The Silver Lake Phase 1
30×40, 30×45 +2 more plots by Harinatha Reddy · Byrasandra, near Doddaballapur Road, Bengaluru
Byrasandra, near Doddaballapur Road, BengaluruOpen on Google Maps (opens in a new tab)
- Under construction
- RERA registered
- plotted
Price: Price on request
Site photo filed with Karnataka RERA Karnataka RERA filing · Source ↗ (opens in a new tab)
The Silver Lake Phase 1 at a glance
- Completion (RERA)Dec 2026Karnataka RERA
- Construction100% builtPromoter’s RERA update · as on 30 Sep 2026
- RERA complaints (project)None listedKarnataka RERA · as on 16 Oct 2026
- Approvals filed3 of 9 on RERAKarnataka RERA uploads · 16 Oct 2026
- Nearest metroDoddajala · 14.29 km (under construction)Open now: Madavara, 21.21 km · straight line · OpenStreetMap, 5 Oct 2026
- Airport driveapprox. 81 min at peak20 km straight line · estimate
- Nearest lakeUnnamed lake · 35 mFrom the RERA map point · OpenStreetMap, 5 Oct 2026
Project summary
The Silver Lake Phase 1 is a plotted development by Harinatha Reddy in Byrasandra, Bengaluru with 101 plots, registered with Karnataka RERA. The completion date on RERA is 30 Dec 2026.
Facts collected on 16 Oct 2026 from public records — each linked to its source. Free for buyers. If you book through us, the developer pays us a commission.
The Silver Lake Phase 1 buyers’ group: join to ask for a group price
No one has joined yet. Be one of the first 10 buyers in this group — the founding members.
Join free. When enough buyers have joined, our agent partner asks Harinatha Reddy for a group price — for example a lower price, an easier payment plan or waived charges. Nothing is promised: you see what the developer offers and book directly with the developer if you want to. Free for buyers. If you book through us, the developer pays us a commission.
- Gathering buyers
- Talking to the developer
- Group offer
- Group site visit
- Booking
0 buyers have joined · 0 committed
Committed buyers have confirmed their budget, plot size and timeline with us on a call; developers negotiate with them. Joining is free and never obliges you to buy.
Join the The Silver Lake Phase 1 buyers’ groupHow group buying works
See it for yourself
Visit the site with our team, or get a call to clear your questions. Free, no obligation.
Key facts: plot sizes, approval, land and completion
- Plot sizes (feet)
- 30×40, 30×45, 30×50, 30×60
- Plot area
- 1,199 – 7,175 sq ft
- Total plots
- 101
- Layout approved by
- Doddaballapur Planning Authority
- Land
- Not found in public records yet: land area
- Land conversion orders
- 2
- Completion (RERA)
- Dec 2026
- Development (RERA update)
- 100%
Plot sizes (RERA filing)
| Size (feet) | Area | Plots |
|---|---|---|
| 30×40 | 1,200 sq ft | 3 |
| 30×45 | 1,350 sq ft | 11 |
| 30×50 | 1,500 sq ft | 39 |
| 30×60 | 1,800 sq ft | 5 |
| Odd-sized (irregular) | varies | 43 |
Sizes as filed with RERA, converted from metres to feet (9.14 m = 30 ft, 12.19 m = 40 ft). Ask the developer which plots are still unsold.
Land conversion orders (RERA filing)
| Survey no. | Converted for | Order | By |
|---|---|---|---|
| 22/1 | Residential | No. 790672, 16 Sep 2025 | DC Office, Bangalore Rural |
| 24/4 | Residential | No. 790719, 16 Sep 2025 | DC Office, Bangalore Rural |
RERA does not cover each plot’s khata. Ask the developer for the khata and title documents and have a lawyer check them before paying an advance.
The Silver Lake Phase 1 RERA number and registration details
- RERA number
- PRM/KA/RERA/1250/301/PR/120126/008395
- Registered on
- 12 Jan 2026
- Promised completion
- 30 Dec 2026
- Extended to
- No extension recorded
- RERA status
- Under construction
- Plots booked
- Not found in public records yet: plots booked
- Price
- Not found in public records yet: price
- Project type
- Plotted
Summary in plain English
The Silver Lake Phase 1 is a plotted layout by Harinatha Reddy in Byrasandra, Doddaballapura, Bengaluru Rural. The project has 101 plots and is registered with Karnataka RERA. The completion date is 30 December 2026.
Written by AI from the RERA record above on 17 Oct 2026. Every number in it was checked against that record; if anything differs, the record wins.
Open space, loans, escrow and other details
- Open space
- Not found in public records yet: open space
- Water and power
- Water source filed with RERA: Local Authority
- Plot loans: approved banks
- Not found in public records yet: bank approvals
- Payment plans
- Not found in public records yet: payment plans
- Maintenance
- Not found in public records yet: maintenance
- Car parking
- Not found in public records yet: car parking charge
- Escrow bank (RERA)
- YES BANK, Sahakar Nagar
- Building plan (RERA)
- Doddaballapur Planning Authority · No. DPA/TP/LAO/29/2025-26 · dated 3 Dec 2025
- Project cost declared to RERA
- ₹16.54 Cr
Amenities
The Silver Lake Phase 1 location and address
- Address
- Sy no 22/1 and 24/4 of Byrasandra Village , Madure Hobli , Doddaballapura , Bengaluru Rural, Karnataka - 561203
- Village (RERA)
- Byrasandra
- Locality
- Near Doddaballapur RoadAlso known as Doddaballapura Road, Doddaballapur Main Road
- PIN code
- 561203
- City
- Bengaluru
- State
- Karnataka
- Coordinates
- 13.24140, 77.52443
Distances to landmarks
Not found in public records yet: landmarksAbout Byrasandra
Not found in public records yet: locality factsCommute times to tech parks and the airport
| To | Straight line | Peak-hour drive (estimate) |
|---|---|---|
| Kempegowda International AirportMap point on OpenStreetMap (opens in a new tab) | 20 km | approx. 81 min |
| Manyata Tech ParkMap point on OpenStreetMap (opens in a new tab) | 23.85 km | approx. 97 min |
| KSR Bengaluru City railway station (Majestic)Map point on OpenStreetMap (opens in a new tab) | 29.68 km | approx. 120 min |
| ITPL, Whitefield (main gate)Map point on OpenStreetMap (opens in a new tab) | 36.47 km | approx. 148 min |
| Outer Ring Road tech corridor (RMZ Ecospace, Bellandur)Map point on OpenStreetMap (opens in a new tab) | 39.2 km | approx. 159 min |
| Electronic City Phase 1Map point on OpenStreetMap (opens in a new tab) | 46.14 km | approx. 187 min |
How we calculate
Straight line: from the project’s map point on RERA to the destination’s point on OpenStreetMap.
Peak-hour drive is a rough estimate, not a route: straight line × 1.35 for the road network, at 20 km/h. Real times vary a lot with the route and the hour.
Sources:Source (openstreetmap.org) (opens in a new tab)How we calculate this
Nearest metro station and railway
- Doddajala (ದೊಡ್ಡಜಾಲ)Blue Line metro, under construction14.29 km
- Bagalur Cross (ಬಾಗಲೂರು ಕ್ರಾಸ್)Blue Line metro, under construction16.42 km
- Yelahanka (ಯಲಹಂಕ)Blue Line metro, under construction17.55 km
- Madavara (ಮದವರ)Open now — nearest operating metro station21.21 km
- Dodballapur (ದೊಡ್ಡಬಳ್ಳಾಪುರ)Nearest railway station5.11 km
Straight-line distances from the RERA map point to the station points mapped on OpenStreetMap; status (open or under construction) as tagged there. Places data © OpenStreetMap contributors, extract of 5 Oct 2026.
Lake and lake-buffer check
The nearest mapped lake is Unnamed lake (mapped on OpenStreetMap), 35 m from the project’s RERA map point.
The site may be next to the lake. The RERA point is one approximate spot and the site boundary is not published as a shape — check the approved plan for the lake buffer.
- Unnamed lake (mapped on OpenStreetMap) on OpenStreetMap (opens in a new tab) 35 m
- Unnamed lake (mapped on OpenStreetMap) on OpenStreetMap (opens in a new tab) 1,106 m
The buffer rule
Bengaluru’s lake buffer rule has changed over time: the National Green Tribunal ordered a 75 m buffer in May 2016; the Supreme Court set that order aside on 5 March 2019, leaving the 30 m buffer of the Revised Master Plan 2015. Check the current rule and the approved plan before relying on either number.
- LiveLaw: SC sets aside NGT order enlarging buffer zones (2019) (livelaw.in) (opens in a new tab)
- Citizen Matters: Shrinking lake buffers (citizenmatters.in) (opens in a new tab)
Shortest distance from the RERA map point to the mapped water edge (OpenStreetMap water polygons tagged lake or reservoir, or named lake/kere/tank). Mapped shorelines can differ from the revenue-record boundary of a lake. Places data © OpenStreetMap contributors, extract of 5 Oct 2026.
Sources:Source (openstreetmap.org) (opens in a new tab)Source (livelaw.in) (opens in a new tab)Source (citizenmatters.in) (opens in a new tab)How we calculate this
Satellite time-lapse of the site
Satellite photos load when you scroll to them.
Photos from Esri World Imagery Wayback, centred on the project’s map point; dates are the capture dates in Esri’s metadata. Loaded from Esri when you scroll here.
Sources:Source (livingatlas.arcgis.com) (opens in a new tab)
The Silver Lake Phase 1 layout plan and plot types as filed
Documents the developer uploaded to Karnataka RERA, shown as filed. Tap a page to see it full size; the full PDF opens on the RERA website.
Approved layout plan3 files

Approved Layout Plan/Demarcation PlanFull PDF on RERA 
ADLR Sketch and Village Map Demarcation.pdfFull PDF on RERA 
CDP Demarcation.pdfFull PDF on RERA
Layout plan and brochure not published? The developer shares them only on request. We’ll get the brochure, layout plan and current price list for you, free.
Get brochure, layout plan & price| Plot type (as filed) | Area | Plots |
|---|---|---|
| Plot 9.14 m × 12.19 m | — | 3 |
| Plot 9.14 m × 13.71 m | — | 11 |
| Plot 9.14 m × 15.24 m | — | 39 |
| Plot 9.14 m × 18.29 m | — | 5 |
| Odd-shaped plots | — | 43 |
Plot types and counts as filed with Karnataka RERA.
We have not collected the layout plan drawing; the developer’s sales team can share it.
The Silver Lake Phase 1 completion date and development status
Promoter’s quarterly update to RERA for Q2 2026-27, submitted 2026-10-15.
Timeline
- 15 Dec 2025Project start date given to RERA
- 12 Jan 2026Registered with Karnataka RERA
- 30 Dec 2026Completion date given at registration
Approvals and documents checklist
| Approval | Authority | Source |
|---|---|---|
| Layout plan | Doddaballapur Planning Authority · No. DPA/TP/LAO/29/2025-26 · dated 2025-12-03 | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Land conversion (2 orders) | DC Office, Bangalore Rural · No. 790672 and 1 more · dated 2025-09-16 | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Approved Layout Plan/Demarcation Plan | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| NOC from ESCOMs | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| NOC for Water | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
Documents uploaded to RERA
- Building or layout plan · Approved drawings from the planning authorityFiled on RERA ✓ — Doddaballapur Planning Authority · No. DPA/TP/LAO/29/2025-26 · dated 3 Dec 2025
- Commencement certificate · Permission to start buildingNot on RERA yet
- Environment clearance · SEIAA KarnatakaNot on RERA yet
- Fire NOC · Karnataka Fire and Emergency ServicesNot on RERA yet
- Pollution board consent · KSPCBNot on RERA yet
- Water and sewerage · BWSSBFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
- Electricity · BESCOMFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
- Height clearance · Airports Authority of IndiaNot on RERA yet
- Occupancy certificate (OC) · Issued only when the building is finishedNot on RERA yet — expected at completion
From the documents the promoter uploaded to Karnataka RERA, collected 16 Oct 2026. “Filed” means a document is on RERA — we have not checked its contents or validity. Not every approval applies to every project (for example, smaller projects may not need an environment clearance). The project page on RERA lists each upload.
The Silver Lake Phase 1 RERA complaints
No complaints listed on Karnataka RERA for this registration as on Source (rera.karnataka.gov.in) (opens in a new tab)
Court and consumer cases
We list case numbers, courts and outcomes only — never names of private individuals.
About Harinatha Reddy
- Promoter type
- Proprietorship
- Projects on this site
- 1
- RERA complaints against promoter
- 0
- Company number (CIN)
- Not found in public records yet: CIN
From Karnataka RERA, as collected so far (16 Oct 2026). Complaints are those RERA lists against this promoter across all its projects.
Harinatha Reddy’s RERA recordHarinatha Reddy delivery record
- 1Projects in Bengaluru on RERA1 approved registration under Harinatha Reddy in Bengaluru Urban and Rural. Source (rera.karnataka.gov.in) (opens in a new tab)
- 101Plots registeredAs stated in each registrations.
- 0RERA complaintsas on Source (rera.karnataka.gov.in) (opens in a new tab)
- 0Complaints per 1,000 plots0 complaints ÷ 101 plots in its 1 registration on Karnataka RERA in Bengaluru.
Sources:Source (rera.karnataka.gov.in) (opens in a new tab)How we calculate this
What’s changed since Dec 2025
- 15 Oct 2026Quarterly update filed for Q2 2026-27: 100% built Source (rera.karnataka.gov.in) (opens in a new tab)
- 13 Jul 2026Quarterly update filed for Q1 2026-27: 97% built Source (rera.karnataka.gov.in) (opens in a new tab)
- 4 Jul 2026Quarterly update filed for Q4 2025-26: 45% built Source (rera.karnataka.gov.in) (opens in a new tab)
- 12 Jan 2026Registered with Karnataka RERA (PRM/KA/RERA/1250/301/PR/120126/008395); completion date 30 Dec 2026 Source (rera.karnataka.gov.in) (opens in a new tab)
- 15 Dec 2025Project start date in the RERA record Source (rera.karnataka.gov.in) (opens in a new tab)
- 3 Dec 2025Building plan approved by Doddaballapur Planning Authority (No. DPA/TP/LAO/29/2025-26) Source (rera.karnataka.gov.in) (opens in a new tab)
Newest first. No extension of the completion date is recorded on RERA. When the RERA crawl sees a new filing, complaint or extension, it is added here with its date.
Plot loan EMI calculator
- Monthly EMI
- —
- Down payment
- —
- Loan amount
- —
- Total interest
- —
A calculation only, from the numbers you enter — not a loan offer.
The Silver Lake Phase 1 FAQs
What plot sizes are available in The Silver Lake Phase 1?
The project offers plots in four sizes: 30×50 feet (1,500 sq ft), 30×45 feet (1,350 sq ft), 30×60 feet (1,800 sq ft), and 30×40 feet (1,200 sq ft). There are also 43 odd-sized plots in the layout.
How many plots are in The Silver Lake Phase 1?
The project has 101 plots in total. This includes 39 plots of 30×50 feet, 11 plots of 30×45 feet, 5 plots of 30×60 feet, 3 plots of 30×40 feet, and 43 odd-sized plots.
What is the RERA registration number for The Silver Lake Phase 1?
The RERA registration number is PRM/KA/RERA/1250/301/PR/120126/008395, registered on 12 January 2026.
When will The Silver Lake Phase 1 be completed?
The completion date on RERA is 30 December 2026.
Who approved the layout for The Silver Lake Phase 1?
The layout was approved by Doddaballapur Planning Authority.
How many land conversion orders are there for The Silver Lake Phase 1?
There are 2 land conversion orders for the project.
What is the development progress of The Silver Lake Phase 1?
As of Q2 2026-27 (quarter ended 30 September 2026), the layout development is 100 percent complete.
Are there any RERA complaints against The Silver Lake Phase 1 or the developer?
There are no RERA complaints on this project and no complaints against the developer across all projects on record.
Where is The Silver Lake Phase 1 located?
The project is located in Byrasandra, Doddaballapura taluk, Bengaluru Rural district, PIN code 561203.
Who is the developer of The Silver Lake Phase 1?
The developer is Harinatha Reddy, a proprietorship entity. This is the only project by this developer in the Bengaluru RERA records.
Written by AI from the RERA record above on 17 Oct 2026. Answers use only that record; check them against the source before you decide.
Questions about The Silver Lake Phase 1
No questions published yet. Ask the first one: you get an instant answer from this page’s public record, and our team follows up on anything the record does not show.
Bought a plot from Harinatha Reddy? Review the developer.
Reviews of Harinatha Reddy by verified buyers
No verified reviews of Harinatha Reddy yet. If you bought a plot from them, your review helps other buyers.
How reviews work: only buyers and owners can review; we confirm each purchase by phone before publishing, publish positive and negative reviews alike, never accept payment for reviews, and the developer may reply.
Similar projects within 5 km
| Project | Distance | Plots | Completion (RERA) | Developed | Complaints | Price |
|---|---|---|---|---|---|---|
| NORTHWINDS by GEOWN & NIVARAGEOWN CASPER ESTATES LLP & Nivara Group | 2.4 km | 126 | Dec 2028 | 100% | 0 | Not collected |
| Century EdenGeetanjali Effective Realty Solutions Private Limited | 2.5 km | 219 | Apr 2027 | — | 1 | Not collected |
| KNS BilloreBillore Ventures Private Limited | 2.6 km | 199 | May 2026 | — | 0 | Not collected |
| J V Green ValleySrinivasulu G | 2.9 km | 115 | Dec 2028 | — | 0 | Not collected |
| Under The StarsSSD Housing Nellukunte | 3.1 km | 69 | Oct 2030 | 30% | 0 | Not collected |
| Under The SilvermoonSurya Sunshine Developers | 3.2 km | 44 | Sep 2030 | 15% | 0 | Not collected |
Projects of the same kind within 5 km in a straight line of this project’s RERA map point, nearest first. % built is the promoter’s latest quarterly figure on RERA (shown for single-registration projects); prices are from the developer’s own website where we found one.
Sources and last checked dates
Collected on 16 Oct 2026 by AI research agents reading public pages. Facts are written in our own words. Not found yet: price; court cases; landmarks; specifications; news.
How to check on RERA: On rera.karnataka.gov.in/viewAllProjects, type the registration number in 'Registration No', press Search, then click the 'View Project Details' icon. Complaints open from the 'Complaints / Litigation' icon in the same row. Registration number: PRM/KA/RERA/1250/301/PR/120126/008395.
- RERA record last checked: 16 Oct 2026
- Last change in the record (registration, quarterly filing or complaint): 16 Oct 2026
How this page is made: software builds it from public records (Karnataka RERA filings, OpenStreetMap, the developer’s own website). AI is used only to read filings into fields and to write the plain-English summary and FAQ answers, which are checked against the record. Facts are checked automatically against the RERA filing. Methodology · How we earn · Report an error
More new projects nearby
Doddatumkur, near Doddaballapur RoadUnder constructionRERA registeredBuyers’ group openNORTHWINDS by GEOWN & NIVARA
by GEOWN CASPER ESTATES LLP & Nivara Group
Price: Price on requestGet brochure & price →
- Plot sizes not found
- 869 – 20,955 sq ft plots
- Approved by Doddaballapur Planning Authority
- Dec 2028
126 plots
Be one of the first 10 buyers in this groupFounding members — it’s free
Join group for NORTHWINDS by GEOWN & NIVARA- Hosahudya, Doddaballapur Road© Esri, Maxar, Earthstar GeographicsReady to moveRERA registeredBuyers’ group open
Century Eden
by Geetanjali Effective Realty Solutions
Price: Price on requestGet brochure & price →
- 30×40, 30×50
- 851 – 3,163 sq ft plots
- Approved by Local Planning Authority
- Apr 2027
3 phases on RERA · 219 plots · 1 RERA complaint
Be one of the first 10 buyers in this groupFounding members — it’s free
Join group for Century Eden
Kadatanamale, Doddaballapur RoadUnder constructionRERA registeredBuyers’ group openKNS Billore
by Billore Ventures
Price: Price on requestGet brochure & price →
- 30×30, 30×35, 30×40 +1 more
- 7,942 – 28,213 sq ft plots
- Approved by BMRDA
- May 2026
RERA not updated since promised May 2026 · 199 plots
Be one of the first 10 buyers in this groupFounding members — it’s free
Join group for KNS Billore