Trifecta Verde En Resplandor Villa Phase 3 at a glance
- Completion (RERA)Dec 2027Karnataka RERA
- Construction98% built · on pace for Oct 2026RERA filing to 30 Sep 2026; estimate from average pace
- RERA complaints (project)None listedKarnataka RERA · as on 16 Oct 2026
- Approvals filed4 of 9 on RERAKarnataka RERA uploads · 16 Oct 2026
- Nearest metroKIAL Terminals · 10.81 km (under construction)Open now: Whitefield (Kadugodi), 12.52 km · straight line · OpenStreetMap, 5 Oct 2026
- Airport driveapprox. 46 min at peak11.45 km straight line · estimate
- Nearest lakeUnnamed lake · 877 mFrom the RERA map point · OpenStreetMap, 5 Oct 2026
Project summary
Trifecta Verde En Resplandor Villa Phase 3 is a plotted development by Trifecta Projects Private Limited in Bengaluru with 158 plots, registered with Karnataka RERA. The completion date on RERA is 9 Dec 2027.
Not in the RERA record we collected yet: locality. This page fills in as the record is collected.
Facts collected on 16 Oct 2026 from public records — each linked to its source. Free for buyers. If you book through us, the developer pays us a commission.
Trifecta Verde En Resplandor Villa Phase 3 buyers’ group: join to ask for a group price
No one has joined yet. Be one of the first 10 buyers in this group — the founding members.
Join free. When enough buyers have joined, our agent partner asks Trifecta Projects Private Limited for a group price — for example a lower price, an easier payment plan or waived charges. Nothing is promised: you see what the developer offers and book directly with the developer if you want to. Free for buyers. If you book through us, the developer pays us a commission.
- Gathering buyers
- Talking to the developer
- Group offer
- Group site visit
- Booking
0 buyers have joined · 0 committed
Committed buyers have confirmed their budget, plot size and timeline with us on a call; developers negotiate with them. Joining is free and never obliges you to buy.
Join the Trifecta Verde En Resplandor Villa Phase 3 buyers’ groupHow group buying works
See it for yourself
Visit the site with our team, or get a call to clear your questions. Free, no obligation.
Key facts: plot sizes, approval, land and completion
- Plot sizes (feet)
- 30×40, 30×43, 33×40, 30×45 +10 more
- Plot area
- 1,082 – 2,803 sq ft
- Total plots
- 158
- Layout approved by
- Hoskote Planning Authority
- Land
- Not found in public records yet: land area
- Land conversion orders
- 13
- Completion (RERA)
- Dec 2027
- Development (RERA update)
- 98%
Plot sizes (RERA filing)
15 rows: plot sizes. Scroll inside the table to see them all.
| Size (feet) | Area | Plots |
|---|---|---|
| 30×40 | 1,200 sq ft | 3 |
| 30×43 | 1,290 sq ft | 11 |
| 33×40 | 1,320 sq ft | 14 |
| 30×45 | 1,350 sq ft | 1 |
| 35×40 | 1,400 sq ft | 10 |
| 30×49 | 1,470 sq ft | 10 |
| 30×50 | 1,500 sq ft | 30 |
| 40×40 | 1,600 sq ft | 4 |
| 30×55 | 1,650 sq ft | 5 |
| 40×45 | 1,800 sq ft | 2 |
| 40×50 | 2,000 sq ft | 3 |
| 35×60 | 2,100 sq ft | 1 |
| 40×55 | 2,200 sq ft | 2 |
| 50×55 | 2,750 sq ft | 1 |
| Odd-sized (irregular) | varies | 61 |
Sizes as filed with RERA, converted from metres to feet (9.14 m = 30 ft, 12.19 m = 40 ft). Ask the developer which plots are still unsold.
Land conversion orders (RERA filing)
13 rows: land conversion orders. Scroll inside the table to see them all.
| Survey no. | Converted for | Order | By |
|---|---|---|---|
| 5/6 | Residential and Commercial | No. ALN(EBB)SR/75/17-18, 30 Apr 2018 | DC |
| 10/2 | Residential and Commercial | No. 679084, 27 Jun 2024 | DC |
| 20/9 | Residential and Commercial | No. 585967, 20 Jan 2024 | DC |
| 5/5 (Old 5/1) | Residential and Commercial | No. ALN(EBB)SR/101/17-18, 7 Jul 2018 | DC |
| 6/7 | Residential and Commercial | No. ALN(EBB)SR/79/17-18, 30 Apr 2018 | DC |
| 6/10 (Old 6/1) | Residential and Commercial | No. 645553, 3 Apr 2024 | dc |
| 6/11 (Old Sy. No. 6/8) | Residential and Commercial | No. 645554, 3 Apr 2024 | DC |
| 6/12 (Old Sy. No. 6/9) | Residential and Commercial | No. 645557, 2 Feb 2024 | DC |
| 9/1A | Residential and Commercial | No. 333490, 11 Apr 2022 | DC |
| 10/1 | Residential and Commercial | No. 333488, 11 Apr 2022 | DC |
| 10-3 | Residential and Commercial | No. 197061, 19 Dec 2021 | DC |
| 24/5 | Residential and Commercial | No. 411105, 9 Oct 2022 | DC |
| 24/12 | Residential and Commercial | No. 686813, 22 Jul 2024 | DC |
RERA does not cover each plot’s khata. Ask the developer for the khata and title documents and have a lawyer check them before paying an advance.
Trifecta Verde En Resplandor Villa Phase 3 RERA number and registration details
- RERA number
- PRM/KA/RERA/1251/446/PR/230125/007422
- Registered on
- 23 Jan 2025
- Promised completion
- 9 Dec 2027
- Extended to
- No extension recorded
- RERA status
- Under construction
- Plots booked
- Not found in public records yet: plots booked
- Price
- Not found in public records yet: price
- Project type
- Plotted
Summary in plain English
Trifecta Verde En Resplandor Villa Phase 3 is a plotted layout by Trifecta Projects Private Limited in Hoskote, Bengaluru East, with 158 plots. The layout has been approved by Hoskote Planning Authority with 13 land conversion orders. The project is scheduled for completion on 9 December 2027.
Written by AI from the RERA record above on 16 Oct 2026. Every number in it was checked against that record; if anything differs, the record wins.
Open space, loans, escrow and other details
- Open space
- Not found in public records yet: open space
- Water and power
- Water source filed with RERA: BoreWell
- Plot loans: approved banks
- Not found in public records yet: bank approvals
- Payment plans
- Not found in public records yet: payment plans
- Maintenance
- Not found in public records yet: maintenance
- Car parking
- Not found in public records yet: car parking charge
- Escrow bank (RERA)
- HDFC, Mhadevapura
- Building plan (RERA)
- Hoskote Planning Authority · No. HPA/LAO/07/2022-23 · dated 12 Sep 2024
- Project cost declared to RERA
- ₹92.08 Cr
Amenities
Trifecta Verde En Resplandor Villa Phase 3 location and address
- Address
- Sy No 5/5, 5/6, 6/7, 6/10, 6/11, 6/12, 9/1A, 10/1, 10/2, 10/3, 20/9, 24/5, 24/12 of Jyothipura , Bidarahalli Hobli, Bengaluru East Taluk, Bangalore Urb , Bengaluru East , Bengaluru Urban, Karnataka - 562129
- Village (RERA)
- Not found in public records yet: village
- Locality
- Near HoskoteAlso known as Hosakote
- PIN code
- 562129
- City
- Bengaluru
- State
- Karnataka
- Coordinates
- 13.10815, 77.75070
Distances to landmarks
Not found in public records yet: landmarksAbout the locality
Not found in public records yet: locality factsCommute times to tech parks and the airport
| To | Straight line | Peak-hour drive (estimate) |
|---|---|---|
| Kempegowda International AirportMap point on OpenStreetMap (opens in a new tab) | 11.45 km | approx. 46 min |
| ITPL, Whitefield (main gate)Map point on OpenStreetMap (opens in a new tab) | 13.47 km | approx. 55 min |
| Manyata Tech ParkMap point on OpenStreetMap (opens in a new tab) | 15.66 km | approx. 63 min |
| Outer Ring Road tech corridor (RMZ Ecospace, Bellandur)Map point on OpenStreetMap (opens in a new tab) | 21.85 km | approx. 88 min |
| KSR Bengaluru City railway station (Majestic)Map point on OpenStreetMap (opens in a new tab) | 24.37 km | approx. 99 min |
| Electronic City Phase 1Map point on OpenStreetMap (opens in a new tab) | 30.2 km | approx. 122 min |
How we calculate
Straight line: from the project’s map point on RERA to the destination’s point on OpenStreetMap.
Peak-hour drive is a rough estimate, not a route: straight line × 1.35 for the road network, at 20 km/h. Real times vary a lot with the route and the hour.
Sources:Source (openstreetmap.org) (opens in a new tab)How we calculate this
Schools and hospitals nearby
Within 2 km
- 1Schools and colleges1 schools, 0 colleges, 0 kindergartens
- 0Hospitals and clinics0 hospitals, 0 clinics
Places as mapped on OpenStreetMap (amenity=school, college, kindergarten, university; hospital, clinic), counted within 2 km in a straight line of the RERA map point. Volunteers map these, so some places may be missing or closed. Places data © OpenStreetMap contributors, extract of 5 Oct 2026.
Nearest metro station and railway
- KIAL Terminals (ಕೆಐಎಬಿ ವಿಮಾನ ನಿಲ್ದಾಣ ಟರ್ಮಿನಲ್ಸ್)Blue Line metro, under construction10.81 km
- Airport City (ವಿಮಾನ ನಿಲ್ದಾಣ ನಗರ)Blue Line metro, under construction12.17 km
- Whitefield (Kadugodi) (ವೈಟ್ಫೀಲ್ಡ್ (ಕಾಡುಗೋಡಿ))Open now — nearest operating metro station12.52 km
- Whitefield (ವೈಟ್ಫೀಲ್ಡ್)Nearest railway station12.48 km
Straight-line distances from the RERA map point to the station points mapped on OpenStreetMap; status (open or under construction) as tagged there. Places data © OpenStreetMap contributors, extract of 5 Oct 2026.
Lake and lake-buffer check
The nearest mapped lake is Unnamed lake (mapped on OpenStreetMap), 877 m from the project’s RERA map point.
The site boundary is not published as a shape, so its nearest edge can be closer than this point. Whether any building sits inside a lake buffer can only be checked on the approved plan.
The buffer rule
Bengaluru’s lake buffer rule has changed over time: the National Green Tribunal ordered a 75 m buffer in May 2016; the Supreme Court set that order aside on 5 March 2019, leaving the 30 m buffer of the Revised Master Plan 2015. Check the current rule and the approved plan before relying on either number.
- LiveLaw: SC sets aside NGT order enlarging buffer zones (2019) (livelaw.in) (opens in a new tab)
- Citizen Matters: Shrinking lake buffers (citizenmatters.in) (opens in a new tab)
Shortest distance from the RERA map point to the mapped water edge (OpenStreetMap water polygons tagged lake or reservoir, or named lake/kere/tank). Mapped shorelines can differ from the revenue-record boundary of a lake. Places data © OpenStreetMap contributors, extract of 5 Oct 2026.
Sources:Source (openstreetmap.org) (opens in a new tab)Source (livelaw.in) (opens in a new tab)Source (citizenmatters.in) (opens in a new tab)How we calculate this
Satellite time-lapse of the site
Satellite photos load when you scroll to them.
Photos from Esri World Imagery Wayback, centred on the project’s map point; dates are the capture dates in Esri’s metadata. Loaded from Esri when you scroll here.
Sources:Source (livingatlas.arcgis.com) (opens in a new tab)
Trifecta Verde En Resplandor Villa Phase 3 layout plan and plot types as filed
Documents the developer uploaded to Karnataka RERA, shown as filed. Tap a page to see it full size; the full PDF opens on the RERA website.
Approved layout plan

Approved Layout Plan/Demarcation PlanFull PDF on RERA
Layout plan and brochure not published? The developer shares them only on request. We’ll get the brochure, layout plan and current price list for you, free.
Get brochure, layout plan & price| Plot type (as filed) | Area | Plots |
|---|---|---|
| 9.00m*12.00m | — | 3 |
| 9.14m*13.00m | — | 11 |
| 9.14m*13.72m | — | 1 |
| 9.14m*14.86m | — | 10 |
| 9.14m*15.24m | — | 27 |
| 9.14m*16.76m | — | 5 |
| 10.06m*12.00m | — | 14 |
| 10.69m*12.00m | — | 10 |
| 10.69m*18.29m | — | 1 |
| 12.00m*12.00m | — | 4 |
| 12.00m*15.24m | — | 3 |
| 12.00m*16.76m | — | 2 |
| 13.72m*12.00m | — | 2 |
| 15.24m*9.14m | — | 3 |
| 15.24m*16.76m | — | 1 |
| Odd-shaped plots | — | 61 |
Plot types and counts as filed with Karnataka RERA.
We have not collected the layout plan drawing; the developer’s sales team can share it.
Trifecta Verde En Resplandor Villa Phase 3 completion date and development status
Promoter’s quarterly update to RERA for Q2 2026-27, submitted 2026-10-15.
Timeline
- 10 Dec 2024Project start date given to RERA
- 23 Jan 2025Registered with Karnataka RERA
- 9 Dec 2027Completion date given at registration
Construction pace from RERA quarterly filings
At the average pace so far, construction would reach 100% around Oct 2026 — about 14 months before the completion date on RERA (9 Dec 2027).
At the pace between the 4 quarterly filings we have (80% → 98% in 9 months), it would be around Oct 2026 — about 13 months before the RERA date.
- Filed on RERA
- Average pace since start
- Pace between filings (and 0% assumed at the start date)
- RERA completion date
Quarterly filings
| Quarter | Filed on | Developed | Plots booked |
|---|---|---|---|
| Q2 2026-27to 30 Sep 2026 | 15 Oct 2026 | 98% | — |
| Q1 2026-27to 30 Jun 2026 | 15 Jul 2026 | 92% | — |
| Q4 2025-26to 31 Mar 2026 | 15 Apr 2026 | 87% | — |
| Q3 2025-26to 31 Dec 2025 | 13 Jan 2026 | 80% | — |
How we calculate
Average pace = % built ÷ months since the start date in the RERA record. Here: 98% ÷ 21.6 months (10 Dec 2024 to 30 Sep 2026) = 4.5% a month.
Estimated finish = latest filing date + (100 − % built) ÷ pace = 30 Sep 2026 + 2 ÷ 4.5 = 0.4 months → Oct 2026. This is an estimate, not a date from the builder or RERA.
Pace between filings = (98% − 80%) ÷ 9 months = 2% a month.
A straight line is a simplification: the builder reports one overall %, which mixes excavation, structure and finishing, and work rarely moves at a constant speed. The % values are the promoter’s own figures filed with RERA, not checked by us. Promoter’s quarterly update to RERA for Q2 2026-27, submitted 2026-10-15.
Sources:Source (rera.karnataka.gov.in) (opens in a new tab)How we calculate this
Approvals and documents checklist
| Approval | Authority | Source |
|---|---|---|
| Layout plan | Hoskote Planning Authority · No. HPA/LAO/07/2022-23 · dated 2024-09-12 | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Land conversion (13 orders) | DC · No. ALN(EBB)SR/75/17-18 and 12 more · dated 2024-07-22 | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Approved Layout Plan/Demarcation Plan | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| NOC from ESCOMs | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| NOC for Water | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| KSPCB (If Applicable) | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
Documents uploaded to RERA
- Building or layout plan · Approved drawings from the planning authorityFiled on RERA ✓ — Hoskote Planning Authority · No. HPA/LAO/07/2022-23 · dated 12 Sep 2024
- Commencement certificate · Permission to start buildingNot on RERA yet
- Environment clearance · SEIAA KarnatakaNot on RERA yet
- Fire NOC · Karnataka Fire and Emergency ServicesNot on RERA yet
- Pollution board consent · KSPCBFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
- Water and sewerage · BWSSBFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
- Electricity · BESCOMFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
- Height clearance · Airports Authority of IndiaNot on RERA yet
- Occupancy certificate (OC) · Issued only when the building is finishedNot on RERA yet — expected at completion
From the documents the promoter uploaded to Karnataka RERA, collected 16 Oct 2026. “Filed” means a document is on RERA — we have not checked its contents or validity. Not every approval applies to every project (for example, smaller projects may not need an environment clearance). The project page on RERA lists each upload.
Trifecta Verde En Resplandor Villa Phase 3 RERA complaints
No complaints listed on Karnataka RERA for this registration as on Source (rera.karnataka.gov.in) (opens in a new tab)
Court and consumer cases
We list case numbers, courts and outcomes only — never names of private individuals.
About Trifecta Projects Private Limited
- Promoter type
- Company
- Projects on this site
- 5
- RERA complaints against promoter
- 2
- Company number (CIN)
- U45200KA2012PTC062831
From Karnataka RERA, as collected so far (16 Oct 2026). Complaints are those RERA lists against this promoter across all its projects.
Trifecta Projects Private Limited’s RERA recordTrifecta Projects Private Limited delivery record
- 5Projects in Bengaluru on RERA6 approved registrations under Trifecta Projects Private Limited in Bengaluru Urban and Rural. Source (rera.karnataka.gov.in) (opens in a new tab)
- 1,866Homes and plots registeredAs stated in each registrations.
- 2RERA complaints2 open, 0 disposed. as on Source (rera.karnataka.gov.in) (opens in a new tab)
- 1.1Complaints per 1,000 homes and plots2 complaints ÷ 1,866 homes and plots in its 6 registrations on Karnataka RERA in Bengaluru.
- 2Completion filed on RERARegistrations where the promoter applied to RERA for completion; 2 with an occupancy certificate on RERA.
- 2 of 2Filed by the date given at registrationMedian gap 0 months (on-time ones count as 0). The completion application can come after handover, so this is an upper bound on lateness.
What the complaints are about
2 complaint subjects as written on RERA, as on . Each subject is sorted into one group by keywords (first match wins: delay, refund, registration, quality, litigation, association); one complaint often raises several issues. Source (rera.karnataka.gov.in) (opens in a new tab)
Completion filed on RERA
| Project | Date at registration | Completion filed | Gap |
|---|---|---|---|
| Trifecta Verdeen Resplandor Row House Phase-3OC on RERA | 30 Sep 2026 | 29 Sep 2026 | By the date |
| Trifecta RettoOC on RERA | 26 Mar 2026 | 23 Dec 2025 | By the date |
Measured against the completion date given at registration; many projects had RERA extensions (including the COVID-period extension), shown under the date.
Sources:Source (rera.karnataka.gov.in) (opens in a new tab)How we calculate this
What’s changed since Sep 2024
- 15 Oct 2026Quarterly update filed for Q2 2026-27: 98% built Source (rera.karnataka.gov.in) (opens in a new tab)
- 15 Jul 2026Quarterly update filed for Q1 2026-27: 92% built Source (rera.karnataka.gov.in) (opens in a new tab)
- 15 Apr 2026Quarterly update filed for Q4 2025-26: 87% built Source (rera.karnataka.gov.in) (opens in a new tab)
- 13 Jan 2026Quarterly update filed for Q3 2025-26: 80% built Source (rera.karnataka.gov.in) (opens in a new tab)
- 23 Jan 2025Registered with Karnataka RERA (PRM/KA/RERA/1251/446/PR/230125/007422); completion date 9 Dec 2027 Source (rera.karnataka.gov.in) (opens in a new tab)
- 10 Dec 2024Project start date in the RERA record Source (rera.karnataka.gov.in) (opens in a new tab)
- 12 Sep 2024Building plan approved by Hoskote Planning Authority (No. HPA/LAO/07/2022-23) Source (rera.karnataka.gov.in) (opens in a new tab)
Newest first. No extension of the completion date is recorded on RERA. When the RERA crawl sees a new filing, complaint or extension, it is added here with its date.
Plot loan EMI calculator
- Monthly EMI
- —
- Down payment
- —
- Loan amount
- —
- Total interest
- —
A calculation only, from the numbers you enter — not a loan offer.
Trifecta Verde En Resplandor Villa Phase 3 FAQs
What plot sizes are available in Trifecta Verde En Resplandor Villa Phase 3?
Plot sizes range from 30×40 feet (1,200 sq ft) to 50×55 feet (2,750 sq ft). The most common plot size is 30×50 feet with 1,500 sq ft area (30 plots available). The project also has 61 odd-sized plots not listed individually in the RERA record.
How many plots are in this project?
The project has 158 plots in total.
What is the RERA registration number for Trifecta Verde En Resplandor Villa Phase 3?
The RERA registration number is PRM/KA/RERA/1251/446/PR/230125/007422, registered on 23 January 2025.
When will Trifecta Verde En Resplandor Villa Phase 3 be completed?
The project is scheduled for completion on 9 December 2027 according to the RERA record.
What is the current development progress of the layout?
As of Q2 2026-27 (ended 30 September 2026), the layout development is 98 percent complete.
How many plots have been booked in Trifecta Verde En Resplandor Villa Phase 3?
The RERA record does not show how many plots have been booked.
Are there any RERA complaints against this project?
No RERA complaints have been filed on this project registration.
Where is Trifecta Verde En Resplandor Villa Phase 3 located?
The project is in Hoskote, Bengaluru East taluk, with PIN code 562129.
Who approved the layout and what land conversion orders were issued?
The layout was approved by Hoskote Planning Authority with 13 land conversion orders.
What is the developer's track record with RERA?
Trifecta Projects Private Limited has 2 RERA complaints across all projects and 8 projects registered with Karnataka RERA.
Written by AI from the RERA record above on 16 Oct 2026. Answers use only that record; check them against the source before you decide.
Questions about Trifecta Verde En Resplandor Villa Phase 3
No questions published yet. Ask the first one: you get an instant answer from this page’s public record, and our team follows up on anything the record does not show.
Bought a plot from Trifecta Projects Private Limited? Review the developer.
Reviews of Trifecta Projects Private Limited by verified buyers
No verified reviews of Trifecta Projects Private Limited yet. If you bought a plot from them, your review helps other buyers.
How reviews work: only buyers and owners can review; we confirm each purchase by phone before publishing, publish positive and negative reviews alike, never accept payment for reviews, and the developer may reply.
Similar projects within 5 km
| Project | Distance | Plots | Completion (RERA) | Developed | Complaints | Price |
|---|---|---|---|---|---|---|
| Sizzle East Coast Phase 4Harsha S | 2.5 km | 56 | Aug 2031 | — | 0 | Not collected |
| M1 Terra Alegria Phase 2M1 Housing LLP | 2.6 km | 224 | Jun 2026 | 100% | 0 | Not collected |
| Konig Fortune CountyKonig Homes | 3.5 km | 146 | Mar 2028 | 77% | 0 | Not collected |
| White LakesM S Vijayakumar | 4 km | 76 | May 2025extended | — | 0 | Not collected |
| Elements Of Nature Happy HiveUrban Fields Realty LLP | 4.4 km | 301 | Oct 2028 | — | 0 | Not collected |
| Signature Tulips UptownM/S KVR Sowbhagya Properties | 4.8 km | 182 | May 2026 | — | 0 | Not collected |
Projects of the same kind within 5 km in a straight line of this project’s RERA map point, nearest first. % built is the promoter’s latest quarterly figure on RERA (shown for single-registration projects); prices are from the developer’s own website where we found one.
Sources and last checked dates
Collected on 16 Oct 2026 by AI research agents reading public pages. Facts are written in our own words. Not found yet: price; court cases; landmarks; specifications; news.
How to check on RERA: On rera.karnataka.gov.in/viewAllProjects, type the registration number in 'Registration No', press Search, then click the 'View Project Details' icon. Complaints open from the 'Complaints / Litigation' icon in the same row. Registration number: PRM/KA/RERA/1251/446/PR/230125/007422.
- RERA record last checked: 16 Oct 2026
- Last change in the record (registration, quarterly filing or complaint): 16 Oct 2026
How this page is made: software builds it from public records (Karnataka RERA filings, OpenStreetMap, the developer’s own website). AI is used only to read filings into fields and to write the plain-English summary and FAQ answers, which are checked against the record. Facts are checked automatically against the RERA filing. Methodology · How we earn · Report an error
More new projects nearby
Kodagihalli, near Budigere CrossUnder constructionRERA registeredBuyers’ group openSizzle East Coast Phase 4
by Harsha S
Price: Price on requestGet brochure & price →
- 25×40, 30×40, 30×50 +1 more
- 982 – 1,600 sq ft plots
- Approved by Hoskote Planning Authority
- Aug 2031
56 plots
Be one of the first 10 buyers in this groupFounding members — it’s free
Join group for Sizzle East Coast Phase 4- Alappanahalli, near Hoskote© Esri, Maxar, Earthstar GeographicsReady to moveRERA registeredBuyers’ group open
M1 Terra Alegria Phase 2
by M1 Housing
Price: Price on requestGet brochure & price →
- 30×40, 30×50
- 865 – 5,499 sq ft plots
- Approved by BMRDA
- Jun 2026
224 plots
Be one of the first 10 buyers in this groupFounding members — it’s free
Join group for M1 Terra Alegria Phase 2
Bamenahalli, Budigere CrossUnder constructionRERA registeredBuyers’ group openKonig Fortune County
by Konig Homes
Price: Price on requestGet brochure & price →
- 30×40, 30×50, 40×40 +1 more
- 1,087 – 5,199 sq ft plots
- Approved by Local Planning Authority
- Mar 2028
146 plots
Be one of the first 10 buyers in this groupFounding members — it’s free
Join group for Konig Fortune County