True North by Livingwalls
2, 3 & 4 BHK apartments by M/S VDB Infra and Realty Private Limited · Hennur Road, Bengaluru
Hennur Road, BengaluruOpen on Google Maps (opens in a new tab)
- Under construction
- RERA registered
- residential
by M/S VDB Infra and Realty Private Limited
Price: Price on request
Site photo filed with Karnataka RERA Karnataka RERA filing · Source ↗ (opens in a new tab)
True North by Livingwalls at a glance
- Possession (RERA)Jun 2028Karnataka RERA
- Construction41% built · on pace for May 2029 10 mo after RERA dateRERA filing to 30 Jun 2026; estimate from average pace
- Homes booked153 bookedRERA lists 82 homes; figures as filed · RERA update · as on 30 Jun 2026
- RERA complaints (project)None listedKarnataka RERA · as on 21 Oct 2026
- Approvals filed8 of 9 on RERAKarnataka RERA uploads · 21 Oct 2026
- Nearest metroNagawara · 4.69 km (under construction)Open now: Krishnarajapura, 8.74 km · straight line · OpenStreetMap, 5 Oct 2026
- Airport driveapprox. 61 min at peak15.16 km straight line · estimate
- Nearest lakeUnnamed lake · 648 mFrom the RERA map point · OpenStreetMap, 5 Oct 2026
Project summary
True North by Livingwalls is a residential project by M/S VDB Infra and Realty Private Limited in Bengaluru with 82 homes, registered with Karnataka RERA. The completion date on RERA is 30 Jun 2028.
Not in the RERA record we collected yet: locality. This page fills in as the record is collected.
Facts collected on 21 Oct 2026 from public records — each linked to its source. Free for buyers. If you book through us, the builder pays us a commission.
True North by Livingwalls buyers’ group: join to ask for a group price
No one has joined yet. Be one of the first 10 buyers in this group — the founding members.
Join free. When enough buyers have joined, our agent partner asks M/S VDB Infra and Realty Private Limited for a group price — for example a lower price, an easier payment plan or waived charges. Nothing is promised: you see what the builder offers and book directly with the builder if you want to. Free for buyers. If you book through us, the builder pays us a commission.
- Gathering buyers
- Talking to the builder
- Group offer
- Group site visit
- Booking
0 buyers have joined · 0 committed
Committed buyers have confirmed their budget, home type and timeline with us on a call; builders negotiate with them. Joining is free and never obliges you to buy.
Join the True North by Livingwalls buyers’ groupHow group buying works
See it for yourself
Visit the site with our team, or get a call to clear your questions. Free, no obligation.
Key facts: home types, towers, land and possession
- Home types
- 2 BHK, 3 BHK, 3.5 BHK, 4 BHK
- Carpet area
- 866 – 3,167 sq ft
- Towers
- 2
- Floors
- 33
- Total homes
- 82
- Land
- 2.9 acres
- Possession (RERA)
- Jun 2028
- Built (RERA update)
- 41%
True North by Livingwalls RERA number and registration details
- RERA number
- PRM/KA/RERA/1251/446/PR/050824/006961
- Registered on
- 5 Aug 2024
- Promised completion
- 30 Jun 2028
- Extended to
- No extension recorded
- RERA status
- New launch
- Homes booked
- 153 of 82 as on
- Price
- Not found in public records yet: price
- Project type
- Residential
Towers and blocks (RERA filing)
| Tower | Floors | Basements | Homes |
|---|---|---|---|
| West Tower | 33 | 3 | 186 |
| East Tower | 32 | 3 | 120 |
A dash (—) means the filing did not state that value.
Summary in plain English
True North by Livingwalls is a residential project by M/S VDB Infra and Realty Private Limited in Bengaluru East with 82 homes across 2 towers, each up to 33 floors. The project is registered with Karnataka RERA and is scheduled for completion on 30 June 2028.
Written by AI from the RERA record above on 21 Oct 2026. Every number in it was checked against that record; if anything differs, the record wins.
Open space, home loans, escrow and other details
- Open space
- 76.5% of land
- Water and power
- Water source filed with RERA: BWSSB
- Home loans: approved banks
- Not found in public records yet: bank approvals
- Payment plans
- Not found in public records yet: payment plans
- Maintenance
- Not found in public records yet: maintenance
- Car parking
- Not found in public records yet: car parking charge
- Escrow bank (RERA)
- ICICI Bank, Indiranagar
- Building plan (RERA)
- BBMP - Bruhat Bengaluru Mahanagara Palike · No. BBMP/AddL.Dir/JDNORTH/0103/23-24 · dated 12 Jun 2024
- Project cost declared to RERA
- ₹269 Cr
Open area as a share of the land, from the areas filed with RERA (includes driveways and landscaped areas).
Amenities
- Electricity
- CCTV Surveillance
- Club House
- Outdoor Sports facility
- Indoor Sports facility
- Swimming Pool
- Gym
- Parks
- Power Backup
Amenities and internal works as filed by the promoter with Karnataka RERA; we have not visited the site.
True North by Livingwalls location and address
- Address
- KATHA NO. 675/162/1, 161/2, SY. NO. 162/1, 161/2 HENNUR BAGALURU MAIN ROAD , WARD NO. 54, MAHADEVPURA , Bengaluru East , Bengaluru Urban, Karnataka - 560077
- Village (RERA)
- Not found in public records yet: village
- Locality
- Hennur RoadAlso known as Hennur Main Road, Hennur-Bagalur Road, Hennur
- PIN code
- 560077
- City
- Bengaluru
- State
- Karnataka
- Coordinates
- 13.07440, 77.65182
Distances to landmarks
Not found in public records yet: landmarksAbout Hennur Road
Not found in public records yet: locality factsCommute times to tech parks and the airport
| To | Straight line | Peak-hour drive (estimate) |
|---|---|---|
| Manyata Tech ParkMap point on OpenStreetMap (opens in a new tab) | 4.53 km | approx. 18 min |
| ITPL, Whitefield (main gate)Map point on OpenStreetMap (opens in a new tab) | 13.41 km | approx. 54 min |
| KSR Bengaluru City railway station (Majestic)Map point on OpenStreetMap (opens in a new tab) | 13.93 km | approx. 56 min |
| Kempegowda International AirportMap point on OpenStreetMap (opens in a new tab) | 15.16 km | approx. 61 min |
| Outer Ring Road tech corridor (RMZ Ecospace, Bellandur)Map point on OpenStreetMap (opens in a new tab) | 17.06 km | approx. 69 min |
| Electronic City Phase 1Map point on OpenStreetMap (opens in a new tab) | 25.03 km | approx. 101 min |
How we calculate
Straight line: from the project’s map point on RERA to the destination’s point on OpenStreetMap.
Peak-hour drive is a rough estimate, not a route: straight line × 1.35 for the road network, at 20 km/h. Real times vary a lot with the route and the hour.
Sources:Source (openstreetmap.org) (opens in a new tab)How we calculate this
Schools and hospitals nearby
Within 2 km
- 35Schools and colleges19 schools, 14 colleges, 2 kindergartens
- 5Hospitals and clinics3 hospitals, 2 clinics
Nearest schools and colleges
- Poornaprajna School · 0.09 km
- New Horizon International School · 0.19 km
- Southern Asia Bible College · 0.37 km
Nearest hospitals and clinics
- Bangalore Baptist Clinic · 1.47 km
- Shirdi Sai Hospital · 1.58 km
- K Narayanapura Urban Primary Health Centre · 1.61 km
Places as mapped on OpenStreetMap (amenity=school, college, kindergarten, university; hospital, clinic), counted within 2 km in a straight line of the RERA map point. Volunteers map these, so some places may be missing or closed. Places data © OpenStreetMap contributors, extract of 5 Oct 2026.
Nearest metro station and railway
- Nagawara (ನಾಗವಾರ)Pink Line metro, under construction4.69 km
- Veerannapalya (ವೀರಣ್ಣಪಾಳ್ಯ)Blue Line metro, under construction5.21 km
- HBR Layout (ಎಚ್ಬಿಆರ್ ಲೇ ಔಟ್)Blue Line metro, under construction5.23 km
- Krishnarajapura (ಕೃಷ್ಣರಾಜಪುರ (ಕೆ.ಆರ್.ಪುರ))Open now — nearest operating metro station8.74 km
- Channasandra (ಚನ್ನಸಂದ್ರ)Nearest railway station7.05 km
Straight-line distances from the RERA map point to the station points mapped on OpenStreetMap; status (open or under construction) as tagged there. Places data © OpenStreetMap contributors, extract of 5 Oct 2026.
Lake and lake-buffer check
The nearest mapped lake is Unnamed lake (mapped on OpenStreetMap), 648 m from the project’s RERA map point.
The site boundary is not published as a shape, so its nearest edge can be closer than this point. Whether any building sits inside a lake buffer can only be checked on the approved plan.
- Unnamed lake (mapped on OpenStreetMap) on OpenStreetMap (opens in a new tab) 648 m
- Nagaraesh Nagenahalli Lake on OpenStreetMap (opens in a new tab) (ನಾಗೇನಹಳ್ಳಿ ಕೆರೆ)861 m
- Unnamed lake (mapped on OpenStreetMap) on OpenStreetMap (opens in a new tab) 1,054 m
The buffer rule
Bengaluru’s lake buffer rule has changed over time: the National Green Tribunal ordered a 75 m buffer in May 2016; the Supreme Court set that order aside on 5 March 2019, leaving the 30 m buffer of the Revised Master Plan 2015. Check the current rule and the approved plan before relying on either number.
- LiveLaw: SC sets aside NGT order enlarging buffer zones (2019) (livelaw.in) (opens in a new tab)
- Citizen Matters: Shrinking lake buffers (citizenmatters.in) (opens in a new tab)
Shortest distance from the RERA map point to the mapped water edge (OpenStreetMap water polygons tagged lake or reservoir, or named lake/kere/tank). Mapped shorelines can differ from the revenue-record boundary of a lake. Places data © OpenStreetMap contributors, extract of 5 Oct 2026.
Sources:Source (openstreetmap.org) (opens in a new tab)Source (livelaw.in) (opens in a new tab)Source (citizenmatters.in) (opens in a new tab)How we calculate this
Satellite time-lapse of the site
Satellite photos load when you scroll to them.
Photos from Esri World Imagery Wayback, centred on the project’s map point; dates are the capture dates in Esri’s metadata. Loaded from Esri when you scroll here.
Sources:Source (livingatlas.arcgis.com) (opens in a new tab)
True North by Livingwalls home types and carpet areas
Documents the builder uploaded to Karnataka RERA, shown as filed. Tap a page to see it full size; the full PDF opens on the RERA website.
Approved building plan2 files

Modified Approved PlanFull PDF on RERA 
VDB approved drawing.pdfFull PDF on RERA
Approved layout plan3 files

Approved Layout PlanFull PDF on RERA 
CDP Demarcation plan.pdfFull PDF on RERA 
Location & demarcation.pngFull PDF on RERA
Floor plans and brochure not published? The builder shares them only on request. We’ll get the brochure, floor plans and current price list for you, free.
Get brochure, floor plans & price| Home type | Carpet area | Homes |
|---|---|---|
| 2 BHK | 866 – 869 sq ft | 9 |
| 3 BHK | 1,113 – 1,869 sq ft | 38 |
| 3.5 BHK | 1,399 – 1,921 sq ft | 28 |
| 4 BHK | 2,033 – 3,167 sq ft | 7 |
Home types, counts and carpet areas as filed with Karnataka RERA (carpet area, not super built-up).
We have not collected floor-plan drawings; the builder’s sales team can share them.
True North by Livingwalls possession date and construction status
Promoter’s quarterly update to RERA for Q1 2026-27, submitted 2026-07-15.
By tower (Q1 2026-27)
Units sold and unsold, from RERA (Q1 2026-27)
| Type | Homes | Booked | Available |
|---|---|---|---|
| 2 BHK | 30 | 8 | 22 |
| 3 BHK | 152 | 84 | 68 |
| 4 BHK | 8 | 1 | 7 |
| 3.5 BHK | 116 | 60 | 56 |
As reported by the promoter in the quarterly update to RERA, not verified by us.
Timeline
- 1 Jul 2024Project start date given to RERA
- 5 Aug 2024Registered with Karnataka RERA
- 30 Jun 2028Completion date given at registration
Construction pace from RERA quarterly filings
At the average pace so far, construction would reach 100% around May 2029 — about 10 months after the completion date on RERA (30 Jun 2028).
At the pace between the 3 quarterly filings we have (34% → 41% in 6 months), it would be around Sep 2030 — about 26 months after the RERA date.
- Filed on RERA
- Average pace since start
- Pace between filings (and 0% assumed at the start date)
- RERA completion date
Quarterly filings
| Quarter | Filed on | Built | Homes booked |
|---|---|---|---|
| Q1 2026-27to 30 Jun 2026 | 15 Jul 2026 | 41% | 153 of 306 |
| Q4 2025-26to 31 Mar 2026 | 15 Apr 2026 | 38% | 150 of 306 |
| Q3 2025-26to 31 Dec 2025 | 14 Jan 2026 | 34% | 146 of 306 |
How we calculate
Average pace = % built ÷ months since the start date in the RERA record. Here: 41% ÷ 23.9 months (1 Jul 2024 to 30 Jun 2026) = 1.7% a month.
Estimated finish = latest filing date + (100 − % built) ÷ pace = 30 Jun 2026 + 59 ÷ 1.7 = 34.5 months → May 2029. This is an estimate, not a date from the builder or RERA.
Pace between filings = (41% − 34%) ÷ 5.9 months = 1.2% a month.
A straight line is a simplification: the builder reports one overall %, which mixes excavation, structure and finishing, and work rarely moves at a constant speed. The % values are the promoter’s own figures filed with RERA, not checked by us. Promoter’s quarterly update to RERA for Q1 2026-27, submitted 2026-07-15.
Sources:Source (rera.karnataka.gov.in) (opens in a new tab)How we calculate this
Approvals and documents checklist
14 rows: approvals. Scroll inside the table to see them all.
| Approval | Authority | Source |
|---|---|---|
| Building plan | BBMP - Bruhat Bengaluru Mahanagara Palike · No. BBMP/AddL.Dir/JDNORTH/0103/23-24 · dated 2024-06-12 | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Land conversion (2 orders) | DC office, Bangalore · No. 10508 and 1 more · dated 2024-05-21 | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Commencement Certificate | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Electricity Permission Letter | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Water Permission Letter | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Approved Layout Plan | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Approved Building/Plotting Plan | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Approved Section Of Building/Infrastructure Plan of Plotting | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| ESCOM/Electricity | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| KWSSB/Water | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Fire Force Department | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Airport Authority of India | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| KSPCB | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| SEIAA | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
Documents uploaded to RERA
- Building or layout plan · Approved drawings from the planning authorityFiled on RERA ✓ — BBMP - Bruhat Bengaluru Mahanagara Palike · No. BBMP/AddL.Dir/JDNORTH/0103/23-24 · dated 12 Jun 2024
- Commencement certificate · Permission to start buildingFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
- Environment clearance · SEIAA KarnatakaFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
- Fire NOC · Karnataka Fire and Emergency ServicesFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
- Pollution board consent · KSPCBFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
- Water and sewerage · BWSSBFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
- Electricity · BESCOMFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
- Height clearance · Airports Authority of IndiaFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
- Occupancy certificate (OC) · Issued only when the building is finishedNot on RERA yet — expected at completion
From the documents the promoter uploaded to Karnataka RERA, collected 21 Oct 2026. “Filed” means a document is on RERA — we have not checked its contents or validity. Not every approval applies to every project (for example, smaller projects may not need an environment clearance). The project page on RERA lists each upload.
True North by Livingwalls RERA complaints
No complaints listed on Karnataka RERA for this registration as on Source (rera.karnataka.gov.in) (opens in a new tab)
Court and consumer cases
We list case numbers, courts and outcomes only — never names of private individuals.
About M/S VDB Infra and Realty Private Limited
- Promoter type
- Company
- Projects on this site
- 2
- RERA complaints against promoter
- 0
- Company number (CIN)
- U70100KA2011PTC059684
From Karnataka RERA, as collected so far (21 Oct 2026). Complaints are those RERA lists against this promoter across all its projects.
M/S VDB Infra and Realty Private Limited’s RERA recordM/S VDB Infra and Realty Private Limited delivery record
- 2Projects in Bengaluru on RERA2 approved registrations under M/S VDB Infra and Realty Private Limited in Bengaluru Urban and Rural. Source (rera.karnataka.gov.in) (opens in a new tab)
- 96Homes registeredAs stated in each registrations.
- 0RERA complaintsas on Source (rera.karnataka.gov.in) (opens in a new tab)
- 0Complaints per 1,000 homes0 complaints ÷ 96 homes in its 2 registrations on Karnataka RERA in Bengaluru.
Sources:Source (rera.karnataka.gov.in) (opens in a new tab)How we calculate this
What’s changed since Jun 2024
- 15 Jul 2026Quarterly update filed for Q1 2026-27: 41% built, 153 of 306 homes booked Source (rera.karnataka.gov.in) (opens in a new tab)
- 15 Apr 2026Quarterly update filed for Q4 2025-26: 38% built, 150 of 306 homes booked Source (rera.karnataka.gov.in) (opens in a new tab)
- 14 Jan 2026Quarterly update filed for Q3 2025-26: 34% built, 146 of 306 homes booked Source (rera.karnataka.gov.in) (opens in a new tab)
- 5 Aug 2024Registered with Karnataka RERA (PRM/KA/RERA/1251/446/PR/050824/006961); completion date 30 Jun 2028 Source (rera.karnataka.gov.in) (opens in a new tab)
- 1 Jul 2024Project start date in the RERA record Source (rera.karnataka.gov.in) (opens in a new tab)
- 12 Jun 2024Building plan approved by BBMP - Bruhat Bengaluru Mahanagara Palike (No. BBMP/AddL.Dir/JDNORTH/0103/23-24) Source (rera.karnataka.gov.in) (opens in a new tab)
Newest first. No extension of the completion date is recorded on RERA. When the RERA crawl sees a new filing, complaint or extension, it is added here with its date.
Home loan EMI calculator
- Monthly EMI
- —
- Down payment
- —
- Loan amount
- —
- Total interest
- —
A calculation only, from the numbers you enter — not a loan offer.
All-in cost: GST, registration and other charges
The calculator loads when you scroll to it.
Assumptions
- Base price: the builder’s price is not published in a form we could collect — enter it from the cost sheet.
- GST 5% on the base price and charges — the usual rate for an under-construction home that is not “affordable housing” (1%).
- Stamp duty about 5.6% and registration 2% — the Karnataka rule (registration was raised from 1% to 2% on 31 Aug 2025). Calculated on the agreement value.
- Car parking, other charges and the maintenance deposit are not in the public record we collect; enter them from the builder’s cost sheet.
- Loan on the agreement value (banks usually lend up to 75–90%); EMI is the standard reducing-balance formula. Example rate only — use your bank’s quote.
True North by Livingwalls FAQs
What is the completion date for True North by Livingwalls?
The project is scheduled for completion on 30 June 2028, according to the Karnataka RERA record.
How many homes are in True North by Livingwalls?
The project has 82 homes across 2 towers, each with a maximum of 33 floors.
What home types are available in True North by Livingwalls?
The project offers 2 BHK (9 homes), 3 BHK (38 homes), 3.5 BHK (28 homes), and 4 BHK (7 homes).
What is the carpet area range for 3 BHK homes in True North by Livingwalls?
3 BHK homes have carpet area between 1,113 sq ft and 1,869 sq ft.
What is the carpet area range for 3.5 BHK homes in True North by Livingwalls?
3.5 BHK homes have carpet area between 1,399 sq ft and 1,921 sq ft.
What is the carpet area range for 4 BHK homes in True North by Livingwalls?
4 BHK homes have carpet area between 2,033 sq ft and 3,167 sq ft.
Where is True North by Livingwalls located?
The project is located in Bengaluru East taluk, Bengaluru Urban district, with PIN code 560077.
What is the construction progress for True North by Livingwalls?
As of Q1 2026-27 (quarter ended 30 June 2026), the project is 41 per cent complete.
How many homes have been booked in True North by Livingwalls?
As of Q1 2026-27 (quarter ended 30 June 2026), 153 homes were booked out of 306 in the booking table.
Are there any RERA complaints on True North by Livingwalls?
There are no RERA complaints on this project, and no complaints against the builder across all their projects on record.
Written by AI from the RERA record above on 21 Oct 2026. Answers use only that record; check them against the source before you decide.
Questions about True North by Livingwalls
No questions published yet. Ask the first one: you get an instant answer from this page’s public record, and our team follows up on anything the record does not show.
Bought a home from M/S VDB Infra and Realty Private Limited? Review the builder.
Reviews of M/S VDB Infra and Realty Private Limited by verified buyers
No verified reviews of M/S VDB Infra and Realty Private Limited yet. If you bought a home from them, your review helps other buyers.
How reviews work: only buyers and owners can review; we confirm each purchase by phone before publishing, publish positive and negative reviews alike, never accept payment for reviews, and the builder may reply.
Similar projects within 5 km
| Project | Distance | Homes | Possession (RERA) | Built | Complaints | Price |
|---|---|---|---|---|---|---|
| Neuma ElyseeNeuma Realty Private Limited | 0.5 km | 32 | Dec 2030 | 25% | 0 | Not collected |
| DNR ParklinkDNR Corporation Private Limited | 0.7 km | 784 | May 2029 | — | 0 | Not collected |
| La VitaSattva Resi Private Limited | 0.7 km | 63 | Jul 2026 | 66% | 0 | Not collected |
| Assetz Mizu & KiApg Skywards Private Limited | 1 km | 188 | Aug 2030 | 50% | 0 | Not collected |
| The Pearl ParadiseSri Sai Infra Projects | 1.1 km | 32 | Dec 2026 | 90% | 0 | Not collected |
| Adarsh TranqvilleVarin Infra Projects Private Limited | 1.1 km | 81 | Mar 2026extended | 100% | 2 | Not collected |
Projects of the same kind within 5 km in a straight line of this project’s RERA map point, nearest first. % built is the promoter’s latest quarterly figure on RERA (shown for single-registration projects); prices are from the builder’s own website where we found one.
Sources and last checked dates
Collected on 21 Oct 2026 by AI research agents reading public pages. Facts are written in our own words. Not found yet: price; court cases; landmarks; specifications; news.
How to check on RERA: On rera.karnataka.gov.in/viewAllProjects, type the registration number in 'Registration No', press Search, then click the 'View Project Details' icon. Complaints open from the 'Complaints / Litigation' icon in the same row. Registration number: PRM/KA/RERA/1251/446/PR/050824/006961.
- RERA record last checked: 21 Oct 2026
- Last change in the record (registration, quarterly filing or complaint): 15 Jul 2026
How this page is made: software builds it from public records (Karnataka RERA filings, OpenStreetMap, the builder’s own website). AI is used only to read filings into fields and to write the plain-English summary and FAQ answers, which are checked against the record. Facts are checked automatically against the RERA filing. Methodology · How we earn · Report an error
More new projects in Hennur Road
Byrathi, Hennur RoadUnder constructionRERA registeredBuyers’ group openNeuma Elysee
by Neuma Realty
Price: Price on requestGet brochure & price →
- 5 BHK
- 2,861 – 6,318 sq ft
- Dec 2030
32 homes
Be one of the first 10 buyers in this groupFounding members — it’s free
Join group for Neuma Elysee
Byrathi Chikkagubbi, Hennur RoadUnder constructionRERA registeredBuyers’ group openDNR Parklink
by DNR Corporation
Price: Price on requestGet brochure & price →
- 1 BHK, 2 BHK, 2.5 BHK, 3 BHK
- 431 – 12,347 sq ft
- May 2029
2 phases on RERA · 784 homes
Be one of the first 10 buyers in this groupFounding members — it’s free
Join group for DNR Parklink
Byrathi, Hennur RoadArtist’s impressionUnder constructionRERA registeredBuyers’ group openLa Vita
by Sattva Resi
Price: Price on requestGet brochure & price →
- Villa
- 2,497 – 2,579 sq ft
- Jul 2026
RERA not updated since promised Jul 2026 · 63 homes
Be one of the first 10 buyers in this groupFounding members — it’s free
Join group for La Vita