The Valley By Essem18
30×40 plots by Essem18 Developers Private Limited · Rachanamadu BM Kaval, near Kanakapura Road, Bengaluru
Rachanamadu BM Kaval, near Kanakapura Road, BengaluruOpen on Google Maps (opens in a new tab)
- Under construction
- RERA registered
- plotted
by Essem18 Developers Private Limited
Price: Price on request
Site photo filed with Karnataka RERA Karnataka RERA filing · Source ↗ (opens in a new tab)
The Valley By Essem18 at a glance
- Completion (RERA)Sep 2021 Date passedWas Dec 2026 · Karnataka RERA
- RERA complaints (project)None listedKarnataka RERA · as on 16 Oct 2026
- Approvals filed3 of 9 on RERAKarnataka RERA uploads · 16 Oct 2026
- Nearest metroSilk Institute · 1.84 kmstraight line · OpenStreetMap, 5 Oct 2026
- Airport driveapprox. 174 min at peak43.02 km straight line · estimate
- Nearest lakeLingadeeranahalli Lake · 1,010 mFrom the RERA map point · OpenStreetMap, 5 Oct 2026
Project summary
The Valley By Essem18 is a plotted development by Essem18 Developers Private Limited in Rachanamadu BM Kaval, Bengaluru, registered with Karnataka RERA. The completion date on RERA is 30 Sep 2021. It is registered in 2 phases.
Not in the RERA record we collected yet: number of plots. This page fills in as the record is collected.
Facts collected on 16 Oct 2026 from public records — each linked to its source. Free for buyers. If you book through us, the developer pays us a commission.
The Valley By Essem18 buyers’ group: join to ask for a group price
No one has joined yet. Be one of the first 10 buyers in this group — the founding members.
Join free. When enough buyers have joined, our agent partner asks Essem18 Developers Private Limited for a group price — for example a lower price, an easier payment plan or waived charges. Nothing is promised: you see what the developer offers and book directly with the developer if you want to. Free for buyers. If you book through us, the developer pays us a commission.
- Gathering buyers
- Talking to the developer
- Group offer
- Group site visit
- Booking
0 buyers have joined · 0 committed
Committed buyers have confirmed their budget, plot size and timeline with us on a call; developers negotiate with them. Joining is free and never obliges you to buy.
Join the The Valley By Essem18 buyers’ groupHow group buying works
See it for yourself
Visit the site with our team, or get a call to clear your questions. Free, no obligation.
Key facts: plot sizes, approval, land and completion
- Plot sizes (feet)
- 30×40
- Plot area
- 1,098 – 8,388 sq ft
- Total plots
- Not found in public records yet: total plots
- Layout approved by
- Local Planning Authority
- Land
- Not found in public records yet: land area
- Land conversion orders
- 2
- Completion (extended)
- Sep 2021
- Development (RERA update)
- Not found in public records yet: development progress
Plot sizes (RERA filing)
| Size (feet) | Area | Plots |
|---|---|---|
| 30×40 | 1,200 sq ft | 9 |
| Odd-sized (irregular) | varies | 15 |
Sizes as filed with RERA, converted from metres to feet (9.14 m = 30 ft, 12.19 m = 40 ft). Ask the developer which plots are still unsold.
Approving authority as filed: Local Planing Authority.
Land conversion orders (RERA filing)
| Phase | Survey no. | Converted for | Order | By |
|---|---|---|---|---|
| Phase 1 | 103/12 | Residential | No. 771570, 17 Jun 2025 | DC Office Bengaluru |
| Phase 1 | 103/15 | Residential | No. 771571, 17 Jun 2025 | DC Office Bengaluru |
RERA does not cover each plot’s khata. Ask the developer for the khata and title documents and have a lawyer check them before paying an advance.
The Valley By Essem18 RERA number and registration details
- RERA number
- PRM/KA/RERA/1251/310/PR/190525/002579
- Registered on
- 25 May 2019
- Promised completion
- 31 Dec 2026
- Extended to
- 30 Sep 2021
- RERA status
- Under construction
- Plots booked
- Not found in public records yet: plots booked
- Price
- Not found in public records yet: price
- Project type
- Plotted
2 RERA registrations (one per phase) are shown together on this page; dates above are the latest across phases.
Phases and RERA numbers
| Phase | RERA number | Promised completion | Plots | Status | Source |
|---|---|---|---|---|---|
| Main registration | PRM/KA/RERA/1251/310/PR/190525/002579 | 31 Dec 2020Extended to 30 Sep 2021 | — | Completed | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Phase 1 | PRM/KA/RERA/1251/310/PR/281125/008284 | 31 Dec 2026 | 24 | Under construction | Source (rera.karnataka.gov.in) (opens in a new tab) |
Summary in plain English
The Valley By Essem18 is a plotted layout by Essem18 Developers Private Limited in Rachanamadu BM Kaval, Bengaluru South. The main registration was completed on 30 September 2021, and Phase 1 has 24 plots with a completion date of 31 December 2026.
Written by AI from the RERA record above on 17 Oct 2026. Every number in it was checked against that record; if anything differs, the record wins.
Open space, loans, escrow and other details
- Open space
- Not found in public records yet: open space
- Water and power
- Water source filed with RERA: BoreWell
- Plot loans: approved banks
- Not found in public records yet: bank approvals
- Payment plans
- Not found in public records yet: payment plans
- Maintenance
- Not found in public records yet: maintenance
- Car parking
- Not found in public records yet: car parking charge
- Escrow bank (RERA) · Main registration
- KOTAK MAHINDRA BANK, BASAVANAGUDI
- Escrow bank (RERA) · Phase 1
- KOTAK MAHINDRA BANK, GANDHI BAZAR, BASAVANAGUDI
Amenities
The Valley By Essem18 location and address
- Address
- SY NO'S 103/1, 103/3, 103/4. 103/5, 103/6, 103/7, 103/8, 103/9, 103/11, 103/13, 103/14, 105/8, 105/12, 105/15, 15/2, 15/3, 15/4, RACHANAMADU AND BM KAVAL VILLAGE
- Village (RERA)
- Rachanamadu BM Kaval
- Locality
- Near Kanakapura RoadAlso known as Kanakapura Main Road
- PIN code
- 560062
- City
- Bengaluru
- State
- Karnataka
- Coordinates
- 12.86180, 77.51299
Distances to landmarks
Not found in public records yet: landmarksAbout Rachanamadu BM Kaval
Not found in public records yet: locality factsCommute times to tech parks and the airport
| To | Straight line | Peak-hour drive (estimate) |
|---|---|---|
| KSR Bengaluru City railway station (Majestic)Map point on OpenStreetMap (opens in a new tab) | 14.32 km | approx. 58 min |
| Electronic City Phase 1Map point on OpenStreetMap (opens in a new tab) | 16.53 km | approx. 67 min |
| Outer Ring Road tech corridor (RMZ Ecospace, Bellandur)Map point on OpenStreetMap (opens in a new tab) | 19.49 km | approx. 79 min |
| Manyata Tech ParkMap point on OpenStreetMap (opens in a new tab) | 23.74 km | approx. 96 min |
| ITPL, Whitefield (main gate)Map point on OpenStreetMap (opens in a new tab) | 28.09 km | approx. 114 min |
| Kempegowda International AirportMap point on OpenStreetMap (opens in a new tab) | 43.02 km | approx. 174 min |
How we calculate
Straight line: from the project’s map point on RERA to the destination’s point on OpenStreetMap.
Peak-hour drive is a rough estimate, not a route: straight line × 1.35 for the road network, at 20 km/h. Real times vary a lot with the route and the hour.
Sources:Source (openstreetmap.org) (opens in a new tab)How we calculate this
Schools and hospitals nearby
Within 2 km
- 7Schools and colleges6 schools, 1 colleges, 0 kindergartens
- 1Hospitals and clinics0 hospitals, 1 clinics
Nearest schools and colleges
- The Valley School · 0.96 km
- The Study · 1.52 km
- RV College of Architecture · 1.83 km
Nearest hospitals and clinics
- Central Ayurveda Research Institute · 0.92 km
Places as mapped on OpenStreetMap (amenity=school, college, kindergarten, university; hospital, clinic), counted within 2 km in a straight line of the RERA map point. Volunteers map these, so some places may be missing or closed. Places data © OpenStreetMap contributors, extract of 5 Oct 2026.
Nearest metro station and railway
- Silk Institute (ರೇಷ್ಮೆ ಸಂಸ್ಥೆ)Open now — nearest operating metro station1.84 km
- Kengeri (ಕೆಂಗೇರಿ)Nearest railway station6.97 km
Straight-line distances from the RERA map point to the station points mapped on OpenStreetMap; status (open or under construction) as tagged there. Places data © OpenStreetMap contributors, extract of 5 Oct 2026.
Lake and lake-buffer check
The nearest mapped lake is Lingadeeranahalli Lake, 1,010 m from the project’s RERA map point.
The site boundary is not published as a shape, so its nearest edge can be closer than this point. Whether any building sits inside a lake buffer can only be checked on the approved plan.
- Lingadeeranahalli Lake on OpenStreetMap (opens in a new tab) 1,010 m
- Thalaghattapura Lake on OpenStreetMap (opens in a new tab) (ತಲಘಟ್ಟಪುರ ಕೆರೆ)1,886 m
The buffer rule
Bengaluru’s lake buffer rule has changed over time: the National Green Tribunal ordered a 75 m buffer in May 2016; the Supreme Court set that order aside on 5 March 2019, leaving the 30 m buffer of the Revised Master Plan 2015. Check the current rule and the approved plan before relying on either number.
- LiveLaw: SC sets aside NGT order enlarging buffer zones (2019) (livelaw.in) (opens in a new tab)
- Citizen Matters: Shrinking lake buffers (citizenmatters.in) (opens in a new tab)
Shortest distance from the RERA map point to the mapped water edge (OpenStreetMap water polygons tagged lake or reservoir, or named lake/kere/tank). Mapped shorelines can differ from the revenue-record boundary of a lake. Places data © OpenStreetMap contributors, extract of 5 Oct 2026.
Sources:Source (openstreetmap.org) (opens in a new tab)Source (livelaw.in) (opens in a new tab)Source (citizenmatters.in) (opens in a new tab)How we calculate this
Satellite time-lapse of the site
Satellite photos load when you scroll to them.
Photos from Esri World Imagery Wayback, centred on the project’s map point; dates are the capture dates in Esri’s metadata. Loaded from Esri when you scroll here.
Sources:Source (livingatlas.arcgis.com) (opens in a new tab)
The Valley By Essem18 layout plan and plot types as filed
Documents the developer uploaded to Karnataka RERA, shown as filed. Tap a page to see it full size; the full PDF opens on the RERA website.
Approved layout plan

Phase 1: Approved Layout Plan/Demarcation PlanFull PDF on RERA
Layout plan and brochure not published? The developer shares them only on request. We’ll get the brochure, layout plan and current price list for you, free.
Get brochure, layout plan & price| Plot type (as filed) | Area | Plots |
|---|---|---|
| 9.14*12.19 m | — | 9 |
| Odd | — | 15 |
Plot types and counts as filed with Karnataka RERA.
We have not collected the layout plan drawing; the developer’s sales team can share it.
The Valley By Essem18 completion date and development status
Timeline
- 18 Nov 2018Main registration: Project start date given to RERA
- 25 May 2019Main registration: Registered with Karnataka RERA
- 31 Dec 2020Main registration: Completion date given at registration
- 30 Sep 2021Main registration: Covid Extension: completion date moved to this date
- 13 Oct 2022Main registration: Promoter applied to RERA for completion
- 1 Oct 2025Phase 1: Project start date given to RERA
- 28 Nov 2025Phase 1: Registered with Karnataka RERA
- 31 Dec 2026Phase 1: Completion date given at registration
Approvals and documents checklist
| Approval | Authority | Source |
|---|---|---|
| Layout plan (Main registration) | Local Planing Authority | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Layout plan (Phase 1) | BMICAPA - Bengaluru - Mysuru Infrastructure Corridor Area Planning Authority · No. BMICAPA/01/20/2025-26 · dated 2025-10-18 | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Land conversion (2 orders) (Phase 1) | DC Office Bengaluru · No. 771570 and 1 more · dated 2025-06-17 | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Approved Layout Plan/Demarcation Plan (Phase 1) | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| NOC from ESCOMs (Phase 1) | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| NOC for Water (Phase 1) | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
Documents uploaded to RERA (Phase 1)
- Building or layout plan · Approved drawings from the planning authorityFiled on RERA ✓ — BMICAPA - Bengaluru - Mysuru Infrastructure Corridor Area Planning Authority · No. BMICAPA/01/20/2025-26 · dated 18 Oct 2025
- Commencement certificate · Permission to start buildingNot on RERA yet
- Environment clearance · SEIAA KarnatakaNot on RERA yet
- Fire NOC · Karnataka Fire and Emergency ServicesNot on RERA yet
- Pollution board consent · KSPCBNot on RERA yet
- Water and sewerage · BWSSBFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
- Electricity · BESCOMFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
- Height clearance · Airports Authority of IndiaNot on RERA yet
- Occupancy certificate (OC) · Issued only when the building is finishedNot on RERA yet — expected at completion
From the documents the promoter uploaded to Karnataka RERA, collected 16 Oct 2026. “Filed” means a document is on RERA — we have not checked its contents or validity. Not every approval applies to every project (for example, smaller projects may not need an environment clearance). Each phase is registered separately; this list is for the phase named above. The project page on RERA lists each upload.
The Valley By Essem18 RERA complaints
No complaints listed on Karnataka RERA for these registrations as on Source (rera.karnataka.gov.in) (opens in a new tab)
Court and consumer cases
We list case numbers, courts and outcomes only — never names of private individuals.
About Essem18 Developers Private Limited
- Promoter type
- Company
- Projects on this site
- 3
- RERA complaints against promoter
- 0
- Company number (CIN)
- U45205KA2016PTC085138
From Karnataka RERA, as collected so far (16 Oct 2026). Complaints are those RERA lists against this promoter across all its projects.
Essem18 Developers Private Limited’s RERA recordEssem18 Developers Private Limited delivery record
- 3Projects in Bengaluru on RERA4 approved registrations under Essem18 Developers Private Limited in Bengaluru Urban and Rural. Source (rera.karnataka.gov.in) (opens in a new tab)
- 200Homes and plots registeredAs stated in 3 of the 4 registrations.
- 0RERA complaintsas on Source (rera.karnataka.gov.in) (opens in a new tab)
- 0Complaints per 1,000 homes and plots0 complaints ÷ 200 homes and plots in its 4 registrations on Karnataka RERA in Bengaluru.
- 1Completion filed on RERARegistrations where the promoter applied to RERA for completion; 0 with an occupancy certificate on RERA.
- 0 of 1Filed by the date given at registrationMedian gap 21.4 months (on-time ones count as 0). The completion application can come after handover, so this is an upper bound on lateness.
Completion filed on RERA
| Project | Date at registration | Completion filed | Gap |
|---|---|---|---|
| The Valley By Essem18 | 31 Dec 2020extended to 30 Sep 2021 | 13 Oct 2022 | 21 months after |
Measured against the completion date given at registration; many projects had RERA extensions (including the COVID-period extension), shown under the date.
Sources:Source (rera.karnataka.gov.in) (opens in a new tab)How we calculate this
What’s changed since Nov 2018
- 15 Oct 2026Phase 1: Quarterly update filed for Q2 2026-27: 100% built Source (rera.karnataka.gov.in) (opens in a new tab)
- 15 Jul 2026Phase 1: Quarterly update filed for Q1 2026-27: 45% built Source (rera.karnataka.gov.in) (opens in a new tab)
- 15 Apr 2026Phase 1: Quarterly update filed for Q4 2025-26: 30% built Source (rera.karnataka.gov.in) (opens in a new tab)
- 14 Jan 2026Phase 1: Quarterly update filed for Q3 2025-26: 15% built Source (rera.karnataka.gov.in) (opens in a new tab)
- 28 Nov 2025Phase 1: Registered with Karnataka RERA (PRM/KA/RERA/1251/310/PR/281125/008284); completion date 31 Dec 2026 Source (rera.karnataka.gov.in) (opens in a new tab)
- 18 Oct 2025Phase 1: Building plan approved by BMICAPA - Bengaluru - Mysuru Infrastructure Corridor Area Planning Authority (No. BMICAPA/01/20/2025-26) Source (rera.karnataka.gov.in) (opens in a new tab)
- 1 Oct 2025Phase 1: Project start date in the RERA record Source (rera.karnataka.gov.in) (opens in a new tab)
- 13 Oct 2022Main registration: Promoter applied to RERA for completion Source (rera.karnataka.gov.in) (opens in a new tab)
- 30 Sep 2021Main registration: Completion date extended to 30 Sep 2021 Source (rera.karnataka.gov.in) (opens in a new tab)
- 25 May 2019Main registration: Registered with Karnataka RERA (PRM/KA/RERA/1251/310/PR/190525/002579); completion date 31 Dec 2020 Source (rera.karnataka.gov.in) (opens in a new tab)
- 18 Nov 2018Main registration: Project start date in the RERA record Source (rera.karnataka.gov.in) (opens in a new tab)
Newest first. When the RERA crawl sees a new filing, complaint or extension, it is added here with its date.
Plot loan EMI calculator
- Monthly EMI
- —
- Down payment
- —
- Loan amount
- —
- Total interest
- —
A calculation only, from the numbers you enter — not a loan offer.
The Valley By Essem18 FAQs
What is The Valley By Essem18?
The Valley By Essem18 is a plotted layout in Rachanamadu BM Kaval, Bengaluru South, developed by Essem18 Developers Private Limited.
How many plots are in Phase 1 of The Valley By Essem18?
Phase 1 has 24 plots: 9 plots of 30×40 feet (1,200 sq ft each) and 15 odd-sized plots. The exact sizes of the odd-sized plots are not in the RERA record.
What are the plot sizes in The Valley By Essem18 Phase 1?
The project has plots of 30×40 feet (1,200 sq ft each). There are also 15 odd-sized plots whose individual dimensions are not listed in the RERA record.
What is the completion date for The Valley By Essem18 Phase 1?
The completion date is 31 December 2026.
What is the RERA registration number for The Valley By Essem18?
The main registration number is PRM/KA/RERA/1251/310/PR/190525/002579, and Phase 1 is registered as PRM/KA/RERA/1251/310/PR/281125/008284.
Who approved the layout for The Valley By Essem18?
The main registration was approved by the Local Planning Authority, and Phase 1 was approved by BMICAPA. Phase 1 also has 2 land conversion orders.
What is the development progress of The Valley By Essem18 Phase 1?
As of Q2 2026-27 (quarter ended 30 September 2026), the layout development is 100 percent complete.
How many plots are booked in The Valley By Essem18 Phase 1?
The latest quarterly update (Q2 2026-27) does not state how many plots have been booked.
Are there any RERA complaints against The Valley By Essem18?
There are no RERA complaints on this project.
What other projects does Essem18 Developers Private Limited have?
Essem18 Developers Private Limited has 5 projects in the Bengaluru RERA records and no complaints against the developer across all projects.
Written by AI from the RERA record above on 17 Oct 2026. Answers use only that record; check them against the source before you decide.
Questions about The Valley By Essem18
No questions published yet. Ask the first one: you get an instant answer from this page’s public record, and our team follows up on anything the record does not show.
Bought a plot from Essem18 Developers Private Limited? Review the developer.
Reviews of Essem18 Developers Private Limited by verified buyers
No verified reviews of Essem18 Developers Private Limited yet. If you bought a plot from them, your review helps other buyers.
How reviews work: only buyers and owners can review; we confirm each purchase by phone before publishing, publish positive and negative reviews alike, never accept payment for reviews, and the developer may reply.
Similar projects within 5 km
| Project | Distance | Plots | Completion (RERA) | Developed | Complaints | Price |
|---|---|---|---|---|---|---|
| Cinnamon CitadelRroyal Indraprastha Cinnamon Citadel LLP | 3.3 km | 49 | May 2027 | — | 0 | Not collected |
| The Prime NestShivraj P | 3.7 km | 81 | Feb 2027 | 80% | 0 | Not collected |
| Elegant Mystic EliteElegant Builders And Developers | 3.9 km | 79 | Dec 2027 | 74% | 0 | Not collected |
| AtaraxisPradeep Krishnappa | 4.2 km | 84 | Jan 2026 | — | 0 | Not collected |
| Casper ValleyAura Wave Estates LLP | 4.6 km | 50 | Jun 2027 | — | 0 | Not collected |
| Brhat Valley ParkP Chandra | 4.8 km | 81 | Dec 2025 | 100% | 0 | Not collected |
Projects of the same kind within 5 km in a straight line of this project’s RERA map point, nearest first. % built is the promoter’s latest quarterly figure on RERA (shown for single-registration projects); prices are from the developer’s own website where we found one.
Sources and last checked dates
Collected on 16 Oct 2026 by AI research agents reading public pages. Facts are written in our own words. Not found yet: price; court cases; landmarks; specifications; news.
How to check on RERA: On rera.karnataka.gov.in/viewAllProjects, type the registration number in 'Registration No', press Search, then click the 'View Project Details' icon. Complaints open from the 'Complaints / Litigation' icon in the same row. Registration numbers: PRM/KA/RERA/1251/310/PR/190525/002579, PRM/KA/RERA/1251/310/PR/281125/008284.
- RERA record last checked: 16 Oct 2026
- Last change in the record (registration, quarterly filing or complaint): 16 Oct 2026
How this page is made: software builds it from public records (Karnataka RERA filings, OpenStreetMap, the developer’s own website). AI is used only to read filings into fields and to write the plain-English summary and FAQ answers, which are checked against the record. Facts are checked automatically against the RERA filing. Methodology · How we earn · Report an error
More new projects nearby
B M Kaval, Kanakapura RoadUnder constructionRERA registeredBuyers’ group openCinnamon Citadel
by Rroyal Indraprastha Cinnamon Citadel
Price: Price on requestGet brochure & price →
- 30×55, 31×58
- 1,259 – 2,096 sq ft plots
- Approved by BMICAPA
- May 2027
49 plots
Be one of the first 10 buyers in this groupFounding members — it’s free
Join group for Cinnamon Citadel
Agara, HSR LayoutUnder constructionRERA registeredBuyers’ group openThe Prime Nest
by Shivraj P
Price: Price on requestGet brochure & price →
- 20×30, 30×40
- 600 – 2,296 sq ft plots
- Approved by BDA
- Feb 2027
81 plots
Be one of the first 10 buyers in this groupFounding members — it’s free
Join group for The Prime Nest
B M Kaval, near Kanakapura RoadUnder constructionRERA registeredBuyers’ group openElegant Mystic Elite
by Elegant Builders And
Price: Price on requestGet brochure & price →
- 20×30, 30×40, 40×40
- 6,458 – 18,514 sq ft plots
- Approved by BDA
- Dec 2027
79 plots
Be one of the first 10 buyers in this groupFounding members — it’s free
Join group for Elegant Mystic Elite