United Green Woods

Apartments by United Green Woods · Samethanahalli, near Kadugodi–Hope Farm, Bengaluru

Samethanahalli, near Kadugodi–Hope Farm, BengaluruOpen on Google Maps (opens in a new tab)

  • Under construction
  • RERA registered
  • residential

by United Green Woods

Price: Price on request

Get brochure, floor plans & price

Brochure, floor plans and price list for United Green Woods

Builders share their brochure, floor plans and price list only on request. Tell us how to reach you and we’ll get them and send them to you, free.

Free for buyers. If you book through us, the builder pays us a commission. How we earn

Project summary

United Green Woods is a residential project by United Green Woods in Samethanahalli, Bengaluru with 282 homes, registered with Karnataka RERA. The completion date on RERA is 16 Mar 2028.

Facts collected on 21 Oct 2026 from public records — each linked to its source. Free for buyers. If you book through us, the builder pays us a commission.

United Green Woods buyers’ group: join to ask for a group price

No one has joined yet. Be one of the first 10 buyers in this group — the founding members.

Join free. When enough buyers have joined, our agent partner asks United Green Woods for a group price — for example a lower price, an easier payment plan or waived charges. Nothing is promised: you see what the builder offers and book directly with the builder if you want to. Free for buyers. If you book through us, the builder pays us a commission.

  1. Gathering buyers
  2. Talking to the builder
  3. Group offer
  4. Group site visit
  5. Booking

0 buyers have joined · 0 committed

Committed buyers have confirmed their budget, home type and timeline with us on a call; builders negotiate with them. Joining is free and never obliges you to buy.

Join the United Green Woods buyers’ groupHow group buying works

See it for yourself

Visit the site with our team, or get a call to clear your questions. Free, no obligation.

Key facts: home types, towers, land and possession

Updated on 21 Oct 2026
Home types
Not found in public records yet: home types
Carpet area
552 – 1,632 sq ft
Towers
2
Floors
5
Total homes
282
Land
4.26 acres
Possession (RERA)
Mar 2028
Built (RERA update)
65%

United Green Woods RERA number and registration details

RERA number
PRM/KA/RERA/1250/304/PR/161124/007237
Registered on
16 Nov 2024
Promised completion
16 Mar 2028
Extended to
No extension recorded
RERA status
New launch
Homes booked
190 of 282 as on
Price
Not found in public records yet: price
Project type
Residential

Towers and blocks (RERA filing)

TowerFloorsBasementsHomes
Block A51192
Block B5090

A dash (—) means the filing did not state that value.

Sources:Source (rera.karnataka.gov.in) (opens in a new tab)

Summary in plain English

United Green Woods is a residential project by United Green Woods in Samethanahalli, Hosakote, with 282 homes across 2 towers. The project has a RERA completion date of 16 March 2028.

Written by AI from the RERA record above on 5 Oct 2026. Every number in it was checked against that record; if anything differs, the record wins.

Open space, home loans, escrow and other details

Open space
62.8% of land
Water and power
Water source filed with RERA: BoreWell,Others
Home loans: approved banks
Not found in public records yet: bank approvals
Payment plans
Not found in public records yet: payment plans
Maintenance
Not found in public records yet: maintenance
Car parking
Not found in public records yet: car parking charge
Escrow bank (RERA)
Axis Bank, KADUGODI, BENGALURU
Building plan (RERA)
Local Planing Authority · No. STRRPA/TP/CC/73/2024-25 · dated 17 Aug 2024
Project cost declared to RERA
₹72.33 Cr

Open area as a share of the land, from the areas filed with RERA (includes driveways and landscaped areas).

Sources:Source (rera.karnataka.gov.in) (opens in a new tab)

Amenities

  • Electricity
  • CCTV Surveillance
  • Club House
  • Community Hall
  • Indoor Sports facility
  • Swimming Pool
  • Gym
  • Parks
  • Power Backup
  • Water and Sanitation

Amenities and internal works as filed by the promoter with Karnataka RERA; we have not visited the site.

Sources:Source (rera.karnataka.gov.in) (opens in a new tab)

United Green Woods location and address

Address
Sy no 11/1A, 11/18, 11/19, 12/2 and 34/2 (Khatha No - 1829/11/1A/11/7/11/8/34/2/12/2, PID NO. 150300402500522821) of SAMETHANAHALLI VILLAGE , ANUGONDANAHALLI HOBLI , Hosakote , Bengaluru Rural, Karnataka - 560067
Village (RERA)
Samethanahalli
Locality
Near Kadugodi–Hope FarmAlso known as Kadugodi, Hope Farm
PIN code
560067
City
Bengaluru
State
Karnataka
Coordinates
12.98669, 77.79464

Distances to landmarks

Not found in public records yet: landmarks

About Samethanahalli

Not found in public records yet: locality facts

Commute times to tech parks and the airport

As on 5 Oct 2026
ToStraight linePeak-hour drive (estimate)
ITPL, Whitefield (main gate)Map point on OpenStreetMap (opens in a new tab)6.16 kmapprox. 25 min
Outer Ring Road tech corridor (RMZ Ecospace, Bellandur)Map point on OpenStreetMap (opens in a new tab)14.14 kmapprox. 57 min
Manyata Tech ParkMap point on OpenStreetMap (opens in a new tab)20.13 kmapprox. 82 min
Electronic City Phase 1Map point on OpenStreetMap (opens in a new tab)20.73 kmapprox. 84 min
KSR Bengaluru City railway station (Majestic)Map point on OpenStreetMap (opens in a new tab)24.41 kmapprox. 99 min
Kempegowda International AirportMap point on OpenStreetMap (opens in a new tab)25.73 kmapprox. 104 min
How we calculate

Straight line: from the project’s map point on RERA to the destination’s point on OpenStreetMap.

Peak-hour drive is a rough estimate, not a route: straight line × 1.35 for the road network, at 20 km/h. Real times vary a lot with the route and the hour.

Sources:Source (openstreetmap.org) (opens in a new tab)How we calculate this

Schools and hospitals nearby

As on 5 Oct 2026

Within 2 km

  • 3Schools and colleges3 schools, 0 colleges, 0 kindergartens
  • 1Hospitals and clinics0 hospitals, 1 clinics

Nearest schools and colleges

  • Bangalore International Academy · 0.73 km

Nearest hospitals and clinics

  • Soukya International Holistic Health Center · 0.93 km

Places as mapped on OpenStreetMap (amenity=school, college, kindergarten, university; hospital, clinic), counted within 2 km in a straight line of the RERA map point. Volunteers map these, so some places may be missing or closed. Places data © OpenStreetMap contributors, extract of 5 Oct 2026.

Sources:Source (openstreetmap.org) (opens in a new tab)

Nearest metro station and railway

As on 5 Oct 2026
  • Whitefield (Kadugodi) (ವೈಟ್‌ಫೀಲ್ಡ್ (ಕಾಡುಗೋಡಿ))Open now — nearest operating metro station4.1 km
  • Whitefield (ವೈಟ್‌ಫೀಲ್ಡ್)Nearest railway station3.76 km

Straight-line distances from the RERA map point to the station points mapped on OpenStreetMap; status (open or under construction) as tagged there. Places data © OpenStreetMap contributors, extract of 5 Oct 2026.

Sources:Source (openstreetmap.org) (opens in a new tab)

Lake and lake-buffer check

As on 5 Oct 2026

The nearest mapped lake is Unnamed lake (mapped on OpenStreetMap), 431 m from the project’s RERA map point.

The site boundary is not published as a shape, so its nearest edge can be closer than this point. Whether any building sits inside a lake buffer can only be checked on the approved plan.

The buffer rule

Bengaluru’s lake buffer rule has changed over time: the National Green Tribunal ordered a 75 m buffer in May 2016; the Supreme Court set that order aside on 5 March 2019, leaving the 30 m buffer of the Revised Master Plan 2015. Check the current rule and the approved plan before relying on either number.

Shortest distance from the RERA map point to the mapped water edge (OpenStreetMap water polygons tagged lake or reservoir, or named lake/kere/tank). Mapped shorelines can differ from the revenue-record boundary of a lake. Places data © OpenStreetMap contributors, extract of 5 Oct 2026.

Sources:Source (openstreetmap.org) (opens in a new tab)Source (livelaw.in) (opens in a new tab)Source (citizenmatters.in) (opens in a new tab)How we calculate this

Satellite time-lapse of the site

Satellite photos load when you scroll to them.

Photos from Esri World Imagery Wayback, centred on the project’s map point; dates are the capture dates in Esri’s metadata. Loaded from Esri when you scroll here.

Sources:Source (livingatlas.arcgis.com) (opens in a new tab)

United Green Woods floor plans, brochure and elevations

Documents the builder uploaded to Karnataka RERA, shown as filed. Tap a page to see it full size; the full PDF opens on the RERA website.

Floor plans7 files

Approved layout plan3 files

Home typeCarpet areaHomes
2 b - 4t1,268 sq ft1
2.5b - 2t610 – 888 sq ft155
2b - 2t552 – 779 sq ft75
3.5b - 4t1,239 – 1,436 sq ft4
3.5b -2t1,084 – 1,227 sq ft4
3b - 3t989 – 1,049 sq ft4
3b - 4t1,094 – 1,303 sq ft3
4.5b-4-t1,450 – 1,605 sq ft4
4b - 4t1,245 – 1,590 sq ft20
5b - 4t1,272 – 1,632 sq ft12

Home types, counts and carpet areas as filed with Karnataka RERA (carpet area, not super built-up).

We have not collected floor-plan drawings; the builder’s sales team can share them.

Sources:Source (rera.karnataka.gov.in) (opens in a new tab)

United Green Woods possession date and construction status

  • Whole project (promoter’s RERA update)65%

    as on · 190 of 282 homes booked

Promoter’s quarterly update to RERA for Q2 2026-27, submitted 2026-10-15.

By tower (Q2 2026-27)

  • Block A58%
  • Block B72%

Units sold and unsold, from RERA (Q2 2026-27)

TypeHomesBookedAvailable
2.5B - 2T15513223
2B - 2T754629
3.5B - 4T413
4.5B-4-T422
4B - 4T20416
5B - 4T12111
2 B - 4T101
3.5B -2T404
3B - 3T422
3B - 4T321

As reported by the promoter in the quarterly update to RERA, not verified by us.

Timeline

  1. 1 Oct 2024Project start date given to RERA
  2. 16 Nov 2024Registered with Karnataka RERA
  3. 16 Mar 2028Completion date given at registration

Sources:Source (rera.karnataka.gov.in) (opens in a new tab)

Construction pace from RERA quarterly filings

As on 15 Oct 2026

At the average pace so far, construction would reach 100% around Oct 2027 — about 5 months before the completion date on RERA (16 Mar 2028).

At the pace between the 4 quarterly filings we have (51% → 65% in 9 months), it would be around Aug 2028 — about 5 months after the RERA date.

0%25%50%75%100%2025202620272028RERA date51%60%54%65%
  • Filed on RERA
  • Average pace since start
  • Pace between filings (and 0% assumed at the start date)
  • RERA completion date

Quarterly filings

QuarterFiled onBuiltHomes booked
Q2 2026-27to 30 Sep 202615 Oct 202665%190 of 282
Q1 2026-27to 30 Jun 202614 Jul 202654%183 of 282
Q4 2025-26to 31 Mar 202615 Apr 202660%191 of 282
Q3 2025-26to 31 Dec 202521 Feb 202651%175 of 282
How we calculate

Average pace = % built ÷ months since the start date in the RERA record. Here: 65% ÷ 23.9 months (1 Oct 2024 to 30 Sep 2026) = 2.7% a month.

Estimated finish = latest filing date + (100 − % built) ÷ pace = 30 Sep 2026 + 35 ÷ 2.7 = 12.9 months → Oct 2027. This is an estimate, not a date from the builder or RERA.

Pace between filings = (65% − 51%) ÷ 9 months = 1.6% a month.

A straight line is a simplification: the builder reports one overall %, which mixes excavation, structure and finishing, and work rarely moves at a constant speed. The % values are the promoter’s own figures filed with RERA, not checked by us. Promoter’s quarterly update to RERA for Q2 2026-27, submitted 2026-10-15.

Sources:Source (rera.karnataka.gov.in) (opens in a new tab)How we calculate this

Approvals and documents checklist

15 rows: approvals. Scroll inside the table to see them all.

ApprovalAuthoritySource
Building planLocal Planing Authority · No. STRRPA/TP/CC/73/2024-25 · dated 2024-08-17Source (rera.karnataka.gov.in) (opens in a new tab)
Land conversion (5 orders)DC Office, Bangalore Rural · No. 620381 and 4 more · dated 2024-01-25Source (rera.karnataka.gov.in) (opens in a new tab)
Commencement Certificatescan uploaded to RERASource (rera.karnataka.gov.in) (opens in a new tab)
Electricity Permission Letterscan uploaded to RERASource (rera.karnataka.gov.in) (opens in a new tab)
Water Permission Letterscan uploaded to RERASource (rera.karnataka.gov.in) (opens in a new tab)
Approved Building/Plotting Planscan uploaded to RERASource (rera.karnataka.gov.in) (opens in a new tab)
Approved Section Of Building/Infrastructure Plan of Plottingscan uploaded to RERASource (rera.karnataka.gov.in) (opens in a new tab)
Change of Land Usescan uploaded to RERASource (rera.karnataka.gov.in) (opens in a new tab)
Conversion Certificate under section 95 of the KLR Act 1964scan uploaded to RERASource (rera.karnataka.gov.in) (opens in a new tab)
ESCOM/Electricityscan uploaded to RERASource (rera.karnataka.gov.in) (opens in a new tab)
KWSSB/Waterscan uploaded to RERASource (rera.karnataka.gov.in) (opens in a new tab)
Fire Force Departmentscan uploaded to RERASource (rera.karnataka.gov.in) (opens in a new tab)
Airport Authority of Indiascan uploaded to RERASource (rera.karnataka.gov.in) (opens in a new tab)
KSPCBscan uploaded to RERASource (rera.karnataka.gov.in) (opens in a new tab)
SEIAAscan uploaded to RERASource (rera.karnataka.gov.in) (opens in a new tab)

Documents uploaded to RERA

As on 21 Oct 2026
  • Building or layout plan · Approved drawings from the planning authorityFiled on RERA ✓ — Local Planing Authority · No. STRRPA/TP/CC/73/2024-25 · dated 17 Aug 2024
  • Commencement certificate · Permission to start buildingFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
  • Environment clearance · SEIAA KarnatakaFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
  • Fire NOC · Karnataka Fire and Emergency ServicesFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
  • Pollution board consent · KSPCBFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
  • Water and sewerage · BWSSBFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
  • Electricity · BESCOMFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
  • Height clearance · Airports Authority of IndiaFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
  • Occupancy certificate (OC) · Issued only when the building is finishedNot on RERA yet — expected at completion

From the documents the promoter uploaded to Karnataka RERA, collected 21 Oct 2026. “Filed” means a document is on RERA — we have not checked its contents or validity. Not every approval applies to every project (for example, smaller projects may not need an environment clearance). The project page on RERA lists each upload.

Sources:Source (rera.karnataka.gov.in) (opens in a new tab)

United Green Woods RERA complaints

No complaints listed on Karnataka RERA for this registration as on Source (rera.karnataka.gov.in) (opens in a new tab)

Court and consumer cases

Not found in public records yet: court cases

We list case numbers, courts and outcomes only — never names of private individuals.

About United Green Woods

Promoter type
Partnership Firm
Projects on this site
1
RERA complaints against promoter
0
Company number (CIN)
Not found in public records yet: CIN

From Karnataka RERA, as collected so far (21 Oct 2026). Complaints are those RERA lists against this promoter across all its projects.

United Green Woods’s RERA record

United Green Woods delivery record

As on 21 Oct 2026

Sources:Source (rera.karnataka.gov.in) (opens in a new tab)How we calculate this

What’s changed since Aug 2024

As on 21 Oct 2026
  1. 15 Oct 2026Quarterly update filed for Q2 2026-27: 65% built, 190 of 282 homes booked Source (rera.karnataka.gov.in) (opens in a new tab)
  2. 14 Jul 2026Quarterly update filed for Q1 2026-27: 54% built, 183 of 282 homes booked Source (rera.karnataka.gov.in) (opens in a new tab)
  3. 15 Apr 2026Quarterly update filed for Q4 2025-26: 60% built, 191 of 282 homes booked Source (rera.karnataka.gov.in) (opens in a new tab)
  4. 21 Feb 2026Quarterly update filed for Q3 2025-26: 51% built, 175 of 282 homes booked Source (rera.karnataka.gov.in) (opens in a new tab)
  5. 16 Nov 2024Registered with Karnataka RERA (PRM/KA/RERA/1250/304/PR/161124/007237); completion date 16 Mar 2028 Source (rera.karnataka.gov.in) (opens in a new tab)
  6. 1 Oct 2024Project start date in the RERA record Source (rera.karnataka.gov.in) (opens in a new tab)
  7. 17 Aug 2024Building plan approved by Local Planing Authority (No. STRRPA/TP/CC/73/2024-25) Source (rera.karnataka.gov.in) (opens in a new tab)

Newest first. No extension of the completion date is recorded on RERA. When the RERA crawl sees a new filing, complaint or extension, it is added here with its date.

Home loan EMI calculator

No listed price found — enter one to try.

Example only — use your bank’s quote.

Monthly EMI
—
Down payment
—
Loan amount
—
Total interest
—

A calculation only, from the numbers you enter — not a loan offer.

All-in cost: GST, registration and other charges

The calculator loads when you scroll to it.

Assumptions
  • Base price: the builder’s price is not published in a form we could collect — enter it from the cost sheet.
  • GST 5% on the base price and charges — the usual rate for an under-construction home that is not “affordable housing” (1%).
  • Stamp duty about 5.6% and registration 2% — the Karnataka rule (registration was raised from 1% to 2% on 31 Aug 2025). Calculated on the agreement value.
  • Car parking, other charges and the maintenance deposit are not in the public record we collect; enter them from the builder’s cost sheet.
  • Loan on the agreement value (banks usually lend up to 75–90%); EMI is the standard reducing-balance formula. Example rate only — use your bank’s quote.

How we calculate this

United Green Woods FAQs

What types of homes are available in United Green Woods?

The project offers homes ranging from 2-bedroom to 5-bedroom units. Carpet area ranges from 552 sq ft for 2-bedroom homes to 1,632 sq ft for 5-bedroom homes.

How many homes are in United Green Woods?

The project has 282 homes across 2 towers, each with a maximum of 5 floors.

What is the completion date for United Green Woods?

According to the RERA record, the completion date is 16 March 2028.

What is the RERA registration number for United Green Woods?

The RERA registration number is PRM/KA/RERA/1250/304/PR/161124/007237, registered on 16 November 2024.

What is the project status of United Green Woods on RERA?

The project status is listed as New Project Launch on RERA.

How much construction is complete in United Green Woods?

As of the latest quarterly update for Q1 2026-27 (ending 30 June 2026), the project is 54% complete.

How many homes have been booked in United Green Woods?

As of Q1 2026-27 (ending 30 June 2026), 183 homes have been booked out of 282 homes.

Where is United Green Woods located?

United Green Woods is located in Samethanahalli, Hosakote taluk, Bengaluru Rural district, PIN code 560067.

Are there any RERA complaints against United Green Woods?

There are no RERA complaints on this project or against the builder.

What is the land area of United Green Woods?

The project land area is 17,249 sq m.

Written by AI from the RERA record above on 5 Oct 2026. Answers use only that record; check them against the source before you decide.

Questions about United Green Woods

No questions published yet. Ask the first one: you get an instant answer from this page’s public record, and our team follows up on anything the record does not show.

Bought a home from United Green Woods? Review the builder.

Reviews of United Green Woods by verified buyers

No verified reviews of United Green Woods yet. If you bought a home from them, your review helps other buyers.

How reviews work: only buyers and owners can review; we confirm each purchase by phone before publishing, publish positive and negative reviews alike, never accept payment for reviews, and the builder may reply.

Similar projects within 5 km

ProjectDistanceHomesPossession (RERA)BuiltComplaintsPrice
Sowparnika Rhythm of RainSowparnika Homes Private Limited0.1 km725Jan 203236%0Not collected
Sowparnika AshiyanaSowparnika Projects And Infrastructure Private Limited0.3 km1,518Dec 2025—0Not collected
Emmay Environs PrideEmmay environs0.4 km77Mar 2024extended—0Not collected
AnahataIshtika Vibranium Developers LLP0.6 km440Jul 2029—0Not collected
Riviera UnoNirvana Developers0.8 km137Jan 203065%0Not collected
Kumari NautilusKumari Infra Homes Private Limited1 km165Jan 202890%0Not collected

Projects of the same kind within 5 km in a straight line of this project’s RERA map point, nearest first. % built is the promoter’s latest quarterly figure on RERA (shown for single-registration projects); prices are from the builder’s own website where we found one.

Sources:Source (rera.karnataka.gov.in) (opens in a new tab)

Sources and last checked dates

  1. Karnataka RERA — project register (search by the registration number) (opens in a new tab)

Collected on 21 Oct 2026 by AI research agents reading public pages. Facts are written in our own words. Not found yet: price; court cases; landmarks; specifications; news.

How to check on RERA: On rera.karnataka.gov.in/viewAllProjects, type the registration number in 'Registration No', press Search, then click the 'View Project Details' icon. Complaints open from the 'Complaints / Litigation' icon in the same row. Registration number: PRM/KA/RERA/1250/304/PR/161124/007237.

  • RERA record last checked: 21 Oct 2026
  • Last change in the record (registration, quarterly filing or complaint): 21 Oct 2026

How this page is made: software builds it from public records (Karnataka RERA filings, OpenStreetMap, the builder’s own website). AI is used only to read filings into fields and to write the plain-English summary and FAQ answers, which are checked against the record. Facts are checked automatically against the RERA filing. Methodology · How we earn · Report an error