Amberstone Elanza

2 & 3 BHK apartments by Srivari Ventures · Anjanapura, Kanakapura Road, Bengaluru

Anjanapura, Kanakapura Road, BengaluruOpen on Google Maps (opens in a new tab)

  • Under construction
  • RERA registered
  • residential

by Srivari Ventures

Price: Price on request

Get brochure, floor plans & price

Brochure, floor plans and price list for Amberstone Elanza

Builders share their brochure, floor plans and price list only on request. Tell us how to reach you and we’ll get them and send them to you, free.

Free for buyers. If you book through us, the builder pays us a commission. How we earn

Project summary

Amberstone Elanza is a residential project by Srivari Ventures in Anjanapura, Bengaluru with 116 homes, registered with Karnataka RERA. The completion date on RERA is 31 Dec 2028.

Facts collected on 19 Oct 2026 from public records — each linked to its source. Free for buyers. If you book through us, the builder pays us a commission.

Amberstone Elanza buyers’ group: join to ask for a group price

No one has joined yet. Be one of the first 10 buyers in this group — the founding members.

Join free. When enough buyers have joined, our agent partner asks Srivari Ventures for a group price — for example a lower price, an easier payment plan or waived charges. Nothing is promised: you see what the builder offers and book directly with the builder if you want to. Free for buyers. If you book through us, the builder pays us a commission.

  1. Gathering buyers
  2. Talking to the builder
  3. Group offer
  4. Group site visit
  5. Booking

0 buyers have joined · 0 committed

Committed buyers have confirmed their budget, home type and timeline with us on a call; builders negotiate with them. Joining is free and never obliges you to buy.

Join the Amberstone Elanza buyers’ groupHow group buying works

See it for yourself

Visit the site with our team, or get a call to clear your questions. Free, no obligation.

Key facts: home types, towers, land and possession

Updated on 19 Oct 2026
Home types
2 BHK, 2.5 BHK, 3 BHK
Carpet area
768 – 1,166 sq ft
Towers
3
Floors
3
Total homes
116
Land
1.79 acres
Possession (RERA)
Dec 2028
Built (RERA update)
63%

Amberstone Elanza RERA number and registration details

RERA number
PRM/KA/RERA/1251/310/PR/180925/008102
Registered on
18 Sep 2025
Promised completion
31 Dec 2028
Extended to
No extension recorded
RERA status
New launch
Homes booked
75 of 116 as on
Price
Not found in public records yet: price
Project type
Residential

Towers and blocks (RERA filing)

TowerFloorsBasementsHomes
BLOCK A3148
BLOCK B3140
BLOCK C3128

A dash (—) means the filing did not state that value.

Sources:Source (rera.karnataka.gov.in) (opens in a new tab)

Summary in plain English

Amberstone Elanza is a residential project by Srivari Ventures in Anjanapura, Bengaluru South, with 116 homes across 3 towers. The project has 2 BHK, 2.5 BHK, and 3 BHK homes, registered with Karnataka RERA with a completion date of 31 December 2028.

Written by AI from the RERA record above on 19 Oct 2026. Every number in it was checked against that record; if anything differs, the record wins.

Open space, home loans, escrow and other details

Open space
50.2% of land
Water and power
Water source filed with RERA: BWSSB
Home loans: approved banks
Not found in public records yet: bank approvals
Payment plans
Not found in public records yet: payment plans
Maintenance
Not found in public records yet: maintenance
Car parking
Not found in public records yet: car parking charge
Escrow bank (RERA)
Indian Bank, JP NAGAR SARRAKI BRANCH
Building plan (RERA)
BBMP - Bruhat Bengaluru Mahanagara Palike · No. BBMP/Ad.Com./BMH/0149/25-26 · dated 1 Sep 2025
Project cost declared to RERA
₹89.14 Cr

Open area as a share of the land, from the areas filed with RERA (includes driveways and landscaped areas).

Sources:Source (rera.karnataka.gov.in) (opens in a new tab)

Amenities

  • Electricity
  • Power Backup
  • Water and Sanitation

Amenities and internal works as filed by the promoter with Karnataka RERA; we have not visited the site.

Sources:Source (rera.karnataka.gov.in) (opens in a new tab)

Amberstone Elanza location and address

Address
Sy No. 27/4 & 27/16, Anjanapura Village , Uttarahalli Hobli, Bangalore south Taluk , Bengaluru South , Bengaluru Urban, Karnataka - 560108
Village (RERA)
Anjanapura
Locality
Kanakapura RoadAlso known as Kanakapura Main Road
PIN code
560108
City
Bengaluru
State
Karnataka
Coordinates
12.84995, 77.55033

Distances to landmarks

Not found in public records yet: landmarks

About Kanakapura Road

Not found in public records yet: locality facts

Commute times to tech parks and the airport

As on 5 Oct 2026
ToStraight linePeak-hour drive (estimate)
Electronic City Phase 1Map point on OpenStreetMap (opens in a new tab)12.43 kmapprox. 50 min
KSR Bengaluru City railway station (Majestic)Map point on OpenStreetMap (opens in a new tab)14.41 kmapprox. 58 min
Outer Ring Road tech corridor (RMZ Ecospace, Bellandur)Map point on OpenStreetMap (opens in a new tab)16.39 kmapprox. 66 min
Manyata Tech ParkMap point on OpenStreetMap (opens in a new tab)23.29 kmapprox. 94 min
ITPL, Whitefield (main gate)Map point on OpenStreetMap (opens in a new tab)25.44 kmapprox. 103 min
Kempegowda International AirportMap point on OpenStreetMap (opens in a new tab)42.43 kmapprox. 172 min
How we calculate

Straight line: from the project’s map point on RERA to the destination’s point on OpenStreetMap.

Peak-hour drive is a rough estimate, not a route: straight line × 1.35 for the road network, at 20 km/h. Real times vary a lot with the route and the hour.

Sources:Source (openstreetmap.org) (opens in a new tab)How we calculate this

Schools and hospitals nearby

As on 5 Oct 2026

Within 2 km

  • 4Schools and colleges4 schools, 0 colleges, 0 kindergartens
  • 3Hospitals and clinics0 hospitals, 3 clinics

Nearest schools and colleges

  • Sri Kumaran Children's Home CBSE · 0.84 km
  • Sri Kumaran Children's Home ICSE · 1.02 km
  • Cohesion Montessori · 1.45 km

Nearest hospitals and clinics

  • Apollo Clinic · 1.2 km
  • Shishu Care Clinic · 1.44 km
  • Dixit Skin & Ortho Care · 1.9 km

Places as mapped on OpenStreetMap (amenity=school, college, kindergarten, university; hospital, clinic), counted within 2 km in a straight line of the RERA map point. Volunteers map these, so some places may be missing or closed. Places data © OpenStreetMap contributors, extract of 5 Oct 2026.

Sources:Source (openstreetmap.org) (opens in a new tab)

Nearest metro station and railway

As on 5 Oct 2026
  • Silk Institute (ರೇಷ್ಮೆ ಸಂಸ್ಥೆ)Open now — nearest operating metro station2.57 km
  • Jnanabharati (ಜ್ಞಾನಭಾರತಿ)Nearest railway station10.38 km

Straight-line distances from the RERA map point to the station points mapped on OpenStreetMap; status (open or under construction) as tagged there. Places data © OpenStreetMap contributors, extract of 5 Oct 2026.

Sources:Source (openstreetmap.org) (opens in a new tab)

Lake and lake-buffer check

As on 5 Oct 2026

The nearest mapped lake is Unnamed lake (mapped on OpenStreetMap), 1,159 m from the project’s RERA map point.

The site boundary is not published as a shape, so its nearest edge can be closer than this point. Whether any building sits inside a lake buffer can only be checked on the approved plan.

The buffer rule

Bengaluru’s lake buffer rule has changed over time: the National Green Tribunal ordered a 75 m buffer in May 2016; the Supreme Court set that order aside on 5 March 2019, leaving the 30 m buffer of the Revised Master Plan 2015. Check the current rule and the approved plan before relying on either number.

Shortest distance from the RERA map point to the mapped water edge (OpenStreetMap water polygons tagged lake or reservoir, or named lake/kere/tank). Mapped shorelines can differ from the revenue-record boundary of a lake. Places data © OpenStreetMap contributors, extract of 5 Oct 2026.

Sources:Source (openstreetmap.org) (opens in a new tab)Source (livelaw.in) (opens in a new tab)Source (citizenmatters.in) (opens in a new tab)How we calculate this

Satellite time-lapse of the site

Satellite photos load when you scroll to them.

Photos from Esri World Imagery Wayback, centred on the project’s map point; dates are the capture dates in Esri’s metadata. Loaded from Esri when you scroll here.

Sources:Source (livingatlas.arcgis.com) (opens in a new tab)

Amberstone Elanza home types and carpet areas

Documents the builder uploaded to Karnataka RERA, shown as filed. Tap a page to see it full size; the full PDF opens on the RERA website.

Approved building plan2 pages

Floor plans and brochure not published? The builder shares them only on request. We’ll get the brochure, floor plans and current price list for you, free.

Get brochure, floor plans & price

Brochure, floor plans and price list for Amberstone Elanza

Builders share their brochure, floor plans and price list only on request. Tell us how to reach you and we’ll get them and send them to you, free.

Free for buyers. If you book through us, the builder pays us a commission. How we earn

Home typeCarpet areaHomes
2 BHK768 – 827 sq ft20
2.5 BHK1,059 sq ft48
3 BHK1,114 – 1,166 sq ft48

Home types, counts and carpet areas as filed with Karnataka RERA (carpet area, not super built-up).

We have not collected floor-plan drawings; the builder’s sales team can share them.

Sources:Source (rera.karnataka.gov.in) (opens in a new tab)

Amberstone Elanza possession date and construction status

  • Whole project (promoter’s RERA update)63%

    as on · 75 of 116 homes booked

Promoter’s quarterly update to RERA for Q2 2026-27, submitted 2026-10-15.

By tower (Q2 2026-27)

  • BLOCK A50%
  • BLOCK B60%
  • BLOCK C70%

Units sold and unsold, from RERA (Q2 2026-27)

TypeHomesBookedAvailable
2.5 BHK40400
3 BHK32311
2 BHK440

As reported by the promoter in the quarterly update to RERA, not verified by us.

Timeline

  1. 15 Sep 2025Project start date given to RERA
  2. 18 Sep 2025Registered with Karnataka RERA
  3. 31 Dec 2028Completion date given at registration

Sources:Source (rera.karnataka.gov.in) (opens in a new tab)

Construction pace from RERA quarterly filings

As on 15 Oct 2026

At the average pace so far, construction would reach 100% around May 2027 — about 20 months before the completion date on RERA (31 Dec 2028).

At the pace between the 4 quarterly filings we have (25% → 63% in 9 months), it would be around Jun 2027 — about 18 months before the RERA date.

0%25%50%75%100%2026202720282029RERA date25%36%47%63%
  • Filed on RERA
  • Average pace since start
  • Pace between filings (and 0% assumed at the start date)
  • RERA completion date

Quarterly filings

QuarterFiled onBuiltHomes booked
Q2 2026-27to 30 Sep 202615 Oct 202663%75 of 76
Q1 2026-27to 30 Jun 202615 Jul 202647%115 of 116
Q4 2025-26to 31 Mar 202614 Jul 202636%115 of 116
Q3 2025-26to 31 Dec 202520 Feb 202625%90 of 116
How we calculate

Average pace = % built ÷ months since the start date in the RERA record. Here: 63% ÷ 12.5 months (15 Sep 2025 to 30 Sep 2026) = 5% a month.

Estimated finish = latest filing date + (100 − % built) ÷ pace = 30 Sep 2026 + 37 ÷ 5 = 7.3 months → May 2027. This is an estimate, not a date from the builder or RERA.

Pace between filings = (63% − 25%) ÷ 9 months = 4.2% a month.

A straight line is a simplification: the builder reports one overall %, which mixes excavation, structure and finishing, and work rarely moves at a constant speed. The % values are the promoter’s own figures filed with RERA, not checked by us. Promoter’s quarterly update to RERA for Q2 2026-27, submitted 2026-10-15.

Sources:Source (rera.karnataka.gov.in) (opens in a new tab)How we calculate this

Approvals and documents checklist

ApprovalAuthoritySource
Building planBBMP - Bruhat Bengaluru Mahanagara Palike · No. BBMP/Ad.Com./BMH/0149/25-26 · dated 2025-09-01Source (rera.karnataka.gov.in) (opens in a new tab)
Land conversion (2 orders)District Commissioner, Bangalore · No. 274035 and 1 more · dated 2024-12-10Source (rera.karnataka.gov.in) (opens in a new tab)
Commencement Certificatescan uploaded to RERASource (rera.karnataka.gov.in) (opens in a new tab)
Approved Building Planscan uploaded to RERASource (rera.karnataka.gov.in) (opens in a new tab)
ESCOM/Electricityscan uploaded to RERASource (rera.karnataka.gov.in) (opens in a new tab)
KWSSB/Waterscan uploaded to RERASource (rera.karnataka.gov.in) (opens in a new tab)
KSPCBscan uploaded to RERASource (rera.karnataka.gov.in) (opens in a new tab)

Documents uploaded to RERA

As on 19 Oct 2026
  • Building or layout plan · Approved drawings from the planning authorityFiled on RERA ✓ — BBMP - Bruhat Bengaluru Mahanagara Palike · No. BBMP/Ad.Com./BMH/0149/25-26 · dated 1 Sep 2025
  • Commencement certificate · Permission to start buildingFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
  • Environment clearance · SEIAA KarnatakaNot on RERA yet
  • Fire NOC · Karnataka Fire and Emergency ServicesNot on RERA yet
  • Pollution board consent · KSPCBFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
  • Water and sewerage · BWSSBFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
  • Electricity · BESCOMFiled on RERA ✓ — scanned copy uploaded; number and date not read yet
  • Height clearance · Airports Authority of IndiaNot on RERA yet
  • Occupancy certificate (OC) · Issued only when the building is finishedNot on RERA yet — expected at completion

From the documents the promoter uploaded to Karnataka RERA, collected 19 Oct 2026. “Filed” means a document is on RERA — we have not checked its contents or validity. Not every approval applies to every project (for example, smaller projects may not need an environment clearance). The project page on RERA lists each upload.

Sources:Source (rera.karnataka.gov.in) (opens in a new tab)

Amberstone Elanza RERA complaints

No complaints listed on Karnataka RERA for this registration as on Source (rera.karnataka.gov.in) (opens in a new tab)

Court and consumer cases

Not found in public records yet: court cases

We list case numbers, courts and outcomes only — never names of private individuals.

About Srivari Ventures

Promoter type
Partnership Firm
Projects on this site
1
RERA complaints against promoter
0
Company number (CIN)
Not found in public records yet: CIN

From Karnataka RERA, as collected so far (19 Oct 2026). Complaints are those RERA lists against this promoter across all its projects.

Srivari Ventures’s RERA record

Srivari Ventures delivery record

As on 19 Oct 2026

Sources:Source (rera.karnataka.gov.in) (opens in a new tab)How we calculate this

What’s changed since Sep 2025

As on 19 Oct 2026
  1. 15 Oct 2026Quarterly update filed for Q2 2026-27: 63% built, 75 of 76 homes booked Source (rera.karnataka.gov.in) (opens in a new tab)
  2. 15 Jul 2026Quarterly update filed for Q1 2026-27: 47% built, 115 of 116 homes booked Source (rera.karnataka.gov.in) (opens in a new tab)
  3. 14 Jul 2026Quarterly update filed for Q4 2025-26: 36% built, 115 of 116 homes booked Source (rera.karnataka.gov.in) (opens in a new tab)
  4. 20 Feb 2026Quarterly update filed for Q3 2025-26: 25% built, 90 of 116 homes booked Source (rera.karnataka.gov.in) (opens in a new tab)
  5. 18 Sep 2025Registered with Karnataka RERA (PRM/KA/RERA/1251/310/PR/180925/008102); completion date 31 Dec 2028 Source (rera.karnataka.gov.in) (opens in a new tab)
  6. 15 Sep 2025Project start date in the RERA record Source (rera.karnataka.gov.in) (opens in a new tab)
  7. 1 Sep 2025Building plan approved by BBMP - Bruhat Bengaluru Mahanagara Palike (No. BBMP/Ad.Com./BMH/0149/25-26) Source (rera.karnataka.gov.in) (opens in a new tab)

Newest first. No extension of the completion date is recorded on RERA. When the RERA crawl sees a new filing, complaint or extension, it is added here with its date.

Home loan EMI calculator

No listed price found — enter one to try.

Example only — use your bank’s quote.

Monthly EMI
—
Down payment
—
Loan amount
—
Total interest
—

A calculation only, from the numbers you enter — not a loan offer.

All-in cost: GST, registration and other charges

The calculator loads when you scroll to it.

Assumptions
  • Base price: the builder’s price is not published in a form we could collect — enter it from the cost sheet.
  • GST 5% on the base price and charges — the usual rate for an under-construction home that is not “affordable housing” (1%).
  • Stamp duty about 5.6% and registration 2% — the Karnataka rule (registration was raised from 1% to 2% on 31 Aug 2025). Calculated on the agreement value.
  • Car parking, other charges and the maintenance deposit are not in the public record we collect; enter them from the builder’s cost sheet.
  • Loan on the agreement value (banks usually lend up to 75–90%); EMI is the standard reducing-balance formula. Example rate only — use your bank’s quote.

How we calculate this

Amberstone Elanza FAQs

What is Amberstone Elanza?

Amberstone Elanza is a residential project by Srivari Ventures located in Anjanapura, Bengaluru South (PIN 560108). It has 116 homes across 3 towers, each with a maximum of 3 floors.

When will Amberstone Elanza be completed?

According to the Karnataka RERA record, the project completion date is 31 December 2028.

What home types are available in Amberstone Elanza?

The project offers 2 BHK homes (768-827 carpet sq ft), 2.5 BHK homes (1,059 carpet sq ft), and 3 BHK homes (1,114-1,166 carpet sq ft).

How many homes are in each type at Amberstone Elanza?

The project has 20 units of 2 BHK, 48 units of 2.5 BHK, and 48 units of 3 BHK homes.

What is the RERA registration number for Amberstone Elanza?

The RERA registration number is PRM/KA/RERA/1251/310/PR/180925/008102, registered on 18 September 2025.

What is the construction progress of Amberstone Elanza?

As of the latest quarterly update (Q2 2026-27), the project is 63% complete, with 75 homes booked out of 76 in the booking table.

How many complaints are there against Amberstone Elanza on RERA?

There are no RERA complaints filed against this project.

Where exactly is Amberstone Elanza located?

The project is in Anjanapura, Bengaluru South taluk, Bengaluru Urban district, with PIN code 560108.

Who is the builder of Amberstone Elanza?

The builder is Srivari Ventures, a partnership firm.

What is the land area of Amberstone Elanza?

The project land area is 7,231 sq m.

Written by AI from the RERA record above on 19 Oct 2026. Answers use only that record; check them against the source before you decide.

Questions about Amberstone Elanza

No questions published yet. Ask the first one: you get an instant answer from this page’s public record, and our team follows up on anything the record does not show.

Bought a home from Srivari Ventures? Review the builder.

Reviews of Srivari Ventures by verified buyers

No verified reviews of Srivari Ventures yet. If you bought a home from them, your review helps other buyers.

How reviews work: only buyers and owners can review; we confirm each purchase by phone before publishing, publish positive and negative reviews alike, never accept payment for reviews, and the builder may reply.

Similar projects within 5 km

ProjectDistanceHomesPossession (RERA)BuiltComplaintsPrice
Aparna WonderwoodsAparna Constructions And Estates Private Limited0.9 km1,261Feb 20312%0Not collected
Purva Park HillPuravankara Limited1 km492Dec 2027—20from ₹2.02 Crabout ₹18,200/sq ft carpet
Casagrand CasablancaCasa Grande Garden City Builders Pvt Ltd1.1 km805May 202940%4from ₹1.44 Cr
Zest at Godrej EternityGodrej Home Constructions Private Limited1.4 km180Jul 2024extended—4Not collected
Sattva Forest RidgeSattva Resi Private Limited1.6 km407Dec 202918%1Not collected
Provident Park Square 5Puravankara Limited1.7 km185Jun 2026extended91%2Not collected

Projects of the same kind within 5 km in a straight line of this project’s RERA map point, nearest first. % built is the promoter’s latest quarterly figure on RERA (shown for single-registration projects); prices are from the builder’s own website where we found one.

Sources:Source (rera.karnataka.gov.in) (opens in a new tab)

Sources and last checked dates

  1. Karnataka RERA — project register (search by the registration number) (opens in a new tab)

Collected on 19 Oct 2026 by AI research agents reading public pages. Facts are written in our own words. Not found yet: price; court cases; landmarks; specifications; news.

How to check on RERA: On rera.karnataka.gov.in/viewAllProjects, type the registration number in 'Registration No', press Search, then click the 'View Project Details' icon. Complaints open from the 'Complaints / Litigation' icon in the same row. Registration number: PRM/KA/RERA/1251/310/PR/180925/008102.

  • RERA record last checked: 19 Oct 2026
  • Last change in the record (registration, quarterly filing or complaint): 19 Oct 2026

How this page is made: software builds it from public records (Karnataka RERA filings, OpenStreetMap, the builder’s own website). AI is used only to read filings into fields and to write the plain-English summary and FAQ answers, which are checked against the record. Facts are checked automatically against the RERA filing. Methodology · How we earn · Report an error

More new projects in Kanakapura Road

  • Purva Park Hill: Purva Park Hill project banner with pricing (artist’s impression)Mallasandra, Kanakapura RoadArtist’s impressionUnder constructionRERA registeredBuyers’ group open

    Purva Park Hill

    by Puravankara

    Price: Price on requestGet brochure & price →

    • 2 BHK, 3 BHK
    • 807 – 1,184 sq ft
    • Dec 2027

    4 phases on RERA · 492 homes · 20 RERA complaints

    Be one of the first 10 buyers in this groupFounding members — it’s free

    Join group for Purva Park Hill
  • Casagrand Casablanca: Roman-themed community banner view (artist’s impression)Mallasandra, Kanakapura RoadArtist’s impressionUnder constructionRERA registeredBuyers’ group open

    Casagrand Casablanca

    by Casa Grande Garden City Builders

    Price: Price on requestGet brochure & price →

    • Studio, 2 BHK, 3 BHK, 4 BHK, +1 more
    • 287 – 2,483 sq ft
    • May 2029

    805 homes · 4 RERA complaints

    Be one of the first 10 buyers in this groupFounding members — it’s free

    Join group for Casagrand Casablanca