Site photo filed with Karnataka RERA Karnataka RERA filing · Source ↗ (opens in a new tab)
Arvind Orchards Phase-2 at a glance
- Completion (RERA)Dec 2029Karnataka RERA
- Construction81% built · on pace for Nov 2026RERA filing to 30 Sep 2026; estimate from average pace
- RERA complaints (project)None listedKarnataka RERA · as on 16 Oct 2026
- Approvals filed4 of 9 on RERAKarnataka RERA uploads · 16 Oct 2026
- Nearest metroAirport City · 9.07 km (under construction)Open now: Peenya, 29.23 km · straight line · OpenStreetMap, 5 Oct 2026
- Airport driveapprox. 40 min at peak9.87 km straight line · estimate
Project summary
Arvind Orchards Phase-2 is a plotted development by Arvind SmartSpaces Limited in Vishwanathpura, Bengaluru with 70 plots, registered with Karnataka RERA. The completion date on RERA is 29 Dec 2029.
Facts collected on 16 Oct 2026 from public records — each linked to its source. Free for buyers. If you book through us, the developer pays us a commission.
Arvind Orchards Phase-2 buyers’ group: join to ask for a group price
No one has joined yet. Be one of the first 10 buyers in this group — the founding members.
Join free. When enough buyers have joined, our agent partner asks Arvind SmartSpaces Limited for a group price — for example a lower price, an easier payment plan or waived charges. Nothing is promised: you see what the developer offers and book directly with the developer if you want to. Free for buyers. If you book through us, the developer pays us a commission.
- Gathering buyers
- Talking to the developer
- Group offer
- Group site visit
- Booking
0 buyers have joined · 0 committed
Committed buyers have confirmed their budget, plot size and timeline with us on a call; developers negotiate with them. Joining is free and never obliges you to buy.
Join the Arvind Orchards Phase-2 buyers’ groupHow group buying works
See it for yourself
Visit the site with our team, or get a call to clear your questions. Free, no obligation.
Key facts: plot sizes, approval, land and completion
- Plot sizes (feet)
- 30×40, 30×50
- Plot area
- 802 – 3,707 sq ft
- Total plots
- 70
- Layout approved by
- STRR Planning Authority
- Land
- Not found in public records yet: land area
- Land conversion orders
- 6
- Completion (RERA)
- Dec 2029
- Development (RERA update)
- 81%
Plot sizes (RERA filing)
| Size (feet) | Area | Plots |
|---|---|---|
| 30×40 | 1,200 sq ft | 18 |
| 30×50 | 1,500 sq ft | 7 |
| Odd-sized (irregular) | varies | 45 |
Sizes as filed with RERA, converted from metres to feet (9.14 m = 30 ft, 12.19 m = 40 ft). Ask the developer which plots are still unsold.
Approving authority as filed: Satellite Town Ring Road Planning Authority.
Land conversion orders (RERA filing)
| Survey no. | Converted for | Order | By |
|---|---|---|---|
| 69/6 | Residential | No. 687892, 23 Sep 2024 | Deputy Commissioner |
| 194/1 | Residential | No. 687884, 24 Sep 2024 | Deputy Commissioner |
| 194/3 | Residential | No. 687882, 24 Sep 2024 | Deputy Commissioner |
| 195/2 | Residential | No. 687880, 24 Sep 2024 | 1 Acre 2.5 Guntas |
| 195/4 | Residential | No. 687879, 24 Sep 2024 | Deputy Commissioner |
| 195/5 | Residential | No. 687878, 24 Sep 2024 | Deputy Commissioner |
RERA does not cover each plot’s khata. Ask the developer for the khata and title documents and have a lawyer check them before paying an advance.
Arvind Orchards Phase-2 RERA number and registration details
- RERA number
- PRM/KA/RERA/1250/303/PR/030126/008380
- Registered on
- 3 Jan 2026
- Promised completion
- 29 Dec 2029
- Extended to
- No extension recorded
- RERA status
- Under construction
- Plots booked
- Not found in public records yet: plots booked
- Price
- Not found in public records yet: price
- Project type
- Plotted
Summary in plain English
Arvind Orchards Phase-2 is a plotted layout by Arvind Smarthomes Private Limited in Vishwanathpura, Devanahalli. The project has 70 plots and is registered with Karnataka RERA. The completion date on RERA is 29 December 2029.
Written by AI from the RERA record above on 17 Oct 2026. Every number in it was checked against that record; if anything differs, the record wins.
Open space, loans, escrow and other details
- Open space
- Not found in public records yet: open space
- Water and power
- Water source filed with RERA: Local Authority,Others
- Plot loans: approved banks
- Not found in public records yet: bank approvals
- Payment plans
- Not found in public records yet: payment plans
- Maintenance
- Not found in public records yet: maintenance
- Car parking
- Not found in public records yet: car parking charge
- Escrow bank (RERA)
- ICICI Bank, Devanahalli Branch
- Building plan (RERA)
- Satellite Town Ring Road Planning Authority · No. STRRPA/TP/LAO/01/2025-26 · dated 23 Dec 2025
- Project cost declared to RERA
- ₹40.9 Cr
Amenities
Arvind Orchards Phase-2 location and address
- Address
- Sy No 69/6 of Vishwanathpura Village and Sy Nos 194/1, 194/3, 195/2, 195/4 & 195/5 , of Solur Village, Kundana Hobli, Devanahalli Taluk , Devanahalli , Bengaluru Rural, Karnataka - 562110
- Village (RERA)
- Vishwanathpura
- Locality
- Near Devanahalli
- PIN code
- 562110
- City
- Bengaluru
- State
- Karnataka
- Coordinates
- 13.27076, 77.64845
Distances to landmarks
Not found in public records yet: landmarksAbout Vishwanathpura
Not found in public records yet: locality factsCommute times to tech parks and the airport
| To | Straight line | Peak-hour drive (estimate) |
|---|---|---|
| Kempegowda International AirportMap point on OpenStreetMap (opens in a new tab) | 9.87 km | approx. 40 min |
| Manyata Tech ParkMap point on OpenStreetMap (opens in a new tab) | 24.95 km | approx. 101 min |
| ITPL, Whitefield (main gate)Map point on OpenStreetMap (opens in a new tab) | 32.93 km | approx. 133 min |
| KSR Bengaluru City railway station (Majestic)Map point on OpenStreetMap (opens in a new tab) | 33.64 km | approx. 136 min |
| Outer Ring Road tech corridor (RMZ Ecospace, Bellandur)Map point on OpenStreetMap (opens in a new tab) | 38.75 km | approx. 157 min |
| Electronic City Phase 1Map point on OpenStreetMap (opens in a new tab) | 46.86 km | approx. 190 min |
How we calculate
Straight line: from the project’s map point on RERA to the destination’s point on OpenStreetMap.
Peak-hour drive is a rough estimate, not a route: straight line × 1.35 for the road network, at 20 km/h. Real times vary a lot with the route and the hour.
Sources:Source (openstreetmap.org) (opens in a new tab)How we calculate this
Schools and hospitals nearby
Within 2 km
- 2Schools and colleges1 schools, 1 colleges, 0 kindergartens
- 0Hospitals and clinics0 hospitals, 0 clinics
Nearest schools and colleges
- Government Higher Primary School · 0.19 km
- Government PU College · 1.18 km
Places as mapped on OpenStreetMap (amenity=school, college, kindergarten, university; hospital, clinic), counted within 2 km in a straight line of the RERA map point. Volunteers map these, so some places may be missing or closed. Places data © OpenStreetMap contributors, extract of 5 Oct 2026.
Nearest metro station and railway
- Airport City (ವಿಮಾನ ನಿಲ್ದಾಣ ನಗರ)Blue Line metro, under construction9.07 km
- Doddajala (ದೊಡ್ಡಜಾಲ)Blue Line metro, under construction9.17 km
- KIAL Terminals (ಕೆಐಎಬಿ ವಿಮಾನ ನಿಲ್ದಾಣ ಟರ್ಮಿನಲ್ಸ್)Blue Line metro, under construction10.67 km
- Peenya (ಪೀಣ್ಯ)Open now — nearest operating metro station29.23 km
- Devanahalli (ದೇವನಹಳ್ಳಿ)Nearest railway station6.68 km
Straight-line distances from the RERA map point to the station points mapped on OpenStreetMap; status (open or under construction) as tagged there. Places data © OpenStreetMap contributors, extract of 5 Oct 2026.
Satellite time-lapse of the site
Satellite photos load when you scroll to them.
Photos from Esri World Imagery Wayback, centred on the project’s map point; dates are the capture dates in Esri’s metadata. Loaded from Esri when you scroll here.
Sources:Source (livingatlas.arcgis.com) (opens in a new tab)
Arvind Orchards Phase-2 layout plan and plot types as filed
Documents the developer uploaded to Karnataka RERA, shown as filed. Tap a page to see it full size; the full PDF opens on the RERA website.
Brochure

BrochureFull PDF on RERA
Approved layout plan

Approved Layout Plan/Demarcation PlanFull PDF on RERA
| Plot type (as filed) | Area | Plots |
|---|---|---|
| Plot 9.15 m × 12.20 m | — | 18 |
| Plot 9.15 m × 15.25 m | — | 7 |
| Odd-shaped plots | — | 45 |
Plot types and counts as filed with Karnataka RERA.
We have not collected the layout plan drawing; the developer’s sales team can share it.
Arvind Orchards Phase-2 completion date and development status
Promoter’s quarterly update to RERA for Q2 2026-27, submitted 2026-10-13.
Timeline
- 3 Jan 2026Registered with Karnataka RERA
- 16 Feb 2026Project start date given to RERA
- 29 Dec 2029Completion date given at registration
Construction pace from RERA quarterly filings
At the average pace so far, construction would reach 100% around Nov 2026 — about 37 months before the completion date on RERA (29 Dec 2029).
At the pace between the 3 quarterly filings we have (65% → 81% in 6 months), it would be around May 2027 — about 32 months before the RERA date.
- Filed on RERA
- Average pace since start
- Pace between filings (and 0% assumed at the start date)
- RERA completion date
Quarterly filings
| Quarter | Filed on | Developed | Plots booked |
|---|---|---|---|
| Q2 2026-27to 30 Sep 2026 | 13 Oct 2026 | 81% | — |
| Q1 2026-27to 30 Jun 2026 | 15 Jul 2026 | 80% | — |
| Q4 2025-26to 31 Mar 2026 | 15 Apr 2026 | 65% | — |
How we calculate
Average pace = % built ÷ months since the start date in the RERA record. Here: 81% ÷ 7.4 months (16 Feb 2026 to 30 Sep 2026) = 10.9% a month.
Estimated finish = latest filing date + (100 − % built) ÷ pace = 30 Sep 2026 + 19 ÷ 10.9 = 1.7 months → Nov 2026. This is an estimate, not a date from the builder or RERA.
Pace between filings = (81% − 65%) ÷ 6 months = 2.7% a month.
A straight line is a simplification: the builder reports one overall %, which mixes excavation, structure and finishing, and work rarely moves at a constant speed. The % values are the promoter’s own figures filed with RERA, not checked by us. Promoter’s quarterly update to RERA for Q2 2026-27, submitted 2026-10-13.
Sources:Source (rera.karnataka.gov.in) (opens in a new tab)How we calculate this
Approvals and documents checklist
| Approval | Authority | Source |
|---|---|---|
| Layout plan | Satellite Town Ring Road Planning Authority · No. STRRPA/TP/LAO/01/2025-26 · dated 2025-12-23 | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Land conversion (6 orders) | Deputy Commissioner · No. 687892 and 5 more · dated 2024-09-24 | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Approved Layout Plan/Demarcation Plan | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| NOC from ESCOMs | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| NOC for Water | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| KSPCB (If Applicable) | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
Documents uploaded to RERA
- Building or layout plan · Approved drawings from the planning authorityFiled on RERA ✓ — Satellite Town Ring Road Planning Authority · No. STRRPA/TP/LAO/01/2025-26 · dated 23 Dec 2025
- Commencement certificate · Permission to start buildingNot on RERA yet
- Environment clearance · SEIAA KarnatakaNot on RERA yet
- Fire NOC · Karnataka Fire and Emergency ServicesNot on RERA yet
- Pollution board consent · KSPCBFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
- Water and sewerage · BWSSBFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
- Electricity · BESCOMFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
- Height clearance · Airports Authority of IndiaNot on RERA yet
- Occupancy certificate (OC) · Issued only when the building is finishedNot on RERA yet — expected at completion
From the documents the promoter uploaded to Karnataka RERA, collected 16 Oct 2026. “Filed” means a document is on RERA — we have not checked its contents or validity. Not every approval applies to every project (for example, smaller projects may not need an environment clearance). The project page on RERA lists each upload.
Arvind Orchards Phase-2 RERA complaints
No complaints listed on Karnataka RERA for this registration as on Source (rera.karnataka.gov.in) (opens in a new tab)
Court and consumer cases
We list case numbers, courts and outcomes only — never names of private individuals.
About Arvind SmartSpaces Limited
- Promoter type
- Company
- Projects on this site
- 6
- RERA complaints against promoter
- 7
- Company number (CIN)
- U70109GJ2022PTC134678
From Karnataka RERA, as collected so far (16 Oct 2026). Complaints are those RERA lists against this promoter across all its projects.
Arvind SmartSpaces Limited’s RERA recordArvind SmartSpaces Limited delivery record
- 6Projects in Bengaluru on RERA6 approved registrations under Arvind SmartSpaces Limited in Bengaluru Urban and Rural. Source (rera.karnataka.gov.in) (opens in a new tab)
- 1,575Homes and plots registeredAs stated in each registrations.
- 7RERA complaints0 open, 7 disposed. as on Source (rera.karnataka.gov.in) (opens in a new tab)
- 4.4Complaints per 1,000 homes and plots7 complaints ÷ 1,575 homes and plots in its 6 registrations on Karnataka RERA in Bengaluru.
- 1Completion filed on RERARegistrations where the promoter applied to RERA for completion; 1 with an occupancy certificate on RERA.
- 1 of 1Filed by the date given at registrationMedian gap 0 months (on-time ones count as 0). The completion application can come after handover, so this is an upper bound on lateness.
What the complaints are about
7 complaint subjects as written on RERA, as on . Each subject is sorted into one group by keywords (first match wins: delay, refund, registration, quality, litigation, association); one complaint often raises several issues. Source (rera.karnataka.gov.in) (opens in a new tab)
Completion filed on RERA
| Project | Date at registration | Completion filed | Gap |
|---|---|---|---|
| The EdgeOC on RERA | 30 Jun 2026extended to 30 Mar 2027 | 25 Jun 2026 | By the date |
Measured against the completion date given at registration; many projects had RERA extensions (including the COVID-period extension), shown under the date.
Sources:Source (rera.karnataka.gov.in) (opens in a new tab)How we calculate this
What’s changed since Dec 2025
- 13 Oct 2026Quarterly update filed for Q2 2026-27: 81% built Source (rera.karnataka.gov.in) (opens in a new tab)
- 15 Jul 2026Quarterly update filed for Q1 2026-27: 80% built Source (rera.karnataka.gov.in) (opens in a new tab)
- 15 Apr 2026Quarterly update filed for Q4 2025-26: 65% built Source (rera.karnataka.gov.in) (opens in a new tab)
- 16 Feb 2026Project start date in the RERA record Source (rera.karnataka.gov.in) (opens in a new tab)
- 3 Jan 2026Registered with Karnataka RERA (PRM/KA/RERA/1250/303/PR/030126/008380); completion date 29 Dec 2029 Source (rera.karnataka.gov.in) (opens in a new tab)
- 23 Dec 2025Building plan approved by Satellite Town Ring Road Planning Authority (No. STRRPA/TP/LAO/01/2025-26) Source (rera.karnataka.gov.in) (opens in a new tab)
Newest first. No extension of the completion date is recorded on RERA. When the RERA crawl sees a new filing, complaint or extension, it is added here with its date.
Plot loan EMI calculator
- Monthly EMI
- —
- Down payment
- —
- Loan amount
- —
- Total interest
- —
A calculation only, from the numbers you enter — not a loan offer.
Arvind Orchards Phase-2 FAQs
What plot sizes are available in Arvind Orchards Phase-2?
The project has plots in two standard sizes: 30×40 feet (1,200 sq ft, 18 plots) and 30×50 feet (1,500 sq ft, 7 plots). There are also 45 plots of other sizes, but their dimensions are not in the RERA record.
How many plots are in Arvind Orchards Phase-2?
The project has 70 plots in total.
Which authority approved the layout for Arvind Orchards Phase-2?
The layout was approved by STRR Planning Authority.
How many land conversion orders were issued for Arvind Orchards Phase-2?
6 land conversion orders were issued for this project.
What is the RERA registration number for Arvind Orchards Phase-2?
The project is registered under RERA registration number PRM/KA/RERA/1250/303/PR/030126/008380.
When is Arvind Orchards Phase-2 scheduled for completion?
The completion date on RERA is 29 December 2029.
What is the construction progress in Arvind Orchards Phase-2?
As of Q2 2026-27 (quarter ended 30 September 2026), the layout development is 81% complete.
Are there any RERA complaints against Arvind Orchards Phase-2 or Arvind Smarthomes Private Limited?
No complaints have been filed against this project or the developer with RERA.
Where is Arvind Orchards Phase-2 located?
The project is in Vishwanathpura, Devanahalli taluk, Bengaluru Rural district, PIN code 562110.
How many other projects does Arvind Smarthomes Private Limited have on RERA record in Bengaluru?
Arvind Smarthomes Private Limited has 2 projects registered with RERA in Bengaluru.
Written by AI from the RERA record above on 17 Oct 2026. Answers use only that record; check them against the source before you decide.
Questions about Arvind Orchards Phase-2
No questions published yet. Ask the first one: you get an instant answer from this page’s public record, and our team follows up on anything the record does not show.
Bought a plot from Arvind SmartSpaces Limited? Review the developer.
Reviews of Arvind SmartSpaces Limited by verified buyers
No verified reviews of Arvind SmartSpaces Limited yet. If you bought a plot from them, your review helps other buyers.
How reviews work: only buyers and owners can review; we confirm each purchase by phone before publishing, publish positive and negative reviews alike, never accept payment for reviews, and the developer may reply.
Similar projects within 5 km
| Project | Distance | Plots | Completion (RERA) | Developed | Complaints | Price |
|---|---|---|---|---|---|---|
| Arvind OrchardsArvind SmartSpaces Limited | 0.5 km | 313 | Dec 2029 | 100% | 0 | Not collected |
| Prestige Gardenia EstatePrestige Estates Projects Ltd | 2 km | 711 | Oct 2027 | — | 0 | Not collected |
| Brigade OasisBrigade Enterprises Ltd | 2.1 km | 988 | Jun 2026extended | — | 6 | Not collected |
| G K Hill ViewG K Builders & Developers | 2.4 km | 267 | Jun 2025 | — | 0 | Not collected |
| Legacy MihiraLegacy Global Projects Pvt Ltd | 2.8 km | 279 | Dec 2030 | 25% | 0 | Not collected |
| ShantivanSidharth Madhuban | 2.8 km | 80 | Oct 2028 | 35% | 0 | Not collected |
Projects of the same kind within 5 km in a straight line of this project’s RERA map point, nearest first. % built is the promoter’s latest quarterly figure on RERA (shown for single-registration projects); prices are from the developer’s own website where we found one.
Sources and last checked dates
Collected on 16 Oct 2026 by AI research agents reading public pages. Facts are written in our own words. Not found yet: price; court cases; landmarks; specifications; news.
How to check on RERA: On rera.karnataka.gov.in/viewAllProjects, type the registration number in 'Registration No', press Search, then click the 'View Project Details' icon. Complaints open from the 'Complaints / Litigation' icon in the same row. Registration number: PRM/KA/RERA/1250/303/PR/030126/008380.
- RERA record last checked: 16 Oct 2026
- Last change in the record (registration, quarterly filing or complaint): 16 Oct 2026
How this page is made: software builds it from public records (Karnataka RERA filings, OpenStreetMap, the developer’s own website). AI is used only to read filings into fields and to write the plain-English summary and FAQ answers, which are checked against the record. Facts are checked automatically against the RERA filing. Methodology · How we earn · Report an error
More new projects nearby
- Vishwanathapura, near Devanahalli© Esri, Maxar, Earthstar GeographicsUnder constructionRERA registeredBuyers’ group open
Arvind Orchards
by Arvind SmartSpaces
Price: Price on requestGet brochure & price →
- 30×40, 30×50, 30×60
- 747 – 3,160 sq ft plots
- Approved by Local Planning Authority
- Dec 2029
313 plots
Be one of the first 10 buyers in this groupFounding members — it’s free
Join group for Arvind Orchards
Bidluru, near DevanahalliUnder constructionRERA registeredBuyers’ group openPrestige Gardenia Estate
by Prestige Estates
Price: Price on requestGet brochure & price →
- 30×40, 30×50, 38×40 +14 more
- 1,202 – 6,206 sq ft plots
- Approved by STRR Planning Authority
- Oct 2027
2 phases on RERA · 711 plots
Be one of the first 10 buyers in this groupFounding members — it’s free
Join group for Prestige Gardenia Estate- Lakshmipura, near Devanahalli© Esri, Maxar, Earthstar GeographicsReady to moveRERA registeredBuyers’ group open
Brigade Oasis
by Brigade Enterprises
Price: Price on requestGet brochure & price →
- 19×40, 25×38, 24×40 +85 more
- 976 – 18,535 sq ft plots
- Approved by Local Planning Authority
- Jun 2026 (extended)
3 phases on RERA · 988 plots · 6 RERA complaints