet areas ranging from 1,647 sq ft to 2,648 sq ft.

What is the carpet area range in The Magic Faraway Tree?

Carpet areas range from 1,647 sq ft to 2,648 sq ft depending on the home type.

How much of The Magic Faraway Tree is completed?

As of Q2 2026-27, Phase 2 is 82% complete and Phase 2a is 90% complete.

How many homes are booked in The Magic Faraway Tree?

As of Q2 2026-27, Phase 2 has 2,23 homes booked out of 2,40 in the booking table, and Phase 2a has 1,13 homes booked out of 1,20 in the booking table.

Are there complaints filed against The Magic Faraway Tree?

There are 3 RERA complaints on this project as recorded in RERA.

What is the builder's track record?

Total Environment Building Systems Pvt Ltd has 8 projects in the Bengaluru RERA records and 17 complaints filed against the builder across all projects.

Where is The Magic Faraway Tree located?

The project is located in Bengaluru South taluk, Bengaluru Urban district.

Written by AI from the RERA record above on 18 Oct 2026. Answers use only that record; check them against the source before you decide.

Questions about The Magic Faraway Tree

No questions published yet. Ask the first one: you get an instant answer from this page’s public record, and our team follows up on anything the record does not show.

Bought a home from Total Environment Building Systems Pvt Ltd? Review the builder.

Reviews of Total Environment Building Systems Pvt Ltd by verified buyers

No verified reviews of Total Environment Building Systems Pvt Ltd yet. If you bought a home from them, your review helps other buyers.

How reviews work: only buyers and owners can review; we confirm each purchase by phone before publishing, publish positive and negative reviews alike, never accept payment for reviews, and the builder may reply.

Similar projects within 5 km

ProjectDistanceHomesPossession (RERA)BuiltComplaintsPrice
Skav MadhuraTeamview Developers LLP1.7 km111Feb 203110%0Not collected
Shivaganga Sai RakshaShivaganga Built Tech3.1 km130Mar 202687%0Not collected
Platinum LandmarkSai Properties4.4 km103Dec 202738%0Not collected

Projects of the same kind within 5 km in a straight line of this project’s RERA map point, nearest first. % built is the promoter’s latest quarterly figure on RERA (shown for single-registration projects); prices are from the builder’s own website where we found one.

Sources:Source (rera.karnataka.gov.in) (opens in a new tab)

Sources and last checked dates

  1. Karnataka RERA — project register (search by the registration number) (opens in a new tab)

Collected on 18 Oct 2026 by AI research agents reading public pages. Facts are written in our own words. Not found yet: price; court cases; landmarks; specifications; news.

How to check on RERA: On rera.karnataka.gov.in/viewAllProjects, type the registration number in 'Registration No', press Search, then click the 'View Project Details' icon. Complaints open from the 'Complaints / Litigation' icon in the same row. Registration numbers: PRM/KA/RERA/1251/310/PR/171015/000424, PRM/KA/RERA/1251/310/PR/181204/002194.

  • RERA record last checked: 18 Oct 2026
  • Last change in the record (registration, quarterly filing or complaint): 18 Oct 2026

How this page is made: software builds it from public records (Karnataka RERA filings, OpenStreetMap, the builder’s own website). AI is used only to read filings into fields and to write the plain-English summary and FAQ answers, which are checked against the record. Facts are checked automatically against the RERA filing. Methodology · How we earn · Report an error