After The Rain-Phase Iib
4 BHK apartments by Total Environment Building Systems Private Limited · Bettahalasuru, Bellary Road (Airport Road), Bengaluru
Bettahalasuru, Bellary Road (Airport Road), BengaluruOpen on Google Maps (opens in a new tab)
- Under construction
- RERA registered
- RERA not updated: completion promised Aug 2026; no extension or completion filed
- residential
by Total Environment Building Systems Private Limited
Price: Price on request
Site photo filed with Karnataka RERA Karnataka RERA filing · Source ↗ (opens in a new tab)
After The Rain-Phase Iib at a glance
- Possession (RERA)Aug 2026 Date passedWas Nov 2024 · Karnataka RERA
- Construction61% built · on pace for Oct 2030 50 mo after RERA dateRERA filing to 30 Jun 2026; estimate from average pace
- Homes booked36 of 37 (97%)RERA update · as on 30 Jun 2026
- RERA complaints (project)1 complaintKarnataka RERA · as on 13 Oct 2026
- Approvals filed1 of 9 on RERAKarnataka RERA uploads · 13 Oct 2026
- Nearest metroBagalur Cross · 4.34 km (under construction)Open now: Peenya, 15.96 km · straight line · OpenStreetMap, 5 Oct 2026
- Airport driveapprox. 47 min at peak11.73 km straight line · estimate
- Nearest lakeUnnamed lake · 699 mFrom the RERA map point · OpenStreetMap, 5 Oct 2026
Project summary
After The Rain-Phase Iib is a residential project by Total Environment Building Systems Private Limited in Bettahalasuru, Bengaluru with 37 homes, registered with Karnataka RERA. The completion date on RERA is 1 Aug 2026.
Facts collected on 13 Oct 2026 from public records — each linked to its source. Free for buyers. If you book through us, the builder pays us a commission.
After The Rain-Phase Iib buyers’ group: join to ask for a group price
No one has joined yet. Be one of the first 10 buyers in this group — the founding members.
Join free. When enough buyers have joined, our agent partner asks Total Environment Building Systems Private Limited for a group price — for example a lower price, an easier payment plan or waived charges. Nothing is promised: you see what the builder offers and book directly with the builder if you want to. Free for buyers. If you book through us, the builder pays us a commission.
- Gathering buyers
- Talking to the builder
- Group offer
- Group site visit
- Booking
0 buyers have joined · 0 committed
Committed buyers have confirmed their budget, home type and timeline with us on a call; builders negotiate with them. Joining is free and never obliges you to buy.
Join the After The Rain-Phase Iib buyers’ groupHow group buying works
See it for yourself
Visit the site with our team, or get a call to clear your questions. Free, no obligation.
Key facts: home types, towers, land and possession
- Home types
- 4 BHK
- Carpet area
- 2,669 – 4,058 sq ft
- Towers
- 5
- Floors
- 1
- Total homes
- 37
- Land
- 5.25 acres
- Possession (extended)
- Aug 2026
- Built (RERA update)
- 61%
After The Rain-Phase Iib RERA number and registration details
- RERA number
- PRM/KA/RERA/1251/309/PR/191015/002923
- Registered on
- 15 Oct 2019
- Promised completion
- 1 Nov 2024
- Extended to
- 1 Aug 2026
- RERA status
- New launch
- Homes booked
- 36 of 37 as on
- Price
- Not found in public records yet: price
- Project type
- Residential
Towers and blocks (RERA filing)
| Tower | Floors | Basements | Homes |
|---|---|---|---|
| BLOCK 23 | 1 | 1 | 5 |
| BLOCK 24 | 1 | 0 | 8 |
| BLOCK 25 | 1 | 0 | 8 |
| BLOCK 26 | 1 | 1 | 6 |
| BLOCK 27 | 1 | 0 | 10 |
A dash (—) means the filing did not state that value.
Summary in plain English
After The Rain-Phase Iib is a residential project by Total Environment Building Systems Private Limited in Bettahalasuru, Bengaluru North. The project has 37 four-bedroom homes across 5 towers with a completion date of 1 August 2026 on RERA.
Written by AI from the RERA record above on 5 Oct 2026. Every number in it was checked against that record; if anything differs, the record wins.
Open space, home loans, escrow and other details
- Open space
- 55.2% of land
- Water and power
- Not found in public records yet: water and power
- Home loans: approved banks
- Not found in public records yet: bank approvals
- Payment plans
- Not found in public records yet: payment plans
- Maintenance
- Not found in public records yet: maintenance
- Car parking
- Not found in public records yet: car parking charge
- Escrow bank (RERA)
- Axis Bank, M G Road
- Project cost declared to RERA
- ₹160 Cr
Open area as a share of the land, from the areas filed with RERA (includes driveways and landscaped areas).
Amenities
After The Rain-Phase Iib location and address
- Address
- "Survey Nos. 226/2, 227/2, 228/1, 228/2, 228/3, 229,230/1,230/2, 230/3,230/4, 230/5, 230/6, 231/2 ,239/2B, 240/1, 240/2, 241, 242/1, 242/2, 245/1, 245/2, 246(P), 353, 355,SIR MVIT COLLEGE ROAD , BETTAHALASURU VILLAGE,JALA HOBLI,BANGALORE NORTH TALUK
- Village (RERA)
- Bettahalasuru
- Locality
- Bellary Road (Airport Road)Also known as Airport Road, International Airport Road, Bellary Road, NH 44
- PIN code
- 560066
- City
- Bengaluru
- State
- Karnataka
- Coordinates
- 13.15819, 77.60531
Distances to landmarks
Not found in public records yet: landmarksAbout Bellary Road (Airport Road)
Not found in public records yet: locality factsCommute times to tech parks and the airport
| To | Straight line | Peak-hour drive (estimate) |
|---|---|---|
| Kempegowda International AirportMap point on OpenStreetMap (opens in a new tab) | 11.73 km | approx. 47 min |
| Manyata Tech ParkMap point on OpenStreetMap (opens in a new tab) | 12.34 km | approx. 50 min |
| KSR Bengaluru City railway station (Majestic)Map point on OpenStreetMap (opens in a new tab) | 20.39 km | approx. 83 min |
| ITPL, Whitefield (main gate)Map point on OpenStreetMap (opens in a new tab) | 23.78 km | approx. 96 min |
| Outer Ring Road tech corridor (RMZ Ecospace, Bellandur)Map point on OpenStreetMap (opens in a new tab) | 27.34 km | approx. 111 min |
| Electronic City Phase 1Map point on OpenStreetMap (opens in a new tab) | 34.91 km | approx. 141 min |
How we calculate
Straight line: from the project’s map point on RERA to the destination’s point on OpenStreetMap.
Peak-hour drive is a rough estimate, not a route: straight line × 1.35 for the road network, at 20 km/h. Real times vary a lot with the route and the hour.
Sources:Source (openstreetmap.org) (opens in a new tab)How we calculate this
Schools and hospitals nearby
Within 2 km
- 11Schools and colleges6 schools, 5 colleges, 0 kindergartens
- 2Hospitals and clinics1 hospitals, 1 clinics
Nearest schools and colleges
- Sadhu Vashwani International School · 0.83 km
- Krishnadevaraya College of Dental Science · 0.97 km
- Sir M Visvesvarayya Institute of Technology · 0.97 km
Nearest hospitals and clinics
- Krishnadevaraya Hospital And Research Centre · 0.98 km
- The Insole Co · 1.5 km
Places as mapped on OpenStreetMap (amenity=school, college, kindergarten, university; hospital, clinic), counted within 2 km in a straight line of the RERA map point. Volunteers map these, so some places may be missing or closed. Places data © OpenStreetMap contributors, extract of 5 Oct 2026.
Nearest metro station and railway
- Bagalur Cross (ಬಾಗಲೂರು ಕ್ರಾಸ್)Blue Line metro, under construction4.34 km
- Doddajala (ದೊಡ್ಡಜಾಲ)Blue Line metro, under construction5.42 km
- Yelahanka (ಯಲಹಂಕ)Blue Line metro, under construction6.29 km
- Peenya (ಪೀಣ್ಯ)Open now — nearest operating metro station15.96 km
- Betta Halasuru (ಬೆಟ್ಟಹಲಸೂರು)Nearest railway station0.89 km
Straight-line distances from the RERA map point to the station points mapped on OpenStreetMap; status (open or under construction) as tagged there. Places data © OpenStreetMap contributors, extract of 5 Oct 2026.
Lake and lake-buffer check
The nearest mapped lake is Unnamed lake (mapped on OpenStreetMap), 699 m from the project’s RERA map point.
The site boundary is not published as a shape, so its nearest edge can be closer than this point. Whether any building sits inside a lake buffer can only be checked on the approved plan.
- Unnamed lake (mapped on OpenStreetMap) on OpenStreetMap (opens in a new tab) 699 m
- Gantiganahalli Kere on OpenStreetMap (opens in a new tab) (ಗಂಟಿಗನಹಳ್ಳಿ ಕೆರೆ)1,855 m
- Thimmasandra on OpenStreetMap (opens in a new tab) (ತಿಮ್ಮಸಂದ್ರ)2,000 m
The buffer rule
Bengaluru’s lake buffer rule has changed over time: the National Green Tribunal ordered a 75 m buffer in May 2016; the Supreme Court set that order aside on 5 March 2019, leaving the 30 m buffer of the Revised Master Plan 2015. Check the current rule and the approved plan before relying on either number.
- LiveLaw: SC sets aside NGT order enlarging buffer zones (2019) (livelaw.in) (opens in a new tab)
- Citizen Matters: Shrinking lake buffers (citizenmatters.in) (opens in a new tab)
Shortest distance from the RERA map point to the mapped water edge (OpenStreetMap water polygons tagged lake or reservoir, or named lake/kere/tank). Mapped shorelines can differ from the revenue-record boundary of a lake. Places data © OpenStreetMap contributors, extract of 5 Oct 2026.
Sources:Source (openstreetmap.org) (opens in a new tab)Source (livelaw.in) (opens in a new tab)Source (citizenmatters.in) (opens in a new tab)How we calculate this
Satellite time-lapse of the site
Satellite photos load when you scroll to them.
Photos from Esri World Imagery Wayback, centred on the project’s map point; dates are the capture dates in Esri’s metadata. Loaded from Esri when you scroll here.
Sources:Source (livingatlas.arcgis.com) (opens in a new tab)
After The Rain-Phase Iib home types and carpet areas
Floor plans and brochure not published? The builder shares them only on request. We’ll get the brochure, floor plans and current price list for you, free.
Get brochure, floor plans & price| Home type | Carpet area | Homes |
|---|---|---|
| 4 BHK | 2,669 – 4,058 sq ft | 37 |
Home types, counts and carpet areas as filed with Karnataka RERA (carpet area, not super built-up).
We have not collected floor-plan drawings; the builder’s sales team can share them.
After The Rain-Phase Iib possession date and construction status
Promoter’s quarterly update to RERA for Q1 2026-27, submitted 2026-07-15.
By tower (Q1 2026-27)
Units sold and unsold, from RERA (Q1 2026-27)
| Type | Homes | Booked | Available |
|---|---|---|---|
| 4 BHK | 37 | 36 | 1 |
As reported by the promoter in the quarterly update to RERA, not verified by us.
Timeline
- 15 Oct 2019Registered with Karnataka RERA
- 1 Nov 2019Project start date given to RERA
- 1 Nov 2024Completion date given at registration
- 1 Aug 2025Covid Extension: completion date moved to this date
- 1 Aug 2026Section 6 Extension: completion date moved to this date
Construction pace from RERA quarterly filings
At the average pace so far, construction would reach 100% around Oct 2030 — about 50 months after the completion date on RERA (1 Aug 2026).
- Filed on RERA
- Average pace since start
- RERA completion date
Quarterly filings
| Quarter | Filed on | Built | Homes booked |
|---|---|---|---|
| Q1 2026-27to 30 Jun 2026 | 15 Jul 2026 | 61% | 36 of 37 |
| Q4 2025-26to 31 Mar 2026 | 15 Apr 2026 | 62% | 33 of 37 |
| Q3 2025-26to 31 Dec 2025 | 27 Jan 2026 | 98% | 33 of 37 |
How we calculate
Average pace = % built ÷ months since the start date in the RERA record. Here: 61% ÷ 79.9 months (1 Nov 2019 to 30 Jun 2026) = 0.8% a month.
Estimated finish = latest filing date + (100 − % built) ÷ pace = 30 Jun 2026 + 39 ÷ 0.8 = 51.1 months → Oct 2030. This is an estimate, not a date from the builder or RERA.
Pace between filings = (61% − 98%) ÷ 5.9 months = -6.2% a month.
A straight line is a simplification: the builder reports one overall %, which mixes excavation, structure and finishing, and work rarely moves at a constant speed. The % values are the promoter’s own figures filed with RERA, not checked by us. Promoter’s quarterly update to RERA for Q1 2026-27, submitted 2026-07-15.
Sources:Source (rera.karnataka.gov.in) (opens in a new tab)How we calculate this
Approvals and documents checklist
| Approval | Authority | Source |
|---|---|---|
| Building plan | BDA - Bangalore Development Authority | Source (rera.karnataka.gov.in) (opens in a new tab) |
Documents uploaded to RERA
- Building or layout plan · Approved drawings from the planning authorityFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
- Commencement certificate · Permission to start buildingNot on RERA yet
- Environment clearance · SEIAA KarnatakaNot on RERA yet
- Fire NOC · Karnataka Fire and Emergency ServicesNot on RERA yet
- Pollution board consent · KSPCBNot on RERA yet
- Water and sewerage · BWSSBNot on RERA yet
- Electricity · BESCOMNot on RERA yet
- Height clearance · Airports Authority of IndiaNot on RERA yet
- Occupancy certificate (OC) · Issued only when the building is finishedNot on RERA yet — expected at completion
From the documents the promoter uploaded to Karnataka RERA, collected 13 Oct 2026. “Filed” means a document is on RERA — we have not checked its contents or validity. Not every approval applies to every project (for example, smaller projects may not need an environment clearance). The project page on RERA lists each upload.
After The Rain-Phase Iib RERA complaints and orders
1 complaint as on Source (rera.karnataka.gov.in) (opens in a new tab)
| Complaint ref | Filed | Subject | Status | Source |
|---|---|---|---|---|
| 00617/2025 | 9 Apr 2025 | Delay period interest | Disposed | Source (rera.karnataka.gov.in) (opens in a new tab) |
Court and consumer cases
We list case numbers, courts and outcomes only — never names of private individuals.
About Total Environment Building Systems Private Limited
- Promoter type
- Company
- Projects on this site
- 7
- RERA complaints against promoter
- 17
- Company number (CIN)
- U45202KA1996PTC020790
From Karnataka RERA, as collected so far (13 Oct 2026). Complaints are those RERA lists against this promoter across all its projects.
Total Environment Building Systems Private Limited’s RERA recordTotal Environment Building Systems Private Limited delivery record
- 7Projects in Bengaluru on RERA9 approved registrations under Total Environment Building Systems Private Limited in Bengaluru Urban and Rural. Source (rera.karnataka.gov.in) (opens in a new tab)
- 1,842Homes registeredAs stated in each registrations.
- 17RERA complaints2 open, 15 disposed. as on Source (rera.karnataka.gov.in) (opens in a new tab)
- 9.2Complaints per 1,000 homes17 complaints ÷ 1,842 homes in its 9 registrations on Karnataka RERA in Bengaluru.
- 2Completion filed on RERARegistrations where the promoter applied to RERA for completion; 2 with an occupancy certificate on RERA.
- 0 of 2Filed by the date given at registrationMedian gap 48.1 months (on-time ones count as 0). The completion application can come after handover, so this is an upper bound on lateness.
What the complaints are about
17 complaint subjects as written on RERA, as on . Each subject is sorted into one group by keywords (first match wins: delay, refund, registration, quality, litigation, association); one complaint often raises several issues. Source (rera.karnataka.gov.in) (opens in a new tab)
Completion filed on RERA
| Project | Date at registration | Completion filed | Gap |
|---|---|---|---|
| After the Rain - Phase II AOC on RERA | 31 Dec 2022extended to 30 Sep 2024 | 31 Dec 2025 | 36 months after |
| After the Rain- Phase 1OC on RERA | 30 Jun 2019extended to 30 Apr 2022 | 3 Jul 2024 | 60 months after |
Measured against the completion date given at registration; many projects had RERA extensions (including the COVID-period extension), shown under the date.
Sources:Source (rera.karnataka.gov.in) (opens in a new tab)How we calculate this
What’s changed since Oct 2019
- 1 Aug 2026Completion date extended to 1 Aug 2026 Source (rera.karnataka.gov.in) (opens in a new tab)
- 15 Jul 2026Quarterly update filed for Q1 2026-27: 61% built, 36 of 37 homes booked Source (rera.karnataka.gov.in) (opens in a new tab)
- 15 Apr 2026Quarterly update filed for Q4 2025-26: 62% built, 33 of 37 homes booked Source (rera.karnataka.gov.in) (opens in a new tab)
- 27 Jan 2026Quarterly update filed for Q3 2025-26: 98% built, 33 of 37 homes booked Source (rera.karnataka.gov.in) (opens in a new tab)
- 9 Apr 2025Complaint 00617/2025 filed with RERA: “Delay period interest” — now disposed Source (rera.karnataka.gov.in) (opens in a new tab)
- 1 Nov 2019Project start date in the RERA record Source (rera.karnataka.gov.in) (opens in a new tab)
- 15 Oct 2019Registered with Karnataka RERA (PRM/KA/RERA/1251/309/PR/191015/002923); completion date 1 Nov 2024 Source (rera.karnataka.gov.in) (opens in a new tab)
Newest first. When the RERA crawl sees a new filing, complaint or extension, it is added here with its date.
Home loan EMI calculator
- Monthly EMI
- —
- Down payment
- —
- Loan amount
- —
- Total interest
- —
A calculation only, from the numbers you enter — not a loan offer.
All-in cost: GST, registration and other charges
The calculator loads when you scroll to it.
Assumptions
- Base price: the builder’s price is not published in a form we could collect — enter it from the cost sheet.
- GST 5% on the base price and charges — the usual rate for an under-construction home that is not “affordable housing” (1%).
- Stamp duty about 5.6% and registration 2% — the Karnataka rule (registration was raised from 1% to 2% on 31 Aug 2025). Calculated on the agreement value.
- Car parking, other charges and the maintenance deposit are not in the public record we collect; enter them from the builder’s cost sheet.
- Loan on the agreement value (banks usually lend up to 75–90%); EMI is the standard reducing-balance formula. Example rate only — use your bank’s quote.
After The Rain-Phase Iib FAQs
What is the completion date for After The Rain-Phase Iib?
The completion date on RERA is 1 August 2026. This date was extended from the original 1 November 2024 due to a Covid Extension (to 1 August 2025) and a Section 6 Extension (to 1 August 2026).
Where is After The Rain-Phase Iib located?
The project is in Bettahalasuru, Bengaluru North taluk, PIN code 560066.
How many homes are in After The Rain-Phase Iib?
The project has 37 homes, all 4 BHK units across 5 towers.
What is the carpet area range for homes in After The Rain-Phase Iib?
The 4 BHK homes have a carpet area range of 2,669 to 4,058 sq ft.
What is the current construction progress of After The Rain-Phase Iib?
As of the quarter ended 30 June 2026, construction is 61 per cent complete.
How many homes are booked in After The Rain-Phase Iib?
As of the quarter ended 30 June 2026, 36 out of 37 homes are booked.
What is the RERA registration number for After The Rain-Phase Iib?
The RERA registration number is PRM/KA/RERA/1251/309/PR/191015/002923, registered on 15 October 2019.
Are there complaints against After The Rain-Phase Iib?
There is 1 complaint on the RERA record for this project.
How many complaints does Total Environment Building Systems Private Limited have across all projects?
The builder has 17 complaints on RERA across all projects and 8 projects registered in the Bengaluru RERA records.
Which bank holds the escrow account for After The Rain-Phase Iib?
Axis Bank holds the escrow account for this project.
Written by AI from the RERA record above on 5 Oct 2026. Answers use only that record; check them against the source before you decide.
Questions about After The Rain-Phase Iib
No questions published yet. Ask the first one: you get an instant answer from this page’s public record, and our team follows up on anything the record does not show.
Bought a home from Total Environment Building Systems Private Limited? Review the builder.
Reviews of Total Environment Building Systems Private Limited by verified buyers
No verified reviews of Total Environment Building Systems Private Limited yet. If you bought a home from them, your review helps other buyers.
How reviews work: only buyers and owners can review; we confirm each purchase by phone before publishing, publish positive and negative reviews alike, never accept payment for reviews, and the builder may reply.
Similar projects within 5 km
| Project | Distance | Homes | Possession (RERA) | Built | Complaints | Price |
|---|---|---|---|---|---|---|
| Riviera GladeGoyal Hariyana Infrastructures | 0.2 km | 112 | Dec 2030 | 25% | 0 | Not collected |
| After The Rain-Phase IicTotal Environment Building Systems Private limited | 0.3 km | 26 | Apr 2028 | 48% | 0 | Not collected |
| After The Rain Phase IIITotal Environment Building Systems Pvt Ltd | 0.3 km | 36 | Apr 2032 | 3% | 0 | Not collected |
| Embassy EdenSion Eden Developers Limited | 1.5 km | 95 | Dec 2031 | 0% | 0 | Not collected |
| Axis OaklynAxis Concept Construction Pvt Ltd | 1.8 km | 56 | Mar 2027 | 100% | 0 | Not collected |
| Embassy RiverineSummit Developments Limited | 2.6 km | 217 | Sep 2032 | 2% | 0 | Not collected |
Projects of the same kind within 5 km in a straight line of this project’s RERA map point, nearest first. % built is the promoter’s latest quarterly figure on RERA (shown for single-registration projects); prices are from the builder’s own website where we found one.
Sources and last checked dates
Collected on 13 Oct 2026 by AI research agents reading public pages. Facts are written in our own words. Not found yet: price; court cases; landmarks; specifications; news.
How to check on RERA: On rera.karnataka.gov.in/viewAllProjects, type the registration number in 'Registration No', press Search, then click the 'View Project Details' icon. Complaints open from the 'Complaints / Litigation' icon in the same row. Registration number: PRM/KA/RERA/1251/309/PR/191015/002923.
- RERA record last checked: 13 Oct 2026
- Last change in the record (registration, quarterly filing or complaint): 15 Jul 2026
How this page is made: software builds it from public records (Karnataka RERA filings, OpenStreetMap, the builder’s own website). AI is used only to read filings into fields and to write the plain-English summary and FAQ answers, which are checked against the record. Facts are checked automatically against the RERA filing. Methodology · How we earn · Report an error
More new projects in Bellary Road (Airport Road)
Bettahalasuru, Bellary Road (Airport Road)Under constructionRERA registeredBuyers’ group openRiviera Glade
by Goyal Hariyana Infrastructures
Price: Price on requestGet brochure & price →
- 4 BHK
- 2,305 – 2,558 sq ft
- Dec 2030
112 homes
Be one of the first 10 buyers in this groupFounding members — it’s free
Join group for Riviera Glade
Bettahalasuru, Bellary Road (Airport Road)Under constructionRERA registeredBuyers’ group openAfter The Rain-Phase Iic
by Total Environment Building Systems
Price: Price on requestGet brochure & price →
- 4 BHK, Villa
- 2,702 – 4,058 sq ft
- Apr 2028
26 homes
Be one of the first 10 buyers in this groupFounding members — it’s free
Join group for After The Rain-Phase Iic
Bettahalasuru, Bellary Road (Airport Road)Under constructionRERA registeredBuyers’ group openAfter The Rain Phase III
by Total Environment Building Systems
Price: Price on requestGet brochure & price →
- 3 BHK, 4 BHK
- 354 – 6,964 sq ft
- Apr 2032
36 homes
Be one of the first 10 buyers in this groupFounding members — it’s free
Join group for After The Rain Phase III