Vistar White Pearl

2 & 3 BHK apartments by Vistar Builders and Developers · Muthanallur, near Chandapura–Attibele, Bengaluru

Muthanallur, near Chandapura–Attibele, BengaluruOpen on Google Maps (opens in a new tab)

  • Under construction
  • RERA registered
  • RERA not updated: completion promised Mar 2026; no extension or completion filed
  • residential

by Vistar Builders and Developers

Price: Price on request

Get brochure, floor plans & price

Brochure, floor plans and price list for Vistar White Pearl

Builders share their brochure, floor plans and price list only on request. Tell us how to reach you and we’ll get them and send them to you, free.

Free for buyers. If you book through us, the builder pays us a commission. How we earn

Project summary

Vistar White Pearl is a residential project by Vistar Builders and Developers in Muthanallur, Bengaluru with 46 homes, registered with Karnataka RERA. The completion date on RERA is 31 Mar 2026.

Facts collected on 20 Oct 2026 from public records — each linked to its source. Free for buyers. If you book through us, the builder pays us a commission.

Vistar White Pearl buyers’ group: join to ask for a group price

No one has joined yet. Be one of the first 10 buyers in this group — the founding members.

Join free. When enough buyers have joined, our agent partner asks Vistar Builders and Developers for a group price — for example a lower price, an easier payment plan or waived charges. Nothing is promised: you see what the builder offers and book directly with the builder if you want to. Free for buyers. If you book through us, the builder pays us a commission.

  1. Gathering buyers
  2. Talking to the builder
  3. Group offer
  4. Group site visit
  5. Booking

0 buyers have joined · 0 committed

Committed buyers have confirmed their budget, home type and timeline with us on a call; builders negotiate with them. Joining is free and never obliges you to buy.

Join the Vistar White Pearl buyers’ groupHow group buying works

See it for yourself

Visit the site with our team, or get a call to clear your questions. Free, no obligation.

Key facts: home types, towers, land and possession

Updated on 20 Oct 2026
Home types
2 BHK, 3 BHK
Carpet area
947 – 1,323 sq ft
Towers
1
Floors
7
Total homes
46
Land
0.66 acres
Possession (extended)
Mar 2026
Built (RERA update)
54%

Vistar White Pearl RERA number and registration details

RERA number
TOR/PRM/KA/RERA/1251/308/PR/250206/001087
Registered on
6 Feb 2025
Promised completion
29 Mar 2021
Extended to
31 Mar 2026
RERA status
Under construction
Homes booked
18 of 46 as on
Price
Not found in public records yet: price
Project type
Residential

Towers and blocks (RERA filing)

TowerFloorsBasementsHomes
NA7146

A dash (—) means the filing did not state that value.

Sources:Source (rera.karnataka.gov.in) (opens in a new tab)

Summary in plain English

Vistar White Pearl is a residential project by Vistar Builders and Developers in Muthanallur, Anekal with 46 homes across one 7-storey tower. The project is registered with Karnataka RERA and scheduled for completion on 31 March 2026.

Written by AI from the RERA record above on 5 Oct 2026. Every number in it was checked against that record; if anything differs, the record wins.

Open space, home loans, escrow and other details

Open space
65% of land
Water and power
Not found in public records yet: water and power
Home loans: approved banks
Not found in public records yet: bank approvals
Payment plans
Not found in public records yet: payment plans
Maintenance
Not found in public records yet: maintenance
Car parking
Not found in public records yet: car parking charge
Escrow bank (RERA)
HDFC, J p Nagar
Project cost declared to RERA
₹16.31 Cr

Open area as a share of the land, from the areas filed with RERA (includes driveways and landscaped areas).

Sources:Source (rera.karnataka.gov.in) (opens in a new tab)

Amenities

Not found in public records yet: amenities

Vistar White Pearl location and address

Address
Plot No.242A, Sy. No.145 & 146/2, Muthanallur Village,Sarjapura Hobli
Village (RERA)
Muthanallur
Locality
Near Chandapura–AttibeleAlso known as Chandapura, Attibele
PIN code
560073
City
Bengaluru
State
Karnataka
Coordinates
12.84569, 77.72931

Distances to landmarks

Not found in public records yet: landmarks

About Muthanallur

Not found in public records yet: locality facts

Commute times to tech parks and the airport

As on 5 Oct 2026
ToStraight linePeak-hour drive (estimate)
Electronic City Phase 1Map point on OpenStreetMap (opens in a new tab)6.99 kmapprox. 28 min
Outer Ring Road tech corridor (RMZ Ecospace, Bellandur)Map point on OpenStreetMap (opens in a new tab)10.12 kmapprox. 41 min
ITPL, Whitefield (main gate)Map point on OpenStreetMap (opens in a new tab)15.81 kmapprox. 64 min
KSR Bengaluru City railway station (Majestic)Map point on OpenStreetMap (opens in a new tab)22.73 kmapprox. 92 min
Manyata Tech ParkMap point on OpenStreetMap (opens in a new tab)25.44 kmapprox. 103 min
Kempegowda International AirportMap point on OpenStreetMap (opens in a new tab)39.57 kmapprox. 160 min
How we calculate

Straight line: from the project’s map point on RERA to the destination’s point on OpenStreetMap.

Peak-hour drive is a rough estimate, not a route: straight line × 1.35 for the road network, at 20 km/h. Real times vary a lot with the route and the hour.

Sources:Source (openstreetmap.org) (opens in a new tab)How we calculate this

Schools and hospitals nearby

As on 5 Oct 2026

Within 2 km

  • 8Schools and colleges7 schools, 1 colleges, 0 kindergartens
  • 1Hospitals and clinics0 hospitals, 1 clinics

Nearest schools and colleges

  • Mahatma Vidyalaya · 0.88 km
  • Poorna Pragathi Public School · 1.08 km
  • Head Start Educational Academy · 1.64 km

Nearest hospitals and clinics

  • Sudama Health Clinic · 0.79 km

Places as mapped on OpenStreetMap (amenity=school, college, kindergarten, university; hospital, clinic), counted within 2 km in a straight line of the RERA map point. Volunteers map these, so some places may be missing or closed. Places data © OpenStreetMap contributors, extract of 5 Oct 2026.

Sources:Source (openstreetmap.org) (opens in a new tab)

Nearest metro station and railway

As on 5 Oct 2026
  • Delta Electronics Bommasandra (ಡೆಲ್ಟಾ ಎಲೆಕ್ಟ್ರಾನಿಕ್ಸ್ ಬೊಮ್ಮಸಂದ್ರ)Open now — nearest operating metro station5.32 km
  • Huskuru (ಹುಸ್ಕೂರ್)Nearest railway station2.58 km

Straight-line distances from the RERA map point to the station points mapped on OpenStreetMap; status (open or under construction) as tagged there. Places data © OpenStreetMap contributors, extract of 5 Oct 2026.

Sources:Source (openstreetmap.org) (opens in a new tab)

Lake and lake-buffer check

As on 5 Oct 2026

The nearest mapped lake is Unnamed lake (mapped on OpenStreetMap), 989 m from the project’s RERA map point.

The site boundary is not published as a shape, so its nearest edge can be closer than this point. Whether any building sits inside a lake buffer can only be checked on the approved plan.

The buffer rule

Bengaluru’s lake buffer rule has changed over time: the National Green Tribunal ordered a 75 m buffer in May 2016; the Supreme Court set that order aside on 5 March 2019, leaving the 30 m buffer of the Revised Master Plan 2015. Check the current rule and the approved plan before relying on either number.

Shortest distance from the RERA map point to the mapped water edge (OpenStreetMap water polygons tagged lake or reservoir, or named lake/kere/tank). Mapped shorelines can differ from the revenue-record boundary of a lake. Places data © OpenStreetMap contributors, extract of 5 Oct 2026.

Sources:Source (openstreetmap.org) (opens in a new tab)Source (livelaw.in) (opens in a new tab)Source (citizenmatters.in) (opens in a new tab)How we calculate this

Satellite time-lapse of the site

Satellite photos load when you scroll to them.

Photos from Esri World Imagery Wayback, centred on the project’s map point; dates are the capture dates in Esri’s metadata. Loaded from Esri when you scroll here.

Sources:Source (livingatlas.arcgis.com) (opens in a new tab)

Vistar White Pearl home types and carpet areas

Floor plans and brochure not published? The builder shares them only on request. We’ll get the brochure, floor plans and current price list for you, free.

Get brochure, floor plans & price

Brochure, floor plans and price list for Vistar White Pearl

Builders share their brochure, floor plans and price list only on request. Tell us how to reach you and we’ll get them and send them to you, free.

Free for buyers. If you book through us, the builder pays us a commission. How we earn

Home typeCarpet areaHomes
2 BHK947 – 1,323 sq ft32
3 BHK966 – 1,286 sq ft14

Home types, counts and carpet areas as filed with Karnataka RERA (carpet area, not super built-up).

We have not collected floor-plan drawings; the builder’s sales team can share them.

Sources:Source (rera.karnataka.gov.in) (opens in a new tab)

Vistar White Pearl possession date and construction status

  • Whole project (promoter’s RERA update)54%

    as on · 18 of 46 homes booked

Promoter’s quarterly update to RERA for Q3 2025-26, submitted 2026-02-20.

Units sold and unsold, from RERA (Q3 2025-26)

TypeHomesBookedAvailable
2 BHK32725
3 BHK14113

As reported by the promoter in the quarterly update to RERA, not verified by us.

Timeline

  1. 20 May 2016Project start date given to RERA
  2. 29 Mar 2021Completion date given at registration
  3. 29 Mar 2022Section 6 Extension: completion date moved to this date
  4. 6 Feb 2025Registered with Karnataka RERA
  5. 31 Mar 2026Further Extension: completion date moved to this date

Sources:Source (rera.karnataka.gov.in) (opens in a new tab)

Construction pace from RERA quarterly filings

As on 20 Feb 2026

At the average pace so far, construction would reach 100% around Mar 2034 — about 95 months after the completion date on RERA (31 Mar 2026).

0%25%50%75%100%201720192021202320252027202920312033RERA date54%
  • Filed on RERA
  • Average pace since start
  • RERA completion date

Quarterly filings

QuarterFiled onBuiltHomes booked
Q3 2025-26to 31 Dec 202520 Feb 202654%18 of 46
How we calculate

Average pace = % built ÷ months since the start date in the RERA record. Here: 54% ÷ 115.4 months (20 May 2016 to 31 Dec 2025) = 0.5% a month.

Estimated finish = latest filing date + (100 − % built) ÷ pace = 31 Dec 2025 + 46 ÷ 0.5 = 98.3 months → Mar 2034. This is an estimate, not a date from the builder or RERA.

A straight line is a simplification: the builder reports one overall %, which mixes excavation, structure and finishing, and work rarely moves at a constant speed. The % values are the promoter’s own figures filed with RERA, not checked by us. Promoter’s quarterly update to RERA for Q3 2025-26, submitted 2026-02-20.

Sources:Source (rera.karnataka.gov.in) (opens in a new tab)How we calculate this

Approvals and documents checklist

ApprovalAuthoritySource
Building planLocal Planing AuthoritySource (rera.karnataka.gov.in) (opens in a new tab)

Documents uploaded to RERA

As on 20 Oct 2026
  • Building or layout plan · Approved drawings from the planning authorityFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
  • Commencement certificate · Permission to start buildingNot on RERA yet
  • Environment clearance · SEIAA KarnatakaNot on RERA yet
  • Fire NOC · Karnataka Fire and Emergency ServicesNot on RERA yet
  • Pollution board consent · KSPCBNot on RERA yet
  • Water and sewerage · BWSSBNot on RERA yet
  • Electricity · BESCOMNot on RERA yet
  • Height clearance · Airports Authority of IndiaNot on RERA yet
  • Occupancy certificate (OC) · Issued only when the building is finishedNot on RERA yet — expected at completion

From the documents the promoter uploaded to Karnataka RERA, collected 20 Oct 2026. “Filed” means a document is on RERA — we have not checked its contents or validity. Not every approval applies to every project (for example, smaller projects may not need an environment clearance). The project page on RERA lists each upload.

Sources:Source (rera.karnataka.gov.in) (opens in a new tab)

Vistar White Pearl RERA complaints

No complaints listed on Karnataka RERA for this registration as on Source (rera.karnataka.gov.in) (opens in a new tab)

Court and consumer cases

Not found in public records yet: court cases

We list case numbers, courts and outcomes only — never names of private individuals.

About Vistar Builders and Developers

Promoter type
Partnership Firm
Projects on this site
1
RERA complaints against promoter
0
Company number (CIN)
Not found in public records yet: CIN

From Karnataka RERA, as collected so far (20 Oct 2026). Complaints are those RERA lists against this promoter across all its projects.

Vistar Builders and Developers’s RERA record

Vistar Builders and Developers delivery record

As on 20 Oct 2026

Sources:Source (rera.karnataka.gov.in) (opens in a new tab)How we calculate this

What’s changed since May 2016

As on 20 Oct 2026
  1. 31 Mar 2026Completion date extended to 31 Mar 2026 Source (rera.karnataka.gov.in) (opens in a new tab)
  2. 20 Feb 2026Quarterly update filed for Q3 2025-26: 54% built, 18 of 46 homes booked Source (rera.karnataka.gov.in) (opens in a new tab)
  3. 6 Feb 2025Registered with Karnataka RERA (TOR/PRM/KA/RERA/1251/308/PR/250206/001087); completion date 29 Mar 2021 Source (rera.karnataka.gov.in) (opens in a new tab)
  4. 20 May 2016Project start date in the RERA record Source (rera.karnataka.gov.in) (opens in a new tab)

Newest first. When the RERA crawl sees a new filing, complaint or extension, it is added here with its date.

Home loan EMI calculator

No listed price found — enter one to try.

Example only — use your bank’s quote.

Monthly EMI
—
Down payment
—
Loan amount
—
Total interest
—

A calculation only, from the numbers you enter — not a loan offer.

All-in cost: GST, registration and other charges

The calculator loads when you scroll to it.

Assumptions
  • Base price: the builder’s price is not published in a form we could collect — enter it from the cost sheet.
  • GST 5% on the base price and charges — the usual rate for an under-construction home that is not “affordable housing” (1%).
  • Stamp duty about 5.6% and registration 2% — the Karnataka rule (registration was raised from 1% to 2% on 31 Aug 2025). Calculated on the agreement value.
  • Car parking, other charges and the maintenance deposit are not in the public record we collect; enter them from the builder’s cost sheet.
  • Loan on the agreement value (banks usually lend up to 75–90%); EMI is the standard reducing-balance formula. Example rate only — use your bank’s quote.

How we calculate this

Vistar White Pearl FAQs

What is the completion date for Vistar White Pearl?

The project completion date on RERA is 31 March 2026. The original completion date was 29 March 2021, which was extended first to 29 March 2022 and then further extended to 31 March 2026.

How many homes are in Vistar White Pearl?

The project has 46 homes total: 32 units of 2 BHK and 14 units of 3 BHK.

What are the carpet areas for homes in Vistar White Pearl?

2 BHK homes range from 947 to 1,323 sq ft carpet area, and 3 BHK homes range from 966 to 1,286 sq ft carpet area.

How is construction progressing on Vistar White Pearl?

As of Q3 2025-26 (quarter ended 31 December 2025), the project is 54% complete.

How many homes have been booked in Vistar White Pearl?

As of Q3 2025-26, 18 homes have been booked out of 46 homes in the project.

Where is Vistar White Pearl located?

The project is in Muthanallur, Anekal taluk, Bengaluru Urban district, PIN code 560073.

Are there any RERA complaints filed against Vistar White Pearl?

There are no RERA complaints filed against this project.

What is the builder's track record with RERA?

Vistar Builders and Developers has no RERA complaints across all their projects in the Bengaluru records.

Who is the escrow bank for Vistar White Pearl?

HDFC is the escrow bank for the project.

What is the project structure of Vistar White Pearl?

The project has one tower with 7 floors and a land area of 2,654 sq m.

Written by AI from the RERA record above on 5 Oct 2026. Answers use only that record; check them against the source before you decide.

Questions about Vistar White Pearl

No questions published yet. Ask the first one: you get an instant answer from this page’s public record, and our team follows up on anything the record does not show.

Bought a home from Vistar Builders and Developers? Review the builder.

Reviews of Vistar Builders and Developers by verified buyers

No verified reviews of Vistar Builders and Developers yet. If you bought a home from them, your review helps other buyers.

How reviews work: only buyers and owners can review; we confirm each purchase by phone before publishing, publish positive and negative reviews alike, never accept payment for reviews, and the builder may reply.

Similar projects within 5 km

ProjectDistanceHomesPossession (RERA)BuiltComplaintsPrice
EllegenzaNambiar Builders Private Limited0.7 km270Sep 2029—0Not collected
Acorn HiveAcorn Group0.7 km90Dec 2026100%0Not collected
Saiven Mulberry GrovesSaiven Developers And Constructions Pvt Ltd1.2 km75Jun 2027—0Not collected
Mahidhara HarmonyMahidhara Projects Private Limited1.7 km146Sep 2026extended98%1Not collected
Perlite PremierM/s. PERLITE DEVELOPERS2.2 km126Dec 203111%0Not collected
Sapthagiri Sampada B BlockSapthagiri Constructions3.1 km108Dec 203141%0Not collected

Projects of the same kind within 5 km in a straight line of this project’s RERA map point, nearest first. % built is the promoter’s latest quarterly figure on RERA (shown for single-registration projects); prices are from the builder’s own website where we found one.

Sources:Source (rera.karnataka.gov.in) (opens in a new tab)

Sources and last checked dates

  1. Karnataka RERA — project register (search by the registration number) (opens in a new tab)

Collected on 20 Oct 2026 by AI research agents reading public pages. Facts are written in our own words. Not found yet: price; court cases; landmarks; specifications; news.

How to check on RERA: On rera.karnataka.gov.in/viewAllProjects, type the registration number in 'Registration No', press Search, then click the 'View Project Details' icon. Complaints open from the 'Complaints / Litigation' icon in the same row. Registration number: TOR/PRM/KA/RERA/1251/308/PR/250206/001087.

  • RERA record last checked: 20 Oct 2026
  • Last change in the record (registration, quarterly filing or complaint): 20 Feb 2026

How this page is made: software builds it from public records (Karnataka RERA filings, OpenStreetMap, the builder’s own website). AI is used only to read filings into fields and to write the plain-English summary and FAQ answers, which are checked against the record. Facts are checked automatically against the RERA filing. Methodology · How we earn · Report an error

More new projects nearby

  • Mahidhara Harmony: Site photo filed with Karnataka RERAMuthanallur, near Chandapura–AttibeleUnder constructionRERA registeredBuyers’ group open

    Mahidhara Harmony

    by Mahidhara

    Price: Price on requestGet brochure & price →

    • 3 BHK, 4 BHK
    • 1,352 – 2,230 sq ft
    • Sep 2026 (extended)

    RERA not updated since promised Sep 2026 · 146 homes · 1 RERA complaint

    Be one of the first 10 buyers in this groupFounding members — it’s free

    Join group for Mahidhara Harmony
  • Ellegenza: Site photo filed with Karnataka RERAGopasandra, near Chandapura–AttibeleUnder constructionRERA registeredBuyers’ group open

    Ellegenza

    by Nambiar Builders

    Price: Price on requestGet brochure & price →

    • 4 BHK, Plot
    • 1,709 – 3,820 sq ft
    • Sep 2029

    3 phases on RERA · 270 homes

    Be one of the first 10 buyers in this groupFounding members — it’s free

    Join group for Ellegenza