Anahata
1, 2 & 3 BHK apartments by Ishtika Vibranium Developers LLP · Samethanahalli, near Kadugodi–Hope Farm, Bengaluru
Samethanahalli, near Kadugodi–Hope Farm, BengaluruOpen on Google Maps (opens in a new tab)
- Under construction
- RERA registered
- residential
by Ishtika Vibranium Developers LLP
Price: Price on request
Site photo filed with Karnataka RERA Karnataka RERA filing · Source ↗ (opens in a new tab)
Anahata at a glance
- Possession (RERA)Jul 2029Karnataka RERA
- Construction33% built · on pace for Oct 2029 6 mo after RERA dateRERA filing to 30 Sep 2026 (Main registration); estimate from average pace
- RERA complaints (project)None listedKarnataka RERA · as on 20 Oct 2026
- Approvals filed8 of 9 on RERAKarnataka RERA uploads · 20 Oct 2026
- Nearest metroWhitefield (Kadugodi) · 4.15 kmstraight line · OpenStreetMap, 5 Oct 2026
- Airport driveapprox. 106 min at peak26.22 km straight line · estimate
- Nearest lakeUnnamed lake · 683 mFrom the RERA map point · OpenStreetMap, 5 Oct 2026
Project summary
Anahata is a residential project by Ishtika Vibranium Developers LLP in Samethanahalli, Bengaluru with 440 homes, registered with Karnataka RERA. The completion date on RERA is 31 Jul 2029. It is registered in 2 phases.
Facts collected on 20 Oct 2026 from public records — each linked to its source. Free for buyers. If you book through us, the builder pays us a commission.
Anahata buyers’ group: join to ask for a group price
No one has joined yet. Be one of the first 10 buyers in this group — the founding members.
Join free. When enough buyers have joined, our agent partner asks Ishtika Vibranium Developers LLP for a group price — for example a lower price, an easier payment plan or waived charges. Nothing is promised: you see what the builder offers and book directly with the builder if you want to. Free for buyers. If you book through us, the builder pays us a commission.
- Gathering buyers
- Talking to the builder
- Group offer
- Group site visit
- Booking
0 buyers have joined · 0 committed
Committed buyers have confirmed their budget, home type and timeline with us on a call; builders negotiate with them. Joining is free and never obliges you to buy.
Join the Anahata buyers’ groupHow group buying works
See it for yourself
Visit the site with our team, or get a call to clear your questions. Free, no obligation.
Key facts: home types, towers, land and possession
- Home types
- 1 BHK, 2 BHK, 2.5 BHK, 3 BHK
- Carpet area
- 369 – 1,073 sq ft
- Towers
- 5
- Floors
- 12
- Total homes
- 440
- Land
- 4.73 acres
- Possession (RERA)
- Jul 2029
- Built (RERA update)
- Not found in public records yet: construction progress
Anahata RERA number and registration details
- RERA number
- PRM/KA/RERA/1250/304/PR/290425/007702
- Registered on
- 29 Apr 2025
- Promised completion
- 31 Jul 2029
- Extended to
- No extension recorded
- RERA status
- New launch
- Homes booked
- Not found in public records yet: homes booked
- Price
- Not found in public records yet: price
- Project type
- Residential
2 RERA registrations (one per phase) are shown together on this page; dates above are the latest across phases.
Phases and RERA numbers
| Phase | RERA number | Promised completion | Homes | Status | Source |
|---|---|---|---|---|---|
| Main registration | PRM/KA/RERA/1250/304/PR/290425/007702 | 31 Mar 2029 | 259 | New launch | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Phase - 2 | PRM/KA/RERA/1250/304/PR/050725/007898 | 31 Jul 2029 | 181 | New launch | Source (rera.karnataka.gov.in) (opens in a new tab) |
Towers and blocks (RERA filing)
| Tower | Phase | Floors | Basements | Homes |
|---|---|---|---|---|
| Tower C | Main registration | 12 | 1 | 104 |
| Tower D | Main registration | 12 | 1 | 65 |
| Tower E | Main registration | 12 | 1 | 90 |
| Tower A | Phase - 2 | 12 | 1 | 77 |
| Tower B | Phase - 2 | 12 | 1 | 104 |
A dash (—) means the filing did not state that value.
Summary in plain English
Anahata is a residential project by Ishtika Vibranium Developers LLP in Samethanahalli, Hosakote. The project has 440 homes across 5 towers in 2 RERA registrations, with completion dates of 31 March 2029 (Main registration) and 31 July 2029 (Phase 2).
Written by AI from the RERA record above on 20 Oct 2026. Every number in it was checked against that record; if anything differs, the record wins.
Open space, home loans, escrow and other details
- Open space
- Not found in public records yet: open space
- Water and power
- Water source filed with RERA: BoreWell,Local Authority
- Home loans: approved banks
- Not found in public records yet: bank approvals
- Payment plans
- Not found in public records yet: payment plans
- Maintenance
- Not found in public records yet: maintenance
- Car parking
- Not found in public records yet: car parking charge
- Escrow bank (RERA) · Main registration
- HDFC, 2ND PHASE JP NAGAR
- Escrow bank (RERA) · Phase - 2
- HDFC, 2nd Phase JP Nagar
Amenities
- Electricity
- CCTV Surveillance
- Club House
- Indoor Sports facility
- Swimming Pool
- Gym
- Parks
- Power Backup
- Water and Sanitation
Amenities and internal works as filed by the promoter with Karnataka RERA; we have not visited the site.
Anahata location and address
- Address
- Khatha No 150300402500501201, Sy. no. 5, Samethanahalli Village , Anugondanahalli Hobli , Hosakote , Bengaluru Rural, Karnataka - 560067
- Village (RERA)
- Samethanahalli
- Locality
- Near Kadugodi–Hope FarmAlso known as Kadugodi, Hope Farm
- PIN code
- 560067
- City
- Bengaluru
- State
- Karnataka
- Coordinates
- 12.98138, 77.79330
Distances to landmarks
Not found in public records yet: landmarksAbout Samethanahalli
Not found in public records yet: locality factsCommute times to tech parks and the airport
| To | Straight line | Peak-hour drive (estimate) |
|---|---|---|
| ITPL, Whitefield (main gate)Map point on OpenStreetMap (opens in a new tab) | 6.06 km | approx. 25 min |
| Outer Ring Road tech corridor (RMZ Ecospace, Bellandur)Map point on OpenStreetMap (opens in a new tab) | 13.73 km | approx. 56 min |
| Manyata Tech ParkMap point on OpenStreetMap (opens in a new tab) | 20.2 km | approx. 82 min |
| Electronic City Phase 1Map point on OpenStreetMap (opens in a new tab) | 20.2 km | approx. 82 min |
| KSR Bengaluru City railway station (Majestic)Map point on OpenStreetMap (opens in a new tab) | 24.25 km | approx. 98 min |
| Kempegowda International AirportMap point on OpenStreetMap (opens in a new tab) | 26.22 km | approx. 106 min |
How we calculate
Straight line: from the project’s map point on RERA to the destination’s point on OpenStreetMap.
Peak-hour drive is a rough estimate, not a route: straight line × 1.35 for the road network, at 20 km/h. Real times vary a lot with the route and the hour.
Sources:Source (openstreetmap.org) (opens in a new tab)How we calculate this
Schools and hospitals nearby
Within 2 km
- 4Schools and colleges4 schools, 0 colleges, 0 kindergartens
- 2Hospitals and clinics1 hospitals, 1 clinics
Nearest schools and colleges
- Bangalore International Academy · 1.34 km
Nearest hospitals and clinics
- Ayurvedagram Heritage Wellness Centre · 1.52 km
- Soukya International Holistic Health Center · 1.53 km
Places as mapped on OpenStreetMap (amenity=school, college, kindergarten, university; hospital, clinic), counted within 2 km in a straight line of the RERA map point. Volunteers map these, so some places may be missing or closed. Places data © OpenStreetMap contributors, extract of 5 Oct 2026.
Nearest metro station and railway
- Whitefield (Kadugodi) (ವೈಟ್ಫೀಲ್ಡ್ (ಕಾಡುಗೋಡಿ))Open now — nearest operating metro station4.15 km
- Whitefield (ವೈಟ್ಫೀಲ್ಡ್)Nearest railway station3.84 km
Straight-line distances from the RERA map point to the station points mapped on OpenStreetMap; status (open or under construction) as tagged there. Places data © OpenStreetMap contributors, extract of 5 Oct 2026.
Lake and lake-buffer check
The nearest mapped lake is Unnamed lake (mapped on OpenStreetMap), 683 m from the project’s RERA map point.
The site boundary is not published as a shape, so its nearest edge can be closer than this point. Whether any building sits inside a lake buffer can only be checked on the approved plan.
- Unnamed lake (mapped on OpenStreetMap) on OpenStreetMap (opens in a new tab) 683 m
- Unnamed lake (mapped on OpenStreetMap) on OpenStreetMap (opens in a new tab) 999 m
The buffer rule
Bengaluru’s lake buffer rule has changed over time: the National Green Tribunal ordered a 75 m buffer in May 2016; the Supreme Court set that order aside on 5 March 2019, leaving the 30 m buffer of the Revised Master Plan 2015. Check the current rule and the approved plan before relying on either number.
- LiveLaw: SC sets aside NGT order enlarging buffer zones (2019) (livelaw.in) (opens in a new tab)
- Citizen Matters: Shrinking lake buffers (citizenmatters.in) (opens in a new tab)
Shortest distance from the RERA map point to the mapped water edge (OpenStreetMap water polygons tagged lake or reservoir, or named lake/kere/tank). Mapped shorelines can differ from the revenue-record boundary of a lake. Places data © OpenStreetMap contributors, extract of 5 Oct 2026.
Sources:Source (openstreetmap.org) (opens in a new tab)Source (livelaw.in) (opens in a new tab)Source (citizenmatters.in) (opens in a new tab)How we calculate this
Satellite time-lapse of the site
Satellite photos load when you scroll to them.
Photos from Esri World Imagery Wayback, centred on the project’s map point; dates are the capture dates in Esri’s metadata. Loaded from Esri when you scroll here.
Sources:Source (livingatlas.arcgis.com) (opens in a new tab)
Anahata floor plans, brochure and elevations
Documents the builder uploaded to Karnataka RERA, shown as filed. Tap a page to see it full size; the full PDF opens on the RERA website.
Floor plans12 files

Main registration: Typical Floor Plan 1_.pdfFull PDF on RERA 
Phase - 2: Typical Floor Plan 1_.pdfFull PDF on RERA 
Phase - 2: Typical Floor Plan 2_.pdfFull PDF on RERA 
Main registration: Typical Floor Plan 2_.pdfFull PDF on RERA 
Phase - 2: First Floor Plan_.pdfFull PDF on RERA 
Main registration: First Floor Plan_.pdfFull PDF on RERA 
Phase - 2: Ground Floor Plan_.pdfFull PDF on RERA 
Main registration: Ground Floor Plan_.pdfFull PDF on RERA 
Phase - 2: Basement Floor Plan_.pdfFull PDF on RERA 
Main registration: Basement Floor Plan_.pdfFull PDF on RERA 
Main registration: Terrace Floor Plan_.pdfFull PDF on RERA 
Phase - 2: Terrace Floor Plan_.pdfFull PDF on RERA
Elevations2 files

Phase - 2: Elevation Plan.pdfFull PDF on RERA 
Main registration: Elevation Plan_.pdfFull PDF on RERA
Approved building plan2 files

Phase - 2: Approved Building PlanFull PDF on RERA 
Main registration: Approved Building PlanFull PDF on RERA
Approved layout plan6 files

Main registration: Anahata - CDP Demarcation.pdfFull PDF on RERA 
Phase - 2: Anahata Phase 2 - CDP Demarcation.pdfFull PDF on RERA 
Main registration: Anahat Phase 1 Plan Demarcation and area details.pdfFull PDF on RERA 
Phase - 2: Anahat Phase 2 Plan Demarcation.pdfFull PDF on RERA 
Main registration: Village Map Demarcation and ADLR Sketch.pdfFull PDF on RERA 
Phase - 2: Village Map_ Demarcation.pdfFull PDF on RERA
| Home type | Carpet area | Homes |
|---|---|---|
| 1 BHK | 369 sq ft | 13 |
| 2 BHK | 684 – 798 sq ft | 142 |
| 2.5 BHK | 894 – 949 sq ft | 129 |
| 3 BHK | 1,023 – 1,073 sq ft | 156 |
Home types, counts and carpet areas as filed with Karnataka RERA (carpet area, not super built-up).
We have not collected floor-plan drawings; the builder’s sales team can share them.
Anahata possession date and construction status
Timeline
- 1 Apr 2025Main registration: Project start date given to RERA
- 29 Apr 2025Main registration: Registered with Karnataka RERA
- 5 Jul 2025Phase - 2: Registered with Karnataka RERA
- 1 Aug 2025Phase - 2: Project start date given to RERA
- 31 Mar 2029Main registration: Completion date given at registration
- 31 Jul 2029Phase - 2: Completion date given at registration
Construction pace from RERA quarterly filings (Main registration)
At the average pace so far, construction would reach 100% around Oct 2029 — about 6 months after the completion date on RERA (31 Mar 2029).
At the pace between the 4 quarterly filings we have (15% → 33% in 9 months), it would be around Jul 2029 — about 3 months after the RERA date.
This project has 2 RERA registrations; the chart uses Main registration, the one with the most quarterly filings.
- Filed on RERA
- Average pace since start
- Pace between filings (and 0% assumed at the start date)
- RERA completion date
Quarterly filings
| Quarter | Filed on | Built | Homes booked |
|---|---|---|---|
| Q2 2026-27to 30 Sep 2026 | 15 Oct 2026 | 33% | 129 of 259 |
| Q1 2026-27to 30 Jun 2026 | 15 Jul 2026 | 30% | 118 of 259 |
| Q4 2025-26to 31 Mar 2026 | 15 Apr 2026 | 25% | 98 of 259 |
| Q3 2025-26to 31 Dec 2025 | 19 Feb 2026 | 15% | 76 of 259 |
How we calculate
Average pace = % built ÷ months since the start date in the RERA record. Here: 33% ÷ 18 months (1 Apr 2025 to 30 Sep 2026) = 1.8% a month.
Estimated finish = latest filing date + (100 − % built) ÷ pace = 30 Sep 2026 + 67 ÷ 1.8 = 36.5 months → Oct 2029. This is an estimate, not a date from the builder or RERA.
Pace between filings = (33% − 15%) ÷ 9 months = 2% a month.
A straight line is a simplification: the builder reports one overall %, which mixes excavation, structure and finishing, and work rarely moves at a constant speed. The % values are the promoter’s own figures filed with RERA, not checked by us.
Sources:Source (rera.karnataka.gov.in) (opens in a new tab)How we calculate this
Approvals and documents checklist
20 rows: approvals. Scroll inside the table to see them all.
| Approval | Authority | Source |
|---|---|---|
| Building plan (Main registration) | Satellite Town Ring Road Planning Authority · No. STRRPA/TP/CC/314/2024-25 · dated 2025-03-12 | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Land conversion (Main registration) | Deputy Commissioner, Bangalore Rural District · No. A.L.N.(H).S.R.105/2004-05 · dated 2005-03-24 | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Commencement Certificate (Main registration) | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Approved Building Plan (Main registration) | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| ESCOM/Electricity (Main registration) | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| KWSSB/Water (Main registration) | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| KSPCB (Main registration) | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| SEIAA (Main registration) | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Fire Force Department (Main registration) | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Airport Authority of India (Main registration) | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Building plan (Phase - 2) | Satellite Town Ring Road Planning Authority · No. STRRPA/TP/CC/314/2024-25 · dated 2025-03-12 | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Land conversion (Phase - 2) | Deputy Commissioner, Bangalore Rural District · No. A.L.N. (H).S.R.105/2004-05 · dated 2005-03-24 | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Commencement Certificate (Phase - 2) | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Approved Building Plan (Phase - 2) | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| ESCOM/Electricity (Phase - 2) | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| KWSSB/Water (Phase - 2) | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| KSPCB (Phase - 2) | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| SEIAA (Phase - 2) | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Fire Force Department (Phase - 2) | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
| Airport Authority of India (Phase - 2) | scan uploaded to RERA | Source (rera.karnataka.gov.in) (opens in a new tab) |
Documents uploaded to RERA (Main registration)
- Building or layout plan · Approved drawings from the planning authorityFiled on RERA ✓ — Satellite Town Ring Road Planning Authority · No. STRRPA/TP/CC/314/2024-25 · dated 12 Mar 2025
- Commencement certificate · Permission to start buildingFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
- Environment clearance · SEIAA KarnatakaFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
- Fire NOC · Karnataka Fire and Emergency ServicesFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
- Pollution board consent · KSPCBFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
- Water and sewerage · BWSSBFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
- Electricity · BESCOMFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
- Height clearance · Airports Authority of IndiaFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
- Occupancy certificate (OC) · Issued only when the building is finishedNot on RERA yet — expected at completion
From the documents the promoter uploaded to Karnataka RERA, collected 20 Oct 2026. “Filed” means a document is on RERA — we have not checked its contents or validity. Not every approval applies to every project (for example, smaller projects may not need an environment clearance). Each phase is registered separately; this list is for the phase named above. The project page on RERA lists each upload.
Anahata RERA complaints
No complaints listed on Karnataka RERA for these registrations as on Source (rera.karnataka.gov.in) (opens in a new tab)
Court and consumer cases
We list case numbers, courts and outcomes only — never names of private individuals.
About Ishtika Vibranium Developers LLP
- Promoter type
- Partnership Firm
- Projects on this site
- 1
- RERA complaints against promoter
- 0
- Company number (CIN)
- ACG-7405
From Karnataka RERA, as collected so far (20 Oct 2026). Complaints are those RERA lists against this promoter across all its projects.
Ishtika Vibranium Developers LLP’s RERA recordIshtika Vibranium Developers LLP delivery record
- 1Projects in Bengaluru on RERA2 approved registrations under Ishtika Vibranium Developers LLP in Bengaluru Urban and Rural. Source (rera.karnataka.gov.in) (opens in a new tab)
- 440Homes registeredAs stated in each registrations.
- 0RERA complaintsas on Source (rera.karnataka.gov.in) (opens in a new tab)
- 0Complaints per 1,000 homes0 complaints ÷ 440 homes in its 2 registrations on Karnataka RERA in Bengaluru.
Sources:Source (rera.karnataka.gov.in) (opens in a new tab)How we calculate this
What’s changed since Mar 2025
- 15 Oct 2026Main registration: Quarterly update filed for Q2 2026-27: 33% built, 129 of 259 homes booked Source (rera.karnataka.gov.in) (opens in a new tab)
- 15 Oct 2026Phase - 2: Quarterly update filed for Q2 2026-27: 22% built, 90 of 181 homes booked Source (rera.karnataka.gov.in) (opens in a new tab)
- 15 Jul 2026Main registration: Quarterly update filed for Q1 2026-27: 30% built, 118 of 259 homes booked Source (rera.karnataka.gov.in) (opens in a new tab)
- 15 Jul 2026Phase - 2: Quarterly update filed for Q4 2025-26: 15% built, 71 of 181 homes booked Source (rera.karnataka.gov.in) (opens in a new tab)
- 15 Jul 2026Phase - 2: Quarterly update filed for Q1 2026-27: 20% built, 82 of 181 homes booked Source (rera.karnataka.gov.in) (opens in a new tab)
- 15 Apr 2026Main registration: Quarterly update filed for Q4 2025-26: 25% built, 98 of 259 homes booked Source (rera.karnataka.gov.in) (opens in a new tab)
- 20 Feb 2026Phase - 2: Quarterly update filed for Q3 2025-26: 5% built, 52 of 181 homes booked Source (rera.karnataka.gov.in) (opens in a new tab)
- 19 Feb 2026Main registration: Quarterly update filed for Q3 2025-26: 15% built, 76 of 259 homes booked Source (rera.karnataka.gov.in) (opens in a new tab)
- 1 Aug 2025Phase - 2: Project start date in the RERA record Source (rera.karnataka.gov.in) (opens in a new tab)
- 5 Jul 2025Phase - 2: Registered with Karnataka RERA (PRM/KA/RERA/1250/304/PR/050725/007898); completion date 31 Jul 2029 Source (rera.karnataka.gov.in) (opens in a new tab)
- 29 Apr 2025Main registration: Registered with Karnataka RERA (PRM/KA/RERA/1250/304/PR/290425/007702); completion date 31 Mar 2029 Source (rera.karnataka.gov.in) (opens in a new tab)
- 1 Apr 2025Main registration: Project start date in the RERA record Source (rera.karnataka.gov.in) (opens in a new tab)
- 12 Mar 2025Main registration: Building plan approved by Satellite Town Ring Road Planning Authority (No. STRRPA/TP/CC/314/2024-25) Source (rera.karnataka.gov.in) (opens in a new tab)
- 12 Mar 2025Phase - 2: Building plan approved by Satellite Town Ring Road Planning Authority (No. STRRPA/TP/CC/314/2024-25) Source (rera.karnataka.gov.in) (opens in a new tab)
Newest first. No extension of the completion date is recorded on RERA. When the RERA crawl sees a new filing, complaint or extension, it is added here with its date.
Home loan EMI calculator
- Monthly EMI
- —
- Down payment
- —
- Loan amount
- —
- Total interest
- —
A calculation only, from the numbers you enter — not a loan offer.
All-in cost: GST, registration and other charges
The calculator loads when you scroll to it.
Assumptions
- Base price: the builder’s price is not published in a form we could collect — enter it from the cost sheet.
- GST 5% on the base price and charges — the usual rate for an under-construction home that is not “affordable housing” (1%).
- Stamp duty about 5.6% and registration 2% — the Karnataka rule (registration was raised from 1% to 2% on 31 Aug 2025). Calculated on the agreement value.
- Car parking, other charges and the maintenance deposit are not in the public record we collect; enter them from the builder’s cost sheet.
- Loan on the agreement value (banks usually lend up to 75–90%); EMI is the standard reducing-balance formula. Example rate only — use your bank’s quote.
Anahata FAQs
What is Anahata and who is building it?
Anahata is a residential project by Ishtika Vibranium Developers LLP, a partnership firm, located in Samethanahalli, Hosakote, Bengaluru Rural district, PIN 560067.
How many homes are in Anahata?
The project has 440 homes across 2 RERA registrations: 259 homes in the Main registration and 181 homes in Phase 2.
What home types are available in Anahata?
The project offers 1 BHK (369 sq ft carpet area), 2 BHK (684 to 798 sq ft), 2.5 BHK (894 to 949 sq ft), and 3 BHK (1023 to 1073 sq ft) homes.
When will Anahata be completed?
The Main registration is expected to complete on 31 March 2029, and Phase 2 on 31 July 2029, according to RERA records.
What is the construction progress of Anahata?
As of Q2 2026-27 (30 September 2026), the Main registration is 33% complete and Phase 2 is 22% complete.
How many homes have been booked in Anahata?
As of Q2 2026-27, 129 homes have been booked in the Main registration (out of 259) and 90 homes in Phase 2 (out of 181).
What are the RERA registration numbers for Anahata?
The Main registration number is PRM/KA/RERA/1250/304/PR/290425/007702 (registered 29 April 2025) and Phase 2 is PRM/KA/RERA/1250/304/PR/050725/007898 (registered 5 July 2025).
Are there any RERA complaints against Anahata?
There are no complaints filed against this project or the builder in the RERA record.
What is the land area of Anahata?
The Main registration covers 11,068 sq m and Phase 2 covers 8,058 sq m.
How many towers are in Anahata?
The project has 5 towers total: 3 towers in the Main registration and 2 towers in Phase 2, each with a maximum of 12 floors.
Written by AI from the RERA record above on 20 Oct 2026. Answers use only that record; check them against the source before you decide.
Questions about Anahata
No questions published yet. Ask the first one: you get an instant answer from this page’s public record, and our team follows up on anything the record does not show.
Bought a home from Ishtika Vibranium Developers LLP? Review the builder.
Reviews of Ishtika Vibranium Developers LLP by verified buyers
No verified reviews of Ishtika Vibranium Developers LLP yet. If you bought a home from them, your review helps other buyers.
How reviews work: only buyers and owners can review; we confirm each purchase by phone before publishing, publish positive and negative reviews alike, never accept payment for reviews, and the builder may reply.
Similar projects within 5 km
| Project | Distance | Homes | Possession (RERA) | Built | Complaints | Price |
|---|---|---|---|---|---|---|
| Sowparnika AshiyanaSowparnika Projects And Infrastructure Private Limited | 0.4 km | 1,518 | Dec 2025 | — | 0 | Not collected |
| Sowparnika Rhythm of RainSowparnika Homes Private Limited | 0.5 km | 725 | Jan 2032 | 36% | 0 | Not collected |
| United Green WoodsUnited Green Woods | 0.6 km | 282 | Mar 2028 | 65% | 0 | Not collected |
| Saritha SantoriniSaritha Developers | 0.9 km | 198 | Apr 2029 | 23% | 0 | Not collected |
| Emmay Environs PrideEmmay environs | 1 km | 77 | Mar 2024extended | — | 0 | Not collected |
| Isha HilifeIsha Corp | 1.1 km | 195 | Dec 2026 | 95% | 0 | Not collected |
Projects of the same kind within 5 km in a straight line of this project’s RERA map point, nearest first. % built is the promoter’s latest quarterly figure on RERA (shown for single-registration projects); prices are from the builder’s own website where we found one.
Sources and last checked dates
Collected on 20 Oct 2026 by AI research agents reading public pages. Facts are written in our own words. Not found yet: price; court cases; landmarks; specifications; news.
How to check on RERA: On rera.karnataka.gov.in/viewAllProjects, type the registration number in 'Registration No', press Search, then click the 'View Project Details' icon. Complaints open from the 'Complaints / Litigation' icon in the same row. Registration numbers: PRM/KA/RERA/1250/304/PR/290425/007702, PRM/KA/RERA/1250/304/PR/050725/007898.
- RERA record last checked: 20 Oct 2026
- Last change in the record (registration, quarterly filing or complaint): 20 Oct 2026
How this page is made: software builds it from public records (Karnataka RERA filings, OpenStreetMap, the builder’s own website). AI is used only to read filings into fields and to write the plain-English summary and FAQ answers, which are checked against the record. Facts are checked automatically against the RERA filing. Methodology · How we earn · Report an error
More new projects nearby
Samethanahalli, near Kadugodi–Hope FarmArtist’s impressionUnder constructionRERA registeredBuyers’ group openSowparnika Ashiyana
by Sowparnika Projects And Infrastructure
Price: Price on requestGet brochure & price →
- Studio, 1 BHK, 2 BHK, 3 BHK
- 207 – 642 sq ft
- Dec 2025
RERA not updated since promised Dec 2025 · 2 phases on RERA · 1,518 homes
Be one of the first 10 buyers in this groupFounding members — it’s free
Join group for Sowparnika Ashiyana
Samethanahalli, near Kadugodi–Hope FarmUnder constructionRERA registeredBuyers’ group openSowparnika Rhythm of Rain
by Sowparnika Homes
Price: Price on requestGet brochure & price →
- 1 BHK, 2 BHK, 3 BHK
- 308 – 923 sq ft
- Jan 2032
725 homes
Be one of the first 10 buyers in this groupFounding members — it’s free
Join group for Sowparnika Rhythm of Rain
Samethanahalli, near Kadugodi–Hope FarmUnder constructionRERA registeredBuyers’ group openUnited Green Woods
by United Green Woods
Price: Price on requestGet brochure & price →
- Types not found
- 552 – 1,632 sq ft
- Mar 2028
282 homes
Be one of the first 10 buyers in this groupFounding members — it’s free
Join group for United Green Woods