Century Eden
30×40, 30×50 plots by Geetanjali Effective Realty Solutions Private Limited · Hosahudya, Doddaballapur Road, Bengaluru
Hosahudya, Doddaballapur Road, BengaluruOpen on Google Maps (opens in a new tab)
- Completion filed with RERA
- RERA registered
- plotted
Plots still available: 3 of 219 plots were unsold when the developer filed completion with RERA (12 Jan 2026). Some may have sold since — join the group and we’ll ask the developer what is left and for a group price.
by Geetanjali Effective Realty Solutions Private Limited
Price: Price on request
Century Eden at a glance
- Completion (RERA)Apr 2027Karnataka RERA
- RERA complaints (project)1 complaintKarnataka RERA · as on 4 Oct 2026
- Approvals filed4 of 9 on RERAKarnataka RERA uploads · 4 Oct 2026
- Nearest metroDoddajala · 11.81 km (under construction)Open now: Chikkabidarakallu, 21.25 km · straight line · OpenStreetMap, 5 Oct 2026
- Airport driveapprox. 71 min at peak17.5 km straight line · estimate
- Nearest lakeUnnamed lake · 439 mFrom the RERA map point · OpenStreetMap, 5 Oct 2026
Project summary
Century Eden is a plotted development by Geetanjali Effective Realty Solutions Private Limited in Hosahudya, Bengaluru with 219 plots, registered with Karnataka RERA. The completion date on RERA is 30 Apr 2027. It is registered in 3 phases.
Facts collected on 4 Oct 2026 from public records — each linked to its source. Free for buyers. If you book through us, the developer pays us a commission.
Century Eden buyers’ group: join to ask for a group price
No one has joined yet. Be one of the first 10 buyers in this group — the founding members.
Join free. When enough buyers have joined, our agent partner asks Geetanjali Effective Realty Solutions Private Limited for a group price — for example a lower price, an easier payment plan or waived charges. Nothing is promised: you see what the developer offers and book directly with the developer if you want to. Free for buyers. If you book through us, the developer pays us a commission.
- Gathering buyers
- Talking to the developer
- Group offer
- Group site visit
- Booking
0 buyers have joined · 0 committed
Committed buyers have confirmed their budget, plot size and timeline with us on a call; developers negotiate with them. Joining is free and never obliges you to buy.
Join the Century Eden buyers’ groupHow group buying works
See it for yourself
Visit the site with our team, or get a call to clear your questions. Free, no obligation.
Key facts: plot sizes, approval, land and completion
- Plot sizes (feet)
- 30×40, 30×50
- Plot area
- 851 – 3,163 sq ft
- Total plots
- 219
- Layout approved by
- Local Planning Authority
- Land
- Not found in public records yet: land area
- Land conversion orders
- 8
- Completion (RERA)
- Apr 2027
- Development (RERA update)
- Not found in public records yet: development progress
Plot sizes (RERA filing)
| Size (feet) | Area | Plots |
|---|---|---|
| 30×40 | 1,200 sq ft | 147 |
| 30×50 | 1,500 sq ft | 5 |
| Odd-sized (irregular) | varies | 67 |
Sizes as filed with RERA, converted from metres to feet (9.14 m = 30 ft, 12.19 m = 40 ft). Ask the developer which plots are still unsold.
Approving authority as filed: Local Planing Authority.
Land conversion orders (RERA filing)
| Phase | Survey no. | Converted for | Order | By |
|---|---|---|---|---|
| Phase 3 | 39/3 (Old Sy No. 39/1(P)), | Residential | No. 409031, 7 Nov 2022 | Deputy Commissioner, Bangalore Rural District |
| Phase 4 | 40/1 | Residential | No. ALN:(D.R)SR.30/2006-07, 30 Jul 2012 | Deputy Commissioner, Bangalore Rural District |
| Phase 4 | 40/2 (Old No. 40) | Residential | No. ALN:(D):SR:58:/1997-98, 21 Jan 1998 | Deputy Commissioner, Bangalore Rural District |
| Phase 4 | 40/3 (Old No. 40) | Residential | No. ALN:(D):SR:75:/2004-05, 9 Mar 2005 | Deputy Commissioner, Bangalore Rural District |
| Phase 5 | 34/1 | Residential | No. NO. BDS-ALN-SR(DB) 16 (1993-94), 18 Mar 1994 | DC |
| Phase 5 | 35/2 | Residential | No. NO. ALN(D)SR-63 (1997-98), 21 Jan 1998 | DC |
| Phase 5 | 35/3 | Residential | No. NO. BDS-ALN-SR(DB) 16 (1993-94), NO. ALN(D)SR-39 (2003-04) & NO. ALN(D)SR-68 (2004-05), 9 Mar 2005 | DC |
| Phase 5 | 79 (Old No. 21) | Residential | No. NO. ALN(D)-SR-86 (2004-05), 29 Apr 2005 | DC |
RERA does not cover each plot’s khata. Ask the developer for the khata and title documents and have a lawyer check them before paying an advance.
Century Eden RERA number and registration details
- RERA number
- PRM/KA/RERA/1250/301/PR/300523/005956
- Registered on
- 30 May 2023
- Promised completion
- 30 Apr 2027
- Extended to
- No extension recorded
- RERA status
- Completed
- Plots booked
- Not found in public records yet: plots booked
- Price
- Not found in public records yet: price
- Project type
- Plotted
3 RERA registrations (one per phase) are shown together on this page; dates above are the latest across phases.
Phases and RERA numbers
| Phase | RERA number | Promised completion | Plots | Status | Source |
|---|---|---|---|---|---|
| Phase 3 | PRM/KA/RERA/1250/301/PR/300523/005956 | 28 Feb 2026 | 38 | Completed | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Phase 4 | PRM/KA/RERA/1250/301/PR/060623/005973 | 28 Feb 2026 | 75 | Completed | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Phase 5 | PRM/KA/RERA/1250/301/PR/150724/006939 | 30 Apr 2027 | 106 | Completed | Source (rera.karnataka.gov.in) (opens in a new tab) |
Summary in plain English
Century Eden is a plotted layout by Geetanjali Effective Realty Solutions Private Limited in Hosahudya, Doddaballapura, with 2,19 plots across five phases. Phase 3, Phase 4 and Phase 5 are registered with RERA, with Phase 3 and Phase 4 due for completion by 28 February 2026 and Phase 5 by 30 April 2027.
Written by AI from the RERA record above on 7 Oct 2026. Every number in it was checked against that record; if anything differs, the record wins.
Open space, loans, escrow and other details
- Open space
- Not found in public records yet: open space
- Water and power
- Water source filed with RERA: Local Authority
- Plot loans: approved banks
- Not found in public records yet: bank approvals
- Payment plans
- Not found in public records yet: payment plans
- Maintenance
- Not found in public records yet: maintenance
- Car parking
- Not found in public records yet: car parking charge
- Escrow bank (RERA) · Phase 3
- Axis Bank, Yeshwanthpur Branch, Bangalore
- Escrow bank (RERA) · Phase 4
- Axis Bank, Yeshwanthpur Branch, Bangalore
- Escrow bank (RERA) · Phase 5
- Axis Bank, Yeshwanthpur Branch
Amenities
Century Eden location and address
- Address
- Sy No. 39/3 (Old Sy No. 39/1(P)), Hosahudya Village, Kasaba Hobli, , Doddaballapura Taluk, Bengaluru Rural Dist , Doddaballapura , Bengaluru Rural, Karnataka - 561203
- Village (RERA)
- Hosahudya
- Locality
- Doddaballapur RoadAlso known as Doddaballapura Road, Doddaballapur Main Road
- PIN code
- 561203
- City
- Bengaluru
- State
- Karnataka
- Coordinates
- 13.23477, 77.54654
Distances to landmarks
Not found in public records yet: landmarksAbout Doddaballapur Road
Not found in public records yet: locality factsCommute times to tech parks and the airport
| To | Straight line | Peak-hour drive (estimate) |
|---|---|---|
| Kempegowda International AirportMap point on OpenStreetMap (opens in a new tab) | 17.5 km | approx. 71 min |
| Manyata Tech ParkMap point on OpenStreetMap (opens in a new tab) | 22.22 km | approx. 90 min |
| KSR Bengaluru City railway station (Majestic)Map point on OpenStreetMap (opens in a new tab) | 28.64 km | approx. 116 min |
| ITPL, Whitefield (main gate)Map point on OpenStreetMap (opens in a new tab) | 34.41 km | approx. 139 min |
| Outer Ring Road tech corridor (RMZ Ecospace, Bellandur)Map point on OpenStreetMap (opens in a new tab) | 37.54 km | approx. 152 min |
| Electronic City Phase 1Map point on OpenStreetMap (opens in a new tab) | 44.7 km | approx. 181 min |
How we calculate
Straight line: from the project’s map point on RERA to the destination’s point on OpenStreetMap.
Peak-hour drive is a rough estimate, not a route: straight line × 1.35 for the road network, at 20 km/h. Real times vary a lot with the route and the hour.
Sources:Source (openstreetmap.org) (opens in a new tab)How we calculate this
Schools and hospitals nearby
Within 2 km
- 1Schools and colleges1 schools, 0 colleges, 0 kindergartens
- 0Hospitals and clinics0 hospitals, 0 clinics
Places as mapped on OpenStreetMap (amenity=school, college, kindergarten, university; hospital, clinic), counted within 2 km in a straight line of the RERA map point. Volunteers map these, so some places may be missing or closed. Places data © OpenStreetMap contributors, extract of 5 Oct 2026.
Nearest metro station and railway
- Doddajala (ದೊಡ್ಡಜಾಲ)Blue Line metro, under construction11.81 km
- Bagalur Cross (ಬಾಗಲೂರು ಕ್ರಾಸ್)Blue Line metro, under construction14.55 km
- Airport City (ವಿಮಾನ ನಿಲ್ದಾಣ ನಗರ)Blue Line metro, under construction15.73 km
- Chikkabidarakallu (ಚಿಕ್ಕಬಿದರಕಲ್ಲು)Open now — nearest operating metro station21.25 km
- Dodballapur (ದೊಡ್ಡಬಳ್ಳಾಪುರ)Nearest railway station5.01 km
Straight-line distances from the RERA map point to the station points mapped on OpenStreetMap; status (open or under construction) as tagged there. Places data © OpenStreetMap contributors, extract of 5 Oct 2026.
Lake and lake-buffer check
The nearest mapped lake is Unnamed lake (mapped on OpenStreetMap), 439 m from the project’s RERA map point.
The site boundary is not published as a shape, so its nearest edge can be closer than this point. Whether any building sits inside a lake buffer can only be checked on the approved plan.
- Unnamed lake (mapped on OpenStreetMap) on OpenStreetMap (opens in a new tab) 439 m
- Unnamed lake (mapped on OpenStreetMap) on OpenStreetMap (opens in a new tab) 1,369 m
- Unnamed lake (mapped on OpenStreetMap) on OpenStreetMap (opens in a new tab) 1,630 m
The buffer rule
Bengaluru’s lake buffer rule has changed over time: the National Green Tribunal ordered a 75 m buffer in May 2016; the Supreme Court set that order aside on 5 March 2019, leaving the 30 m buffer of the Revised Master Plan 2015. Check the current rule and the approved plan before relying on either number.
- LiveLaw: SC sets aside NGT order enlarging buffer zones (2019) (livelaw.in) (opens in a new tab)
- Citizen Matters: Shrinking lake buffers (citizenmatters.in) (opens in a new tab)
Shortest distance from the RERA map point to the mapped water edge (OpenStreetMap water polygons tagged lake or reservoir, or named lake/kere/tank). Mapped shorelines can differ from the revenue-record boundary of a lake. Places data © OpenStreetMap contributors, extract of 5 Oct 2026.
Sources:Source (openstreetmap.org) (opens in a new tab)Source (livelaw.in) (opens in a new tab)Source (citizenmatters.in) (opens in a new tab)How we calculate this
Satellite time-lapse of the site
Satellite photos load when you scroll to them.
Photos from Esri World Imagery Wayback, centred on the project’s map point; dates are the capture dates in Esri’s metadata. Loaded from Esri when you scroll here.
Sources:Source (livingatlas.arcgis.com) (opens in a new tab)
Century Eden layout plan and plot types as filed
Layout plan and brochure not published? The developer shares them only on request. We’ll get the brochure, layout plan and current price list for you, free.
Get brochure, layout plan & price| Plot type (as filed) | Area | Plots |
|---|---|---|
| 9.14m*12.19m (30*40sqft) | — | 147 |
| 9.14m*15.24m (30*50sqft) | — | 5 |
| Odd plots | — | 34 |
| Odd-shaped plots | — | 33 |
Plot types and counts as filed with Karnataka RERA.
We have not collected the layout plan drawing; the developer’s sales team can share it.
Century Eden completion date and development status
Timeline
- 1 Apr 2023Phase 4: Project start date given to RERA
- 7 Apr 2023Phase 3: Project start date given to RERA
- 30 May 2023Phase 3: Registered with Karnataka RERA
- 6 Jun 2023Phase 4: Registered with Karnataka RERA
- 1 May 2024Phase 5: Project start date given to RERA
- 23 May 2024Phase 4: Promoter applied to RERA for completion
- 15 Jul 2024Phase 5: Registered with Karnataka RERA
- 1 Aug 2024Phase 3: Promoter applied to RERA for completion
- 12 Jan 2026Phase 5: Promoter applied to RERA for completion
- 28 Feb 2026Phase 3: Completion date given at registration
- 28 Feb 2026Phase 4: Completion date given at registration
- 30 Apr 2027Phase 5: Completion date given at registration
Approvals and documents checklist
41 rows: approvals. Scroll inside the table to see them all.
| Approval | Authority | Source |
|---|---|---|
| Layout plan (Phase 3) | Local Planing Authority · No. DPA/TP/LAO/23/2022-23/32 · dated 2023-04-05 | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Land conversion (Phase 3) | Deputy Commissioner, Bangalore Rural District · No. 409031 · dated 2022-11-07 | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Commencement Certificate (Phase 3) | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Electricity Permission Letter (Phase 3) | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Water Permission Letter (Phase 3) | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Approved Layout Plan (Phase 3) | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Approved Building/Plotting Plan (Phase 3) | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Approved Section Of Building/Infrastructure Plan of Plotting (Phase 3) | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Change of Land Use (Phase 3) | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| District Magistrate (Phase 3) | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Conversion Certificate under section 95 of the KLR Act 1964 (Phase 3) | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| ESCOM/Electricity (Phase 3) | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| KWSSB/Water (Phase 3) | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Approval/NOC under section 14 of the KTCP Act (Phase 3) | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Layout plan (Phase 4) | Local Planing Authority · No. DPA/TP/LAO/10/2020-21/1567 · dated 2023-03-29 | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Land conversion (3 orders) (Phase 4) | Deputy Commissioner, Bangalore Rural District · No. ALN:(D.R)SR.30/2006-07 and 2 more · dated 2012-07-30 | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Commencement Certificate (Phase 4) | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Electricity Permission Letter (Phase 4) | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Water Permission Letter (Phase 4) | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Approved Layout Plan (Phase 4) | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Approved Building/Plotting Plan (Phase 4) | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Approved Section Of Building/Infrastructure Plan of Plotting (Phase 4) | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Change of Land Use (Phase 4) | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| District Magistrate (Phase 4) | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Conversion Certificate under section 95 of the KLR Act 1964 (Phase 4) | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| ESCOM/Electricity (Phase 4) | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| KWSSB/Water (Phase 4) | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Approval/NOC under section 14 of the KTCP Act (Phase 4) | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Layout plan (Phase 5) | Local Planing Authority · No. DPA/TP/LAO/07/2023-24/1424 · dated 2024-01-10 | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Land conversion (4 orders) (Phase 5) | DC · No. NO. BDS-ALN-SR(DB) 16 (1993-94) and 3 more · dated 2005-04-29 | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Commencement Certificate (Phase 5) | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Electricity Permission Letter (Phase 5) | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Water Permission Letter (Phase 5) | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Approved Layout Plan (Phase 5) | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Approved Building/Plotting Plan (Phase 5) | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Approved Section Of Building/Infrastructure Plan of Plotting (Phase 5) | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Change of Land Use (Phase 5) | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| District Magistrate (Phase 5) | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Conversion Certificate under section 95 of the KLR Act 1964 (Phase 5) | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| ESCOM/Electricity (Phase 5) | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| KWSSB/Water (Phase 5) | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
Documents uploaded to RERA (Phase 3)
- Building or layout plan · Approved drawings from the planning authorityFiled on RERA ✓ — Local Planing Authority · No. DPA/TP/LAO/23/2022-23/32 · dated 5 Apr 2023
- Commencement certificate · Permission to start buildingFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
- Environment clearance · SEIAA KarnatakaNot on RERA yet
- Fire NOC · Karnataka Fire and Emergency ServicesNot on RERA yet
- Pollution board consent · KSPCBNot on RERA yet
- Water and sewerage · BWSSBFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
- Electricity · BESCOMFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
- Height clearance · Airports Authority of IndiaNot on RERA yet
- Occupancy certificate (OC) · Issued only when the building is finishedNot on RERA yet — expected at completion
From the documents the promoter uploaded to Karnataka RERA, collected 4 Oct 2026. “Filed” means a document is on RERA — we have not checked its contents or validity. Not every approval applies to every project (for example, smaller projects may not need an environment clearance). Each phase is registered separately; this list is for the phase named above. The project page on RERA lists each upload.
Century Eden RERA complaints
1 complaint as on Source (rera.karnataka.gov.in) (opens in a new tab)
| Complaint ref | Filed | Subject | Status | Source |
|---|---|---|---|---|
| 01062/2026 | 27 Aug 2026 | Illegal CAM charges, non payment of property taxes dues and non payment of penalty for infrastructure delay. | Under enquiry | Source (rera.karnataka.gov.in) (opens in a new tab) |
Court and consumer cases
We list case numbers, courts and outcomes only — never names of private individuals.
About Geetanjali Effective Realty Solutions Private Limited
- Promoter type
- Company
- Projects on this site
- 1
- RERA complaints against promoter
- 6
- Company number (CIN)
- U80301KA1999PTC024775
From Karnataka RERA, as collected so far (4 Oct 2026). Complaints are those RERA lists against this promoter across all its projects.
Geetanjali Effective Realty Solutions Private Limited’s RERA recordGeetanjali Effective Realty Solutions Private Limited delivery record
- 1Projects in Bengaluru on RERA3 approved registrations under Geetanjali Effective Realty Solutions Private Limited in Bengaluru Urban and Rural. Source (rera.karnataka.gov.in) (opens in a new tab)
- 219Plots registeredAs stated in each registrations.
- 6RERA complaints5 open, 1 disposed. as on Source (rera.karnataka.gov.in) (opens in a new tab)
- 27.4Complaints per 1,000 plots6 complaints ÷ 219 plots in its 3 registrations on Karnataka RERA in Bengaluru.
- 3Completion filed on RERARegistrations where the promoter applied to RERA for completion; 0 with an occupancy certificate on RERA.
- 3 of 3Filed by the date given at registrationMedian gap 0 months (on-time ones count as 0). The completion application can come after handover, so this is an upper bound on lateness.
What the complaints are about
6 complaint subjects as written on RERA, as on . Each subject is sorted into one group by keywords (first match wins: delay, refund, registration, quality, litigation, association); one complaint often raises several issues. Source (rera.karnataka.gov.in) (opens in a new tab)
Completion filed on RERA
| Project | Date at registration | Completion filed | Gap |
|---|---|---|---|
| Century Eden Phase 5 | 30 Apr 2027 | 12 Jan 2026 | By the date |
| Century Eden Phase 3 | 28 Feb 2026 | 1 Aug 2024 | By the date |
| Century Eden Phase 4 | 28 Feb 2026 | 23 May 2024 | By the date |
Measured against the completion date given at registration; many projects had RERA extensions (including the COVID-period extension), shown under the date.
Sources:Source (rera.karnataka.gov.in) (opens in a new tab)How we calculate this
What’s changed since Mar 2023
- 27 Aug 2026Complaint 01062/2026 filed with RERA: “Illegal CAM charges, non payment of property taxes dues and non payment of penalty for infrastructure delay.” — now under enquiry Source (rera.karnataka.gov.in) (opens in a new tab)
- 12 Jan 2026Phase 5: Promoter applied to RERA for completion Source (rera.karnataka.gov.in) (opens in a new tab)
- 1 Aug 2024Phase 3: Promoter applied to RERA for completion Source (rera.karnataka.gov.in) (opens in a new tab)
- 15 Jul 2024Phase 5: Registered with Karnataka RERA (PRM/KA/RERA/1250/301/PR/150724/006939); completion date 30 Apr 2027 Source (rera.karnataka.gov.in) (opens in a new tab)
- 23 May 2024Phase 4: Promoter applied to RERA for completion Source (rera.karnataka.gov.in) (opens in a new tab)
- 1 May 2024Phase 5: Project start date in the RERA record Source (rera.karnataka.gov.in) (opens in a new tab)
- 10 Jan 2024Phase 5: Building plan approved by Local Planing Authority (No. DPA/TP/LAO/07/2023-24/1424) Source (rera.karnataka.gov.in) (opens in a new tab)
- 6 Jun 2023Phase 4: Registered with Karnataka RERA (PRM/KA/RERA/1250/301/PR/060623/005973); completion date 28 Feb 2026 Source (rera.karnataka.gov.in) (opens in a new tab)
- 30 May 2023Phase 3: Registered with Karnataka RERA (PRM/KA/RERA/1250/301/PR/300523/005956); completion date 28 Feb 2026 Source (rera.karnataka.gov.in) (opens in a new tab)
- 7 Apr 2023Phase 3: Project start date in the RERA record Source (rera.karnataka.gov.in) (opens in a new tab)
- 5 Apr 2023Phase 3: Building plan approved by Local Planing Authority (No. DPA/TP/LAO/23/2022-23/32) Source (rera.karnataka.gov.in) (opens in a new tab)
- 1 Apr 2023Phase 4: Project start date in the RERA record Source (rera.karnataka.gov.in) (opens in a new tab)
- 29 Mar 2023Phase 4: Building plan approved by Local Planing Authority (No. DPA/TP/LAO/10/2020-21/1567) Source (rera.karnataka.gov.in) (opens in a new tab)
Newest first. No extension of the completion date is recorded on RERA. When the RERA crawl sees a new filing, complaint or extension, it is added here with its date.
Plot loan EMI calculator
- Monthly EMI
- —
- Down payment
- —
- Loan amount
- —
- Total interest
- —
A calculation only, from the numbers you enter — not a loan offer.
Century Eden FAQs
What plot sizes are available in Century Eden?
Phase 3 has 32 plots of 30×40 feet (1,200 sq ft) and 6 odd-sized plots. Phase 4 has 42 plots of 30×40 feet (1,200 sq ft), 5 plots of 30×50 feet (1,500 sq ft), and 28 odd-sized plots. Phase 5 has 73 plots of 30×40 feet (1,200 sq ft) and 33 odd-sized plots.
How many plots are in each phase of Century Eden?
Phase 3 has 38 plots, Phase 4 has 75 plots, and Phase 5 has 1,06 plots, for a total of 2,19 plots.
What is the RERA registration number for Century Eden?
Phase 3 is registered as PRM/KA/RERA/1250/301/PR/300523/005956, Phase 4 as PRM/KA/RERA/1250/301/PR/060623/005973, and Phase 5 as PRM/KA/RERA/1250/301/PR/150724/006939.
When will Century Eden be completed?
Phase 3 and Phase 4 are due for completion by 28 February 2026. Phase 5 is due for completion by 30 April 2027.
Who approved the layout for Century Eden?
The Local Planning Authority approved the layout.
How many land conversion orders have been issued for Century Eden?
Phase 3 has 1 land conversion order, Phase 4 has 3 land conversion orders, and Phase 5 has 4 land conversion orders.
Are there any RERA complaints against Century Eden?
There is 1 RERA complaint on this project (on Phase 4). There are 6 RERA complaints against the developer across all projects on record.
Where is Century Eden located?
Century Eden is located in Hosahudya, Doddaballapura taluk, Bengaluru Rural district, PIN code 5,61,203.
How many other projects does the developer have?
Geetanjali Effective Realty Solutions Private Limited has 2 projects in the Bengaluru RERA record.
Which bank holds the escrow for Century Eden?
Axis Bank holds the escrow account for Century Eden.
Written by AI from the RERA record above on 7 Oct 2026. Answers use only that record; check them against the source before you decide.
Questions about Century Eden
No questions published yet. Ask the first one: you get an instant answer from this page’s public record, and our team follows up on anything the record does not show.
Bought a plot from Geetanjali Effective Realty Solutions Private Limited? Review the developer.
Reviews of Geetanjali Effective Realty Solutions Private Limited by verified buyers
No verified reviews of Geetanjali Effective Realty Solutions Private Limited yet. If you bought a plot from them, your review helps other buyers.
How reviews work: only buyers and owners can review; we confirm each purchase by phone before publishing, publish positive and negative reviews alike, never accept payment for reviews, and the developer may reply.
Similar projects within 5 km
| Project | Distance | Plots | Completion (RERA) | Developed | Complaints | Price |
|---|---|---|---|---|---|---|
| KNS BilloreBillore Ventures Private Limited | 0.4 km | 199 | May 2026 | — | 0 | Not collected |
| Under The SilvermoonSurya Sunshine Developers | 0.8 km | 44 | Sep 2030 | 15% | 0 | Not collected |
| Under The StarsSSD Housing Nellukunte | 1.5 km | 69 | Oct 2030 | 30% | 0 | Not collected |
| J V Green ValleySrinivasulu G | 2.4 km | 115 | Dec 2028 | — | 0 | Not collected |
| The Silver Lake Phase 1Harinatha Reddy | 2.5 km | 101 | Dec 2026 | 100% | 0 | Not collected |
| KNS WilonaM/S KNS Real Vista LLP | 2.7 km | 23 | Oct 2025 | — | 0 | Not collected |
Projects of the same kind within 5 km in a straight line of this project’s RERA map point, nearest first. % built is the promoter’s latest quarterly figure on RERA (shown for single-registration projects); prices are from the developer’s own website where we found one.
Sources and last checked dates
Collected on 4 Oct 2026 by AI research agents reading public pages. Facts are written in our own words. Not found yet: price; court cases; landmarks; specifications; news.
How to check on RERA: On rera.karnataka.gov.in/viewAllProjects, type the registration number in 'Registration No', press Search, then click the 'View Project Details' icon. Complaints open from the 'Complaints / Litigation' icon in the same row. Registration numbers: PRM/KA/RERA/1250/301/PR/300523/005956, PRM/KA/RERA/1250/301/PR/060623/005973, PRM/KA/RERA/1250/301/PR/150724/006939.
- RERA record last checked: 4 Oct 2026
- Last change in the record (registration, quarterly filing or complaint): 27 Aug 2026
How this page is made: software builds it from public records (Karnataka RERA filings, OpenStreetMap, the developer’s own website). AI is used only to read filings into fields and to write the plain-English summary and FAQ answers, which are checked against the record. Facts are checked automatically against the RERA filing. Methodology · How we earn · Report an error
More new projects in Doddaballapur Road
Kadatanamale, Doddaballapur RoadUnder constructionRERA registeredBuyers’ group openKNS Billore
by Billore Ventures
Price: Price on requestGet brochure & price →
- 30×30, 30×35, 30×40 +1 more
- 7,942 – 28,213 sq ft plots
- Approved by BMRDA
- May 2026
RERA not updated since promised May 2026 · 199 plots
Be one of the first 10 buyers in this groupFounding members — it’s free
Join group for KNS Billore
Off Kadathanamale, Doddaballapur RoadUnder constructionRERA registeredBuyers’ group openUnder The Silvermoon
by Surya Sunshine
Price: Price on requestGet brochure & price →
- 27×42
- 1,150 – 2,640 sq ft plots
- Approved by Gadag-Betageri Urban Development Authority
- Sep 2030
44 plots
Be one of the first 10 buyers in this groupFounding members — it’s free
Join group for Under The Silvermoon
Nellukunte, Doddaballapur RoadUnder constructionRERA registeredBuyers’ group openUnder The Stars
by SSD Housing Nellukunte
Price: Price on requestGet brochure & price →
- 23×45, 30×40, 30×45 +1 more
- 951 – 7,743 sq ft plots
- Approved by Doddaballapur Planning Authority
- Oct 2030
69 plots